Tender For Annual Sweeping And Cleaning Of Residential Area Of Koti Colony Hpp Tehri
Tender Value
26.47 Lakhs
Estimated cost
Bid Submission
25 Aug 2026
2 days left
EMD
52947
Bank guarantee accepted
Document Fee
1770
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Tehri Garhwal → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Annual Sweeping And Cleaning Of Residential Area Of Koti Colony Hpp Tehri
BOQ
| Sl. No. | Item Description |
| 1 | Sweeping & Cleaning |
| 2 | Sweeping & Cleaning of colony area and removal of sweeped materials i/c of all labour, material, T&P required for proper completion of the work. (Two times in one week) |
| 3 | Cleaning of drain small size (300x150mm) including disposal of sludge up to 1.5 m and lead up to 30.0 m etc. (Two times in one month) |
| 4 | Cleaning of drain big size (450x300mm) including disposal of sludge up to 1.5 m and lead up to 30.0 m etc.(Two times in one month) |
| 5 | Cleaning of Nala size (1.2x1.0x1.0 mtr) including disposal of sludge up to 1.5 m and lead up to 30.0 m etc. (One time in three month) |
| 6 | Cleaning of seewer line chamber i/c disposal of sludge out side from colony area. |
| 7 | Cleaning of Kitchen chamber (0.40x0.45x0.60) i/c disposal of sludge out side from colony area. |
| 8 | Collection of garbage from door to door for its disposal near mukari by mechanical transport. |
| 9 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 10 | Dismentling/Demolishing |
| 11 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix). |
| 12 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. |
| 13 | Earth work |
| 14 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5m, as directed by Engineer-in- Charge: All kinds of soil |
| 15 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 16 | Disposal |
| 17 | Disposing of the collected garbage at Mukari dumping point through mechanical transport including cost of loading & unloading. |
| 18 | Disposal of Building Rubbish lead upto 1.0 km by mechanical means. |
| 19 | Disposal of Earth lead upto 1.0 km by mechanical means. |
| 20 | Concrete Work |
| 21 | P/L in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 22 | P/L in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 23 | R.C.C Work |
| 24 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete |
| 25 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girder and cantilever etc. |
| 26 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 27 | P/L in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement RCC 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20mm nominal size derived from natural sources) All work up to plinth level. |
| 28 | Brick work |
| 29 | Brick work (230mm thik) with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in cement mortar 1:6 ( 1 cement : 6 coarse sand) |
| 30 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. In Cement mortar 1:4 (1 cement :4 coarse sand) |
| 31 | Plaster Work |
| 32 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) |
| 33 | Drainage Work |
| 34 | Supply and Fixing of PVC 160 mm dia pipe etc, i/c all cost of materials,labours,T&P etc. |
| 35 | Supply and Fixing of PVC 110 mm dia pipe etc, i/c all cost of materials,labours,T&P etc. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 04, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 25, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysAug 27, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender