Tender For Execution Of Improvement/Maintenance/Emergent Works Of Ht/Lt, Distribution Sub Stations And Maintenance/Improvement In 11 Kv Network, Within The Jurisdiction Of Electric Division -Iii Jammu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
25 Aug 2026
2 days left
EMD
50000
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Jammu → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Execution Of Improvement/Maintenance/Emergent Works Of Ht/Lt, Distribution Sub Stations And Maintenance/Improvement In 11 Kv Network, Within The Jurisdiction Of Electric Division -Iii Jammu
BOQ
| Sl. No. | Item Description |
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Executive Engineer Electric Division-III , JPDCL Jammu Name of Work: : Execution of Improvement/Maintenance/Emergent works of HT/LT, Distribution Sub Stations and Maintenance/Improvement in 11 KV Network, within the jurisdiction of Electric Division -III Jammu Contract No: e-NIT No.33 of 2026-27 dt. 04.08.2026. Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # |
| 2 | Item Description |
| 3 | Particulars of works under Mainttt/improvement in LT Network |
| 4 | Supply, Transportation, Erection of 8 Mtr Long PCC Pole (WL-200 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. |
| 5 | Supply, Transportation, Erection of 8 Mtr Long ST Pole(410 -SP15) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. |
| 6 | Replacement of damaged pole by way of Supply, Transportation, Erection of 8 Mtr Long PCC Pole (WL-200 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. |
| 7 | Replacement of damaged pole by way of Supply, Transportation, Erection of 8 Mtr Long ST Pole(410 -SP15) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. |
| 8 | Transportation, Erection of 8 Mtr Long ST Pole(410 -SP15) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.(Poles to be provide by the department and to be lifted From Divisional Store Janipur) |
| 9 | Transportation, Erection of 8 Mtr Long PCC Pole (WL-200 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.(Poles to be provide by the department and to be lifted From Divisional Store Janipur) |
| 10 | Insertion of pole by way of Supply, Transportation, Erection of 8 Mtr Long PCC Pole (WL-200 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. |
| 11 | Insertion of pole by way of Supply, Transportation, Erection of 8 Mtr Long ST Pole(410 SP15) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. |
| 12 | Providing & Fixing of GI U-Clamp with Shakle Insulator (Polymer/Porcelain) alongwith Nut & Bolt of sorts |
| 13 | Supply, Laying & Stringing of ACSR Weasel Conductor through insulators including proper binding & twisting with soft Aluminium Wire (HT NETWORK) |
| 14 | Supply, Laying & Stringing of ACSR Rabbit Conductor through insulators including proper binding & twisting with soft Aluminium Wire (HT NETWORK) |
| 15 | Supply, Laying & Stringing of ACSR Dog Conductor through insulators including proper binding & twisting with soft Aluminium Wire(HT NETWORK) |
| 16 | Supply, Laying & Stringing of ACSR Weasel Conductor through insulators including proper binding & twisting with soft Aluminium Wire for thickening from Squirrel to Weasel conductor (LT network) |
| 17 | Supply, Laying & Stringing of ACSR Rabbit Conductor through insulators including proper binding & twisting with soft Aluminium Wirefor thickening from Weasel to Rabbit (LT network) |
| 18 | Supply, Laying & Stringing of ACSR Dog Conductor through insulators including proper binding & twisting with soft Aluminium Wirefor thickening from Rabbit to Dog (LT network) |
| 19 | Replacement of ACSR Weasel /Rabbit/Dog Conductor for LT Network (Conductor to be provided by the department and to be lifted From Divisional Store Janipur) |
| 20 | Providing & Fixing of LT Line Spacers |
| 21 | Supply and Replacementof LT AB/XLPE Cable 50 mmsq |
| 22 | Supply and Replacement of LT AB/XLPE Cable 95 mmsq |
| 23 | Supply and Replacement of LT AB/XLPE Cable120sq mm |
| 24 | Supply and Transportation of 13 mtr long ST poles |
| 25 | Laying of LT AB/XLPE Cable 50 mmsq |
| 26 | Laying of LT AB/XLPE Cable 95 mmsq |
| 27 | Laying of LT AB/XLPE Cable120sq mm |
| 28 | Erection of 13 mtr long ST poles |
| 29 | Supply &fixing of Heat Shrinkable Outdoor Kit forPVC Cables50sq mm |
| 30 | Supply &fixing of Heat Shrinkable Outdoor Kit forPVC Cables120sq mm |
| 31 | Supply &fixing of Heat Shrinkable Outdoor Kit for PVC Cables 185sq mm |
| 32 | Supplying and Fixing of Mid Span Straight Jointer Kit for LT ABCables 185 mm² |
| 33 | Supplying and Fixing of Mid Span Straight Jointer Kit for LT ABCables 120 mm² |
| 34 | Supplying and Fixing of Mid Span Straight Jointer Kit for LT ABCables 50mm² |
| 35 | Providing of Cement Bottomining (1:2:4) |
| 36 | Supply fixing of PG clamps for jointing of snapped conductor for ACSR Dog/,Rabbit /Weasel |
| 37 | Providing of Stone Pad (300mmx300mmx75mm) |
| 38 | Providing & Fixing of Stay Set with 50 x 8 mm Stay Clamp, Guy Insulator (2 Nos), Anchoring Plate (200 x 200 x 6 mm), Nut & Bolts, 2 No Turn Buckle, 1.8m long, 16 mm diameter solid Stay Rod & 7/3.15 mm dia stranded wire complete |
| 39 | Providing & Fixing of Danger Plates with Clamps |
| 40 | Providing & Fixing of Anti Climbing device with Clamps |
| 41 | Providing of Earthing Complete by GI Pipe 40 mm or GI Rod 20 mm, 2.5 Mtr Long through GI Strip |
| 42 | Providing and Painting of ST Poles with Red Oxide & Aluminium Paint along with Cross arms braces etc |
| 43 | Supply &Fixing of Suspension clamps for ABCables |
| 44 | Supply &Fixing of Anchoring Clampsfor AB Cables |
| 45 | Providing & fixing of Jumpers with ACSR Dog |
| 46 | Providing & fixing of Jumpers with ACSR Rabbit |
| 47 | Providing & fixing of Jumpers with ACSR Weasel |
| 48 | Providing & fixing of Jumpers with ACSRSquirrel |
| 49 | Providing & fixing of jumper on 11kv line with ACSR Weasel |
| 50 | Providing & fixing of Galvanised nuts &Bolts |
| 51 | Dismantalling of line matereial of existing LT Line complete Job |
| 52 | Carriage of Dismanteled material Figuring at Serial no. (1.49) from Dismantelling Site to Divisional Store |
| 53 | Particulars of works under Mainttt/improvement of HT works |
| 54 | Supply, Transportation, Erection of 9 Mtr Long PCC Pole (WL-300 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.& dismentaling/disposal of existing pole |
| 55 | Supply, Transportation, Erection of 9 Mtr Long ST Pole (410 SP33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.& dismentaling/disposal of existing pole |
| 56 | Supply, Transportation, Erection of11 Mtr Long PCC (360 Kg)Pole including excavation of pit and back filling of soil & consolidating by ramming, watering etc. |
| 57 | Supply, Transportation, Erection of11 Mtr Long ST Pole(410SP56) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. |
| 58 | Transportation, Erection of 9 Mtr Long PCC Pole (WL-300 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.& dismentaling/disposal of existing pole(Poles to be provide by the department and to be lifted From Divisional Store Janipur) |
| 59 | Transportation, Erection of 9 Mtr Long ST Pole (410 SP33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.& dismentaling/disposal of existing pole(Poles to be provide by the department and to be lifted From Divisional Store Janipur) |
| 60 | Transportation, Erection of 11 Mtr Long PCC (360 Kg)Pole including excavation of pit and back filling of soil & consolidating by ramming, watering etc.& dismentaling/disposal of existing pole(Poles to be provide by the department and to be lifted From Divisional Store Janipur) |
| 61 | Transportation, Erection of 11 Mtr Long ST Pole(410SP56) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.& dismentaling/disposal of existing pole(Poles to be provide by the department and to be lifted From Divisional Store Janipur) |
| 62 | Replacement of damaged pole by way of Supply, Transportation, Erection of 9 Mtr Long PCC Pole (WL-300 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.& dismentaling/disposal of existing pole |
| 63 | Replacement of damaged pole by way of Supply, Transportation, Erection of 9 Mtr Long ST Pole (410 SP33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.& dismentaling/disposal of existing pole |
| 64 | Replacement of damaged pole by way of Supply, Transportation, Erection of11 Mtr Long ST Pole(410SP56) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. |
| 65 | Replacement of damaged pole by way of Supply, Transportation, Erection of11 Mtr Long PCC (360 Kg)Pole including excavation of pit and back filling of soil & consolidating by ramming, watering etc. |
| 66 | Insertion of pole by way of Supply, Transportation, Erection of 9 Mtr Long PCC Pole (WL-300 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.& dismentaling/disposal of existing pole |
| 67 | Insertion of pole by way of Supply, Transportation, Erection of 9 Mtr Long ST Pole (410 SP33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.& dismentaling/disposal of existing pole |
| 68 | Insertion of pole pole by way of Supply, Transportation, Erection of11 Mtr Long ST Pole(410SP56) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. |
| 69 | Insertion of pole pole by way of Supply, Transportation, Erection of11 Mtr Long PCC (360 Kg)Pole including excavation of pit and back filling of soil & consolidating by ramming, watering etc. |
| 70 | Supply, Laying & Stringing of ACSR Weasel Conductor through insulators including proper binding & twisting with soft Aluminium Wire |
| 71 | Supply, Laying & Stringing of ACSR Rabbit Conductor through insulators including proper binding & twisting with soft Aluminium Wire |
| 72 | Supply, Laying & Stringing of ACSR Dog Conductor through insulators including proper binding & twisting with soft Aluminium Wire |
| 73 | Replacement of ACSR Weasel /Rabbit/Dog Conductor for HT Network (Conductor to be provide by the department and to be lifted From Divisional Store Janipur) |
| 74 | Supply, Laying & Stringing of ACSR Weasel Conductor through insulators including proper binding & twisting with soft Aluminium Wirefor thickening from Squirrel to Weasel (HT network) |
| 75 | Supply, Laying & Stringing of ACSR Rabbit Conductor through insulators including proper binding & twisting with soft Aluminium Wirefor thickening from Weasel to Rabbit (HT network) |
| 76 | Supply, Laying & Stringing of ACSR Dog Conductor through insulators including proper binding & twisting with soft Aluminium Wirefor thickening from Rabbit to Dog (HT network) |
| 77 | Supply, Transportation, Fabrication & Fixing ofGI Channel Iron, Cross arms, Angle Iron Braces, Clamps etc duly fabricated, including all necessary Nut & Bolts & Washers etc. |
| 78 | Providing & Fixing of 11 KV Pin Insulator with Pins (Polymer/Porcelain) 10 KN |
| 79 | Providing & Fixing of 11 KV Disc Insulator with Fittings (Polymer/Porcelain) 45 KN |
| 80 | Supply ,Erection of 11 KV Pin Insulator 10 KNfor replacement of damaged one |
| 81 | Supply, Erection of 11 KV Disc Insulator 45 KNfor replacement of damaged one |
| 82 | Supply and Replacement of HT AB/XLPE Cable 50 mmsq |
| 83 | Supply and Replacement of HT AB/XLPE Cable 120 mmsq |
| 84 | Supply and ReplacementHT AB/XLPE Cable 185mmsq |
| 85 | Supply and Laying of HT AB/XLPE Cable 50 mmsq |
| 86 | Supply and Laying of HT AB/XLPE Cable 120 mmsq |
| 87 | Supply and Laying HT AB/XLPE Cable 185mmsq |
| 88 | Supply &Erection of Heat Shrinkable Outdoor Kit for HTAB/XLPECables 185mmsq |
| 89 | Supply &Erection of Heat Shrinkable Outdoor Kit for HTAB/XLPECables 120mmsq |
| 90 | Supply &Erection of Heat Shrinkable Outdoor Kit for HTAB/XLPECables 50mmsq |
| 91 | Supply and Fixing of Mid Span Straight Jointer Kit for HT cables 185mmsq |
| 92 | Supply and Fixing of Mid Span Straight Jointer Kit for HT cables 120mmsq |
| 93 | Supply and Fixing of Mid Span Straight Jointer Kit for HT cables 50mmsq |
| 94 | Providing of Cement Bottomining (1:2:4) 0.45 cum |
| 95 | Providing of Stone Pad (300mmx300mmx75mm) |
| 96 | Supply fixing of PG clamps for jointing of snapped conductor for ACSR Dog/,Rabbit /Weasel |
| 97 | Providing & Fixing of Stay Set with 50 x 8 mm Stay Clamp, Guy Insulator (2 Nos), Anchoring Plate (200 x 200 x 6 mm), Nut & Bolts, 2 No Turn Buckle, 1.8m long, 16 mm diameter solid Stay Rod & 7/3.15 mm dia stranded wire complete |
| 98 | Providing & Fixing of Danger Plates with Clamps |
| 99 | Providing & Fixing of Anti Climbing device with Clamps |
| 100 | Providing of Earthing Complete by GI Pipe 40 mm or GI Rod 20 mm, 2.5 Mtr Long through GI Strip |
| 101 | Supply, Installation, Testing & Commissioning of 11 KV GO AB Switch, 3-phase, 3-pole, 400 Amp |
| 102 | Supply, Installation, Testing & Commissioning of 11 KV Link Set (450 x 50 x 6mm) |
| 103 | Supply and Painting of ST Poles with Red Oxide & Aluminium Paint |
| 104 | Supply & Fixing of Suspension clamps for HTABCables |
| 105 | Supply & Fixing of Anchoring Clampsfor HT ABCables |
| 106 | Providing & fixing of jumper on 11kv line with ACSR Dog |
| 107 | Providing & fixing of jumper on 11kv line With ACSR Rabbit |
| 108 | Providing & fixing of jumper on 11kv line with ACSR Weasel |
| 109 | Dismantalling of line matereial of existing HT Line complete JOB |
| 110 | Carriage of Dismanteled material Figuring at serial No 2.57 from Dismantelling Site to Divisional Store |
| 111 | Particulars of Works for Improvement/Maintainance/Emergent works of Distribution Sub Stations on turnkey basis |
| 112 | Supply, Installation, Testing & Commissioning of 11 KV Horn Gap Set for replacement of burnt out |
| 113 | Supply & Fixing of 11 KV LA Set 9 KV, 10 KA with Polymer/Porcelain housing, Stn Type for replacement of burnt out |
| 114 | Supply & Fixing of 11 KV G O AB Switch 3-Phase 3Pole 200 Amp vertical type for replacement of burnt out |
| 115 | Providing & Fixing of PVC Cable 185 mm² Single Core alongwith Al. Thimble of 185 mm² |
| 116 | Providing & Fixing of PVC Cable 70 mm² Single Core alongwith Al. Thimble of 70mm²for replacement of burnt out |
| 117 | Providing & Fixing of PVC Cable 300 mm² Single Core alongwith Al. Thimble of 300 mm²forreplacement of burnt out |
| 118 | Providing & Fixing of PVC Cable 400 mm² Single Core alongwith . Thimble of 400 mm² for replacement of burnt out |
| 119 | Providing & Fixing of PVC Cable120mm² Single Core alongwith Al. Thimble of 120 mm² for replacement of burnt out |
| 120 | Providing & Fixing of PVC Cable95mm² Single Core alongwith Al. Thimble of 95 mm² for replacement of burnt out |
| 121 | Providing & Fixing of PVC Cable50mm² Single Core alongwith Al. Thimble of 50 mm² for replacement of burnt out |
| 122 | Providing & Fixing of LT Distribution Box with 63 Amp MCCB |
| 123 | Providing & Fixing of LT Distribution Box with 100 Amp MCCB |
| 124 | Providing & Fixing of LT Distribution Box with 200 Amp MCCB |
| 125 | Providing & Fixing of LT Distribution Box with 250 Amp MCCB |
| 126 | Providing & Fixing of LT Distribution Box with 400 Amp MCCB |
| 127 | Providing of Earthing of Sub-Station - Excavation of Earth Pitof dia 650mm and depth 3m , Installation of Earth Pipe of 40 mm of nominal bore & 4mm all thickness &length 2.5 Mtr, GI Strip for neutral Earthing of Size 25 mm x 3mm for connection of Transformer Body, GO Set, LA Set (Complete Job) |
| 128 | Supply ,erection testing and commissioning of Prodigy Meter 20-400 A |
| 129 | Providing & Fixing of galvanized Stay Set with 50 x 8 mm Stay Clamp, Guy Insulator (2 Nos), Anchoring Plate (200 x 200 x 6 mm), Nut & Bolts, 2 No Turn Buckle, 1.8m long, 16 mm diameter(GI) solid Stay Rod & 7/3.15 mm dia stranded wire complete refilled with earth enhanced material |
| 130 | Providing & Fixing of Danger Plates with Clamps |
| 131 | Providing & Fixing of Anti Climbing device with Clamps |
| 132 | Providing of Cement bottoming (1:2:4)0.5 cum |
| 133 | Supply ,erection testing and commissioning of LT Circuit Component of Sub Station ( Al busbar, busbar insulators, Shackle insulators with fuse set ) |
| 134 | Supply erection testing and commissioning of 11 KV CT/ PT along with Trivector Meter 2.5 /5 for 25kVA DT |
| 135 | 5/5 for 63kVA DT |
| 136 | 7.5/5 for 100kVA DT |
| 137 | 15/5 for 200kVA DT |
| 138 | 20/5 for 250kVA DT |
| 139 | 25/5 for 400kVA DT |
| 140 | 50/5for 630kVA DT |
| 141 | Dismantling of existing Distribution Transformers |
| 142 | Transporatation ,Erection Testing Commissioning of 11/0.433 KV,25 KVA , Distribution transformer ,transformer to be provided by the department and to be lifted from Divisional Worshop) |
| 143 | Transporatation ,Erection Testing Commissioning of 11/0.433 KV,63 KVA , Distribution transformer ,transformer to be provided by the department and to be lifted from Divisional Worshop) |
| 144 | Transporatation ,Erection Testing Commissioning of 11/0.433 KV,100 KVA , Distribution transformer ,transformer to be provided by the department and to be lifted from Divisional Worshop) |
| 145 | Transporatation ,Erection Testing Commissioning of 11/0.433 KV,250 KVA , Distribution transformer ,transformer to be provided by the department and to be lifted from Divisional Worshop) |
| 146 | Dismantlingof 11/0.433 KV,25 KVA , Distribution transformer |
| 147 | Dismantling of 11/0.433 KV,63 KVA , Distribution transformer |
| 148 | Dismantling of 11/0.433 KV,100 KVA , Distribution transformer |
| 149 | Dismantling of 11/0.433 KV,250 KVA , Distribution transformer |
| 150 | Dismantling of GI Channel Iron, Cross arm , Angle Iron Braces, Clamps etc including all necessary Nut & Bolts & Washers etc. |
| 151 | Dismantling of 11 KV Horn Gap Fuse Set 3 Phase 200 A . |
| 152 | Dismantling of 11 KV Polymeric Composite Pin Insulator |
| 153 | Dismantling of 11 KV Polymeric Composite Disc Insulator |
| 154 | Re-erection of Dismanteled Distribution transformer sub station at new site |
| 155 | Re- installation testing & commissioning of 11/0.433 KV, 25KVA 3-Phase Distribution Transformer (Dismantelled transformer to be re-erected) |
| 156 | Re- installation testing & commissioning of 11/0.433 KV, 63KVA 3-Phase Distribution Transformer (Dismantelled transformer to be re-erected) |
| 157 | Re- installation testing & commissioning of 11/0.433 KV, 100KVA 3-Phase Distribution Transformer (Dismantelled transformer to be re-erected) |
| 158 | Re- installation testing & commissioning of 11/0.433 KV, 250KVA 3-Phase Distribution Transformer (Dismantelled transformer to be re-erected) |
| 159 | Supply, Transportation, Erection of 9 Mtr Long ST Pole (410-SP33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. |
| 160 | Supply, Transportation, Erection of 9 Mtr Long PCC Pole (WL-300 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. |
| 161 | Supply, Transportation, Fabrication & Fixing of GI Channel Iron, GI Cross arm , GI Angle Iron Braces, Clamps etc duly fabricated, red oxide & aluminum paint coated including all necessary Nut & Bolts & Washers etc. |
| 162 | Supply, Installation, Testing & Commissioning of 11 KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type |
| 163 | Supply,Installation, Testing & Commissioning of 11 KV Horn Gap Fuse Set 3 Phase 200 A . |
| 164 | Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type |
| 165 | Providing of Earthing of substation --Excavation of earth pit of dia. 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GIStrip for neutral earthing of size 25 mm x 3 mm for connection of transformer body ,G.O Set &lightening arrestor as per IS 2629/85, GI nuts &bolts ,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 166 | Providing of Stone Pad 300mmx300mmx75mm |
| 167 | Providing & Fixing of Danger Plates with Clamps |
| 168 | Providing & Fixingof 11 KV Polymeric Composite Pin Insulator |
| 169 | Providing & Fixing of 11 KV Polymeric Composite Disc Insulator |
| 170 | Providing & Fixing of Anti Climbing device with Clamps |
| 171 | Fixingof 11 KV Polymeric Composite Pin Insulator (old one to be used) |
| 172 | Fixing of 11 KV Polymeric Composite Disc Insulator (old one to be used) |
| 173 | Providing & Fixing of PG Clamps |
| 174 | Transportation & Fixing of GI Channel Iron, Cross arms, Angle Iron Braces, Clamps etc duly fabricated, red oxide & aluminum paint coated including all necessary Nut & Bolts & Washers etc.(old one to be used) |
| 175 | Installation, Testing & Commissioning of 11 KV link Set (old one to be used) |
| 176 | Installation, Testing & Commissioning of 11 KV Horn Gap Fuse Set 3 Phase 200 A (old one to be used). |
| 177 | Fixing of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type (old one to be used) |
| 178 | Fixing of Galvanized Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm),nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia. GI stranded wire complete(old one to be used) Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 No Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information Compatibility Report for BOQe-NIT68.xls Run on 05-03-2024 17:31 If the workbook is saved in an earlier file format or opened in an earlier version of Microsoft Excel, the listed features will not be available. Significant loss of functionality # of occurrences Version Any effects on this object will be removed. Any text that overflows the boundaries of this graphic will appear truncated. 3.0 Excel 97-2003 Some cells in this workbook contain data validation rules, which refer to values on other worksheets. These rules won't be saved. 4.0 Excel 97-2003 Minor loss of fidelity Some cells or styles in this workbook contain formatting that is not supported by the selected file format. These formats will be converted to the closest format available. 4.0 Excel 97-2003 |
AI Tender Summary
Tender Timeline
Aug 04, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 25, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysAug 27, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender