Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Office Space; Repair/Refurbishment Of Tce Office At Naval Dockyard Mumbai; Service Provider - Wall Decor Paneling Work. Providing And Fixing Decorat
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Office Space; Repair/Refurbishment Of Tce Office At Naval Dockyard Mumbai; Service Provider - Wall Decor Paneling Work. Providing And Fixing Decorative Wooden Panelling Work With Fluted Panel Finish, Using 12Mm Marine Plywood Backing Fixed Over Wall Surface With Necessary Screws And Adhesive, Finished With Ready Made Fluted/ Routed Fluted Laminated Panels Of Approved Shade And Texture. Panels Shall Be Aligned Vertically. Horizontally As Per Design Intent, Ensuring Seamless Joints And Uniform Groove Patterns. The Fluted Finish Shall Be Of Premium Quality Wooden Texture Laminate / Veneer, Termite Resistant, Scratch Resistant, And Durable For Long-Term Performance. Necessary Edge Banding, Corner Detailing, And Provision For Electrical Cutout (If Required) Shall Be Carried Out To Maintain Neat Aesthetics. The Entire Decorative Panelling Shall Be Executed In Plumb, Level And Line Manner, Complete In All Respects, Ready For Final Use To The Satisfaction Of The Engineer-In-Charge. , Glass Door. Providing And Fixing Frameless Glass Door Made From 12Mm Thick Toughened Clear Glass Of Approved Make, Size, And Design,Polish On All Edges And Corner For Smooth And Safe Finish. The Door Shall Be Fitted With Premium Grade Patch Fitting, Including Top And Bottom Pivots, Floor Spring Mechanism, Lock Set And Handle-All In Stainless Steel (Ss304/ 316) Or Brass Finish As Approved. The Glass Door Shall Be Install In Two Vertical Alignment Within A Wooden, Aluminium Or Ss Frame As Per Site Condition, Ensuring Smooth And Noise-Free Operation. Floor Springs Shall Be Of Heavy-Duty Type,Double-Action Where Required, And Suitable For The Glass Weight And Dimensions. Rubber Gaskets Or Clear Silicone Sealant Shall Be Applied Along Edges To Ensure Perfect Sealing And Vibration Absorption. All Fittings Shall Be Corrosion-Resistant And Fixed Securely. The Entire Assembly Shall Be Completed In Line, Level, And Plumb, With Clean Workmanship, Fully Functional And To The Satisfaction Of The Engineer-In-Charge. , Gypsium Ceiling Providing And Fixing Gypsum Board False Ceiling Using 12.5 Mm Thick Tapered Edge Gypsum Boards Fixed On A Framework Of Ultra Brand G.I. Channels And Accessories. The Framework Shall Consist Of G.I. Perimeter Channels (0.55Mm Thick) Fixed To The Wall With Dash Fasteners At 600Mm Centers, And Intermediate G.I. Ceiling Sections Suspended From The Soffit Using Ceiling Angle Hangers And Gi Suspension Clips At Specified Intervals. The Gypsum Board Shall Be Screw-Fixed To The Underside Of The Framework Using 25Mmm Drywall Alignment. All Joints Shall Be Taped With Fiberglass Mesh Tape And Finished With Three Coats Of Jointing Compound, Sanded To A Smooth Finish Ready For Painting. Necessary Cutouts For Lights, Fans, And Services Shall Be Provided As Required. The Entire Ceiling Shall Be Completed In Line And Level, Finished Smooth, And Ready For Paint, Complete In All Respects As Per Drawing And Instructions Of The Engineer-In-Charge. , Pvc Ceiling. Providing And Fixing Pvc Ceiling Made Of Premium Quality Pvc Panels Of Approved Shade, Design, And Texture, With A Thickness Not Less Than 6-8Mm, Having Tongue-And-Groove Interlocking System For Seamless Jointing. The Panels Shall Be Fire-Retardant, Termite-Proof, Moisture-Resistant, And Washable, Suitable For Long-Term Durability In Interior Use. The Pvc Panels Shall Be Fixed On A Framework Of Gi/ Aluminium Channels Securely Fastened To The Ceiling Slab/Walls Using Proper Fasteners And Hangers, Maintaining Perfect Line, Level, And Plumb. Joints Shall Be Finished Neatly, And Necessary Pvc Corner Beads, Edge Trims, And Accessories Shall Be Provided For A Complete Finish. The Ceiling Shall Be Executed With Proper Cut-Outs For Lights, Fans, Ac Frills, Sprinklers, Or Any Other Mep Requirements, Ensuring Smooth Integration With Services. The Entire Works Shall Be Carried Out In A Neat And Professional Manner, Complete In All Respects To The Satisfaction Of The Engineer-In-Charge. , Removal Of Existing Ceiling Providing Labour For Removal Of Existing 2Ftx 2Ft Grid Ceiling System, Including Dismantling Of Mineral Fiver / Gypsum Ceiling Tiles Along With The Gi Grid Framework Consisting Of Main Runners, Cross Tees, And Wall Angles. The Work Shall Include Careful Removal Of All Ceiling Tiles, Suspension Wires, Fasteners, And Supporting Components Without Damaging The Existing Services Such As Lights, Ac Diffusers, Sprinklers, Or Electrical Fittings. All Dismantled Materials Shall Be Stacked Neatly At A Designated Location Or Removed From The Site As Instructed By The Engineer-In-Charge. The Area Shall Be Cleaned Properly After Removal, Ensuring The Ceiling Slab And Surrounding Surfaces Are Left In A Safe And Tidy Condition. , Wooden Flooring. Providing And Laying Wooden Flooring Using 12Mm Thick Interlocking Laminate Planks, Of Approved Make, Shade, And Texture,. The Planks Shall Be Factory-Finished With A Protective Wear Layer And Tongue-And Groove Interlocking System, Installed Without Adhesive(Floating Floor System) Over A Suitable Underlay Foam Sheet (Minimum 2Mm Thick) To Absorb Sound And Minor Floor Undulations. The Sub-Floor Shall Be Thoroughly Cleaned, Levelled, And Made Free Of Moisture Before Installation. Skirting Or Edge Profiles Shall Be Fixed Along The Periphery For A Neat Finish. All Expansion Gaps At Walls, Columns, Or Fixed Structures Shall Be Maintained As Per Manufacturers Guidelines. The Work Shall Be Executed In Line, Level, And Patterns As Approved By The Engineer-In-Charge, Complete In All Respects. , Wall And Ceiling Paint. Providing And Applying Wall Painting With Premium Quality Luster Paint Of Approved Brand And Shade On Internal Plastered Wall Surfaces. The Surface Shall Be Properly Cleaned, Sanded, And Prepared By Applying One Coat Of Primer Followed By Two Coats Of Putty To Achieve A Smooth And Even Surface. After Drying And Sanding, One Coat Of Acrylic Base Primer Shall Be Applied, Followed By A Minimum Of Two Coats Of Solvent-Based Or Water-Based Luster Paint, Applied With Brush/Roller To Achieve A Smooth, Semi-Glossy, And Durable Finish. All Materials Used Shall Be Of Approved Make, And The Application Shall Be Carried Out In A Dust-Free Environment Ensuring Uniform Coverage And Finish. The Work Shall Be Executed In True Line And Level, Complete In All Respects As Per Corrosion-Resistant And Fixed Securely. The Entire Assembly Shall Be Completed In Line, Level, And Plumb, With Clean Workmanship, Fully Functional And To The Satisfaction Of The Engineer-In-Charge. , Changing Room Partition Work. Providing And Fixing Wooden Partition Work With Internal Framework Made Of 2 Inch X 2 Inch Aluminium Box Sections, Fabricated And Installed As Per Approved Layout. Both Sides Of The Aluminium Frame Shall Be Clad With 12Mm Thick Bwp Grade Marine Plywood Of Approved Make, Securely Fixed Using Appropriate Fasteners And Adhesive. The Exposed Surfaces On Both Sides Shall Be Finished With 1.5 Mm Thick Wooden Texture Decorative Laminated In Approved Shade And Finish, Applied Seamlessly To Give A Premium Appearance. All Visible Edges Shall Be Finished With Matching Pvc Edge Banding Or Teakwood Lipping As Specified. Necessary Openings Or Provisions For Glass, Electrical Conduits, Or Other Inserts Shall Be Made As Per Design. The Entire Partition Shall Be Completed In True Line, Plumb, And Level, With A Neat Finish, All As Per Detailed Drawings And To The Satisfaction Of The Engineer-In-Charge. , Materials Curtain With Rod Fitting , Electrical Work. Downlight , Handing Light Type A , Handing Light Type B , Tv Point , Switch Board , Plug Point 5 , Plug Point 15 , Led Strip Light , 1.5 Sq Mm Point , 2.5 Sq Mm Point , Wall Light
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | WALL DECOR PANELING WORK. Providing and fixing decorative wooden panelling work with fluted panel finish, using 12mm marine plywood backing fixed over wall surface with necessary screws and adhesive, finished with ready made fluted/ routed fluted laminated panels of approved shade and texture. Panels shall be aligned vertically. Horizontally as per design intent, ensuring seamless joints and uniform groove patterns. The fluted finish shall be of premium quality wooden texture laminate / veneer, termite resistant, scratch resistant, and durable for long-term performance. Necessary edge banding, corner detailing, and provision for electrical cutout (if required) shall be carried out to maintain neat aesthetics. The entire decorative panelling shall be executed in plumb, level and line manner, complete in all respects, ready for final use to the satisfaction of the Engineer-in-charge. | WALL DECOR PANELING WORK. Providing and fixing decorative wooden panelling work with fluted panel finish, using 12mm marine plywood backing fixed over wall surface with necessary screws and adhesive, finished with ready made fluted/ routed fluted laminated panels of approved shade and texture. Panels shall be aligned vertically. Horizontally as per design intent, ensuring seamless joints and uniform groove patterns. The fluted finish shall be of premium quality wooden texture laminate / veneer, termite resistant, scratch resistant, and durable for long-term performance. Necessary edge banding, corner detailing, and provision for electrical cutout (if required) shall be carried out to maintain neat aesthetics. The entire decorative panelling shall be executed in plumb, level and line manner, complete in all respects, ready for final use to the satisfaction of the Engineer-in-charge. |
| 2 | Glass Door. Providing and fixing frameless glass door made from 12mm thick toughened clear glass of approved make, size, and design,polish on all edges and corner for smooth and safe finish. The door shall be fitted with premium grade patch fitting, including top and bottom pivots, floor spring mechanism, lock set and handle-all in stainless steel (ss304/ 316) or brass finish as approved. The glass door shall be install in two vertical alignment within a wooden, aluminium or ss frame as per site condition, ensuring smooth and noise-free operation. Floor springs shall be of heavy-duty type,double-action where required, and suitable for the glass weight and dimensions. Rubber gaskets or clear silicone sealant shall be applied along edges to ensure perfect sealing and vibration absorption. All fittings shall be corrosion-resistant and fixed securely. The entire assembly shall be completed in line, level, and plumb, with clean workmanship, fully functional and to the satisfaction of the Engineer-in-Charge. | Glass Door. Providing and fixing frameless glass door made from 12mm thick toughened clear glass of approved make, size, and design,polish on all edges and corner for smooth and safe finish. The door shall be fitted with premium grade patch fitting, including top and bottom pivots, floor spring mechanism, lock set and handle-all in stainless steel (ss304/ 316) or brass finish as approved. The glass door shall be install in two vertical alignment within a wooden, aluminium or ss frame as per site condition, ensuring smooth and noise-free operation. Floor springs shall be of heavy-duty type,double-action where required, and suitable for the glass weight and dimensions. Rubber gaskets or clear silicone sealant shall be applied along edges to ensure perfect sealing and vibration absorption. All fittings shall be corrosion-resistant and fixed securely. The entire assembly shall be completed in line, level, and plumb, with clean workmanship, fully functional and to the satisfaction of the Engineer-in-Charge. |
| 3 | GYPSIUM CEILING Providing and fixing gypsum board false ceiling using 12.5 mm thick tapered edge gypsum boards fixed on a framework of Ultra brand G.I. channels and accessories. The framework shall consist of G.I. perimeter channels (0.55mm thick) fixed to the wall with dash fasteners at 600mm centers, and intermediate G.I. ceiling sections suspended from the soffit using ceiling angle hangers and GI suspension clips at specified intervals. The gypsum board shall be screw-fixed to the underside of the framework using 25mmm drywall alignment. All joints shall be taped with fiberglass mesh tape and finished with three coats of jointing compound, sanded to a smooth finish ready for painting. Necessary cutouts for lights, fans, and services shall be provided as required. The entire ceiling shall be completed in line and level, finished smooth, and ready for paint, complete in all respects as per drawing and instructions of the Engineer-in-Charge. | GYPSIUM CEILING Providing and fixing gypsum board false ceiling using 12.5 mm thick tapered edge gypsum boards fixed on a framework of Ultra brand G.I. channels and accessories. The framework shall consist of G.I. perimeter channels (0.55mm thick) fixed to the wall with dash fasteners at 600mm centers, and intermediate G.I. ceiling sections suspended from the soffit using ceiling angle hangers and GI suspension clips at specified intervals. The gypsum board shall be screw-fixed to the underside of the framework using 25mmm drywall alignment. All joints shall be taped with fiberglass mesh tape and finished with three coats of jointing compound, sanded to a smooth finish ready for painting. Necessary cutouts for lights, fans, and services shall be provided as required. The entire ceiling shall be completed in line and level, finished smooth, and ready for paint, complete in all respects as per drawing and instructions of the Engineer-in-Charge. |
| 4 | PVC CEILING. Providing and fixing PVC Ceiling made of premium quality PVC panels of approved shade, design, and texture, with a thickness not less than 6-8mm, having tongue-and-groove interlocking system for seamless jointing. The panels shall be fire-retardant, termite-proof, moisture-resistant, and washable, suitable for long-term durability in interior use. The PVC panels shall be fixed on a framework of GI/ Aluminium channels securely fastened to the ceiling slab/walls using proper fasteners and hangers, maintaining perfect line, level, and plumb. Joints shall be finished neatly, and necessary PVC corner beads, edge trims, and accessories shall be provided for a complete finish. The ceiling shall be executed with proper cut-outs for lights, fans, AC frills, sprinklers, or any other MEP requirements, ensuring smooth integration with services. The entire works shall be carried out in a neat and professional manner, complete in all respects to the satisfaction of the Engineer-in-Charge. | PVC CEILING. Providing and fixing PVC Ceiling made of premium quality PVC panels of approved shade, design, and texture, with a thickness not less than 6-8mm, having tongue-and-groove interlocking system for seamless jointing. The panels shall be fire-retardant, termite-proof, moisture-resistant, and washable, suitable for long-term durability in interior use. The PVC panels shall be fixed on a framework of GI/ Aluminium channels securely fastened to the ceiling slab/walls using proper fasteners and hangers, maintaining perfect line, level, and plumb. Joints shall be finished neatly, and necessary PVC corner beads, edge trims, and accessories shall be provided for a complete finish. The ceiling shall be executed with proper cut-outs for lights, fans, AC frills, sprinklers, or any other MEP requirements, ensuring smooth integration with services. The entire works shall be carried out in a neat and professional manner, complete in all respects to the satisfaction of the Engineer-in-Charge. |
| 5 | REMOVAL OF EXISTING CEILING Providing labour for removal of existing 2ftx 2ft grid ceiling system, including dismantling of mineral fiver / gypsum ceiling tiles along with the GI grid framework consisting of main runners, cross tees, and wall angles. The work shall include careful removal of all ceiling tiles, suspension wires, fasteners, and supporting components without damaging the existing services such as lights, AC diffusers, sprinklers, or electrical fittings. All dismantled materials shall be stacked neatly at a designated location or removed from the site as instructed by the Engineer-in-Charge. The area shall be cleaned properly after removal, ensuring the ceiling slab and surrounding surfaces are left in a safe and tidy condition. | REMOVAL OF EXISTING CEILING Providing labour for removal of existing 2ftx 2ft grid ceiling system, including dismantling of mineral fiver / gypsum ceiling tiles along with the GI grid framework consisting of main runners, cross tees, and wall angles. The work shall include careful removal of all ceiling tiles, suspension wires, fasteners, and supporting components without damaging the existing services such as lights, AC diffusers, sprinklers, or electrical fittings. All dismantled materials shall be stacked neatly at a designated location or removed from the site as instructed by the Engineer-in-Charge. The area shall be cleaned properly after removal, ensuring the ceiling slab and surrounding surfaces are left in a safe and tidy condition. |
| 6 | WOODEN FLOORING. Providing and laying wooden flooring using 12mm thick interlocking laminate planks, of approved make, shade, and texture,. The planks shall be factory-finished with a protective wear layer and tongue-and groove interlocking system, installed without adhesive(floating floor system) over a suitable underlay foam sheet (minimum 2mm thick) to absorb sound and minor floor undulations. The sub-floor shall be thoroughly cleaned, levelled, and made free of moisture before installation. Skirting or edge profiles shall be fixed along the periphery for a neat finish. All expansion gaps at walls, columns, or fixed structures shall be maintained as per manufacturer’s guidelines. The work shall be executed in line, level, and patterns as approved by the Engineer-in-Charge, complete in all respects. | WOODEN FLOORING. Providing and laying wooden flooring using 12mm thick interlocking laminate planks, of approved make, shade, and texture,. The planks shall be factory-finished with a protective wear layer and tongue-and groove interlocking system, installed without adhesive(floating floor system) over a suitable underlay foam sheet (minimum 2mm thick) to absorb sound and minor floor undulations. The sub-floor shall be thoroughly cleaned, levelled, and made free of moisture before installation. Skirting or edge profiles shall be fixed along the periphery for a neat finish. All expansion gaps at walls, columns, or fixed structures shall be maintained as per manufacturer’s guidelines. The work shall be executed in line, level, and patterns as approved by the Engineer-in-Charge, complete in all respects. |
| 7 | WALL AND CEILING PAINT. Providing and applying wall painting with premium quality luster paint of approved brand and shade on internal plastered wall surfaces. The surface shall be properly cleaned, sanded, and prepared by applying one coat of primer followed by two coats of putty to achieve a smooth and even surface. After drying and sanding, one coat of acrylic base primer shall be applied, followed by a minimum of two coats of solvent-based or water-based luster paint, applied with brush/roller to achieve a smooth, semi-glossy, and durable finish. All materials used shall be of approved make, and the application shall be carried out in a dust-free environment ensuring uniform coverage and finish. The work shall be executed in true line and level, complete in all respects as per corrosion-resistant and fixed securely. The entire assembly shall be completed in line, level, and plumb, with clean workmanship, fully functional and to the satisfaction of the Engineer-in-Charge. | WALL AND CEILING PAINT. Providing and applying wall painting with premium quality luster paint of approved brand and shade on internal plastered wall surfaces. The surface shall be properly cleaned, sanded, and prepared by applying one coat of primer followed by two coats of putty to achieve a smooth and even surface. After drying and sanding, one coat of acrylic base primer shall be applied, followed by a minimum of two coats of solvent-based or water-based luster paint, applied with brush/roller to achieve a smooth, semi-glossy, and durable finish. All materials used shall be of approved make, and the application shall be carried out in a dust-free environment ensuring uniform coverage and finish. The work shall be executed in true line and level, complete in all respects as per corrosion-resistant and fixed securely. The entire assembly shall be completed in line, level, and plumb, with clean workmanship, fully functional and to the satisfaction of the Engineer-in-Charge. |
| 8 | CHANGING ROOM PARTITION WORK. Providing and fixing wooden partition work with internal framework made of 2 inch x 2 inch aluminium box sections, fabricated and installed as per approved layout. Both sides of the aluminium frame shall be clad with 12mm thick BWP grade marine plywood of approved make, securely fixed using appropriate fasteners and adhesive. The exposed surfaces on both sides shall be finished with 1.5 mm thick wooden texture decorative laminated in approved shade and finish, applied seamlessly to give a premium appearance. All visible edges shall be finished with matching PVC edge banding or teakwood lipping as specified. Necessary openings or provisions for glass, electrical conduits, or other inserts shall be made as per design. The entire partition shall be completed in true line, plumb, and level, with a neat finish, all as per detailed drawings and to the satisfaction of the Engineer-in-Charge. | CHANGING ROOM PARTITION WORK. Providing and fixing wooden partition work with internal framework made of 2 inch x 2 inch aluminium box sections, fabricated and installed as per approved layout. Both sides of the aluminium frame shall be clad with 12mm thick BWP grade marine plywood of approved make, securely fixed using appropriate fasteners and adhesive. The exposed surfaces on both sides shall be finished with 1.5 mm thick wooden texture decorative laminated in approved shade and finish, applied seamlessly to give a premium appearance. All visible edges shall be finished with matching PVC edge banding or teakwood lipping as specified. Necessary openings or provisions for glass, electrical conduits, or other inserts shall be made as per design. The entire partition shall be completed in true line, plumb, and level, with a neat finish, all as per detailed drawings and to the satisfaction of the Engineer-in-Charge. |
| 9 | Materials CURTAIN WITH ROD FITTING | Materials CURTAIN WITH ROD FITTING |
| 10 | Electrical Work. DOWNLIGHT | Electrical Work. DOWNLIGHT |
| 11 | HANDING LIGHT TYPE A | HANDING LIGHT TYPE A |
| 12 | HANDING LIGHT TYPE B | HANDING LIGHT TYPE B |
| 13 | TV POINT | TV POINT |
| 14 | SWITCH BOARD | SWITCH BOARD |
| 15 | PLUG POINT 5AMP | PLUG POINT 5AMP |
| 16 | PLUG POINT 15AMP | PLUG POINT 15AMP |
| 17 | LED STRIP LIGHT | LED STRIP LIGHT |
| 18 | 1.5 SQ MM POINT | 1.5 SQ MM POINT |
| 19 | 2.5 SQ MM POINT | 2.5 SQ MM POINT |
| 20 | WALL LIGHT | WALL LIGHT |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender