Tender For Technology Works For Experience Center
Tender Overview
Project Description
Tender for Technology Works For Experience Center
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 11-Aug-2026 | date extended | Date | 31-Aug-2026 |
| 2 | 27-Aug-2026 | ESTIMATE BOQ | Other | 15-Sep-2026 |
| 3 | 25-Aug-2026 | tender document | Other | 15-Sep-2026 |
| 4 | 24-Aug-2026 | detail of statue | Other | 15-Sep-2026 |
| 5 | 21-Aug-2026 | date extended 2108 | Date | 09-Sep-2026 |
| 6 | 13-Aug-2026 | Bid Submission Start Date and Time updated | Date | 31-Aug-2026 |
| 7 | 11-Aug-2026 | date extended | Date | 31-Aug-2026 |
| 8 | 29-Aug-2026 | date extended as per attached file | Date | 15-Sep-2026 |
| 9 | 15-Sep-2026 | PLEASE GO THROUGH KEY DATES | Date | 26-Sep-2026 |
| 10 | 06-Sep-2026 | corrigendum | Other | 26-Sep-2026 |
| 11 | 05-Sep-2026 | BOQ UPDATED | BOQ | 26-Sep-2026 |
| 12 | 03-Sep-2026 | SCULPTURE NARRATIVE and ARTIST FABRICATION BRIEF | Other | 26-Sep-2026 |
| 13 | 02-Sep-2026 | corrigendum 02 09 26 | Other | 26-Sep-2026 |
| 14 | 27-Aug-2026 | ESTIMATE BOQ | Other | 26-Sep-2026 |
| 15 | 25-Aug-2026 | tender document | Other | 26-Sep-2026 |
| 16 | 24-Aug-2026 | detail of statue | Other | 26-Sep-2026 |
| 17 | 02-Sep-2026 | tender drawings set part 3 | Other | 26-Sep-2026 |
| 18 | 02-Sep-2026 | tender drawings set part 2 | Other | 26-Sep-2026 |
| 19 | 02-Sep-2026 | tender drawings set | Other | 26-Sep-2026 |
| 20 | 27-Aug-2026 | ESTIMATE BOQ | Other | 16-Oct-2026 |
| 21 | 25-Aug-2026 | tender document | Other | 16-Oct-2026 |
| 22 | 24-Aug-2026 | detail of statue | Other | 16-Oct-2026 |
| 23 | 02-Sep-2026 | tender drawings set part 2 | Other | 16-Oct-2026 |
| 24 | 02-Sep-2026 | tender drawings set | Other | 16-Oct-2026 |
| 25 | 06-Oct-2026 | PLEASE SEE KEY DATES | Date | 16-Oct-2026 |
| 26 | 06-Sep-2026 | corrigendum | Other | 16-Oct-2026 |
| 27 | 05-Sep-2026 | BOQ UPDATED | BOQ | 16-Oct-2026 |
| 28 | 03-Sep-2026 | SCULPTURE NARRATIVE and ARTIST FABRICATION BRIEF | Other | 16-Oct-2026 |
| 29 | 02-Sep-2026 | corrigendum 02 09 26 | Other | 16-Oct-2026 |
| 30 | 02-Sep-2026 | tender drawings set part 3 | Other | 16-Oct-2026 |
| 31 | 21-Aug-2026 | date extended 2108 | Date | 09-Sep-2026 |
| 32 | 13-Aug-2026 | Bid Submission Start Date and Time updated | Date | 31-Aug-2026 |
| 33 | 11-Aug-2026 | date extended | Date | 31-Aug-2026 |
| 34 | 26-Sep-2026 | Date Extended as per attached file | Date | 06-Oct-2026 |
| 35 | 06-Sep-2026 | corrigendum | Other | 06-Oct-2026 |
| 36 | 05-Sep-2026 | BOQ UPDATED | BOQ | 06-Oct-2026 |
| 37 | 03-Sep-2026 | SCULPTURE NARRATIVE and ARTIST FABRICATION BRIEF | Other | 06-Oct-2026 |
| 38 | 02-Sep-2026 | corrigendum 02 09 26 | Other | 06-Oct-2026 |
| 39 | 02-Sep-2026 | tender drawings set part 3 | Other | 06-Oct-2026 |
| 40 | 02-Sep-2026 | tender drawings set part 2 | Other | 06-Oct-2026 |
| 41 | 02-Sep-2026 | tender drawings set | Other | 06-Oct-2026 |
| 42 | 27-Aug-2026 | ESTIMATE BOQ | Other | 06-Oct-2026 |
| 43 | 25-Aug-2026 | tender document | Other | 06-Oct-2026 |
| 44 | 24-Aug-2026 | detail of statue | Other | 06-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | A.1 Audio Systems |
| 2 | Supply, Installation and Fixing of 19\\" standard 36-42 U Equipment Rack with all required accessories - earthing community kit, mounting bracket, cable manager, support angle, equipment shelf, mounting hardware, fan housing units. Ventilated top/bottom covers, removable side panels with slam latches. |
| 3 | SITC of Loudspeakers (Line Array Top): Drivers 2×10\\" LF / 1×1.4\\" HF coaxial; Freq range 60-18 kHz; Power 1000/2000W; 8 Ω; Coverage 60°×40° / 90°×50° rotatable HF horn; Sensitivity 106 dB; SPLmax/peak 138 dB; Polyurea coating IP54 for outdoor. |
| 4 | SITC of Subwoofer: Driver 1×18\\" LF; Freq 32-160 Hz; Power 2400/4800W; 8 Ω; Sensitivity 96 dB Passive; SPLmax/peak 132 dB; Polyurea coating IP54 for outdoor. |
| 5 | Four-Channel Amplifier with inbuilt DSP: 1500W@2Ω, 1200W@4Ω/8Ω, 3000W@4Ω bridge; Max output 140 Vpeak/45 Apeak; FR 20Hz-20kHz; S/N 110 dBA; THD+N <0.2%; 24-bit/48 kHz A/D-D/A; FIR / Butterworth / Linkwitz-Riley / Bessel filters; TruePower limiter; 12-pin Phoenix MC input / 8-pin Phoenix DFK output. |
| 6 | Audio Interface - Pro-grade Dante / MADI-capable interface, min 16×16 channels, 24-bit/192 kHz, MIDI I/O, redundant PSU. |
| 7 | A.2 Projection Mapping System |
| 8 | SITC of 3-Chip DLP Laser Projector - minimum 40,000 lumens brightness; WUXGA (1920×1200) or higher; contrast 20,000:1; brightness uniformity ≥95%; Inputs HDMI 2.0, HDBaseT, DVI-D; Pixel clock ≥580 MHz; illumination life ≥20,000 hrs. Supplied with suitable long-throw zoom lens. Six projectors arranged in arc to cover front and 3/4 angles of multi-armed Vishwaroopa form (face, hands, torso, lotus pedestal). |
| 9 | SITC Projection Housing Enclosure - Interface for setup and monitoring of temperature / humidity / status; Power control circuit with PID management compatible with projection housing & display unit; assembly and mounting with cables, mounting brackets, tilt/pan arrangement for 3D mapping layout. |
| 10 | SITC RDM Control Panel - Independent digital LED display for monitoring of temperature & humidity, exhaust control circuit, heating circuit and power distribution for projectors. |
| 11 | A.3 Control Room - Media Servers, Routing, UPS |
| 12 | SITC Media Server (Master + Slave) - Intel Core i9 / Xeon processor; 4096×2160 output; ≥64 GB RAM; ≥2 TB NVMe SSD; Dedicated 16 GB Quadro / RTX graphics; Multi-output (DVI/HDMI/DP/SDI); Windows 10/11 with lifetime license; Disguise / Pixera / Modulo compatible workstation. |
| 13 | Supply, installation, testing & commissioning of Lighting Control Software complete with necessary software, hardware interface and licenses. |
| 14 | Supply, installation, configuration & commissioning of Media Production Software for Multimedia 3D Mapping show. Licenses and other fees inclusive. |
| 15 | DMX Converter with 3-pin and 5-pin XLR points for programming of lights. |
| 16 | DMX Splitter (Opto-isolated) - min 1 DMX input × 6 DMX outputs; standard 5-pin XLR; power-on LED & DMX active LED indicators; internally terminated input. |
| 17 | 24\\" Flat LCD Display Monitors - 1920×1080 @ 60 Hz; 250 cd/m²; DVI-D w/ HDCP, VGA, USB 2.0 upstream/downstream. |
| 18 | Supply, installation, testing & commissioning of 60 KVA True On-Line 3-Phase Double-Conversion UPS with all safeties; sealed maintenance-free 12V batteries; 30 min backup at full load; MS open battery rack & Nyvin cable. |
| 19 | DVI-D, HDMI, VGA, USB cables - lump sum, all-inclusive for control-room dressing. |
| 20 | 24-port Gigabit Switch with 2× Mini-GBIC fiber uplinks. IEEE 802.3/3u/3x/3ab; Cat 5 & multi-mode fiber; 100-240 VAC, 50/60 Hz; 0-40 °C operating. |
| 21 | HDMI-to-HDMI cable, 50 m, 4K×2K & extended colour space, 15.2 Gbps DTR, 10 MΩ min insulation, -25 to 80 °C working. |
| 22 | A.4 Lasers & Architectural / Moving-Head Lighting |
| 23 | SITC Laser 20,000 mW, graphics capable - 45 kpps @ 8° ILDA; full-colour mixing, analog modulation; link multiple units (Power / DMX / ILDA); custom content storage and playback; programming & playback software. |
| 24 | SITC Laser Housing Enclosure with assembly and mounting per site plan - cables, mounting brackets, tilt / pan arrangement. |
| 25 | Laser control software with full effects and controls library. |
| 26 | Moving-Head Beam Fixture - 280-400 W high-CRI lamp / discharge or LED; 8000 K CT; colour wheel (13+ colours + white); half-colour effect; gobo & prism; pan/tilt; full DMX; IP-rated body suitable for outdoor enclosure. |
| 27 | Weatherproof Dome Housing for moving-head / beam lights - heat-dissipation unit, acrylic dome to pass the beam, suitable for outdoor heritage installation. |
| 28 | A.5 Electrical, Cabling, Conduits & Earthing |
| 29 | DMX Cable - 18 AWG 18/0.20 mm × 2 core ATC copper, PE insulated, twisted, moisture-proof inner sheath, 80% ATC braid shield, matt PVC outer jacket. |
| 30 | CAT 6/5e Shielded Twisted Pair (STP) cable - 24 AWG, overall braid + foil shield, signal & data transmission. |
| 31 | Speaker Cable - 2 core × 4 sq mm copper. |
| 32 | 4 Core × 35 sq mm armoured Aluminium FRLS cable. |
| 33 | 4 Core × 16 sq mm unarmoured Copper FRLS cable. |
| 34 | 3 Core × 4 sq mm armoured Copper FRLS cable. |
| 35 | 1 Core × 70 sq mm unarmoured Copper FRLS cable. |
| 36 | 1 Core × 35 sq mm unarmoured Copper FRLS cable. |
| 37 | 3 Core × 1.5 sq mm Copper FRLS cable. |
| 38 | 3 Core × 2.5 sq mm Copper FRLS cable. |
| 39 | 3 Core × 6 sq mm Copper FRLS cable. |
| 40 | 4 Core × 16 sq mm Aluminium FRLS cable. |
| 41 | Electrical LT Panel - Distribution equipment including main DB, field junction boxes, luminaire / speaker JBs designed per final show concept for control & distribution of power / controls to all field equipment & control room. |
| 42 | Weatherproof (IP-65) Thermoplastic Cable Junction Box with terminal block, multi-size compatible. |
| 43 | Cable Glands (assorted sizes 16 / 19 / 22 / 28 / 32 mm DC) - lump sum. |
| 44 | Maintenance-free Earthing - Copper earth plate 300×300×3 mm with all accessories, masonry enclosure with cover & locking, watering pipe, charcoal & salt per BIS spec. |
| 45 | Earthing strip 25 × 5 mm Cu - supply, laying, jointing, testing & commissioning. |
| 46 | Earthing strip 20 × 3 mm Cu. |
| 47 | 8 S.W.G. Cu earthing wire. |
| 48 | HDPE Double-Wall Corrugated (DWC) Conduit, 90 mm OD / 76 mm ID, IP-67, IS:14930 / 16205; supply & laying with GI pull wires & sealant ends. |
| 49 | Raceway 150 × 50 mm in control room. |
| 50 | DMX Decoder. |
| 51 | Connectors and accessories - lump sum. |
| 52 | A.6 Fabrication of Projection / Speaker / Laser Towers |
| 53 | Projection Tower - Designing / supply / fixing / installation of MS thematic-design projection tower with 10 mm MS base plate, clamps, grouting material, anti-corrosion painting and accessories. (Foundation paid separately.) |
| 54 | Speaker Pole - Designing / supply / fixing / installation of MS speaker poles for 8 line-array tops + spread for subs at base. |
| 55 | Laser Stand - Designing / supply / fixing / installation of MS laser stands. |
| 56 | A.7 Content Creation - 15-20 min show (compact package) |
| 57 | Complete Content Package - Lump sum covering: (a) Script writing with movement, action, expression & dialogue of characters & narrative; (b) Audio-Visual Content - visual storyboard, 2D & 3D animation, graphics, artwork, archival imagery, video timeline, SFx, VFx, voiceovers, music; (c) Music composition & direction including original score, background sound, archival mixing, songs; (d) Artwork by professional artists & illustrators; (e) Voiceovers - narrator and character VO in Hindi & English by professional artists; (f) Light Design & Programming sync'd to script; (g) Laser Animation & Programming sync'd to AV; (h) On-site Audio Design & Distribution; (i) Edge-Blending & 3D Projection Mapping alignment for multi-armed Vishwaroopa geometry (face, hands, torso, lotus pedestal). |
| 58 | SECTION B | AESTHETIC WORKS & DESIGN ENGINEERING |
| 59 | Providing aesthetic look & feel (cladding, thematic wraps, brass-tone finish to match statue) for the projection towers / poles. |
| 60 | Providing aesthetic look & feel for control-room marine container with thematic branding. |
| 61 | Concept, Creativity, Planning, Design and Engineering for the entire Multimedia 3D Projection-Mapping show through team of expert technocrats - site survey, mapping geometry, content briefs, technical drawings, DMX architecture. |
| 62 | SECTION C | MISCELLANEOUS / SITE ASSOCIATED |
| 63 | Marine Container Control Room - 40' × 8' container, fully fit-out, A/C-conditioned with 1.5 TR / 2 TR 5-star BEE-rated inverter split AC, stabilizer-free, for equipment cooling and show control. Includes flooring, lighting, exhaust, equipment-rack placement and entry door. |
| 64 | Customised Branding - signage, IP boards, donor wall and on-site wayfinding for the show. |
| 65 | Year 1 | Comprehensive O&M cost |
| 66 | Year 2 | Comprehensive O&M cost |
| 67 | Year 3 | Comprehensive O&M cost |
| 68 | Development of tourism infrastructure & public Experience Zone behind Unity mall |
| 69 | Development of tourism infrastructure & public Experience Zone behind Unity mall |
| 70 | SPECIALIZED ITEMS ( SCULPTURE ) |
| 71 | Sculpture design and Mock up model as per the RFP clauses (to be submitted with the bid) Foundation with concrete, stone and SS reinforcement (100 year design life) Main Statue : Structure (Above Ground level) Plate fabricated sections shall be with hardware. (100 year design life) Main Statue over concrete podium of two floors : Providing supply, fabrication, machining, finishing, testing and installation of 6-8mm metal composite alloy (primary bronze/brass) for architectural cladding/skin of statue, including casting in required shapes/panels, fixing system, sub-structure support, anchoring, and all complete as per approved drawings and direction of Engineer-in-Charge. Surface area approximately 3400 sqm Structural Design Proof checking by IIT Approval Wind tunnel test Transportation Crane, Hydra, Scaffolding Third party test for all material, workmanship, design, quality etc as per the RFP and Engineer In Charge Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-7 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-8 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-9 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-10 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-11 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-12 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-13 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-14 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-15 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-16 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-17 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-18 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-19 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-20 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-21 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-22 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-23 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-24 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-25 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-26 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-27 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-28 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-29 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-30 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-31 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-32 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-33 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-34 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-35 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-36 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-37 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-38 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-39 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-40 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-41 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-42 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-43 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-44 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayTender Documents