Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard In Ships And Submarines At Naval Dockyard, Mumbai; Repair Rate Agreement For Two Years For Erection/ Removal Of Pipe Scaffolding And Cantile
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard In Ships And Submarines At Naval Dockyard, Mumbai; Repair Rate Agreement For Two Years For Erection/ Removal Of Pipe Scaffolding And Cantilevers Onboard In Ships.. - Erection Of Pipe Scaffolding And Cantilevers, Working Platform With Metallic Gratings And Accessories At The Height Up To 1 To 6 Meters For In Ships (Including All Accessories). Steel Stage Will Be On Volume Basis I.E Lx B X H. Length, Breadth & Height Will Be Considered In Multiples Of 2 Meter, 1.25 Meter & 3 Meter. Therefore, The Least Count Will Be 2 X 1.25 X 3 = 7.5 Cum Will Be 01 Unit Value = 01 Nos. , Removal/ Dismantle Of Pipe Scaffolding And Cantilevers, Working Platform With Metallic Gratings And Accessories At The Height Up To 1 To 6 Meters For In Ships (Including All Accessories). Steel Stage Will Be On Volume Basis I.E Lx B X H. Length, Breadth & Height Will Be Considered In Multiples Of 2 Meter, 1.25 Meter & 3 Meter. Therefore, The Least Count Will Be 2 X 1.25 X 3 = 7.5 Cum Will Be 01 Unit Value = 01 Nos. , Erection Of Pipe Scaffolding And Cantilevers, Working Platform With Metallic Gratings And Accessories At The Height Up To 7 To 12 Meters For In Ships (Including All Accessories). Steel Stage Will Be On Volume Basis I.E Lx B X H. Length, Breadth & Height Will Be Considered In Multiples Of 2 Meter, 1.25 Meter & 3 Meter. Therefore, The Least Count Will Be 2 X 1.25 X 3 = 7.5 Cum Will Be 01 Unit Value = 01 Nos. , Removal/ Dismantle Of Pipe Scaffolding And Cantilevers, Working Platform With Metallic Gratings And Accessories At The Height Up To 7 To 12 Meters For In Ships (Including All Accessories). Steel Stage Will Be On Volume Basis I.E Lx B X H. Length, Breadth & Height Will Be Considered In Multiples Of 2 Meter, 1.25 Meter & 3 Meter. Therefore, The Least Count Will Be 2 X 1.25 X 3 = 7.5 Cum Will Be 01 Unit Value = 01 Nos. , Material Charges Including Transportation Cost For In Ships. 01 Nos = 12 Pipes Which Includes 04 Standard, 04 Ledger And 04 Transom As Shown In Diagram Attached In Annexure -1 , Erection Of Pipe Scaffolding And Cantilevers, Working Platform With Metallic Gratings And Accessories At The Height Up To 1 To 6 Meters For In Submarines (Including All Accessories). Steel Stage Will Be On Volume Basis I.E Lx B X H. Length, Breadth & Height Will Be Considered In Multiples Of 2 Meter, 1.25 Meter & 3 Meter. Therefore, The Least Count Will Be 2 X 1.25 X 3 = 7.5 Cum Will Be 01 Unit Value = 01 Nos. , Removal/ Dismantle Of Pipe Scaffolding And Cantilevers, Working Platform With Metallic Gratings And Accessories At The Height Up To 1 To 6 Meters For In Submarines (Including All Accessories). Steel Stage Will Be On Volume Basis I.E Lx B X H. Length, Breadth & Height Will Be Considered In Multiples Of 2 Meter, 1.25 Meter & 3 Meter. Therefore, The Least Count Will Be 2 X 1.25 X 3 = 7.5 Cum Will Be 01 Unit Value = 01 Nos. , Erection Of Pipe Scaffolding And Cantilevers, Working Platform With Metallic Gratings And Accessories At The Height Up To 7 To 12 Meters For In Submarines (Including All Accessories). Steel Stage Will Be On Volume Basis I.E Lx B X H. Length, Breadth & Height Will Be Considered In Multiples Of 2 Meter, 1.25 Meter & 3 Meter. Therefore, The Least Count Will Be 2 X 1.25 X 3 = 7.5 Cum Will Be 01 Unit Value = 01 Nos. , Removal/ Dismantle Of Pipe Scaffolding And Cantilevers, Working Platform With Metallic Gratings And Accessories At The Height Up To 7 To 12 Meters For In Submarines (Including All Accessories). Steel Stage Will Be On Volume Basis I.E Lx B X H. Length, Breadth & Height Will Be Considered In Multiples Of 2 Meter, 1.25 Meter & 3 Meter. Therefore, The Least Count Will Be 2 X 1.25 X 3 = 7.5 Cum Will Be 01 Unit Value = 01 Nos. , Material Hiring Charges Including Transportation Cost For In Submarines 01 Nos = 12 Pipes Which Includes 04 Standard, 04 Ledger And 04 Transom As Shown In Diagram Attached In Annexure -1
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Erection of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 1 to 6 meters for IN ships (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. | Erection of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 1 to 6 meters for IN ships (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. |
| 2 | Removal/ Dismantle of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 1 to 6 meters for IN ships (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. | Removal/ Dismantle of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 1 to 6 meters for IN ships (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. |
| 3 | Erection of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 7 to 12 meters for IN ships (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. | Erection of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 7 to 12 meters for IN ships (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. |
| 4 | Removal/ Dismantle of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 7 to 12 meters for IN ships (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. | Removal/ Dismantle of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 7 to 12 meters for IN ships (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. |
| 5 | Material charges including transportation cost for IN ships. 01 Nos = 12 Pipes which includes 04 standard, 04 ledger and 04 transom as shown in diagram attached in Annexure -1 | Material charges including transportation cost for IN ships. 01 Nos = 12 Pipes which includes 04 standard, 04 ledger and 04 transom as shown in diagram attached in Annexure -1 |
| 6 | Erection of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 1 to 6 meters for IN submarines (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. | Erection of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 1 to 6 meters for IN submarines (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. |
| 7 | Removal/ Dismantle of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 1 to 6 meters for IN submarines (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. | Removal/ Dismantle of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 1 to 6 meters for IN submarines (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. |
| 8 | Erection of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 7 to 12 meters for IN submarines (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. | Erection of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 7 to 12 meters for IN submarines (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. |
| 9 | Removal/ Dismantle of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 7 to 12 meters for IN submarines (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. | Removal/ Dismantle of pipe scaffolding and cantilevers, working platform with metallic gratings and accessories at the height up to 7 to 12 meters for IN submarines (including all accessories). Steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2 meter, 1.25 meter & 3 meter. Therefore, the least count will be 2 x 1.25 x 3 = 7.5 CuM will be 01 unit value = 01 Nos. |
| 10 | Material hiring charges including transportation cost for IN submarines 01 Nos = 12 Pipes which includes 04 standard, 04 ledger and 04 transom as shown in diagram attached in Annexure -1 | Material hiring charges including transportation cost for IN submarines 01 Nos = 12 Pipes which includes 04 standard, 04 ledger and 04 transom as shown in diagram attached in Annexure -1 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender