Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Miscellaneous Jobs Pertaining To Assistance In Activities Required For Operation Maintenance In Gtg Hrsg Unit At Rcf Trombay Unit; As
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Miscellaneous Jobs Pertaining To Assistance In Activities Required For Operation Maintenance In Gtg Hrsg Unit At Rcf Trombay Unit; As Per Nit - Shifting & Cleaning Of Pump Suction Strainers Of Size Up To 6 , Shifting & Cleaning Of Pump Suction Strainers Of Size Above 6 And Up To 12 , Hrsg Fa Fans, Aux. Air Fans, Seal Air Fans Suction Air Filter Shifting & Cleaning , Air Compressor Air Pre Filter & Filter Cleaning , Gtg Cooling Tower Cells Wire Mesh Filter (02 Filters Per Cell) Lifting By Chain Block And Cleaning , Fitting Of Hose Pipes And For Giving Water Connections Near Hot Job Or For Air Connections For Confined Space Job , Pumps, Fans And Gear Box Oil Draining, Cleaning And Oil Filling , S Le Collection (Of Water, Air, Oil Etc.) And Submission To Rcf Lab , Blow Down Pit Sump Cleaning From Inside , Blow Down Pit Sump Cleaning From Outside , Air Blowing Of Piping 4 And 6 Size For 8 Hours , Pipe Line Flushing 3 & 4 Size For 4 Hours , Pipe Line Flushing 6 Size For 4 Hours , Placing New Oil Drums In Oil Storage Area , Arranging Oil Drums And Hydrazine Drums , Oil Drum Area Housekeeping And Dirty Oil Filling In Drum , Keeping Tri Sodium Phosphate (Tsp) At Both Hrsgs Phosphate Dosing Skid , Keeping Hydrazine At Both Hrsgs Hydrazine Dosing Skid , Keeping Caustic Flakes At Gtg-Hrsg Cooling Tower Dosing Skid. , Carrying Safety Valve Gags Of The Hrsgs To The Location And From Hrsgs To The Storage Area. , Compressor Area & Swas Area Housekeeping , Boiler Feed Pumps Area Housekeeping (In Hrsg#1 & 2) , Cleaning Of Pumps, Compressors, Fans, Vessels From Outside , Shifting Stationary, Chemicals, Safety Items, Hose Pipes Etc. From Store/ Safety To Plant , Gtg Gas Skid Filter Replacement At Gtg Main Gas Station , Gtg-Hrsg Main Gas Station Housekeeping , Gtg Oil Cooler Backwashing , Assistance In Gtg Compressor Washing , Assistance During Gtg Intake Air Filter Inspection & Supervision And/ Or Filters Replacement. , Assistance During Gtg Ventilation Air Filter Panels Inspection And Cleaning. , Gtg Area Cleaning And Water Spraying On Regular Basis To Contain Dust In Area Near Gtg Air Filters. , Housekeeping Of Gtg Area, Air Filter Area, Ventilation Filter Area, Gtg Enclosure From Outside And Its Periphery. , Cleaning Of Drains Of Gtg-Hrsg Area And Shifting Of The Materials At The Scrap Bin Area. , Provision Of Tarpaulin Cover Over Gtg Air Filters, Generator Area & Other Areas, As Per Requirement To Prevent Water Ingress Into The System Esp. During Monsoon Period (Rainy Season) Etc. , Moisture & Water Removal Inside Gtg Enclosure And Cleaning Inside Enclosure , Housekeeping Of Pw To Gtg Pump Area. , Housekeeping Of Gtg Cooling Tower And Acw Pump Area. , Rain Water Removing Work Above Gtes Inlet/ Exhaust Duct Esp. During Monsoon Period (Rainy Season) Etc. , Hrsgs Fa Manhole Cover Opening, Inside Cleaning And Box Up. , Gt Exhaust System (Gtes) Manhole Cover Opening, Inside Cleaning And Box Up. , Gtg Seal Air Cooler Backwash And Flushing. , To Carry Out Regular Greasing Of Equipment As Per Instruction Of Rcf Engineer. , Housekeeping Of Control Room Bldg. Terrace
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Shifting & Cleaning of Pump Suction strainers of size up to 6\\" | Shifting & Cleaning of Pump Suction strainers of size up to 6\\" |
| 2 | Shifting & Cleaning of Pump Suction strainers of size above 6\\" and up to 12” | Shifting & Cleaning of Pump Suction strainers of size above 6\\" and up to 12” |
| 3 | HRSG FA fans, Aux. air fans, Seal Air fans suction air filter shifting & cleaning | HRSG FA fans, Aux. air fans, Seal Air fans suction air filter shifting & cleaning |
| 4 | Air Compressor air pre filter & filter cleaning | Air Compressor air pre filter & filter cleaning |
| 5 | GTG Cooling Tower cells wire mesh filter (02 filters per cell) lifting by chain block and cleaning | GTG Cooling Tower cells wire mesh filter (02 filters per cell) lifting by chain block and cleaning |
| 6 | Fitting of hose pipes and for giving water connections near hot job or for air connections for confined space job | Fitting of hose pipes and for giving water connections near hot job or for air connections for confined space job |
| 7 | Pumps, fans and gear box oil draining, cleaning and oil filling | Pumps, fans and gear box oil draining, cleaning and oil filling |
| 8 | Sample collection (of water, air, oil etc.) and submission to RCF lab | Sample collection (of water, air, oil etc.) and submission to RCF lab |
| 9 | Blow down pit sump cleaning from inside | Blow down pit sump cleaning from inside |
| 10 | Blow down pit sump cleaning from outside | Blow down pit sump cleaning from outside |
| 11 | Air Blowing of Piping 4\\" and 6\\" size for 8 hours | Air Blowing of Piping 4\\" and 6\\" size for 8 hours |
| 12 | Pipe line flushing 3\\" & 4\\" size for 4 hours | Pipe line flushing 3\\" & 4\\" size for 4 hours |
| 13 | Pipe line flushing 6\\" size for 4 hours | Pipe line flushing 6\\" size for 4 hours |
| 14 | Placing new oil drums in Oil storage area | Placing new oil drums in Oil storage area |
| 15 | Arranging oil drums and hydrazine drums | Arranging oil drums and hydrazine drums |
| 16 | Oil drum area housekeeping and dirty oil filling in drum | Oil drum area housekeeping and dirty oil filling in drum |
| 17 | Keeping Tri sodium phosphate (TSP) at both HRSGs phosphate dosing skid | Keeping Tri sodium phosphate (TSP) at both HRSGs phosphate dosing skid |
| 18 | Keeping hydrazine at both HRSGs hydrazine dosing skid | Keeping hydrazine at both HRSGs hydrazine dosing skid |
| 19 | Keeping Caustic flakes at GTG-HRSG cooling tower dosing skid. | Keeping Caustic flakes at GTG-HRSG cooling tower dosing skid. |
| 20 | Carrying safety valve gags of the HRSGs to the location and from HRSGs to the storage area. | Carrying safety valve gags of the HRSGs to the location and from HRSGs to the storage area. |
| 21 | Compressor Area & SWAS Area housekeeping | Compressor Area & SWAS Area housekeeping |
| 22 | Boiler Feed Pumps area housekeeping (in HRSG#1 & 2) | Boiler Feed Pumps area housekeeping (in HRSG#1 & 2) |
| 23 | Cleaning of pumps, compressors, fans, vessels from outside | Cleaning of pumps, compressors, fans, vessels from outside |
| 24 | Shifting stationary, chemicals, safety items, hose pipes etc. from store/ safety to plant | Shifting stationary, chemicals, safety items, hose pipes etc. from store/ safety to plant |
| 25 | GTG Gas skid filter replacement at GTG Main gas station | GTG Gas skid filter replacement at GTG Main gas station |
| 26 | GTG-HRSG Main gas station housekeeping | GTG-HRSG Main gas station housekeeping |
| 27 | GTG oil cooler backwashing | GTG oil cooler backwashing |
| 28 | Assistance in GTG Compressor Washing | Assistance in GTG Compressor Washing |
| 29 | Assistance during GTG Intake air filter inspection & supervision and/ or filters replacement. | Assistance during GTG Intake air filter inspection & supervision and/ or filters replacement. |
| 30 | Assistance during GTG Ventilation air filter panels inspection and cleaning. | Assistance during GTG Ventilation air filter panels inspection and cleaning. |
| 31 | GTG area cleaning and water spraying on regular basis to contain dust in area near GTG air filters. | GTG area cleaning and water spraying on regular basis to contain dust in area near GTG air filters. |
| 32 | Housekeeping of GTG area, air filter area, ventilation filter area, GTG enclosure from outside and its periphery. | Housekeeping of GTG area, air filter area, ventilation filter area, GTG enclosure from outside and its periphery. |
| 33 | Cleaning of drains of GTG-HRSG area and shifting of the materials at the scrap bin area. | Cleaning of drains of GTG-HRSG area and shifting of the materials at the scrap bin area. |
| 34 | Provision of tarpaulin cover over GTG air filters, generator area & other areas, as per requirement to prevent water ingress into the system esp. during monsoon period (rainy season) etc. | Provision of tarpaulin cover over GTG air filters, generator area & other areas, as per requirement to prevent water ingress into the system esp. during monsoon period (rainy season) etc. |
| 35 | Moisture & water removal inside GTG enclosure and cleaning inside enclosure | Moisture & water removal inside GTG enclosure and cleaning inside enclosure |
| 36 | Housekeeping of PW to GTG pump area. | Housekeeping of PW to GTG pump area. |
| 37 | Housekeeping of GTG cooling tower and ACW pump area. | Housekeeping of GTG cooling tower and ACW pump area. |
| 38 | Rain water removing work above GTES Inlet/ exhaust duct esp. during monsoon period (rainy season) etc. | Rain water removing work above GTES Inlet/ exhaust duct esp. during monsoon period (rainy season) etc. |
| 39 | HRSGs FA manhole cover opening, inside cleaning and box up. | HRSGs FA manhole cover opening, inside cleaning and box up. |
| 40 | GT Exhaust system (GTES) manhole cover opening, inside cleaning and box up. | GT Exhaust system (GTES) manhole cover opening, inside cleaning and box up. |
| 41 | GTG seal air cooler backwash and flushing. | GTG seal air cooler backwash and flushing. |
| 42 | To carry out regular greasing of equipment as per instruction of RCF engineer. | To carry out regular greasing of equipment as per instruction of RCF engineer. |
| 43 | Housekeeping of Control Room Bldg. terrace | Housekeeping of Control Room Bldg. terrace |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender