Housing Urban and Rular Development Local Bodies Closing in 26 days TDR #56799109

Tender For Providing, Laying And Jointing Of Lateral Sewer Line In Prn (North) Area For Sewer Zone-6 Of Varioussizes With Construction Of Manholes For Ultimate Discharge Of Sewerage In Stp Nevta Under The Jurisdiction Of Ee (Phe-Ii), Jda, Jaipur.

Issued by Local Bodies · Jaipur, Rajasthan
Tender Value
46.01 Crore
Estimated cost
Bid Submission
18 Sep 2026
26 days left
EMD
92.02 Lakhs
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Jaipur → Rajasthan
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Providing, Laying And Jointing Of Lateral Sewer Line In Prn (North) Area For Sewer Zone-6 Of Varioussizes With Construction Of Manholes For Ultimate Discharge Of Sewerage In Stp Nevta Under The Jurisdiction Of Ee (Phe-Ii), Jda, Jaipur.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 20-Aug-2026 Annexure 2C for EMD and Price Escalation Factor Technical Bid 18-Sep-2026

BOQ

Name of Work:- Providing, Laying and Jointing of Lateral Sewer Line in PRN (North) area for Sewer Zone-6 of variousSizes with construction of Manholes for ultimate discharge of sewerage in STP Nevta under the Jurisdiction of EE (PHE-II), JDA, Jaipur.
Sl. No. Item Description
1Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202.
2By Manual MeansGranular Courses
3By Mechanical MeansBituminous Courses
4Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.
5Depth upto 1.5 m
6Add extra for overall depth of excavation above 1.5 m and upto 3.0 m over item no 17.1.1.1
7Add extra for overall depth of excavation above 3.0 m and upto 4.5 m over item no 17.1.1.1
8Add extra for overall depth of excavation above 4.5 m and upto 6.0 m over item no 17.1.1.1
9Add extra for overall depth of excavation above 6.0 mand upto 7.5 m over item no 17.1.1.1
10Add extra for overall depth of excavation above 7.5 mand upto 9.0 m over item no 17.1.1.1
11Providing and fixing CLOSE timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered) for following depth below NGL.
12Depth upto 3.0 m
13Depth more than 3.0 m and upto 6.0 m
14Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete.Earth, Sand, Lime, Morrum manure or sludgeFor 5 Km.
15Providing and fixing Barricading at site of work for restricting the general public using 80-100 mm dia Wooden Ballies as vertical post with average spacing of 1.80 meter between two vertical posts, having height at least 1.5 m above road/ ground level and at least 30-45 cm below road/ ground level by making suitable size hole in road/ ground, providing and fixing two rows of 80-100 mm Wooden Ballies as horizontal members with jute russies. Both vertical and horizontal members shall be painted in red and white colour sTrips as per approved pattern as and when it becomes shabby but at least after every alternate shifting at new location. After shifting/ removal of barricading holes shall be filled up properly and site is to be cleared in all respect. (Note: measurement is to be done in linear basis)
16Providing, fixing, maintaining, shifting & refixing, barricading of minimum 2.0 mtr height at stipulated active site of the same project site, made with angle iron frame of 50x50x5mm and GI sheet of 0.63mm thick including primer painted initially, painting, lettering & border with reflective paint at the time of every shifting, traffic diversion arrangement, safety guard, suitable lightning arrangement during night, complete in all respect till completion of the project as per technical specification and direction of Engineer-In-charge and same shall be possessed by the contractor after completion of the Project. Payment under this item will be released (1) 50% At the time of Providing new barricading at the time of start of project at location and plan as approved by the Engineer & certification (2) 50% After completion of project including shifting re-erecting and maintaining the barricading in position, during entire construction tenure with requisite manpower /flagman etc. complete for guiding traffic and safety etc and dismantling after completion of project.
17Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths full round HDPE DWC (double wall corrugated) pipes of SN8 grade as per IS 16098 (Part 2) amended upto date in trenches in complete including all material, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications, drawings and as per direction of Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.
18200 mm ID
19Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP4 class (with s/s ends) IS: 458 - 2003 (amended up to date) marked and pipes from 300 mm and upto 1800 mm manufactured through vertical / vibrated casting process at all depths with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets, lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as per specification and / or as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.
20200 mm internal diameter
21250 mm internal diameter
22300 mm internal diameter
23Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP3 class (with s/s ends) IS: 458 - 1988 (amended up to date) marked and pipes from 300 mm upto 2000 mm manufactured through vertical / vibrated casting process all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.
24350 mm internal diameter
25Providing, jointing, laying, testing and commissioning of HDPE PE- 100/PN-6 (suitable for pulling method for jointing) pipes for sewer line as per IS-14333 (amended upto date) with compliance for maintaining slope as per design by trenchless adopting HDD method (Horizontal Directional Drilling) below ground at all depth including carriage etc. complete in all respect, construction of thrust pit and receiving pit of required size upto 3 Mtr depth and soil investigation, making suitable arrangement for barricading of pits, traffic diversion, lights, traffic permission from relevant authority (though department will assist in getting the permission), refilling of pits in compacted layers of 150 mm including disposal of surplus material with all lift and lead upto 50 Mtr as per specification and the direction of the Engineer. Note-1 Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers, Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. Note- 2. Manual Pipe jacking is not permitted for worKmen safety reasons.In all types of soil including mixed strata
26225 mm outer dia
27250 mm outer dia
28400 mm outer dia
29500 mm outer dia
30630 mm outer dia
31900 mm outer dia
32Extra for excavation of driven pit/ exit pit / intermediate pit beyond 3 Mtr depth, required for pushing/ pulling of MS/HDPE/RCC pipe in trenchless technology, with proper protection at three sides with shoring sheets/ wooden planks and ISMB‘s, maintaining during pushing/ puling of pipe, back filling, necessary de-watering including all machinery, tools, and tackles required as per specification and the direction of the Engineer.In all types of soil
33Providing granular bedding having width = outer dia of pipe (Bc) + 500mm, thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer.
34200 mm internal diameter
35250 mm internal diameter
36300 mm internal diameter
37350 mm internal diameter
38Providing, fixing and erecting precast RCC (M20) Ventshaft with cowl, 125mm and 225mm internal andexternal dia respectively at top, 300mm and 450mminternal and external dia at bottom and 9.0m overalllength, bottom 1.175m below ground level fixed in thepit 900mmx900mmx1500mm with PCC M15, 250mmin bed and minimum 200mm all around with top150mm in PCC M15 with 20mm nominal size gradedstone aggregate , junction of vent shaft and concretegrouted with cement mortar 1: including makingconnection with sewer manhole with 150mm dia NP4RCC pipe (IS 458-ammended upto date) as requiredincluding Type-A bedding complete as per standarddesign and finished with water proofing cement ofapproved brand as per drawings and/or as directed byEngineer. Note : Only Excavation work will bemeasured and paid separately
39Providing, fixing and constructing of pre-cast RCC M-40 grade circular manholes with internal dia 1.0m and up to specified depth having pre-cast RCC M-40 grade circular manhole cover frame (ID 0.56m, OD 0.92m), conical piece (top ID 0.56m, bottom ID 1.0m, vertical height 0.805m, wall thickness 125mm), and circular rings of required heights (ID 1.0m, height 150/225/300/600 mm, wall thickness 125mm) below conical piece as per required depth of manhole and having steel reinforcement in conical piece @ not less than 80 kg per cum of concrete, including cast-in-situ PCC M-10 grade (1:3:6) foundation of 1.625m dia and 150mm thickness, PCC M15 grade circular wall ID 0.925m, wall thickness 200mm, height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm (to flush the manhole frame with road top, height of wall can be increased but not more than 100mm), PCC M15 grade benching and channel portion and up to top level of sewer pipe etc complete with curing compaction and form work, supplying and fixing heavy duty SFRC manhole cover as per IS 12592 (Part I and II), supplying and fixing plastic encapsulated CI/MS foot steps / SFRC foot steps, including cost of shuttering, steel reinforcement, testing for water tightness etc. complete in all respect as per drawing, as per specification and the direction of the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately.
40Pre-cast RCC M-40 grade circular manhole conical piece with inbuilt cover and frame (height 0.805), cast-in-situ PCC M-10 grade foundation, PCC M15 grade circular wall ID 0.925m, wall thickness 200mm, wall height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item = height of Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe + 50mm)
41Providing and fixing pre-cast RCC M-40 grade circular ring of ID 1.0m, wall thickness 125mm, height 150/225/300/600 mm for constructing extra depth of manhole beyond depth mentioned in item no-17.59.1 as per drawing.
42Providing, fixing and constructing of pre-cast RCC M-40 grade circular manholes with internal dia 1.2m and up to specified depth having pre-cast RCC M-40 grade circular manhole cover frame (ID 0.56m, OD 0.92m), conical piece (top ID 0.56m, bottom ID 1.2m, vertical height 1.005m, wall thickness 125mm), and circular rings of required heights (ID 1.2m, height 150/225/300/600/900mm, wall thickness 125mm) below conical piece as per required depth of manhole and having steel reinforcement in Conical piece @ not less than 80 kg per cum of concrete, including cast-in-situ PCC M-10 grade (1:3:6) foundation of 1.825m dia and 150mm thickness, PCC M15 grade circular wall ID 1.125m, wall thickness 200mm, height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm (to flush the manhole frame with road top, height of wall can be increased but not more than 100mm), PCC M15 grade benching and channel portion and up to top level of sewer pipe etc complete with curing compaction and form work, supplying and fixing heavy duty SFRC manhole cover as per IS 12592 (Part I and II), supplying and fixing plastic encapsulated CI/MS footsteps / SFRC footsteps, including cost of shuttering, steel reinforcement, testing for water tightness etc complete in all respect as per drawing, as per specification and the direction of the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately.
43Pre-cast RCC M-40 grade circular manhole conical piece with inbuilt cover and frame (height 1.005), cast-in-situ PCC M-10 grade foundation, PCC M15 grade circular wall ID 1.125m, wall thickness 200mm, wall height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item = height of Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe + increased height of wall (if any) + 50mm)
44Providing and fixing pre-cast RCC M-40 grade circular ring of ID 1.2m, wall thickness 125mm, height 150/225/300/600/900mm for constructing extra depth of manhole beyond depth mentioned in item no-17.60.1 as per drawing.
45Providing, fixing and constructing of pre-cast RCC M-40 grade circular manholes with internal dia 1.5m and up to specified depth having pre-cast RCC M-40 grade circular manhole cover frame (ID 0.56m, OD 0.92m), conical piece (top ID 0.56m, bottom ID 1.5m, vertical height 1.305m, wall thickness 125mm), and circular rings of required heights (ID 1.5m, height 150/225/300/600/900/1200 mm, wall thickness 125mm) below conical piece as per required depth of manhole and having steel reinforcement in conical piece @ not less than 80 kg per cum of concrete, including cast-in-situ PCC M-10 grade (1:3:6) foundation of 2.125m dia and 150mm thickness, PCC M15 grade circular wall ID 1.425 m, wall thickness 200mm, height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm (to flush the manhole frame with road top, height of wall can be increased but not more than 100mm), PCC M15 grade benching and channel portion and up to top level of sewer pipe etc complete with curing compaction and form work, supplying and fixing heavy duty SFRC manhole cover as per IS 12592 (Part I and II), supplying and fixing plastic encapsulated CI/MS footsteps / SFRC footsteps, including cost of shuttering, steel reinforcement, testing for water tightness etc complete in all respect as per drawing, as per specification and the direction of the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately.
46Pre-cast RCC M-40 grade circular manhole conical piece with inbuilt cover and frame (height 1.305), cast-in-situ PCC M-10 grade foundation, PCC M15 grade circular wall ID 1.425m, wall thickness 200mm, wall height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item = height of Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe + increased height of wall (if any) + 50mm)
47Providing and fixing pre-cast RCC M-40 grade circular ring of ID 1.5m, wall thickness 125mm, height 150/225/300 /600/900/1200mm for constructing extra depth of manhole beyond depth mentioned in item no-17.61.1 as per drawing.
48Providing and constructing of RCC M-20 gradecast-in-situ circular manholes of \\"Type-F\\" withinternal dia 2.0m and depth upto 12.0m (2.0 inconical shape) having 150 mm thick RCC M-20wall, including 350 mm thick RCC M-20 grade baseslab (foundation), PCC M15 for benching andchannel portion, PCC M20 250mm thick for fixingthe manhole frame and cover, vata in CM1:1around pipe entering and leaving the manhole,providing and fixing of SFRC foot steps ofapproved make at every 0.30m height, supplyingand fixing heavy duty SFRC manhole frame andcover as per IS 12592 (Part I and II) having clearopening of 560mm, including form work,reinforcement, curing, watering, hydro testing ofmanhole, conveyance & cost of water, dewateringetc. complete as directed by the Engineer. Note:-Excavation of earth work and road cutting formanhole will be measured and paid separately.
49Manhole of depth 3.6m as per drawing and direction ofEngineer.
50Providing and constructing extra depth of manhole fordepth beyond 3.6 m and upto 8.0 with 150mm thickRCC M-20 wall as per drawing and direction ofEngineer.
51Providing at site, lowering & laying in trenches, aligning & jointing of U-PVC pipe as per IS 13592 (amended up to date) and as per specifications with rubber rings with socket and spigot joint, (EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and conveyance of water to site for testing) and commissioning etc complete as directed by Engineer for house sewer connection work. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.
52110 mm Nominal Dia
53Providing and making connection to the manhole/ road side chamber/ property chamber by cutting hole in wall, making good the same with brick work/ stone masonry work in cement mortar 1:4, plaster in cement mortar 1:3, encasement of pipe at manhole with 75mm thick M15 grade concrete etc complete as directed by Engineer.
54UPVC SOIL WASTE & RAIN WATER (SWR ) PIPESProviding and Fixing Unplasticized Poly Vinyl Chloride (UPVC) SWR Pipes Type B for sciland waste discharge system (IS:13592 : 1992 Marked) of approved quality /make.Providing and Fixing Unplasticized Poly Vinyl Chloride (UPVC) SWR Pipes fittings type B for sciland waste discharge system (IS:13592 : 1992 Marked) of approved quality /makeSocket Plug
55110 mm dia
56Excavating trenches of required width for pipe cables, etc. including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 Mtr including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr: All kinds of soil Pipes cables, etc. exceeding 80mm dia but not exceeding 300mm dia. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56799109
AUTHORITY Local Bodies
TENDER VALUE 46.01 Crore
LAST DATE 18-09-2026
Authority
Authority Name Jaipur Development Authority
Work Description Tender for Providing, Laying And Jointing Of Lateral Sewer Line In Prn (North) Area For Sewer Zone-6 Of Varioussizes With Construction Of Manholes For Ultimate Discharge Of Sewerage In Stp Nevta Under The Jurisdiction Of Ee (Phe-Ii), Jda, Jaipur.
Basic Detail
Tender No EE PHE-II_04_2026-2027
Bidding Type Tender
Location
City Jaipur
State Rajasthan
Key Dates
Publish Date 20 Aug 2026
Submission Date 18 Sep 2026
Open Date 01 Jan 0001
Finance
Tender Value 46.01 Crore
Tender Fee 5000
EMD 92.02 Lakhs
Exemption Available
Document List
7a054eee-8429-4645-a1f3-917dc62cf9a0.html
BOQ_1030062.xls
td04_eproc.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 20, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 18, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 26 days
Sep 18, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 26 days

Tender Documents

Download All (ZIP) ↓
html

7a054eee-8429-4645-a1f3-917dc62cf9a0.html

xls

BOQ_1030062.xls

pdf

td04_eproc.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders