Defence Statutory Bodies & Commissions/Committees Closing in 10 days TDR #56783361

Tender For Provn Of Work Services For Induction Of Ad System At Af Stn Arjangarh

Issued by Statutory Bodies & Commissions/Committees · Gurgaon, Haryana
Tender Value
14 Crore
Estimated cost
Bid Submission
09 Sep 2026
10 days left
EMD
10.25 Lakhs
Bank guarantee accepted
Document Fee
3000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Gurgaon → Haryana
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Provn Of Work Services For Induction Of Ad System At Af Stn Arjangarh

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 04-Aug-2026 CORRIGENDUM01 Other 04-Sep-2026
2 24-Aug-2026 CORRIGENDUM02 BOQ 07-Sep-2026
3 24-Aug-2026 CORRIGENDUM2 Date 07-Sep-2026
4 24-Aug-2026 CORRIGENDUM002 Other 07-Sep-2026
5 28-Aug-2026 CORRIGENDUM03 BOQ 09-Sep-2026
6 28-Aug-2026 CORRIGENDUM3 Date 09-Sep-2026
7 24-Aug-2026 CORRIGENDUM002 Other 09-Sep-2026
8 24-Aug-2026 CORRIGENDUM02 BOQ 09-Sep-2026
9 24-Aug-2026 CORRIGENDUM2 Date 07-Sep-2026

BOQ

Name of Work:- PROVN OF WORK SERVICES FOR INDUCTION OF AD SYSTEM AT AF STN ARJANGARH
Sl. No. Item Description
1SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.00 under column 5 signifies this fact only.
2Construction of Power house building including ramps with permanent specifications complete all as specified and as shown on drawings.
3Construction of Breaker room including ramps with permanent specifications complete all as specified and as shown on drawings.
4Construction of Eqpt store room and duty crew rest room with permanent specifications complete all as specified and as shown on drawings.
5Construction of Lavatory block for male and female for duty crew with permanent specifications complete all as specified and as shown on drawings.
6Construction of toilet block for Agniveer Vayu women with permanent specifications complete all as specified and as shown on drawings.
7Construction of POL Store with permanent specifications complete all as specified and as shown on drawings.
8Construction of Parking shed for 05 Cars including ramp with permanent specifications complete all as specified and as shown on drawings.
9Construction of Parking shed for 10 Scooters including ramp with permanent specifications complete all as specified and as shown on drawings.
10Construction of LLDPE Septic tank of capacity for 10 user's designed to carry sewage and sullage water, excavation in any type of soil, PCC below foundation, Vent shaft, connection etc. for all necessary functioning complete all as specified and directed by Engr-in-Charge.
11Construction of Soakage Well, excavation, in any type of soil, foundation in PCC 1:3:6, walls of honey combed masonary with top ring of M-25 concrete including intercepting chamber and screen chamber made of brick masonary in CM, RCC cover slab in M-25/ SFRC cover, interconnecting pipes of RCC/ DWC complete filled with brick bats, of size 1.8 m dia and 3.0 m in effective depth complete all as specified and directed by Engr-in-Charge.
12NOTE: Schedule ‘A’ Part II to XIII under Ser No 2.01 to 2.10 are Prepriced by MES.
13Lump sum price worked out by the Contractor for “ SITE CLEARANCE, EXCAVATION AND EARTH WORK ” as listed in Schedule ‘A’ Part II
14Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION WORKS) ” as listed in Schedule ‘A’ Part III
15Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY WORKS\\" as listed in Schedule ‘A’ Part IV
16Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL WORKS” as listed in Schedule ‘A’ Part -V
17Lump sum price worked out by the Contractor for “ROAD, PATH AND HARDSTANDING WORKS” as listed in Schedule ‘A’ Part- VI
18Lump sum price worked out by the Contractor for \\"BORE WELL WORKS” as listed in Schedule ‘A’ Part- VII
19Lump sum price worked out by the Contractor for \\"EXTERNAL WATER SUPPLY WORKS” as listed in Schedule ‘A’ Part VIII
20Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION WORKS\\" as listed in Schedule ‘A’ Part IX
21Lump sum price worked out by the Contractor for “FLAME PROOF LIGHTENING WORKS\\" as listed in Schedule ‘A’ Part X
22Lump sum price worked out by the Contractor for “LIGHTENING ARRESTOR WORKS ” as listed in Schedule ‘A’ Part XI
23SCHEDULE `A' PART - XII MISC ITEMS (B/R & E/M, Srl Item No. 3.01 to 11.01 is not prepriced by MES and prepriced rates indicate 0.00 under column 5 signifies this fact only.
24SITE CLEARANCE AND EARTH WORKS
25Supply only earth for earth filling, spreading and levelling in above or below ground level complete all as specified and as directed by Engr-in-Charge.
26INTERNAL ELECTRIFICATION WORKS
27Supply and fixing of Metal flush box 8 module complete all as specified and directed by Engr-in-Charge.
28Supply and fixing of Highly efficient LED bulbs, 10 watt in B-22 cap complete all as specified and directed by Engr-in-Charge.
29SEWAGE DISPOSAL WORKS
30Supply and fixing of SFRC manhole cover 75mm thick factory made with plain surface as per requirement including 75 X1.5 mm flat iron frame all around the cover complete all as specified and directed by Engr-in-Charge.
31ROAD, PATH AND HARSTANDING WORKS
32Material and labour for painting 2mm thick of thermoplastic fluorescent paint, colour white or golden or any other shade, conforming to BS standard 3262 with 20% glass beads (inter mixed) applied hot with automatic (commercial) machine drive in strips after preparation of surfaces as per manufacturer's instructions, making lines, broken lines/dashes, arrows etc on roads and other like surfaces exceeding 10 cm but not exc 30cm in width or girth complete all as specified and directed by Engr-in-Charge.
33Material and labour for laying 400 micron HDPE polythene film (transparant ) as per IS -2508 laid over sand cushioning all necessary cutting overlaps not less than 300mm and wastage complete all as specified and directed by Engr-in-Charge.
34BORE WELL WORKS Please Enable Macros to View BoQ information
35BORE WELL WORKS Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56783361
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 14 Crore
LAST DATE 09-09-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Provn Of Work Services For Induction Of Ad System At Af Stn Arjangarh
Basic Detail
Tender No CEWAC/GUR/T-02/2026-27
Bidding Type Tender
Location
City Gurgaon
State Haryana
Key Dates
Publish Date 28 Aug 2026
Submission Date 09 Sep 2026
Open Date 01 Jan 0001
Finance
Tender Value 14 Crore
Tender Fee 3000
EMD 10.25 Lakhs
Exemption Available
Document List
820bc1a6-3f9f-4592-b509-ce9c113355b8.html
BOQ_876208.xls
drawings.pdf
Tender.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 28, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 04, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 5 days
Sep 07, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 8 days
Sep 07, 2026
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 8 days
Sep 07, 2026
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 8 days
Sep 09, 2026
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 10 days
Sep 09, 2026
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 10 days
Sep 09, 2026
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 10 days
Sep 09, 2026
18:00 IST

Corrigendum-8 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 10 days
Sep 07, 2026
18:00 IST

Corrigendum-9 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 8 days
Sep 09, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
html

820bc1a6-3f9f-4592-b509-ce9c113355b8.html

xls

BOQ_876208.xls

pdf

drawings.pdf

pdf

Tender.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders