Tender For Electrical Installation Work For Shifting Of 11Kv Lt Lines & S/S Due To Construction Of Road From Banamalipur (Banamalipur High School) To Apuja Under R.W.E.S Khordha.
Tender Value
20.14 Lakhs
Estimated cost
Bid Submission
10 Aug 2026
8 days left
EMD
20148
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Khordha → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Electrical Installation Work For Shifting Of 11Kv Lt Lines & S/S Due To Construction Of Road From Banamalipur (Banamalipur High School) To Apuja Under R.W.E.S Khordha.
BOQ
| Sl. No. | Item Description |
| 1 | WPB (GI) Pole 160x152 (13Mtr. Long, 30.44KG/Mtr.) |
| 2 | Top Channel 100X50X6mm, 9.56 KG/Mtr., each channel length 2.3 mtr., 2 no's channel required =( 2x9.56x2.3) |
| 3 | Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 4 | Double Pole Belting Channel 75X40X 4.8mm., 7.14KG/Mtr., each channel length 1.66 Mtr., 4 no's channel required =( 7.14x1.66x4) |
| 5 | 50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle length 2.671 mtr., 4 nos angle required = (4.5x2.671x4) |
| 6 | Danger Plate, 2 no's. |
| 7 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 8 | H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 9 | H.T. Stay set (Complete ) |
| 10 | H.T. Stay Insulator Type-C |
| 11 | 7/10 SWG Stay Wire 15kg /stay |
| 12 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 13 | 50x6mm GI Flat for earthing, 2.36kg/mtr., (2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 5x2.36 |
| 14 | GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg) |
| 15 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 16 | 11 KV pin insulator polymer |
| 17 | H W fitting(B&S) 70KN, 3Bolt |
| 18 | Disc insulator (B&S) 70 KN polymer |
| 19 | PG Clamp for 100 sq.mm AAA conductor |
| 20 | GI Nut , Bolt & Washer of different sizes (12.261 Kg each DP without AB Switch) |
| 21 | Black Paint |
| 22 | Yellow Colour Paint for Background |
| 23 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 24 | Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr |
| 25 | Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr |
| 26 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe . |
| 27 | WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 28 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 2 no's channel required =( 2x9.56x1.2) |
| 29 | Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280) |
| 30 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 2 no's channel required =(2x9.56x0.306) |
| 31 | Danger Plate, 1 no's. |
| 32 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 33 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 34 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 35 | 11 KV pin insulator polymer |
| 36 | H W fitting(B&S) 70KN, 3Bolt |
| 37 | Disc insulator (B&S) 70 KN polymer |
| 38 | Earthing of Support ( Coil Type ) |
| 39 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 40 | PG Clamp for 100 sq.mm AAA conductor |
| 41 | GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole) |
| 42 | Black Paint |
| 43 | Yellow Colour Paint for Background |
| 44 | Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr |
| 45 | Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr |
| 46 | WPB (GI) Pole 160x152 (13Mtr. Long, 30.44KG/Mtr.) |
| 47 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 4 no's channel required =( 4x9.56x1.2) |
| 48 | Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280) |
| 49 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 4 no's channel required =( 4x9.56x0.306) |
| 50 | Danger Plate, 1 no's. |
| 51 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 52 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 53 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 54 | 11 KV pin insulator polymer |
| 55 | H W fitting(B&S) 70KN, 3Bolt |
| 56 | Disc insulator (B&S) 70 KN polymer |
| 57 | Earthing of Support ( Coil Type ) |
| 58 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 59 | PG Clamp for 100 sq.mm AAA conductor |
| 60 | H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 61 | H.T. Stay set (Complete ) |
| 62 | H.T. Stay Insulator Type-C |
| 63 | 7/10 SWG Stay Wire 15kg /stay |
| 64 | GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 65 | Black Paint |
| 66 | Yellow Colour Paint for Background |
| 67 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 68 | Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr |
| 69 | Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr |
| 70 | WPB (GI) Pole 160x152 (13Mtr. Long, 30.44KG/Mtr.) |
| 71 | 150 x 150 RS Joist Pole (9Mtr. long 30.44KG/Mtr.) |
| 72 | 11 KV V cross Arm (10.2 K.g. each ) |
| 73 | Top bracket 100x50X6 mm GI channel (2kg each) |
| 74 | Danger Plate, 1 no's. for each pole |
| 75 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 76 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 77 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 78 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 79 | Earthing of Support ( Coil Type ) |
| 80 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 81 | GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 82 | 100 mm2 AAAC |
| 83 | Black Paint |
| 84 | Yellow Colour Paint for Background |
| 85 | Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr |
| 86 | Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr |
| 87 | 9Mtr. long PSC Pole 300 Kg. |
| 88 | PSC pole V cross Arm back clamp |
| 89 | 11 KV V cross Arm (10.2 K.g. each ) |
| 90 | Top bracket 100x50X6 mm GI channel (2kg each) |
| 91 | Danger Plate, 1 no's. for each pole |
| 92 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 93 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 94 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 95 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 96 | Earthing of Support ( Coil Type ) |
| 97 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 98 | GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 99 | 55 mm2 AAAC |
| 100 | Black Paint |
| 101 | Yellow Colour Paint for Background |
| 102 | Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr |
| 103 | WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 104 | Top Channel GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 105 | Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 106 | AB Switch Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 107 | AB Switch Side Support Channel 100X50X6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no's channel required =( 9.56x2x0.35) |
| 108 | Channel Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each channel length 0.8 Mtr., 1 no's channel required =( 7.14x0.8x1) |
| 109 | HG/ DO Fuse Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 110 | Cantilever Support Channel 75x40x4.8 mm GI Channel (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 111 | Cantilever Support Angle 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 112 | Transformer Base GI Channel 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 113 | Transformer Base Support GI Channel 100 X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No's) (Each 2x0.515x9.56= 9.85Kg) |
| 114 | Transformer Belting Angle 50 X 50 X 6MM GI (3000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x3.0x4.5 Kg) |
| 115 | Transformer Belting Support Angle 50 X 50 X 6MM GI (580 mm long)(4.5Kg./Mtr,2 No's) (Each 2x0.580x4.5= Kg) |
| 116 | LTDB Mounting Angle 50 X 50 X 6MM GI (1000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x1x4.5 Kg) |
| 117 | 50x6mm GI Flat for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 118 | LT Distribution Box with MCCB, Aluminium Busbar of single Bay with kit kat fuse for 25 KVA S/S |
| 119 | 55mm2 All Alloy Aluminum Conductor (AAAC) - PVC Insulated (50 Mtr. Each Dtr.) |
| 120 | 4 Cx 35 mm2 LT XLPE Cable(Armoured) - FOR 25 KVA Trf. |
| 121 | AB Switch(11KV,200A.3pole,50Hz) |
| 122 | H.G.Fuse( 11KV.200A.3Pole) |
| 123 | PG Clamp for 55 sq.mm AAA conductor |
| 124 | Disc insulator (B&S)70 KN polymer |
| 125 | H W fitting (B&S)70KN(3bolted) |
| 126 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 127 | 11KV pin insulator polymer |
| 128 | HT stay set complete |
| 129 | HT stay Clamp (1.9Kg/pair) |
| 130 | HT stay insulator TYPE-C |
| 131 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 132 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 133 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 134 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 135 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 136 | Danger plate 11kv |
| 137 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 138 | Name plate |
| 139 | Yellow Colour Paint for Background |
| 140 | Black Colour Paint for numbering |
| 141 | Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.450Cu.mtr |
| 142 | Couping ratio 1:1.5:3 (500mmX500mmX450mm) = 0.113Cu.mtr |
| 143 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6 size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 144 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe . |
| 145 | Laying of 4 Cx 35 mm2 LT XLPE Cable |
| 146 | Supply and Erection of GI Fencing with Gate |
| 147 | 9 Mtr. long 300 Kg. PSC Pole |
| 148 | LT Stay set Complete |
| 149 | 7/12 SWG GI stay wire, Grade -2 |
| 150 | LT stay Clamp ( 1.40Kg/pair) |
| 151 | LT Stay insulator |
| 152 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 153 | EYE hook for XLPE Aerial bunched Cable (25-70 sq.mm) |
| 154 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable (25-70 sq.mm) |
| 155 | Suspension Clamp with EYE hook for ABC (25-70 sq.mm) |
| 156 | 3x50 + 1x35+1x16mm2 (LT AB Cable) |
| 157 | Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm |
| 158 | Pipe Earthing (each 5th pole to earth) |
| 159 | Coil Earthing |
| 160 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 161 | Danger plate (LT) |
| 162 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 163 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 164 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 165 | GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole) |
| 166 | Black Paint |
| 167 | Yellow Colour Paint for Background |
| 168 | Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.) |
| 169 | Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr |
| 170 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe . |
| 171 | Dismantaling of 25KVA DP |
| 172 | Dismantaling of Line DP (13Mtr. Long) |
| 173 | Dismantaling of PSC Pole |
| 174 | Dismantaling of Joist Pole |
| 175 | Dismantaling of conductor |
| 176 | Dismantaling of ABC |
| 177 | Dismantaling of V Cross Arm |
| 178 | Dismantaling of GI Pin with Pin Insulator Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 01, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 10, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysAug 11, 2026
Bid Opening Date
Technical bids will be opened and evaluated.