Tender For Design, Supply, Installation, Testing, Commissioning Of Medical Gas Pipeline System Mgps At Teaching Hospital, Government Medical College Doda
Tender Value
3.14 Crore
Estimated cost
Bid Submission
24 Aug 2026
14 days left
EMD
6.28 Lakhs
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Doda → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Design, Supply, Installation, Testing, Commissioning Of Medical Gas Pipeline System Mgps At Teaching Hospital, Government Medical College Doda
BOQ
| Sl. No. | Item Description |
| 1 | SECTION A – PLANT ROOM EQUIPMENTMedical O₂ Fully Automatic Changeover Manifold – Primary bank: 2×10 J-type cylinder racks (20 cylinders), SS pigtail connections, brass headers, microprocessor control panel with LED display (Green/Yellow/Red), auto-switchover, pressure gauges, NRVs, 2-stage regulation to 4.0 bar, alarm relay output. ISO 13485 certified |
| 2 | Medical O₂ Reserve Manifold – Secondary bank: 2×10 J-type cylinder racks (20 cylinders), semi-auto changeover, brass manifold header, pressure gauges. Same make as A.01 |
| 3 | O₂ Line pressure regulator – 2nd stage, 4.2→4.0 bar, dezincification-resistant (DR) brass body, DISS outlet connection. |
| 4 | O₂ Cylinder G-type (46.7 L, 150 bar) –, BIS/PESO certified. Initial fill for 40 cylinders (20 primary + 20 reserve) |
| 5 | O₂ Cylinder trolley – Non-sparking aluminium, 2-cylinder capacity. Indian Make |
| 6 | Medical Vacuum Plant – Packaged Triplex System (N+1+1): 3× oil-free dry-claw vacuum pumps, 750 L/min FAD each (Halward India / Technik Spirits); mounted on common SS base frame with 2×500 L MS receiver vessels (internal epoxy), bacterial inlet filters (0.01 µm HEPA, 3 No.), auto-sequencing control panel, vacuum gauges, isolation valves, NRVs, 3-phase motor starters, indication lamps. Complete factory-tested package. ISO 7396-1 compliant |
| 7 | Vacuum receiver vessel – additional 500 L, MS with epoxy lining, PRV, isolation valve, drain, pressure gauge. Indian fabrication |
| 8 | HEPA bacterial inlet filter replacement set (6-month interval, 3 filters per set) – 2 years supply |
| 9 | Medical Air Compressor – ELGi Equipments Ltd, Coimbatore (Indian Make): Oil-free reciprocating compressor, 500 L/min FAD, 4 kW motor, 7 bar max, complete with inlet pre-filter, aftercooler, moisture separator, flexible connections. ISO 8573-1 Class 0 certified. Supply 2 No. (N+1) |
| 10 | Medical Air Receiver Vessel – 300 L, MS with epoxy lining, PRV, isolation valve, pressure gauge, drain cock. |
| 11 | Medical Air Desiccant Dryer – Twin-tower, 500 L/min capacity, dew point −40°C, pressure dew point monitor, auto-regeneration. |
| 12 | Medical Air 5-Stage Filter Train – pre-filter (5 µm) + activated carbon filter + sterile final filter (0.01 µm) per air line, complete with housings, differential pressure gauges, drain valves. |
| 13 | Medical Air line pressure regulator – 5.5→4.5 bar, DR brass, DISS outlet |
| 14 | N₂O Fully Automatic Changeover Manifold – 2×8 cylinder banks (16 G-type cylinders total), microprocessor panel, auto-switchover at 20% reserve, alarm relay, 2-stage brass regulators to 4.0 bar, NRVs, safety PRVs, pigtail connections, stainless headers. |
| 15 | N₂O Reserve manifold – 5-cylinder semi-auto bank (manual emergency reserve) |
| 16 | N₂O G-type cylinders – initial fill, 20 No. (INOX Air Products / Bhuruka Gases) |
| 17 | AGSS Active Scavenging Unit – 2× centrifugal fans (N+1), 80 L/min per OT, differential pressure alarm module, flow meter, SS enclosure, Modbus output. Indian Make: Technik Spirits |
| 18 | AGSS 100 mm UPVC disposal duct with weather cowl to roof, including supports and fire-stop penetrations |
| 19 | Master Alarm Panel (MAP) – 10-zone, 24V DC, LCD touch-screen display, audible 90 dB + LED visual per zone, battery backup 8 hr (sealed VRLA), Modbus RTU interface for BMS, SS enclosure, wall-recessed mount. |
| 20 | Central Alarm Repeater Panel – Hospital Control Room, 10-zone mimic panel, RS-485 connection to MAP. |
| 21 | UPS – 3 kVA online double-conversion, 8-hr battery backup for all MGPS control panels and alarm systems. |
| 22 | Plant Room Dedicated DB – MCCB panel, motor starters, Earth Leakage CB, indication lamps, emergency stop mushroom buttons. Indian fabrication |
| 23 | O₂ Enrichment Fixed Detector – electrochemical cell, 25% v/v high alarm, audible+visual, relay output to MAP |
| 24 | N₂O Fixed Gas Detector – OT zone, infrared sensor, 25 ppm TWA alarm, relay output. |
| 25 | Plant room civil fitout – anti-static epoxy floor coating, ventilation louvres (mechanical 10 ACH), fire-rated door, gas-specific signage, bunded drainage sump, CCTV point |
| 26 | SECTION B – MEDICAL GRADE COPPER PIPEWORK (MEDIFLOW EN 13348)Medical Copper Pipe DN 50 – O₂ Main Distribution Header, Plant Room to Risers. MEDIFLOW EN 13348, degreased, silver-brazed, purged, colour-coded White. Installed with fittings, supports @1.8 m, ID bands |
| 27 | Medical Copper Pipe DN 63 – VAC Main Collection Header. Yellow colour-code. As above spec |
| 28 | Medical Copper Pipe DN 40 – AIR Main Distribution Header. Blue colour-code. As above spec |
| 29 | Medical Copper Pipe DN 25 – N₂O Header (OT zone only). French Blue colour-code. As above spec |
| 30 | Medical Copper Pipe DN 40 – O₂ Riser to LB1 (OT & ICU zone). Vertical riser in dedicated service duct |
| 31 | Medical Copper Pipe DN 40 – VAC Riser to LB1 |
| 32 | Medical Copper Pipe DN 32 – AIR Riser to LB1 |
| 33 | Medical Copper Pipe DN 20 – N₂O Riser to LB1 |
| 34 | Medical Copper Pipe DN 32 – O₂ Riser to LB2 (90-Bed Ward) |
| 35 | Medical Copper Pipe DN 40 – VAC Riser to LB2 |
| 36 | Medical Copper Pipe DN 32 – O₂ Riser to BF (Emergency + 31-Bed Ward) |
| 37 | Medical Copper Pipe DN 40 – VAC Riser to BF |
| 38 | Medical Copper Pipe DN 25 – AIR Riser to LB3 CSSD |
| 39 | Medical Copper Pipe DN 25 – O₂ Branch, LB1 ICU/CCU/PICU sub-zone |
| 40 | Medical Copper Pipe DN 20 – O₂ Branch per Ward (×7 wards, LB2) |
| 41 | Medical Copper Pipe DN 20 – O₂ Branch, BF 31-Bed Ward |
| 42 | Medical Copper Pipe DN 25 – O₂ Branch, BF Emergency/Triage/Obs zone |
| 43 | Medical Copper Pipe DN 15/12 ALONG WITH LINE VALVE – O₂ Drop pipes to all bedhead panels/pendants (all floors) |
| 44 | Medical Copper Pipe DN 32 – VAC Branch, LB1 ICU/CCU/PICU sub-zone |
| 45 | Medical Copper Pipe DN 20 – VAC Branch per Ward (×7 wards, LB2) |
| 46 | Medical Copper Pipe DN 25 – VAC Branch, BF Emergency zone |
| 47 | Medical Copper Pipe DN 20 – VAC Branch, BF 31-Bed Ward |
| 48 | Medical Copper Pipe DN 15/12 ALONG WITH LINE VALVE – VAC Drop pipes to all bedhead panels/pendants (all floors) |
| 49 | Medical Copper Pipe DN 25 – AIR Branch, LB1 OT pendant drops |
| 50 | Medical Copper Pipe DN 25 – AIR Branch, LB3 CSSD distribution |
| 51 | Medical Copper Pipe DN 15/12 ALONG WITH LINE VALVE – AIR Drop pipes to OT pendants and CSSD outlets |
| 52 | Medical Copper Pipe DN 20 – N₂O Branch distribution, LB1 OT zone |
| 53 | Medical Copper Pipe DN 15/12 ALONG WITH LINE VALVE – N₂O Drop pipes to OT pendants (3 OTs) |
| 54 | AGSS 28 mm copper collection pipe, OT zone – scavenging header to AGSS unit |
| 55 | Pipe colour-identification banding – PVC sleeves + engraved label plates per BS 1710 for all pipe sizes and gases, complete set installed |
| 56 | Pipe support system – GI Unistrut channel, trapeze hangers, threaded rod M10/M12, spring washers. Complete supply and installation |
| 57 | Fire-stop collar / intumescent mastic sealant – at all MGPS pipe penetrations through fire-rated walls and floor slabs. Estimated 120 locations × ₹2,800 avg |
| 58 | Pneumatic pressure test (1.5× WP, 24 hr) + leak test on all pipeline runs, by Authorised Person (Medical Gas) |
| 59 | Pipeline degreasing, nitrogen purging, internal cleanliness certificate (ISO 8573-1), all pipeline runs |
| 60 | SECTION C – ZONE VALVE BOXESZone Valve Box (ZVB) – 4-gas service (O₂/VAC/AIR/N₂O): recessed MS powder-coated enclosure, 4× quarter-turn DR brass ball valves, pressure gauge + DISS test point per gas, hinged clear acrylic cover with tamper seal, colour-coded handles, engraved SS labels per ISO 7396-1. Indian Make: JK Engineering / Medical Air Product. For ZVB-01 (LB1 OT Entry) and ZVB-12 per-floor riser sets (4 sets) |
| 61 | Zone Valve Box (ZVB) – 3-gas service (O₂/VAC/AIR), as above spec. For ZVB-02 (ICU), ZVB-06 (Treatment Room), ZVB-07 (CSSD), ZVB-08 (Emergency entry) |
| 62 | Zone Valve Box (ZVB) – 2-gas service (O₂/VAC), as above spec. For ZVB-03, 04, 05 (Ward clusters), ZVB-09 (Resus), ZVB-10 (Triage/Obs), ZVB-11 (31-Bed Ward) |
| 63 | ZVB installation, connection to pipeline, pressure test, labelling, commissioning check – all 16 ZVBs |
| 64 | SECTION D – TERMINAL UNITS, OT PENDANTS & BEDHEAD PANELSOT Ceiling Supply Pendant – Double-arm (800 mm reach each), with 4× O₂ NIST outlets, 3× VAC NIST, 2× AIR NIST, 2× N₂O NIST, 2× AGSS active scavenging outlets, 6× 15A power sockets, 2× data RJ-45, gas-tight cable entry, SS powder-coated finish, 5-year warranty. |
| 65 | AGSS Active Terminal Interface Unit – wall-mounted per OT, 50 L/min capacity, integral flow indicator, male NIST AGSS connection. Indian Make: Technik Spirits India |
| 66 | ICU/CCU/PICU Bedhead Service Unit (BSU) – wall/ceiling-mounted aluminium extrusion body, per bed: 2× O₂ NIST, 2× VAC NIST, 1× AIR NIST, 4× 15A power sockets, 2× 5A sockets, 1× data port, nurse call module, integral LED examination light, anodised aluminium fascia. For ICU (6 beds) + CCU (5 beds) + PICU (5 beds) = 16 beds |
| 67 | Bedhead Panel – Pre-Op / Post-Op Ward: wall-mounted MS powder-coated, 1× O₂ NIST + 1× VAC NIST per bed, 2× 15A sockets, nurse call provision. For 5+5 = 10 beds |
| 68 | Ward Bedhead Panel (BHPU) – wall-mounted MS powder-coated unit, 1× O₂ NIST + 1× VAC NIST per bed, reading light provision, SS gas outlet labels. ISO 7396-1. For LB2 all 7 wards = 90 beds |
| 69 | Ward Bedhead Panel (BHPU) – as D.05 above. For BF 31-Bed Ward |
| 70 | Emergency Resuscitation Bay Ceiling Pendant – fixed single-arm, 2× O₂ + 2× VAC + 1× AIR NIST, 4× 15A sockets, SS finish. For 6 resus bays |
| 71 | Emergency Standard Bedhead Panel – wall-mounted, 2× O₂ + 2× VAC NIST, 2× 15A sockets. . For 14 standard emergency beds |
| 72 | Triage Area Bedhead Panel – 1× O₂ + 1× VAC NIST, 2× sockets. For 10 triage beds |
| 73 | Observation Ward Bedhead Panel – 1× O₂ + 1× VAC NIST. For 10 obs beds |
| 74 | Isolated Room Outlet Panel – 2× O₂ + 2× VAC + 1× AIR NIST, 4× sockets. For 2 rooms BF |
| 75 | Treatment/Examination Room outlet panel – O₂ + VAC + AIR NIST, 2× sockets. LB2 |
| 76 | CSSD outlet panel – 2× AIR + 2× VAC NIST (autoclave + drying supply). LB3 |
| 77 | Lecture Theatre / Demo Room – O₂ NIST wall outlet box (2 points) with isolation valve. LB3 |
| 78 | Corridor emergency O₂ outlet wall boxes – NIST single-point, SS bezel, all floors (estimated 24 No.) |
| 79 | Nurses Station O₂ emergency outlet point – all nursing stations (6 No.) |
| 80 | Spare capped stub-out outlets – O₂ and VAC NIST capped points with blanking caps and test points, installed in wards/OT/ICU for +30% future expansion (80 No. approx) |
| 81 | SECTION E – AREA ALARM PANELS & MONITORING SYSTEMArea Alarm Panel (AAP) – 4-gas (O₂/VAC/AIR/N₂O), 24V DC, LED display per gas, audible 90 dB buzzer, surface-mount SS enclosure, Modbus output, pre-wired with DISS sensor connections. Indian Make: JK Engineering Works / Mediline Engineers. For AZ-02 LB1 OT – 2 panels (outside OT + NS) |
| 82 | Area Alarm Panel (AAP) – 2-gas (O₂/VAC), as above spec. For AZ-03 ICU, AZ-04 LB2 North Wards, AZ-05 LB2 South Wards, AZ-06 CSSD, AZ-07 Emergency, AZ-08 31-Bed, AZ-09 Obs = 7 panels |
| 83 | Alarm system signal cable – twisted-shielded pair (0.75 mm²), 24V, in conduit/surface trunking. Complete for all 10 zones including MAP and central repeater. Estimated 650 m cable + conduit/trunking lump sum |
| 84 | Pressure transducer/transmitter – 4–20 mA output, SS 316 wetted, 0–10 bar range. Installed at each alarm zone monitored point. Estimated 32 points |
| 85 | Dial pressure gauges – glycerine-filled, 63 mm dia, SS Bourdon tube. At each ZVB downstream and manifold bank (estimated 40 No.) |
| 86 | SECTION F – CYLINDER STORAGE & SAFETYO₂ Cylinder Storage Bay – external brick/block masonry enclosure (2.5 m × 5 m), cylinder chain racks for 100 cylinders (2 rows of 50), concrete pad with drainage, ventilation louvres, UV-stable yellow signage, chain-link fencing + gate, hazard warning lamp. Civil + fitout lump sum |
| 87 | N₂O Cylinder Storage Room – internal ventilated room modification, 30-cylinder capacity, explosion-proof LED luminaire, PRV vent pipe to external, segregation wall from O₂ room, gas-specific signage |
| 88 | Cylinder weight-based monitoring system – load cell per bank, digital display, low-level SMS/relay alarm, interfaces to MAP. |
| 89 | Safety equipment – O₂ enrichment detector (plant room, already in A.23). N₂O leak detector additional (cylinder store). |
| 90 | SECTION G – CIVIL & STRUCTURAL WORKSPlant room additional civil works – RCC equipment pads for compressors and vacuum plant, anti-vibration mounts, epoxy floor coating (20 m²), drainage bund and sump, additional ventilation (over and above architectural provision). Works on existing shell |
| 91 | Service duct pipe routing – breaking and chasing walls/slabs, MS pipe sleeves with GI flanges, making good in cement plaster (estimated 250 penetration locations) |
| 92 | False ceiling access panels – 600×600 mm GI frame with removable panel at each ZVB, junction box, and pipe service point. Estimated 80 locations |
| 93 | Painting – colour-coded identification bands on all exposed pipes and walls at valve locations, direction arrows, zone labels per BS 1710 |
| 94 | SECTION H – TESTING, COMMISSIONING & TRAININGStaff training programme – 2-day on-site training for biomedical engineers, nursing staff (OT + ICU + Ward + Emergency), and maintenance team. Covers: system operation, alarm response, emergency procedures, cylinder management, ZVB use. Training manual included Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 03, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 24, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysAug 25, 2026
Bid Opening Date
Technical bids will be opened and evaluated.