Power Boards / Undertakings / PSU Closing in 2 days TDR #56807959

Tender For Erection And Installation Of 63Mva T/F Alongwith Strengthening Of 132Kv Bus Bar From Single Moose To Twin Moose And Splitting Of 33 Kv Bus At 132Kv Sub-Station Khaga, Under Electy. Trans. Division-Fatehpur

Issued by Boards / Undertakings / PSU · Fatehpur, Uttar Pradesh
Tender Value
21.72 Lakhs
Estimated cost
Bid Submission
18 Aug 2026
2 days left
EMD
26000
Bank guarantee accepted
Document Fee
1770
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Fatehpur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Erection And Installation Of 63Mva T/F Alongwith Strengthening Of 132Kv Bus Bar From Single Moose To Twin Moose And Splitting Of 33 Kv Bus At 132Kv Sub-Station Khaga, Under Electy. Trans. Division-Fatehpur

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 13-Aug-2026 05-ETC-I(P)/ 2026-2027 Date 18-Aug-2026

BOQ

Name of Work:- Erection and installation of 63MVA T/F alongwith strengthening of 132KV Bus Bar from Single Moose to Twin Moose and splitting of 33 KV Bus at 132KV Sub-Station Khaga, under Electy. Trans. Division-Fatehpur
Sl. No. Item Description
1Supply of Material for erection and installation of 63MVA T/F alongwith strengthening of 132KV Bus Bar from Single Moose to Twin Moose and splitting of 33 KV Bus at 132KV Sub-Station Khaga, under Electy. Trans. Division-Fatehpur.
2132KV Bolted type Double tension fitting for twin moose bundle ACSR conductor with turn buckle.
3132KV Bus Isolator clamp suitable for Twin Moose Panther conductor.
4132KV CT clamp made suitable for twin moose and Panther conductor.
5Rigid Spacers for twin ACSR Moose Conductor.
6132 KV CB clamp made of LM-6 aluminium alloy suitable for twin Moose conductor.
7Supply of 75x10mm MS Flat.
8Supply of 50x6mm MS Flat.
9Supply of 25x6mm MS Flat.
10Portable AFP mechanical foam type fire Extinguisher complete with initial charge hose pipe and all other accessories and fitting as per IS 1024 trolly mounted 45/50 Litr capacity.
11Manual Carbon dioxide fire Extinguisher capacity 9 Kg
12G.I. perforated cable tray (225/250mm)
13G.I. perforated cable tray (75mm)
14PG Clamp Moose-Panther
15PG Clamp Panther-Panther
16PG Clamp Moose-Moose
17Copper Bond
18Phase Plate in set of Red Blue & Yellow
19LED Flood Light Luminaries type 150 watt
2033 KV Post Insulator
2140 mm dia MS Electrode of 3 Meter length
22Single Tension fitting for Panther Conductor
23Single Tension fitting for Moose Conductor
24WORK FOR INSTALLATION OF 63MVA TRANSFORMER AND CONSTRUCTION OF ASSOCIATED BAY
25Safely shifting of main tank of 132/33KV, 63MVA Transfromer from unloading place to existing T/F plinth by dragging distance about 20 Mtrs including turning of T/F if required including handling & shifting of all accessories of 63 MVA T/F such as radiator ,conservator tank,bushing,cooling fan,Marchalling box,motor drive mechanism of RTCC panel,oil pipe line,T/F oil drum and all associated materials from store/unloading point to erection site as per requirement, including men, t&p all other work required to complete the job satisfactorily.
26AAdditional shfting of 25 mtr @ 5Mtr/ job
27Complete erection of 63MVA Transformer by erection of radiators, conservator tank, all bushing with its turrents, connecting pipe lines, cooling fan, motor drive mechanism of tap changer, RTCC Panel and associated oil pipeline etc. to complete the job satisfactorily, including first filling of oil and other associated work to complete the job satisfactorily. Crane, t&p shall be provided by contractor, all assistance in getting the transformer successfully commisoned by providing qualifed manpower till commissoning.All men, extra material(if required any) & T&P will be provided by contracor without any extra cost.
28Centrifuging of complete transformer oil of 63MVA Transformer in transformer tank or oil tanker by connecting pipe, circulating the transformer oil through centrifusing machine (to be provided by the contractor) and taking the BDV value of the oil perodically till the required value is achieved as per direction of superviser engineer at 132KV S/S Khaga Fatehpur. All t&p, labour, centrifusing machine will be provided by the contractor at his own cost.
29Prepairing cable schedule and laying ,dressing,binding and termination of cable including fixing of cable tray support structure and termination of cable marking the top and M.S ferruling as per schedule and interconnection with T/F to C&R panel,RTCC Panel,cooling fans,marshalling box,drive machanism etc and as per site requirement for satisfactorily completion of Job.
30Laying of MS Round bar 40/36 mm in 5 mtr interwell on X-Y axis by digging of soil below 0.75 mtr ground level including piercing of 3 meter electrode and proper connect with X-Y axis earthmat and then proper backfilling & leveling etc.
31Earthing of 63MVA Transformer main body at two point using MS flat of size 75x10mm and 50x6mm connected with marshalling box and drive mechanism, OLTC panel, providing the wheel stopper with MS flat as per site requirment as per direction of service Engineer/site Engineer.(M/S Flat will be provided by Department.)
32Making Delta earthing of 63 MVA T/F HV/LV neutral bushing by 3 meter,40/36 mm MS round bar and 75X10 mm, M.S. flat including cutting,bending & proper welding and connect with HV/LV neutral bushing with double M.S flat 75x10 mm as drawing .The job also include Execavation of soil for connecting main earth mat (X and Y axis) co ordination with delta earthing and levelling of soil after completion of work.
33Painting of various M.S flat by one coat of Red oxide primer and two coat bus green paint of Nerolac/Burger/Asian make including painting of joint below ground by best quality of non corrasive paint.
34Fabrication of Radiator guards made of M.S angle frame(inner angle of size35x35x4mm,outer of angle of size 50x50x6 mm supporting leg of size 75x75x10 mm) fitted with steel wire mesh(20x20mm,8SWG) for the front and top of the radiator of L.T side of 63 MVA T/F at 132 KV substation Khaga as per the site requirement including the cost of labour,T&P and material.
35Fixing of New fabricated radiator guards into the pit of size 2x2x2 feet and ground on earth by 1:2:4 C.C mixture and making the plinth of 1x1x1 feet above ground level along with plastering including the cost of labour,T&P and material.
36Rubbing and cleaning of radiator guard by sand paper,removing the dust and rust providing and applying one coat of red oxide primer and then after two coat of synthetic enamel paint of Nerolac/Burger/Asian make including painting of joint below ground by best quality of non corrasive paint.
37Providing jumper of Moose conductor from 132 KV busbar/Jack bus to various equipment like HV bushing,132 KV isolator,132KV TI,132KV CT,132KV CB,132KV LA ,132 KV Bus PT and other equipment as per site requirement including cutting ,bending and tightening of conductor with connector and complete all job satisfactorily.All men, (if required any) & T&P will be provided by contracor without any extra cost.
38Providing jumper of Double Moose conductor from T/F LV bushing to various equipment like 33 KV Bus isolator,33KV CT,33KV CB,33KV LA ,33 KV Bus Bar and other equipment as per site requirement including cutting ,bending and tightening of conductor with connector and complete all job satisfactorily.All men, (if required any) & T&P will be provided by contracor without any extra cost.
39Testing of 63MVA T/F oil for BDV, PPM, DGA from NABL/CPRI approved lab. Testing shall be done two times. Once at the time of charging & commissioning of transfromer and 2nd time after 15days of charging of transformer.
40SFRA and WRM Test of 63MVA TF including tan-delta of all HV / LV bushings by arranging appropriate equipment at erection site of 132KV S/S Khaga. Testing kit, Labour& T&P will be provided by contractor.
41Safe transportation of 20/50KL oil tank from any sub station wherever available within 150 Kms distance from 132KV S/S Khaga. Work includes shifting and loading of Oil Tank with the help of Hydra/ Crane, safe transportation and unloading of it at working site at 132KV S/S Khaga with the help of Hydra/Crane.
42Erection of following new equipment as per instruction manual of various equipments including its shifting from the store to the side job including other associated work to complete the job satisfactorily.
43145 KV Current Transformer with junction Box
44145 KV Circuit Breaker with Structure
45120 KV LA
46145 KV BSI & TI
4730 KV LA
4833 KV CT with JB
4933 KV VCB
5033 KV BSI
51Transformer C&R Panel
52RTCC Panel
53Apex Metering Panel
54Sorting, counting and shitting of various type Galv. S/S Structure from stacking place to loading place and loading on private vehicle (to be provided by contractor) at EFU Naini Prayagraj to 132 KV S/S Khaga distance approx 130 KM. Unloading and stacking at proper place as per instruction of JE/SDO including all cost of men, materials and T&P for complete the job.
55Erection of Galvanised S/S Structure (ATMS-02, BTM-2 AXM-3, CCM-02, CGM-01, BBL-02, ABL-01, BTI-01, BCT-6, ALP-14, YPM-04, YMM-04 etc) at 132 KV S/S Khaga. The job includes shifting of materials from store to site then erection of structure as per drawing using proper size of nut bolts and washer which will be provided by UPPTCL. Matching the hole cutting,matching of member includind fabrication if required shall be done by contractor for satisfactorily completion of work
56Laying of following size of unarmoured control cable from C&R panel,RTCC Panel to Transformer Marchalling box,D/M box,CT,PTand CT/PT secondary to JB,Isolator etc,as per site requirement also prepairing cable schedule and dressing.Binding and termination of cable including fixing of cable tray support structure and termination of cable marking the top and its ferruling as per schedule and inter connection with C&R panel,CT,PT,,Isolator etc,its saddling proper distance with AI. saddle of size of 25X3mm including carriage of cable drum from the store to the laying site and other associated work to complete to job satisfactorily.
572CX2.5mm2
584CX2.5mm2
596CX2.5mm2
6010CX2.5mm2
61Delta earthing of 120KV HV Side Surge Arrester & 30KV LV Side Surge Arrester Making of Shielding Mesh for each 3nos. 132KV LA & 3 Nos 33KV LA by Fabrication of 06nos 3 Meter Long (For 132/33KV Side LA) Electrode with 40 mm dia. M.S. Rod having 150 mm Long Conical Shape and then its Piercing Vertically in the Ground with top 500 mm below Ground Level, its Welding with 75x10 mm size M.S. Flat for Making of Shielding Mesh for LAs and Finally, Connecting the Shielding with Main Earth Mat at 2 Places and finally Painting with Black Anti-Corrosive Paint, with due Digging of Earth / Trench, its Back Filling. Two no risers of 75x10mm MS Flat will be welded with exixting main earth mat to Auxiliary structure, one separate riser will be taken from the laid earth mat to corresponding LA through surge counter for making of proper mesh. The above also include painting of earthing strip with one cote of red oxide and two cote of bus green synthetic enamled paint.
62Earthing of all structure equipment & cable trench by digging of soil as per site reqiurment with X-Y axis MS round including cutting ,bending,laying approx-0.750 mm below the ground level and backfilling of excavated earth along with raising and other associated works by M.S flat 75x10 mm/Flat 50x6 mm/Flat 25x6 mm
63Painting of various M.S flat by one coat of Red oxide primer and two coat bus green paint of Nerolac/Burger/Asian make including painting of joint below ground by best quality of non corrasive paint.
64String of new jack Bus Bar of Panther conductoe Span 24M each with Single Panther conductor and tightening with gantry along with hoisting, clamping and fixing of all hardingle ware and fitting including all other associated word to complete the job satisfactorily.(1 job=one phase per section of bus bar)
65Spliting of 33 KV Main Bus
66Dismantling of existing 33KV Main Bus Bar of Twin ACSR Moose Conductors for spliting of main bus including opening of Jumpers from 33 KV all connected feeders, De-hoisting of Disc Insulator with Bolted type Tension Fitting from Substation Gantry at 132KV Sub Station Khaga alongwith Shifting of the old Conductors, Tension Fittings, P.G. Clamps etc. from Switchyard to Stores at the Sub Station. (1 Job for 1 Phase of each Section of the Main Bus Bar)
67Stringing of 33KV Bus Bar after cutting it 24 mtr length then fixing of double tension fitting of Twin Moose conductor making Bus bar proper for new erectetd 33 KV Gantry including replacement of damaged Bus bar conductor and Jumpers as per requirement in all feeder then proper tightening with clamp etc.including shifting of materials from S/S store to site The job includes of cutting of ACSR moose conductor of suitable size and stringing with the help of tension gun fitting and disc insulator all cost of men and T&P for completion of above work.(1 Job for one Phase of each Section of the Main Bus Bar)
68Providind Jumper of single/double moose conductor from 33 KV Main Bus to 33 KV bus isolator of various feeders & other equipment as per site requirement including ,cutting,bending,proper tightening with clamp within limited shutdown period,required materials carriage from store to site & extra waste materials proper stored in substation store.
69Carriage of miscleanious materials from different substation to 132 KV substation Kaga Fatehpur including loading,unloading and shifting of material(Distance approx 100 Km)
70REPLACEMENT OF 132KV MAIN BUS BAR FROM SINGLE TO TWIN MOOSE CONDUCTOR
71Dismantling of existing 132 KV Main Bus of single ACSR Moose conductor (in 3 Sections) including de-hoisting of disc insulator strings, tension fittings, opening of all bay jumpers, opening of section isolator jumpers etc and proper shifting of these into store alongwith carriage of conductor/materials from store of 132 KV sub station Khaga to erection site (1 job=one phase per section of bus bar)
72Stringing of 132KV 3 phase Main Bus of twin ACSR Moose conductor (in 3 Sections) including hoisting of disc insulator strings, tension fittings, connecting of all bay jumpers to bus bar, connecting of section isolator by twin moose conductor/Jumpering between two sections etc along with shifting of conductor/materials (to be provided by department) from store of 132 KV sub station Khaga to erection site (1 job=one phase per section of bus bar)
73Fixing of rigid spacers at an equal interval between both moose conductors of twin bus bar.
74Fixing and tightening of moose conductor jumpers by cutting, binding,clamping of conductor with suitable spacer/PG clamps from 132 KV main bus to various bus isolator, section isolator, Breaker Etc.
75Providing and fixing of 160watt LED light make syska / Philips/ Bajaj etc. along with MS bend pipe and fitting clamp at 132KV S/S Khaga. The job includes fixing of above light fitting with help of MS bend pipe and clamp then jointing with single phase supply after laying cable and complete with all respect.
76Providing and fixing bay name display board of M.S sheet 16 gauge size 400x250 mm with the help of MS pipe having inner frame approx.size 2\\"x1\\" with welding of two legs of MS angle of 3 feet and writing name of bay black colour after painting sheet with one coat of Red primer & two coat of Yellow colour both side of display board including Digging pit size 2x2x3 feet and grouting above board with 1:2:4 cement, ballast, sand ratio and making plinth of size 1x2 feet from from graund level & all associated work to complete the job.
77Providinlectingg and fixing of name plate made of 3 mm aluminium composite panel of size 300x200 mm to be covered with 3 M hip retro reflecting sheeting with detail of component made by the computer typing in the sheet and fixing it on structure with the helf of nut & bolt.All T&P ,labour,nut bolt shall be provided by the contractor
78Providing and fixing of U.V. fabric substation single line diagram having M.S. frame of 1800X150Cubmm frame fitted with 50Watt LED Made of Bajaj/Syska/Philips and complete writing coverd back with A1 sheet to be designed by computer and printing of best quality and grouting four no 50x50x5 Cubmm angle support on both side to be installed in control room and making all electrical connection and printing of M.S. angle including all cost of labour, T&P and materials ar 132/33 KV S/S Khaga under ETD Fatehpur
79Providing and fixing of Glow sign board of size sign 1800X150Cubmm made of Poly carbon sheet having aluminium frame fitted with 50Watt LED Made of Bajaj/Syska/Philips and complete writing coverd back with A1 sheet to be designed by computer and printing of best quality and grouting four no 50x50x5 Cubmm angle support on both side at roof of control room and making all electrical connection and printing of M.S. angle including all cost of labour, T&P and materials ar 132/33 KV S/S Khaga under ETD Fatehpur Uttar Pradesh Power Transmission Corporation Limited 132/33 KV Substation Khaga [ Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56807959
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 21.72 Lakhs
LAST DATE 18-08-2026
Authority
Authority Name Uttar Pradesh Power Transmission Corporation Limited
Work Description Tender for Erection And Installation Of 63Mva T/F Alongwith Strengthening Of 132Kv Bus Bar From Single Moose To Twin Moose And Splitting Of 33 Kv Bus At 132Kv Sub-Station Khaga, Under Electy. Trans. Division-Fatehpur
Basic Detail
Tender No 05-ETC-I(P)/ 2026-2027
Bidding Type Tender
Location
City Fatehpur
State Uttar Pradesh
Key Dates
Publish Date 13 Aug 2026
Submission Date 18 Aug 2026
Open Date 19 Aug 2026
Finance
Tender Value 21.72 Lakhs
Tender Fee 1770
EMD 26000
Exemption Not Available
Document List
268cf9d6-2163-4b59-8b34-79be5c96d614.html
BOQ_2206386.xls
TD.pdf
Tendernotice_1 (29).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 13, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 18, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 2 days
Aug 18, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Aug 19, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 3 days

Tender Documents

Download All (ZIP) ↓
html

268cf9d6-2163-4b59-8b34-79be5c96d614.html

xls

BOQ_2206386.xls

pdf

TD.pdf

pdf

Tendernotice_1 (29).pdf