Tender For Upkeeping Of Clariflocculator, Filter Bed, Connecting Channel Etc. And Removal Of Froth And Algae From Filter Bed, Channels And Clariflocculator As Well As Handling And Operation Of Alum And Bleaching Powder At Phase -I And Phase - Ii Wate
Tender Overview
Project Description
Tender for Upkeeping Of Clariflocculator, Filter Bed, Connecting Channel Etc. And Removal Of Froth And Algae From Filter Bed, Channels And Clariflocculator As Well As Handling And Operation Of Alum And Bleaching Powder At Phase -I And Phase - Ii Water Treatment Plant At Iwss, Lingaraj Area For Two Years.
BOQ
| Sl. No. | Item Description |
| 1 | Cleaning channels of clariflocculator, sides of filter beds with wire brushes, jute bags etc. on requirements as per instruction of the Engineer-In-Charge. (Once in every two months) |
| 2 | Cleaning of sludge from clariflocculators with the help of wire brush, jute bag etc. as per instruction of Engineer-In-Charge (Once in every six months) |
| 3 | Cleaning of Alum, Lime, bleaching powder tanks including taking out the sludge and disposal the same within a lead of 100 mtrs. As per instruction of Engineer-In-Charge (Once in every two months) |
| 4 | Cleaning of the clear water tank, disilting of filter beds including cleaning the walls, taking out sludge and disposal the same within a lead of 50m as per instruction of Engineer-In-Charge (Once in every six months) |
| 5 | Removal of froth, Algae and mosses from filter beds, clariflocculators and channels at Phase - I and Phase - II of Water Treatment Plant regularly and to keep clean as per instruction of the Engineer-In-Charge. |
| 6 | Handling and application of Alum and Bleaching powder phase - I and Phase - II and valve operation Deulabera pitop pump house as per the direction of EIC. |
| 7 | Carriage of Materials,By Mechanical Transport including loading,unloading and stacking Lime, moorum, building rubbish Lead - 5 |
| 8 | Re-handling of Alumfrom store to clarifier/Alum dozing system during rainy season as per instruction of Engr.in.charge. |
| 9 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender