Housing Urban and Rular Development Government Departments Closing in 8 days TDR #56836908

Tender For Construction Of Bridge Over Nallah Sindh At Sumbal.

Issued by Government Departments · Ganderbal, Jammu and Kashmir
Tender Value
2.94 Crore
Estimated cost
Bid Submission
07 Sep 2026
8 days left
EMD
5.89 Lakhs
Bank guarantee accepted
Document Fee
5500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ganderbal → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of Bridge Over Nallah Sindh At Sumbal.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 29-Aug-2026 extension of Date Date 07-Sep-2026
2 29-Aug-2026 corrigendium addendum Technical Bid 07-Sep-2026
3 29-Aug-2026 corrigendium Technical Bid 07-Sep-2026

BOQ

Name of Work:- Construction of Bridge Over Nallah Sindh at Sumbal.
Sl. No. Item Description
1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock
2Providing and Laying of Stone Soling hand packed including ramming, dressing and watering etc. with all cost and carriage of materials upto site of work complete.
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works above plinth level upto floor V level
6Extra for providing richer mixes at all floor levels. Note:- Excess/ less cement over the specified cement content used is payable/ recoverable separately. Providing M-30 grade concrete instead of M-25 grade BMC/RMC.
7Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
8Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
9Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc
10Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms.
11Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more including loading, unloading and carriage of material upto site of work complete.
12Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic meter of coarse sand for expansion joints.
13Providing and fixing of 100mm dia PVC pipes (B-Type) so as to act as weep holes in cement concrete including cutting and placing in position complete as per the directions of Incharge Engineer.
14Providing, Fixing and Installation in position of elastomeric neoprene bearing at free ends of Plate Girder over abutement and piers locations as per drawings which shall include the following: i) Cost of bearing, assembly, transportation, erection and Installation to level and position, provision for necessary pockets in pedestals lugs inserts as required and grouting of same as directed after installation. ii) All necessary labour and material required for temporary supports and structure locking bearing in position during construction and releasing of the same on completion of units as required in the drawings. iii) Providing of epoxy mortar for levelling and seating including, application of two or more coats of protective anti-corrosive epoxy based paint on exposed steel section of bearings assembly, greasing/ lubrication of moving parts etc as required on completion of Installaion.
15Providing, fixing and Installation of heavy duty M.S water sprouts/ drainage sprouts incuding all necessary fittings/ fixtures and cutting and making good through RCC, jointing with approved sealing and providing iron gratings as per the design and directions of Incharge Engineer.
16Engagement of crane for launcing of bridge beams and other necessary works wherever required as desired by EIC etc complete.
17Providing and Applying of 6 mm plaster including curing on cement concrete or reinforced cement concretework with white cement based polymer modified self curing mortar of approved make as per the direction of Engineer-In-Charge.
18Providing and laying design mix cement concrete of M-30 grade ( Cement concrete prepared with batch mixing machine ) in roads/taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, leveling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints ( 10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in- charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to ,be paid separately). Note:-Cement content considered in M-30 is @ 340 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately.
19Finishing with Deluxe multi surface paint system for interiors and exteriors using primer as per manufacturers’ specifications: Painting steel work with deluxe multi surface paint of required shade to give an even shade. Two or more coats applied @ 0.90litre/10sqm over an under coat of primer applied @ 0.80litre/10sqm of approved brand and manufacture
20Structural steel work (welded) in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer and carriage of materials upto site all complete.
21Dismantling old protection work including cutting of crates and stacking of stones.
22Diversion of Nallah during execution of work including disposal of materials complete job. (complete detials to be provided to divisional office at time of billing with photographs during execution of work and payment to be made as per actual).
23Providing and fixing of Inaugural and foundation stone in brick work with 12mm plaster and paint with Grainate sinage and engraving of letters/ logos/ all details as required etc all complete as per the directions of Inhcarge Engineer.
24Carriage of materials from approved source to site of work complete.
25Sand for an average lead of 30Kms.
26Stone Aggregate for an average lead of 10Kms Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56836908
AUTHORITY Government Departments
TENDER VALUE 2.94 Crore
LAST DATE 07-09-2026
Authority
Authority Name Public Works Department
Work Description Tender for Construction Of Bridge Over Nallah Sindh At Sumbal.
Basic Detail
Tender No ENIT 24
Bidding Type Tender
Location
City Ganderbal
State Jammu and Kashmir
Key Dates
Publish Date 29 Aug 2026
Submission Date 07 Sep 2026
Open Date 08 Sep 2026
Finance
Tender Value 2.94 Crore
Tender Fee 5500
EMD 5.89 Lakhs
Exemption Not Available
Document List
03759cea-e1bf-458f-a7e7-45607b485f9c.html
BOQ_1058444.xls
Tendernotice_1.pdf
Tendernotice_2 (6).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 29, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 07, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 8 days
Sep 07, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 8 days
Sep 07, 2026
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 8 days
Sep 07, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 8 days
Sep 08, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
html

03759cea-e1bf-458f-a7e7-45607b485f9c.html

xls

BOQ_1058444.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2 (6).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders