Tender For Biennial Rate Contract For Cable Laying, Termination, Ofc Splicing, Cctv/Communication Network Maintenance And Miscellaneous Emergency Itc Works Under Itc Department, Btps
Tender Value
18.76 Lakhs
Estimated cost
Bid Submission
17 Aug 2026
12 days left
EMD
18765
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Hooghly → West Bengal
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Biennial Rate Contract For Cable Laying, Termination, Ofc Splicing, Cctv/Communication Network Maintenance And Miscellaneous Emergency Itc Works Under Itc Department, Btps
BOQ
| Sl. No. | Item Description |
| 1 | Cable Laying &Tit bit Job for 1st year |
| 2 | OFC Laying overhead through Cable TrayWith HDPE including supply of HDPE/PVC.Clamping required in Cable Tray/cable trench. All materials exceptOFC will be supplied by the vendor. Proper route marker must beused within 20-meter gap along the Path. |
| 3 | OFC Laying over wall through HDPE/PVCincluding supply of HDPE /PVC conduit.All materials except OFC will be supplied by the vendor. Properroute marker must be used within 20-meter gap along the Path. |
| 4 | OFC Cable Laying underground withOutdoor soil cutting, digging and laying of armored OFC Cable through HDPE Pipe through underground routes, excavatingtrenches of A type with dimensions of trench as top with 30 cm,bottom with 25 cm and depth up to 60 cm including back filing,compacting (after laying the cables) and removing excess earthfrom the site. OFC cable must be laid through metal casing (scrapboiler tube) in case of road crossing. All materials except theOFC Cable will be supplied by the vendor. Proper route markershould be laid along the path. |
| 5 | Only Laying of OFC cableeverything will be Provided by BTPS. |
| 6 | UTP/STP Cable Laying overhead throughCable Tray With HDPE including supply of HDPE/PVC.Clamping required in Cable Tray/cable trench. All materials exceptOFC will be supplied by the vendor. Proper route marker must beused within 20-meter gap along the Path. |
| 7 | STP/UTP Cable over wall through HDPE/PVCincluding supply of HDPE /PVC conduit.All materials except UTP/STP cable will be supplied by thevendor. Proper route marker must be used within 20-meter gapalong the Path. |
| 8 | STP/UTP Cable Laying underground withOutdoor soil cutting, digging and laying of armored OFC Cablethrough HDPE Pipe through underground routes, excavatingtrenches of A type with dimensions of trench as top with 30 cm,bottom with 25 cm and depth up to 60 cm including back filing,compacting (after laying the cables) and removing excess earthfrom the site. UTP/STP cable must be laid through metal casing (scrap boiler tube) in case of road crossing. All materials exceptthe UTP/STP Cable will be supplied by the vendor. Proper routemarker should be laid along the path. |
| 9 | Only Laying of UTP/STP cableeverything will be Provided by BTPS. |
| 10 | Cable Laying underground throughRoad Crossing including supply of HDPE /PVC. OFC/UTP/STPcable must be laid through metal casing (scrap boiler tube) in caseof road crossing. All materials except the OFC/UTP/STP Cablewill be supplied by the vendor. Proper route marker should belaid along the path. |
| 11 | Termination/Splicing of Optical Fiber(Splicing of Single Mode 6 Core Optical Fiber with JunctionBox and proper tagging and Dressing.) one side |
| 12 | Detection of Cut/Faulty OFCBy OTDR testing. |
| 13 | Installaton of 6U/4U/9U Network Rack(Indoor/Outdoor) |
| 14 | Digging of Earth for taking out cableif any cut/damage happened in the underground cable. |
| 15 | Kit Joining of 10 Pair Telephone CableKit jointer and any other materials if required will be under the scope of vendor. |
| 16 | Kit Joining of 20 Pair Telephone CableKit jointer and any other materials if required will be under thescope of vendor. |
| 17 | Kit Joining of 50 Pair Telephone CableKit jointer and any other materials if required will be under thescope of vendor. |
| 18 | Welding Job for CCTV for installationand mounting of CCTV camera. |
| 19 | Erection of light pole for CCTV Camera |
| 20 | Installation/shifting/focusing of P2P / |
| 21 | 3 Core 2.5 Sqmm Power cable layingwith supply all by vendor. |
| 22 | 3 Core 2.5 Sqmm Power cable LayingThrough HDPE/PVC Pipe. Dept will supply cable & HDPE/PVC |
| 23 | Supply & Fixing of IO Box |
| 24 | Supply & Fixing of Flexible Pipe |
| 25 | Supply & Fixing of Power Board WithSocket & switch(one Set). |
| 26 | Page Set & JB Installation |
| 27 | Supply & Fixing of IO Box (Double) |
| 28 | Laying of Twin pair telephone Cable |
| 29 | 20 Pair Telephone cable laying |
| 30 | Cable Laying &Tit bit Job for 2nd year |
| 31 | OFC Laying overhead through Cable TrayWith HDPE including supply of HDPE/PVC.Clamping required in Cable Tray/cable trench. All materials exceptOFC will be supplied by the vendor. Proper route marker must beused within 20-meter gap along the Path |
| 32 | OFC Laying over wall through HDPE/PVCincluding supply of HDPE /PVC conduit.All materials except OFC will be supplied by the vendor. Proper route marker must be used within 20-meter gap along the Path. |
| 33 | OFC Cable Laying underground withOutdoor soil cutting, digging and laying of armored OFC Cablethrough HDPE Pipe through underground routes, excavatingtrenches of A type with dimensions of trench as top with 30 cm,bottom with 25 cm and depth up to 60 cm including back filing,compacting (after laying the cables) and removing excess earthfrom the site. OFC cable must be laid through metal casing (scrapboiler tube) in case of road crossing. All materials except theOFC Cable will be supplied by the vendor. Proper route markershould be laid along the path. |
| 34 | Only Laying of OFC cableeverything will be Provided by BTPS. |
| 35 | UTP/STP Cable Laying overhead throughCable Tray With HDPE including supply of HDPE/PVC.Clamping required in Cable Tray/cable trench. All materials exceptOFC will be supplied by the vendor. Proper route marker must beused within 20-meter gap along the Path. |
| 36 | STP/UTP Cable over wall through HDPE/PVCincluding supply of HDPE /PVC conduit.All materials except UTP/STP cable will be supplied by thevendor. Proper route marker must be used within 20-meter gapalong the Path. |
| 37 | STP/UTP Cable Laying underground withOutdoor soil cutting, digging and laying of armored OFC Cablethrough HDPE Pipe through underground routes, excavatingtrenches of A type with dimensions of trench as top with 30 cm,bottom with 25 cm and depth up to 60 cm including back filing,compacting (after laying the cables) and removing excess earth from the site. UTP/STP cable must be laid through metal casing(scrap boiler tube) in case of road crossing. All materials exceptthe UTP/STP Cable will be supplied by the vendor. Proper routemarker should be laid along the path. |
| 38 | Only Laying of UTP/STP cableeverything will be Provided by BTPS. |
| 39 | Cable Laying underground throughRoad Crossing including supply of HDPE /PVC. OFC/UTP/STPcable must be laid through metal casing (scrap boiler tube) in caseof road crossing. All materials except the OFC/UTP/STP Cablewill be supplied by the vendor. Proper route marker should belaid along the path. |
| 40 | Termination/Splicing of Optical Fiber(Splicing of Single Mode 6 Core Optical Fiber with JunctionBox and proper tagging and Dressing.) one side. |
| 41 | Detection of Cut/Faulty OFCBy OTDR testing. |
| 42 | Installaton of 6U/4U/9U Network Rack(Indoor/Outdoor) |
| 43 | Digging of Earth for taking out cableif any cut/damage happened in the underground cable. |
| 44 | Kit Joining of 10 Pair Telephone CableKit jointer and any other materials if required will be under thescope of vendor. |
| 45 | Kit Joining of 20 Pair Telephone Cable Kit jointer and any other materials if required will be under thescope of vendor. |
| 46 | Kit Joining of 50 Pair Telephone CableKit jointer and any other materials if required will be under thescope of vendor. |
| 47 | Welding Job for CCTV for installationand mounting of CCTV camera. |
| 48 | Erection of light pole for CCTV Camera |
| 49 | Installation/shifting/focusing of P2P/CCTV |
| 50 | 3 Core 2.5 Sqmm Power cable layingwith supply all by vendor. |
| 51 | 3 Core 2.5 Sqmm Power cable LayingThrough HDPE/PVC Pipe. Dept will supply cable & HDPE/PVC |
| 52 | Supply & Fixing of IO Box |
| 53 | Supply & Fixing of Flexible Pipe |
| 54 | Supply & Fixing of Power Board With |
| 55 | Page Set & JB Installation |
| 56 | Supply & Fixing of IO Box (Double) |
| 57 | Laying of Twin pair telephone Cable |
| 58 | 20 Pair Telephone cable laying Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 01, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 17, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysAug 19, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender