Public Administrative Department Local Bodies Closing in 3 days TDR #56853498

Tender For Construction Work For The Pinjaura Cremation Ground Ward No. 02.

Issued by Local Bodies · Saharanpur, Uttar Pradesh
Tender Value
42.27 Lakhs
Estimated cost
Bid Submission
24 Aug 2026
3 days left
EMD
4.22 Lakhs
Bank guarantee accepted
Document Fee
1298
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Saharanpur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Work For The Pinjaura Cremation Ground Ward No. 02.

BOQ

Name of Work:- Construction work for the Pinjaura Cremation Ground Ward No. 02.
Sl. No. Item Description
1Earth work in excavation in foundation in ordinary soil including lift, lead and disposal etc.
2P/L cement concrete 1:6:12 (cement, coarse sand & brick ballast)
3R.C.C. work with cement, coarse sand and approved stone ballast in proportion 1:1½:3
41st class brick work in 1:4 cement and coarse sand mortar in super structure of one brick thick wall
51st class brick work in 1:4 cement and coarse sand mortar in super structure of one brick thick wall (S.I. No. 305a+309+310)
6R.C.C. work with cement, coarse sand and approved stone ballast in proportion 1:2:4 in lintels/beams
7M.S. or iron in plain work such as R.C.C. including bending, binding, hooks and overlapping
812 mm thick plaster with cement & coarse sand mortar in 1:4
9Providing and applying white cement based putty over plastered wall surface
10Finishing wall with waterproof cement paint (two coats)
11Mild steel or iron work for fabrication of gate/hold fasts and similar sections
12Clearing jungle including uprooting of vegetation grass, bush, wood, trees and saplings, removal of rubbish outside the periphery area
13Earth work in excavation in foundation in ordinary soil including lift, lead and disposal
14Providing and laying cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 brick ballast, 40 mm nominal size)
15R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone ballast in proportion 1:1½:3 in columns
16First class brick work in 1:4 cement and coarse sand mortar in foundation and plinth
17Sand filling in plinth including watering, dressing and compaction
18R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone ballast in proportion 1:2:4 in plinth beams, lintel beams and top beams
19First class brick work in 1:4 cement and coarse sand mortar in superstructure of one brick thick wall
20R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone ballast in proportion 1:1.5:3 for slab works
2112 mm thick plaster with cement and coarse sand mortar in 1:4 including supply of all materials and labour
22Providing and applying white cement based putty of average thickness 1 mm over plastered wall surface
23M.S. or iron in plain work such as R.C.C. including bending, binding, hooks, overlaps and binding wire
24Mild steel or iron work for fabrication of grill for windows including riveting or welding where necessary
25Granolithic marble flooring 2.5 cm thick with marble chips finish, concrete base and polishing complete
26Finishing wall with waterproof cement paint of approved make and quality with two coats
27Painting two coats on new iron or wood work over priming coat
28Earth work in excavation in foundation in ordinary soil i/c lift 1.5m & lead 30m & upto 3.00m lift etc......all comp. As per P.W.D schedule item No. 251 (without royality)
29P/L cement concrete with 1:6:12 (1 cement 6 coarse sand 12 brick ballast 40 mm nominal size) etc.... All comp. As per P.W.D schedule item no 273
30R.C.C. work with cement approved coarse sand and 2cm gauge approved stone ballast in proportion of 1:1½:3 in column S.I. No. 289
311st class B/W in 1:4 with cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of work S.I. No. 305a
32Sand filling in plinth incl. supply of necessary qty of sand & inc. watering dressing etc. rate includes cost of all materials, labours and T&P etc. required for proper completion of work all.....comp. As per P.W.D schedule item No. 255
33R.C.C work with cement approved coarse sand and 2cm gauge approved stone ballast in proportion of 1:2:4 in lighter beams. S.I.No. 285
34Supply and fixing Galvanized corrugated iron roofing 24 B.W.G. in position including supply of all materials, labour, Tools &plants etc. required for proper completion of the work and including wastage.
35Supply anf fixing 22 B.W.G. Ridges, valley and gutters for iron roofing fixed with J or U bolts 10mm (3/8\\") dia-with G.I. Limpet and bitumen washers complete including supply of all materials, labour, tools & plants etc. required for proper completion of the work and including wastage .
36M.S or iron in plain work such as R.C.C including bending for proper shape and including supply of steel & its wastage, bend, hooks and authorized overlaping shall be measured and including cost of binding wire etc.... All comp As per P.W.D S.I NO. 504 (For truss)
3712mm thick plaster with cement & C:Sand mortar in 1:4 including supply of all material labour etc..... All comp. As per P.W.D.S.I. NO. 584(i)
38Providing and applying white cement based putty of average thickness 1mm of approved brand and manufacture, over the plastered wall surface to prepare the surface even and smooth complete..P.W.D.S.I. NO. new item
39M.S or iron in plain work such as R.C.C including bending for proper shape and including supply of steel & its wastage, bend, hooks and authorized overlaping shall be measured and including cost of binding wire etc.... All comp As per P.W.D S.I NO. 504
40Brick on edge pavement on patries with bricks laid dry, joint filled with local sand including preparation of base to proper slope and its ramming, spreadind, a layer of 1cm. 3/8\\" depth of local sand over the subgrade & includind supply of all materiels.
41Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper completion of the work.but for weather coatP.W.D.S.I. NO. new item
42Construction of Granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in lace method with rotavator of OMC, and compacting with vibratory power roller to achive the desired density, complete (As per clause 401 RA)
43Supply of 80 mm thick ISI marked I shaped mechanicaly compressed interlocking cement concrete paver blocks manufatactered by high prussureand control vibration machine having plan dimension 200 x (160+120 mm )with minimum 5 mm thick topping of O.P. cement mixed with 25 %marble powder . The compresive strenth of concrete paver block shall not be less than 30 Mpa and 4.50 kg per no. including cost of all material labour T& P etc required for proper complition of work new item no-14 work should be done with colour tiles new item no-14
44Earth work in excavation in foundation in ordinary soil i/c lift 1.50 & lead 30 mtr etc.... All comp. As per P.W.D.S.I. NO. 251 (Excluding royality)
45P/L cement, concreate with 1:6:12 (1 cement, 6 fine sand, 12 brick ballast 40mm nominal size etc.....all comp. As per P.W.D schedule No. 273
46M-150 class brick work with 1:4 cement & coarse sand mortar including supply of all mat. Lab T&P etc reqd. for prop. comp. of the work etc....all comp. Both side eding back side repair/ south side nala. As per P.W.D schedule item No. 305
47E/W in cutting or embankment in ordinary soil including 1.5mtr lift and 30mtr lead including cortage of earth from 5 km as per S.I No 253 (Excluding
48Construction of Granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on
49Providing & Laying 80 mm thick interlocking cement concrete block pavement as per specification.....all work comp.
5012mm thick Plaster with cement & coarse sand mortor consisting of one part of cement and 4 parts of fine sand of 2.25 FM on brick work including supply of all material, labour & T&P etc.....required for proper completion of work. As per
51R.C.C work with cement Approved coarse sand and 2cm gauge approved stone ballast in proportion of 1:2:4 etc slab works etc.....all comp As per P.W.D.S.I. NO. 284
52M.S. or iron in plain work such as R.C.C. i/c bending for proper shape and i/c supply of steel & its wastage, bend, hooks, and authorized overlapping shall be measured and i/c cost of binding wire etc.....all comp. As per P.W.D schedule item No. 504.
53P/L in cement, concrete 4:2:1 with 20mm stone aggregate coarse sand and cement etc.....all comp. As per P.W.D
54Supply and fixing of RCC Bench Cement Precast Bench, Size (Feet): 5 Feet 3 Seater markit rate
55Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. And lead upto 30 M. And including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation
56Disposal of malwa side up to 12 Km distance from site i/c all comp of work
57Sand filling in plinth incl. supply of necessary qty of sand & inc. watering dressing etc. rate includes cost of all materials, labours and T&P etc. required for proper completion of work all.....comp. As per P.W.D schedule item No. 255
58R.C.C. works with cement approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 (column and T-Beam) in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I., binding wire and including ncecessary centering and shuttering etc. and supply of all materials labour, tools & plants etc. require for proper completion of the work, including cost of binding wire. The rate excludes making of drip course which shall be paid extra.
59R.C.C. works with cement approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab roof etc all complete work.
60M.S. (for steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks and authorized overlapping shall be measured and including cost of binding wire.
61Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour, T&P etc. required for proper completion the work.
62M-150 brick work in 1:4 one cement and foure course sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work.
63Same as item no-7 above but in 1:4 (one cement & four course sand of 1.25 F.M.) mortar. as in item 302 (B) to 3307 above but in superstructure including necessary cutting & moulding of bricks as required thickness of walls not be less than 1 brick.
6412 mm thick plaster with cement and approved coarse sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work.
652 cm. thick cement plaster in dado or skirting in 1:2 consisting of one part of cement & two parts of approved coarse sand laid in panels finished with 3 mm floating coat of neat cement or cement mixed with marble dust in ratio 5:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
66S/fixing china white glazed tiles in flooring or in skirting or dado laid with 1:3 Cement and approved coarse sand mortar finished with white cement slurry, jointing and polishing complete, including supply of all materials, labour.
67Supply and fixing 6 to 8 mm thick ivory or light shades vitrefied tiles 600X600 mm size in flooring and skirting with 1:3 approved cement and coarse sand mortar finished with in its cement colour slurry, jointing and polished of approved quality complete, including supply of all materials, labour, tools and plants etc. required for proper completion of the work as per direction of engineer-in-charge.
68M.S or iron work in stair case roilling in heavy sizes such as trusses, built up gates, records rocks, roof work, gates etc including rivetting or welding where necessary.
69Painting roofs or other iron work in large areas with one coat priming and one coat of approved (above one sq. metre) paint (Britesh antesol or equivalent) including supply of all materials labour tools & plants etc required for proper completion of the work paint to be used ISI Marked.
70Providing wall putty on New surface with approvel quality material of berger/ J.K. Birla or similar make 2 coats.
71oil bound distemper of approved brand and manufacture and of required shade on undecorated wall surface to give an evan shade over and including a priming coat with cement primer of approved brand and manufature such as berger, J&N, Shalimar, asian paint after thoroughly brushing the surface free from mortar dropping and other foreign matters and also including thr surface even with plaster of paris or approved synthetic materials and sand papered smooth including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
72Cement Concrete with 2.0 cm. gauge Approved stone grid coarse sand & cement in the proportion of 4:2:1 including, T&P etc.
73P/F water closed sqm. Fitting Orissa pattem W.C. pan of size 580x440 mm Hindware or Equivalent with integral type foot rests and 1 piece construction white vitreous china squatting plate with an integral longitudinal flushing pipe, white 5 litre P.V.C. automatic flushing cistern, with fitting, standard size G.I. flush pipe for back and front flush withk standard spreader pipes with fittings, G.I. clamps and C.P. brass coupling complete including painting of fittings and cutting and making good the walls and floors etc. wherever required.
74Supply and fixing of 10 cm (4\\") inemal dia P.V.C. down pipes Everest or Charminar make complete with bends with door at top and plain at bottom and grantings and including supply of necessary M.S. clamp 2.5 cm x 3 mm (1\\"x1/8\\") fixed to walls with and including supply of 15 cm (6\\") long 6 mm (1/4\\") dia nail all materials, labour and T&P etc. required for proper complection of the work and also including repair of plaster pointing etc. if damaged during fixing of the pipes.
75Construction of Granular sub- base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in lace method with rotavator of OMC, and compacting with vibratory power roller to achive the desired density, complete (As per clause 401 RA)
76Supply of 80 mm thick ISI marked l shaped mechanicaly compressed interlocking cement concrete paver blocks manufatactered by high prussureand control vibration machine having plan dimension 200 x (160+120 mm )with minimum 5 mm thick topping of O.P. cement mixed with 25 %marble powder . The compresive strenth of concrete paver block shall not be less than 30 Mpa and 4.50 kg per no. including cost of all material labour T & P etc required for proper complition of work new item no-14 work should be done with colour tiles.
77ELECTRIFICATION AND MODIFICATION 12.5%
78CONTGENCE 5% add
79Add 18%GST Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56853498
AUTHORITY Local Bodies
TENDER VALUE 42.27 Lakhs
LAST DATE 24-08-2026
Authority
Authority Name Saharanpur Municipal Corporation
Work Description Tender for Construction Work For The Pinjaura Cremation Ground Ward No. 02.
Basic Detail
Tender No 2413 G
Bidding Type Tender
Location
City Saharanpur
State Uttar Pradesh
Key Dates
Publish Date 05 Aug 2026
Submission Date 24 Aug 2026
Open Date 25 Aug 2026
Finance
Tender Value 42.27 Lakhs
Tender Fee 1298
EMD 4.22 Lakhs
Exemption Not Available
Document List
4ff627da-0743-4462-8da3-2b3db15b0948.html
BOQ_2206970.xls
Tendernotice_1 (30).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 05, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 24, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days
Aug 25, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 4 days

Tender Documents

Download All (ZIP) ↓
html

4ff627da-0743-4462-8da3-2b3db15b0948.html

xls

BOQ_2206970.xls

pdf

Tendernotice_1 (30).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders