Feasibility study survey and preparation of DPR for construction of ROB/RUB in lieu of Level Crossings in Jurisdiction of ADEN/BRK & ADEN/MLN ( Total 60 nos).
Tender Overview
Project Description
Tender for Feasibility Study Survey And Preparation Of Dpr For Construction Of Rob/Rub In Lieu Of Level Crossings In Jurisdiction Of Aden/Brk & Aden/Mln ( Total 60 Nos). , - Feasibility Study For Construction Of Rob/Rub In Lieu Of Level Crossing (A). Conducting Feasibility Survey For Construction Of Rob/Rub At Lc Location Or Its Nearby Area Up To 2 Km In Each Direction Having Possibility Of Connectivity By Road. Further After Site Selection, Joint Feasibility To Be Conducted In Presence, Of State Authority And Railway Officials Of All Concern Departments And Also Preparation Of Joint Site Feasibility Report For Available Railway Boundary W.R.T. Existing Railway Tracks Along With Traffic Diversion Plan. Joint Feasibility Report Should Comprise Sketch Plan Approved By State Authority And Railway Officials Of All Concerned Departments, Preparation Of Preliminary Dpr. (B). Conducting Topographic Survey Considering Tentative (Length 800M To 1200M) On Approach Portion And Plan Is To Be Approved By Road Authority. Preparation Of Alignment Plan Showing Proposed Rob/Rub. (C). Preparation Of Preliminary General Arrangement Drawing For Taking Principle Approval From Cbe Conducting Geo Technical Investigation And Preparation Of Geotechnical Investigation Report For All Type Of Soil. Geotechnical Investigation Report Should Be Prepared Based On Relevant Is/Bis Codes And From Nabl Labs. Report Should Be Submitted In 5 Copies (D). Preparation Of Final General Arrangement Drawing And Got Approved From Concerned Divisional Officers & Competent Authority At Hq Office. Note: Total 5 Sets Of Approved Copies Of Gads And Plans Shall Be Supplied By Contractor Free Of Cost To The Railways In Addition To Original Drawing In Tracing Film Of 70 Microns And Soft Copy In Pen Drive. (E). Preparation Of Land Acquisition Plan For Rob/Rub Of Nearby Location Villages In Original Tracing Paper. Data For Tracing Drawing Of Land Plan Is To Be Collected From Revenue Authorities Showing Proposed Alignment Of Rob/Rub, Marking Of Center Line Of Proposed Alignment, Land Boundaries With Distance & Chainage Including Schedule Of Land Such As Numbers, Name Of Owners, Nature Of Land And Area With Circle Rate Under Acquisition As Per Rob/Rub Requirements And As Directed By Engineer-Incharge. (F). Preparation Of Details Of Encroachment & Utility Shifting, If Any (Including List Of Religious Structure Details) Marking The Same On Land Plan (G )Preparation Of Detailed Estimate For Entire Rob/Rub. Detailed Estimate Of Railway Portion And Approach Portion Should Be Based On Latest Irussor And Cpwd Dsr/ Latest Available Accepted Rates Of Any Govt./Psu Deptt (Latest Available). (H). Preparation Pavement Report For Approaches. (1). Completed Detailed Project Report Shall Be Submitted In 5 Copies In Spiral Binding Form.
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 22 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender