Supply Of FIXING CLIP 72MM DIA, => Limited
Tender Overview
Project Description
Supply Of fixing clip 72mm dia, , fixing clip 72mm dia, as per drawing: lp63137 alt a, packing instruction: pi042 ver 3.0 (1) drawing no. icf/j&t/misc-2487 alt. `b? to be followed. (2) it should be ensured tha t item should not rub during transportation. the item should be packed with adequate strength. transit damage, if any, shall be at the cost of supplier. for underframes: bo th (1) & (2) to be followed as stated above. for other items except underframes: only ( 2) need to followed. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] , fixing clip, as per drawing: din3016,b1-70x25 w4, packing instruction: as per stan dard packing. it should be ensured that item should not rub during transportation. th e item should be packed with adequate strength. transit damage , if any , shall be at th e cost of supplier. [ warranty period: 30 months after the date of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | FIXING CLIP 72MM DIA, as per Drawing: LP63137 Alt 'a', Packing Instruction: PI042 VER 3.0 (1) DRAWING NO. ICF/J&T/MISC-2487 ALT. `B? TO BE FOLLOWED. (2) IT SHOULD BE ENSURED THA T ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQUATE STRENGTH. TRANSIT DAMAGE, IF ANY, SHALL BE AT THE COST OF SUPPLIER. FOR UNDERFRAMES: BO TH (1) & (2) TO BE FOLLOWED AS STATED ABOVE. FOR OTHER ITEMS EXCEPT UNDERFRAMES: ONLY ( 2) NEED TO FOLLOWED. [ Warranty Period: 30 Months after the date of delivery ] [Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitt ed: Max 8 lacs ] ] |
| 2 | FIXING CLIP, as per Drawing: DIN3016,B1-70X25 W4, Packing Instruction: AS PER STAN DARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. TH E ITEM SHOULD BE PACKED WITH ADEQUATE STRENGTH. TRANSIT DAMAGE , IF ANY , SHALL BE AT TH E COST OF SUPPLIER. [ Warranty Period: 30 Months after the date of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender