Supply Of STAINLESS STEEL
Tender Overview
Project Description
Supply Of stainless steel , seamless stainless tube 10 mm od. confirming to spec. astm 269, gr. s.s.-304, length 6 m eters [ warranty period: 30 months after the date of delivery ] ] , stainless steel seamless tube 28 mm od x 2 mm wall thickness running length 6 mtrs as per icf spec icf/md/spec-166 rev-3 or latest astm a 269 or tp 304 [ warranty period: 30 months after the date of delivery ] ] , seamless stainless steel tube 3/4 o.d x 0.065 wall thickness (1.65 mm) in length of 6000 mm, as per drawing: icf spec. no: icf/md/spec.-166 rev. no.03 or latest [ warranty period: 30 months after the date of delivery ] ] , stainless steel pipe 25 mm nominal dia. with plain ends in a standard length of 3.8 mtrs.for passenger stock confirming to rdso specn. no. 04-abr-2002 (rev.01 of nov.-2017) & material to astm-a 3 12 schedule-40s gr.tp 304 (seamless).thickness of pipe to be governed by is: 1239 (part-i) heavy c-class. [ warranty period: 30 months after the date of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Seamless Stainless tube 10 mm OD. Confirming to Spec. ASTM 269, Gr. S.S.-304, Length 6 M eters [ Warranty Period: 30 Months after the date of delivery ] ] |
| 2 | STAINLESS STEEL SEAMLESS TUBE 28 MM OD X 2 MM WALL THICKNESS RUNNING LENGTH 6 MTRS AS PER ICF SPEC ICF/MD/SPEC-166 REV-3 OR LATEST ASTM A 269 OR TP 304 [ Warranty Period: 30 Months after the date of delivery ] ] |
| 3 | SEAMLESS STAINLESS STEEL TUBE 3/4" O.D X 0.065" WALL THICKNESS (1.65 MM) IN LENGTH OF 6000 MM, as per Drawing: ICF SPEC. NO: ICF/MD/SPEC.-166 REV. NO.03 OR LATEST [ Warranty Period: 30 Months after the date of delivery ] ] |
| 4 | Stainless Steel Pipe 25 mm nominal dia. With plain ends in a standard length of 3.8 mtrs.for passenger stock confirming to RDSO Specn. No. 04-ABR-2002 (Rev.01 of Nov.-2017) & Material to ASTM-A 3 12 Schedule-40S Gr.TP 304 (Seamless).Thickness of pipe to be governed by IS: 1239 (Part-I) Heavy C-Class. [ Warranty Period: 30 Months after the date of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 72 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender