Tender For Increasing Capacity From 100 Kva To 250 Kva Transformers At Various Site Of Mandakini Vihar, Ekta Vihar, Parish Vihar, Vedantpuram, Dhoran Road, Vishwanath Enclave, Amit Vihar And Heritage School It Park Under Edsd, It Park Under Edd, Raip
Tender Overview
Project Description
Tender for Increasing Capacity From 100 Kva To 250 Kva Transformers At Various Site Of Mandakini Vihar, Ekta Vihar, Parish Vihar, Vedantpuram, Dhoran Road, Vishwanath Enclave, Amit Vihar And Heritage School It Park Under Edsd, It Park Under Edd, Raipur
BOQ
| Sl. No. | Item Description |
| 1 | Total amount of the \\"Rate Schedule\\" sheet SCHEDULE OF QUANTITY AND RATE FOR INCREASING CAPACITY FROM 100 KVA TO 250 KVA TRANSFORMERS AT VARIOUS SITE OF MANDAKINI VIHAR, EKTA VIHAR, PARISH VIHAR, VEDANTPURAM, DHORAN ROAD, VISHWANATH ENCLAVE, AMIT VIHAR AND HERITAGE SCHOOL IT PARK UNDER EDSD, IT PARK UNDER EDD, RAIPUR AGAINST E-TENDER SPECIFICATION NO. 58/EDCRDDUN/2026-27 1- Est.No.-1 (IR.SR2503395) - Est. for I/C 100Kva Overload T/F to 250 kva at Mandakini vihar IT Park2- Est.No.-2 (IR.SR2503397) - Est. for I/C 100Kva Overload T/F to 250 kva at Ekta vihar IT Park 3- Est.No.-3 (IR.SR2503398) - Est. for I/C 100Kva Overload T/F to 250 kva at Parish vihar IT Park 4- Est.No.-4 (IR.SR2503399) - Est. for I/C 100Kva Overload T/F to 250 kva at Vedantpuram IT Park 5- Est.No.-5 (IR.SR2503401) - Est. for I/C 100Kva Overload T/F to 250 kva at Dhoran Road IT Park 6 -Est.No.-6 (IR.SR2503402) - Est. for I/C 100Kva Overload T/F to 250 kva at Vishwanath Enclave IT Park 7- Est.No.-7 (IR.SR2503403) - Est. for I/C 100Kva Overload T/F to 250 kva at Amit Vihar IT Park 8- Est.No.-8 (IR.SR2503406) - Est. for I/C 100Kva Overload T/F to 250 kva at Heritage School IT Park Name of The Bidder's Firm: 0.0 Sl. No. Description of Work Unit Est.-1 Est.-2 Est.-3 Est.-4 Est.-5 Est.-6 Est.-7 Est.-8 TotalQty Rate Amount Part [A] (Supply Portion) |
| 2 | Holding Clamp for ST Pole SP-55 with N&B |
| 3 | LT Clamp for PCC Pole with N&B |
| 4 | LT Clamp for ST Pole SP-55 with N&B |
| 5 | Stay Clamp for ST Pole SP-55 with N&B |
| 6 | LT Clamp for ST Pole SP-23 with N&B |
| 7 | Dead End Clamp with J Hook |
| 8 | Suspension Clamp with J Hook |
| 9 | MS Clamp with N&B for Distribution Box |
| 10 | Shackle Insulator 100x115 mm with N&B |
| 11 | Distribution Box with N&B AB cable 3 Phase-4Way |
| 12 | Insulation Piercing connector 120 sqmm -50 sqmm |
| 13 | 11 KV Fuse Set |
| 14 | Bolt & Nuts off size |
| 15 | Providing Air Circuit Breaker type complete LT Distribution board for 250/400 KVA DTR fitted with 01 No. 800 Amp CT including microprocessor release IPR-1 Fixed type (4 Pole as per IS: 13947-2 & IEC: 60947-2) with panel and mounting structure as per specification |
| 16 | LT XLPE Cable 1x50 sqmm |
| 17 | AL. Crimping type lugs 400 sq mm |
| 18 | GI Strip 40x6 mm Total - Part [A] 0.0 Part [B] (Labour Portion) |
| 19 | Carriage of following type of Material from store centre/JE store to site of work distance approximate 0-20 km. With loading & unloading complete: - a) ST Pole SP- 21/23 Nos 4.0 4.0 8.0 b) ST Pole SP-55 (Galvanized) Nos 2.0 2.0 2.0 2.0 2.0 10.0 0.0 c) 250 KVA DTR Nos 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 8.0 0.0 d) Stock Material Qtl 39.4 24.71 9.91 75.15 31.38 75.19 10.84 15.13 281.71 0.0 |
| 20 | Head load cartage of following material from road to site (0-1 Km) a) St Pole SP 21/23 Nos 4.0 4.0 8.0 b) ST Pole SP-55 (Galvanized) Nos 2.0 2.0 2.0 2.0 8.0 0.0 c) 250 KVA DTR Nos 1.0 1.0 1.0 1.0 1.0 1.0 1.0 7.0 0.0 d) Stock Material Qtl 39.4 24.71 75.15 31.38 75.19 10.84 15.13 271.8 0.0 |
| 21 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work |
| 22 | Erection of following Single support pole in proper level and alignment alongwith fixing of all accessories, like top channel, X-bracing & clamps as per RESPO construction Manual. ST Pole SP-23 Pole (Galvanized) Nos 4.0 4.0 8.0 0.0 |
| 23 | Erection of following Double support pole in proper level and alignment alongwith fixing of all accessories, like top channel, X-bracing & clamps as per RESPO construction Manual. ST Pole SP-55 (Galvanized) Nos 1.0 1.0 1.0 1.0 1.0 5.0 0.0 |
| 24 | Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction Manual. |
| 25 | Muffing of poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc. |
| 26 | Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc as per RESPO sehedule and local approved drawing. |
| 27 | Erection and Earthing of support with M.S. Earth rod of 2.5 meter long including excavation of pit and digging of M.S. Rod to proper depth and connecting the earth electrode with the help of G.I. wire as per construction manual. |
| 28 | Dismantling of PCC double Pole |
| 29 | Dismantling of SP-33 Double Pole |
| 30 | Dismantling of LT Line 3 Phase 4 wire (ACSR Weasel conductor) |
| 31 | Dismantling of 100 KVA DTR |
| 32 | Installation of 250 KVA DTR on Pole Structure |
| 33 | Mounting & Fixing of Fuse sets on double pole structures including making of connections complete work |
| 34 | T-off connection complete 11 KV line |
| 35 | Providing and fixing of Danger Board and number plate complete by providing clamps of M.S. Flat 50x6 mm and Nuts & Bolts, danger Boards of M.S. Sheet 2 mm Thick 11''x7'' size (Including cost of all material) |
| 36 | Making of section Pole |
| 37 | Laying & Fixing of LT XLPE cable |
| 38 | Installation of LT distribution Box. |
| 39 | Earthing of T/F LA & Body |
| 40 | Fixing of Accessories |
| 41 | Dismantling of accessories from ST Pole |
| 42 | Jumpering of DP TPMO, Fuse Set and T/F |
| 43 | Installation of LT ACB Pannel complete in all respect i.e. disconnection of existing cable from DTR terminal and metering cubucals, fixing of new additional cable in ACB LT Distribution board connecting DTR metering complete, testing and commissioning of ACB connection using all lugs pf proper size lugs will be provided by supplier as per required on site and narrated by engineer in change of work. |
| 44 | Earthing of ACB |
| 45 | Fixing of Channel, Angle on Pole |
| 46 | Excavation, Erection of Stay Set complete work |
| 47 | Laying/Erection of LT AB Cable 3x120+95 sqmm. |
| 48 | Back Head load cartage of following material from Site to road (0-1 Km) a) 100 KVA DTR Nos 1.0 1.0 1.0 1.0 1.0 1.0 1.0 7.0 0.0 |
| 49 | Back Carriage of following type of Material from Work Site to store centre/JE store distance approximate 0-20 km. With loading & unloading complete: - a) 100 KVA DTR Nos 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 8.0 0.0 b) scrap material Job 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 8.0 0.0 Total - Part [B] 0.0 TOTAL [Part-(A) + Part (B)] 0.0 Place Date Superintending Engineer Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.