Railways Government Departments Closing in 7 days TDR #56807667

Supply Of Supply, Installation and commissioning of Rotary Screw Electrical Driven Air compressor - 500 CFM, 10 Kg/cm2 having as per attached specifications.

Issued by Government Departments · , Rajasthan
Tender Value
Ref. Documents
Estimated cost
Bid Submission
31 Aug 2026
7 days left
EMD
4.07 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
→ Rajasthan
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Supply Of supply, installation and commissioning of rotary screw electrical driven air compressor - 500 cfm, 10 kg/cm2 having as per attached specifications. , the scope of supply shall include design, manufacture & supply of electrically driven rotary scr ew, microprocessor based stationary air compressor as per parameters in schedule-i with air-cooled oil coole r, air-cooled after cooler and moisture separator/ dehumidifier along with automatic drainage trap as well as manual drainage trap on turnkey basis in compliance with para 4.1.1 to 4.1.4 (if required). it includes all the concomitant accessories/ equipments as detailed in para 4.2 of section iv of specification appended with ten der and other concomitant accessories/ equipment, which the manufacturer considers essential to make the machine fully operational, when installed and commissioned. it shall also include installation and commissio ning of related equipment, training of personnel in operation and maintenance of machine and supply of tec hnical documentation. for basic design features & general characteristics refer to section v. the preventive maintenance of electric air compressors as per clause 16 of section-v shall be in the scope of supplier. ] , the power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 y ears at full rated capacity as per clause 2.2 ] , optional accessories:- a set of optional accessories also includes as per para 4.3 of section iv of specification appended with the tender. it shall also includes spares with breakup of individual items as p er clause 5 and clause 13 of section v of specification appended with tender. it shall also include consumabl es as per clause 6 of section v of specification appended with tender. bidders are required to attach the pric e break up of these accessories individually in pdf file along with submitted bid. ] , the scope of supply shall include design, manufacture & supply of electrically driven rotary scr ew, microprocessor based stationary air compressor as per parameters in schedule-i with air-cooled oil coole r, air-cooled after cooler and moisture separator/ dehumidifier along with automatic drainage trap as well as manual drainage trap on turnkey basis in compliance with para 4.1.1 to 4.1.4 (if required). it includes all the concomitant accessories/ equipments as detailed in para 4.2 of section iv of specification appended with ten der and other concomitant accessories/ equipment, which the manufacturer considers essential to make the machine fully operational, when installed and commissioned. it shall also include installation and commissio ning of related equipment, training of personnel in operation and maintenance of machine and supply of tec hnical documentation. for basic design features & general characteristics refer to section v. the preventive maintenance of electric air compressors as per clause 16 of section-v shall be in the scope of supplier. ] , the power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 y ears at full rated capacity as per clause 2.2 ] , optional accessories:- a set of optional accessories also includes as per para 4.3 of section iv of specification appended with the tender. it shall also includes spares with breakup of individual items as p er clause 5 and clause 13 of section v of specification appended with tender. it shall also include consumabl es as per clause 6 of section v of specification appended with tender. bidders are required to attach the pric e break up of these accessories optional accessories:- a set of optional accessories also includes as per par a 4.3 of section iv of specification appended with the tender. it shall also includes spares with breakup of in dividual items as per clause 5 and clause 13 of section v of specification appended with tender. it shall also i nclude consumables as per clause 6 of section v of specification appended with tender. bidders are required to attach the price break up of these accessories individually in pdf file along with submitted bid. ] , the scope of supply shall include design, manufacture & supply of electrically driven rotary scr ew, microprocessor based stationary air compressor as per parameters in schedule-i with air-cooled oil coole r, air-cooled after cooler and moisture separator/ dehumidifier along with automatic drainage trap as well as manual drainage trap on turnkey basis in compliance with para 4.1.1 to 4.1.4 (if required). it includes all the concomitant accessories/ equipments as detailed in para 4.2 of section iv of specification appended with ten der and other concomitant accessories/ equipment, which the manufacturer considers essential to make the machine fully operational, when installed and commissioned. it shall also include installation and commissio ning of related equipment, training of personnel in operation and maintenance of machine and supply of tec hnical documentation. for basic design features & general characteristics refer to section v. the preventive maintenance of electric air compressors as per clause 16 of section-v shall be in the scope of supplier. ] , the power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 y ears at full rated capacity as per clause 2.2 ] , optional accessories:- a set of optional accessories also includes as per para 4.3 of section iv of specification appended with the tender. it shall also includes spares with breakup of individual items as p er clause 5 and clause 13 of section v of specification appended with tender. it shall also include consumabl es as per clause 6 of section v of specification appended with tender. bidders are required to attach the pric e break up of these accessories individually in pdf file along with submitted bid. ] , the scope of supply shall include design, manufacture & supply of electrically driven rotary scr ew, microprocessor based stationary air compressor as per parameters in schedule-i with air-cooled oil coole r, air-cooled after cooler and moisture separator/ dehumidifier along with automatic drainage trap as well as manual drainage trap on turnkey basis in compliance with para 4.1.1 to 4.1.4 (if required). it includes all the concomitant accessories/ equipments as detailed in para 4.2 of section iv of specification appended with ten der and other concomitant accessories/ equipment, which the manufacturer considers essential to make the machine fully operational, when installed and commissioned. it shall also include installation and commissio ning of related equipment, training of personnel in operation and maintenance of machine and supply of tec hnical documentation. for basic design features & general characteristics refer to section v. the preventive maintenance of electric air compressors as per clause 16 of section-v shall be in the scope of supplier. ] , the power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 y ears at full rated capacity as per clause 2.2 ] , optional accessories:- a set of optional accessories also includes as per para 4.3 of section iv of specification appended with the tender. it shall also includes spares with breakup of individual items as p er clause 5 and clause 13 of section v of specification appended with tender. it shall also include consumabl es as per clause 6 of section v of specification appended with tender. bidders are required to attach the pric e break up of these accessories individually in pdf file along with submitted bid. ]

BOQ

Sl. No.Item Description
1The scope of supply shall include Design, manufacture & supply of electrically driven rotary scr ew, microprocessor based stationary air compressor as per parameters in Schedule-I with air-cooled oil coole r, air-cooled after cooler and moisture separator/ dehumidifier along with automatic drainage trap as well as manual drainage trap on turnkey basis in compliance with Para 4.1.1 to 4.1.4 (if required). It includes all the concomitant accessories/ equipments as detailed in Para 4.2 of section IV of specification appended with ten der and other concomitant accessories/ equipment, which the manufacturer considers essential to make the machine fully operational, when installed and commissioned. It shall also include installation and commissio ning of related equipment, training of personnel in operation and maintenance of machine and supply of tec hnical documentation. For basic design features & general characteristics refer to Section V. The Preventive Maintenance of Electric Air Compressors as per clause 16 of Section-V shall be in the scope of supplier. ]
2The power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 y ears at full rated capacity as per clause 2.2 ]
3Optional Accessories:- A Set of Optional Accessories also includes as per para 4.3 of Section IV of Specification appended with the tender. It shall also includes Spares with breakup of individual items as p er clause 5 and clause 13 of section V of specification appended with tender. It shall also include Consumabl es as per clause 6 of section V of specification appended with tender. Bidders are required to attach the pric e break up of these accessories individually in PDF file along with submitted bid. ]
4The scope of supply shall include Design, manufacture & supply of electrically driven rotary scr ew, microprocessor based stationary air compressor as per parameters in Schedule-I with air-cooled oil coole r, air-cooled after cooler and moisture separator/ dehumidifier along with automatic drainage trap as well as manual drainage trap on turnkey basis in compliance with Para 4.1.1 to 4.1.4 (if required). It includes all the concomitant accessories/ equipments as detailed in Para 4.2 of section IV of specification appended with ten der and other concomitant accessories/ equipment, which the manufacturer considers essential to make the machine fully operational, when installed and commissioned. It shall also include installation and commissio ning of related equipment, training of personnel in operation and maintenance of machine and supply of tec hnical documentation. For basic design features & general characteristics refer to Section V. The Preventive Maintenance of Electric Air Compressors as per clause 16 of Section-V shall be in the scope of supplier. ]
5The power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 y ears at full rated capacity as per clause 2.2 ]
6Optional Accessories:- A Set of Optional Accessories also includes as per para 4.3 of Section IV of Specification appended with the tender. It shall also includes Spares with breakup of individual items as p er clause 5 and clause 13 of section V of specification appended with tender. It shall also include Consumabl es as per clause 6 of section V of specification appended with tender. Bidders are required to attach the pric e break up of these accessories Optional Accessories:- A Set of Optional Accessories also includes as per par a 4.3 of Section IV of Specification appended with the tender. It shall also includes Spares with breakup of in dividual items as per clause 5 and clause 13 of section V of specification appended with tender. It shall also i nclude Consumables as per clause 6 of section V of specification appended with tender. Bidders are required to attach the price break up of these accessories individually in PDF file along with submitted bid. ]
7The scope of supply shall include Design, manufacture & supply of electrically driven rotary scr ew, microprocessor based stationary air compressor as per parameters in Schedule-I with air-cooled oil coole r, air-cooled after cooler and moisture separator/ dehumidifier along with automatic drainage trap as well as manual drainage trap on turnkey basis in compliance with Para 4.1.1 to 4.1.4 (if required). It includes all the concomitant accessories/ equipments as detailed in Para 4.2 of section IV of specification appended with ten der and other concomitant accessories/ equipment, which the manufacturer considers essential to make the machine fully operational, when installed and commissioned. It shall also include installation and commissio ning of related equipment, training of personnel in operation and maintenance of machine and supply of tec hnical documentation. For basic design features & general characteristics refer to Section V. The Preventive Maintenance of Electric Air Compressors as per clause 16 of Section-V shall be in the scope of supplier. ]
8The power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 y ears at full rated capacity as per clause 2.2 ]
9Optional Accessories:- A Set of Optional Accessories also includes as per para 4.3 of Section IV of Specification appended with the tender. It shall also includes Spares with breakup of individual items as p er clause 5 and clause 13 of section V of specification appended with tender. It shall also include Consumabl es as per clause 6 of section V of specification appended with tender. Bidders are required to attach the pric e break up of these accessories individually in PDF file along with submitted bid. ]
10The scope of supply shall include Design, manufacture & supply of electrically driven rotary scr ew, microprocessor based stationary air compressor as per parameters in Schedule-I with air-cooled oil coole r, air-cooled after cooler and moisture separator/ dehumidifier along with automatic drainage trap as well as manual drainage trap on turnkey basis in compliance with Para 4.1.1 to 4.1.4 (if required). It includes all the concomitant accessories/ equipments as detailed in Para 4.2 of section IV of specification appended with ten der and other concomitant accessories/ equipment, which the manufacturer considers essential to make the machine fully operational, when installed and commissioned. It shall also include installation and commissio ning of related equipment, training of personnel in operation and maintenance of machine and supply of tec hnical documentation. For basic design features & general characteristics refer to Section V. The Preventive Maintenance of Electric Air Compressors as per clause 16 of Section-V shall be in the scope of supplier. ]
11The power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 y ears at full rated capacity as per clause 2.2 ]
12Optional Accessories:- A Set of Optional Accessories also includes as per para 4.3 of Section IV of Specification appended with the tender. It shall also includes Spares with breakup of individual items as p er clause 5 and clause 13 of section V of specification appended with tender. It shall also include Consumabl es as per clause 6 of section V of specification appended with tender. Bidders are required to attach the pric e break up of these accessories individually in PDF file along with submitted bid. ]

AI Tender Summary

OUR REF NO 56807667
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 31-08-2026
Authority
Authority Name North Western Railway
Work Description Supply Of supply, installation and commissioning of rotary screw electrical driven air compressor - 500 cfm, 10 kg/cm2 having as per attached specifications. , the scope of supply shall include design, manufacture & supply of electrically driven rotary scr ew, microprocessor based stationary air compressor as per parameters in schedule-i with air-cooled oil coole r, air-cooled after cooler and moisture separator/ dehumidifier along with automatic drainage trap as well as manual drainage trap on turnkey basis in compliance with para 4.1.1 to 4.1.4 (if required). it includes all the concomitant accessories/ equipments as detailed in para 4.2 of section iv of specification appended with ten der and other concomitant accessories/ equipment, which the manufacturer considers essential to make the machine fully operational, when installed and commissioned. it shall also include installation and commissio ning of related equipment, training of personnel in operation and maintenance of machine and supply of tec hnical documentation. for basic design features & general characteristics refer to section v. the preventive maintenance of electric air compressors as per clause 16 of section-v shall be in the scope of supplier. ] , the power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 y ears at full rated capacity as per clause 2.2 ] , optional accessories:- a set of optional accessories also includes as per para 4.3 of section iv of specification appended with the tender. it shall also includes spares with breakup of individual items as p er clause 5 and clause 13 of section v of specification appended with tender. it shall also include consumabl es as per clause 6 of section v of specification appended with tender. bidders are required to attach the pric e break up of these accessories individually in pdf file along with submitted bid. ] , the scope of supply shall include design, manufacture & supply of electrically driven rotary scr ew, microprocessor based stationary air compressor as per parameters in schedule-i with air-cooled oil coole r, air-cooled after cooler and moisture separator/ dehumidifier along with automatic drainage trap as well as manual drainage trap on turnkey basis in compliance with para 4.1.1 to 4.1.4 (if required). it includes all the concomitant accessories/ equipments as detailed in para 4.2 of section iv of specification appended with ten der and other concomitant accessories/ equipment, which the manufacturer considers essential to make the machine fully operational, when installed and commissioned. it shall also include installation and commissio ning of related equipment, training of personnel in operation and maintenance of machine and supply of tec hnical documentation. for basic design features & general characteristics refer to section v. the preventive maintenance of electric air compressors as per clause 16 of section-v shall be in the scope of supplier. ] , the power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 y ears at full rated capacity as per clause 2.2 ] , optional accessories:- a set of optional accessories also includes as per para 4.3 of section iv of specification appended with the tender. it shall also includes spares with breakup of individual items as p er clause 5 and clause 13 of section v of specification appended with tender. it shall also include consumabl es as per clause 6 of section v of specification appended with tender. bidders are required to attach the pric e break up of these accessories optional accessories:- a set of optional accessories also includes as per par a 4.3 of section iv of specification appended with the tender. it shall also includes spares with breakup of in dividual items as per clause 5 and clause 13 of section v of specification appended with tender. it shall also i nclude consumables as per clause 6 of section v of specification appended with tender. bidders are required to attach the price break up of these accessories individually in pdf file along with submitted bid. ] , the scope of supply shall include design, manufacture & supply of electrically driven rotary scr ew, microprocessor based stationary air compressor as per parameters in schedule-i with air-cooled oil coole r, air-cooled after cooler and moisture separator/ dehumidifier along with automatic drainage trap as well as manual drainage trap on turnkey basis in compliance with para 4.1.1 to 4.1.4 (if required). it includes all the concomitant accessories/ equipments as detailed in para 4.2 of section iv of specification appended with ten der and other concomitant accessories/ equipment, which the manufacturer considers essential to make the machine fully operational, when installed and commissioned. it shall also include installation and commissio ning of related equipment, training of personnel in operation and maintenance of machine and supply of tec hnical documentation. for basic design features & general characteristics refer to section v. the preventive maintenance of electric air compressors as per clause 16 of section-v shall be in the scope of supplier. ] , the power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 y ears at full rated capacity as per clause 2.2 ] , optional accessories:- a set of optional accessories also includes as per para 4.3 of section iv of specification appended with the tender. it shall also includes spares with breakup of individual items as p er clause 5 and clause 13 of section v of specification appended with tender. it shall also include consumabl es as per clause 6 of section v of specification appended with tender. bidders are required to attach the pric e break up of these accessories individually in pdf file along with submitted bid. ] , the scope of supply shall include design, manufacture & supply of electrically driven rotary scr ew, microprocessor based stationary air compressor as per parameters in schedule-i with air-cooled oil coole r, air-cooled after cooler and moisture separator/ dehumidifier along with automatic drainage trap as well as manual drainage trap on turnkey basis in compliance with para 4.1.1 to 4.1.4 (if required). it includes all the concomitant accessories/ equipments as detailed in para 4.2 of section iv of specification appended with ten der and other concomitant accessories/ equipment, which the manufacturer considers essential to make the machine fully operational, when installed and commissioned. it shall also include installation and commissio ning of related equipment, training of personnel in operation and maintenance of machine and supply of tec hnical documentation. for basic design features & general characteristics refer to section v. the preventive maintenance of electric air compressors as per clause 16 of section-v shall be in the scope of supplier. ] , the power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 y ears at full rated capacity as per clause 2.2 ] , optional accessories:- a set of optional accessories also includes as per para 4.3 of section iv of specification appended with the tender. it shall also includes spares with breakup of individual items as p er clause 5 and clause 13 of section v of specification appended with tender. it shall also include consumabl es as per clause 6 of section v of specification appended with tender. bidders are required to attach the pric e break up of these accessories individually in pdf file along with submitted bid. ]
Basic Detail
Tender No 65265016
Bidding Type Tender
Location
City
State Rajasthan
Key Dates
Publish Date 03 Aug 2026
Submission Date 31 Aug 2026
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 4.07 Lakhs
Exemption Not Available
Document List
5612491.pdf
5848904.pdf
5858045.pdf
715ee4c1-8594-46b0-95c5-87139b40e2ed.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 03, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 31, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
pdf

5612491.pdf

pdf

5848904.pdf

pdf

5858045.pdf

pdf

715ee4c1-8594-46b0-95c5-87139b40e2ed.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders