Tender For Provn Of Work Services For Induction Of Ad System At Af Stn Arjangarh
Tender Overview
Project Description
Tender for Provn Of Work Services For Induction Of Ad System At Af Stn Arjangarh
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 04-Aug-2026 | CORRIGENDUM01 | Other | 04-Sep-2026 |
| 2 | 24-Aug-2026 | CORRIGENDUM02 | BOQ | 07-Sep-2026 |
| 3 | 24-Aug-2026 | CORRIGENDUM2 | Date | 07-Sep-2026 |
| 4 | 24-Aug-2026 | CORRIGENDUM002 | Other | 07-Sep-2026 |
| 5 | 28-Aug-2026 | CORRIGENDUM03 | BOQ | 09-Sep-2026 |
| 6 | 28-Aug-2026 | CORRIGENDUM3 | Date | 09-Sep-2026 |
| 7 | 24-Aug-2026 | CORRIGENDUM002 | Other | 09-Sep-2026 |
| 8 | 24-Aug-2026 | CORRIGENDUM02 | BOQ | 09-Sep-2026 |
| 9 | 24-Aug-2026 | CORRIGENDUM2 | Date | 07-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.00 under column 5 signifies this fact only. |
| 2 | Construction of Power house building including ramps with permanent specifications complete all as specified and as shown on drawings. |
| 3 | Construction of Breaker room including ramps with permanent specifications complete all as specified and as shown on drawings. |
| 4 | Construction of Eqpt store room and duty crew rest room with permanent specifications complete all as specified and as shown on drawings. |
| 5 | Construction of Lavatory block for male and female for duty crew with permanent specifications complete all as specified and as shown on drawings. |
| 6 | Construction of toilet block for Agniveer Vayu women with permanent specifications complete all as specified and as shown on drawings. |
| 7 | Construction of POL Store with permanent specifications complete all as specified and as shown on drawings. |
| 8 | Construction of Parking shed for 05 Cars including ramp with permanent specifications complete all as specified and as shown on drawings. |
| 9 | Construction of Parking shed for 10 Scooters including ramp with permanent specifications complete all as specified and as shown on drawings. |
| 10 | Construction of LLDPE Septic tank of capacity for 10 user's designed to carry sewage and sullage water, excavation in any type of soil, PCC below foundation, Vent shaft, connection etc. for all necessary functioning complete all as specified and directed by Engr-in-Charge. |
| 11 | Construction of Soakage Well, excavation, in any type of soil, foundation in PCC 1:3:6, walls of honey combed masonary with top ring of M-25 concrete including intercepting chamber and screen chamber made of brick masonary in CM, RCC cover slab in M-25/ SFRC cover, interconnecting pipes of RCC/ DWC complete filled with brick bats, of size 1.8 m dia and 3.0 m in effective depth complete all as specified and directed by Engr-in-Charge. |
| 12 | NOTE: Schedule ‘A’ Part II to XIII under Ser No 2.01 to 2.10 are Prepriced by MES. |
| 13 | Lump sum price worked out by the Contractor for “ SITE CLEARANCE, EXCAVATION AND EARTH WORK ” as listed in Schedule ‘A’ Part II |
| 14 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION WORKS) ” as listed in Schedule ‘A’ Part III |
| 15 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY WORKS\\" as listed in Schedule ‘A’ Part IV |
| 16 | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL WORKS” as listed in Schedule ‘A’ Part -V |
| 17 | Lump sum price worked out by the Contractor for “ROAD, PATH AND HARDSTANDING WORKS” as listed in Schedule ‘A’ Part- VI |
| 18 | Lump sum price worked out by the Contractor for \\"BORE WELL WORKS” as listed in Schedule ‘A’ Part- VII |
| 19 | Lump sum price worked out by the Contractor for \\"EXTERNAL WATER SUPPLY WORKS” as listed in Schedule ‘A’ Part VIII |
| 20 | Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION WORKS\\" as listed in Schedule ‘A’ Part IX |
| 21 | Lump sum price worked out by the Contractor for “FLAME PROOF LIGHTENING WORKS\\" as listed in Schedule ‘A’ Part X |
| 22 | Lump sum price worked out by the Contractor for “LIGHTENING ARRESTOR WORKS ” as listed in Schedule ‘A’ Part XI |
| 23 | SCHEDULE `A' PART - XII MISC ITEMS (B/R & E/M, Srl Item No. 3.01 to 11.01 is not prepriced by MES and prepriced rates indicate 0.00 under column 5 signifies this fact only. |
| 24 | SITE CLEARANCE AND EARTH WORKS |
| 25 | Supply only earth for earth filling, spreading and levelling in above or below ground level complete all as specified and as directed by Engr-in-Charge. |
| 26 | INTERNAL ELECTRIFICATION WORKS |
| 27 | Supply and fixing of Metal flush box 8 module complete all as specified and directed by Engr-in-Charge. |
| 28 | Supply and fixing of Highly efficient LED bulbs, 10 watt in B-22 cap complete all as specified and directed by Engr-in-Charge. |
| 29 | SEWAGE DISPOSAL WORKS |
| 30 | Supply and fixing of SFRC manhole cover 75mm thick factory made with plain surface as per requirement including 75 X1.5 mm flat iron frame all around the cover complete all as specified and directed by Engr-in-Charge. |
| 31 | ROAD, PATH AND HARSTANDING WORKS |
| 32 | Material and labour for painting 2mm thick of thermoplastic fluorescent paint, colour white or golden or any other shade, conforming to BS standard 3262 with 20% glass beads (inter mixed) applied hot with automatic (commercial) machine drive in strips after preparation of surfaces as per manufacturer's instructions, making lines, broken lines/dashes, arrows etc on roads and other like surfaces exceeding 10 cm but not exc 30cm in width or girth complete all as specified and directed by Engr-in-Charge. |
| 33 | Material and labour for laying 400 micron HDPE polythene film (transparant ) as per IS -2508 laid over sand cushioning all necessary cutting overlaps not less than 300mm and wastage complete all as specified and directed by Engr-in-Charge. |
| 34 | BORE WELL WORKS Please Enable Macros to View BoQ information |
| 35 | BORE WELL WORKS Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 8 daysCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 8 daysCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 8 daysCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 10 daysCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 10 daysCorrigendum-7 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 10 daysCorrigendum-8 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 10 daysCorrigendum-9 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 8 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender