Petroleum and Natural Gas Boards / Undertakings / PSU Closing in 19 days TDR #56779945

Tender For Laying And Construction Of Steel Gas Pipeline And Terminals Along With Associated Facilities For Vijaipur - Bina Pipeline (Vbpl) Project

Issued by Boards / Undertakings / PSU · Ghaziabad, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
21 Aug 2026
19 days left
EMD
1.02 Crore
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ghaziabad → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Laying And Construction Of Steel Gas Pipeline And Terminals Along With Associated Facilities For Vijaipur - Bina Pipeline (Vbpl) Project

BOQ

Name of Work:- LAYING AND CONSTRUCTION OF STEEL GAS PIPELINE AND TERMINALS ALONG WITH ASSOCIATED FACILITIES FOR VIJAIPUR - BINA PIPELINE (VBPL) PROJECT
Sl. No. Item Description
1SECTION-A (MAIN LINE WORKS)
2PIPELINE LAYING / INSTALLATION
3Laying/ installation of coated line pipe, associated fittings and accessories, etc. as per specifications, drawings, other provisions of Contract and instructions of Engineer-in-Charge of the sizes mentioned herein, including but not limited to carrying out the following :
4\\"Receiving and taking-over\\", handling, loading (except for cases, where loading of bare/coated line pipe is arranged by owner), transportation and unloading of Owner supplied externally corrosion coated and bare line pipes and other Owner supplied materials from Owner designated place(s) of issue/ dump site(s) to Contractor's own stock-yard(s)/ workshop(s)/ work-site(s) including stringing on the pipeline Right-of-Use (ROU)/ Right of way (ROW); Arrangement of all additional land required for Contractor's storage, fabrication, access for construction (other than Owner provided ROU/ROW); supply of all materials (except Owner supplied materials), consumables, equipment, labour, etc. and other incidental works;carrying out all temporary, ancillary, auxiliary works required to make the pipeline ready for pre-commissioning as per drawings, specifications, scope of work indicated in SCC and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works :
5Staking and installation of temporary construction markers, clearing, grubbing & grading (as required) of Right of Use/ Right of Way;
6Counting the number and type of trees cut in presence of DFO/concerned authorities and keeping record thereof; shifting of all obstruction within the ROU / pipeline route alignment viz. electrical line / pole, telephone line (poles), foreign pipeline; coordination with concerned authorities.
7Trenching to all depths and to a width to accommodate the pipeline and/or optical fiber cable/cable duct/ conduit during lowering (HDPE duct for OFC will be laid on both side of carrier pipeline) & backfilling as specified in scope document and as per the relevant standards, specifications, etc. by excavation in all types of soils (including soft/hard rock), including chiseling or otherwise cutting etc.; providing depth of padding in trench bed & above and around the pipeline, HDPE duct and OFC as required with sand / graded earth approved by Engineer-in Charge;
8Trenching in rocky terrain by use of rock hammer/ Rock breaking tool or any other suitable and approved method, including chemical cracking and controlled blasting (if required) with due approval of EIC.
9Survey of the detours, if required at the time of construction including marking the same in topographical sheet, preparation of AFC drawings showing survey detail and submitting same to Owner to review.
10Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation/ handling after taking over from Owner by Contractor including management of their own dump site, if required.
11Thorough internal cleaning of all pipes by suitable methods to remove debris, shots, grits etc. to the satisfaction of Engineer-in- Charge;
12Stringing of line pipes along ROU/ROW including providing straw and sand.
13Aligning, bending, cutting and beveling (as required) of pipes for welding and field adjustments, NDT of rebevelled area, welding, carrying out non-destructive testing (100%) by computed radiography ( CR) of welds as required and providing all requisite equipment, labor, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpretation radiographs and other tests as required; carrying out repairs of weld joints found defective by Engineer-In- Charge, carrying out re-radiography by CR and other nondestructive tests such as ultrasonic test etc. as required on repaired joints, etc. as mentioned in SCC & Particular Jobs Specification.
14Installation of carrier pipe including concrete coated pipes (wherever required) at all crossings including roads/ cartrack / pathway / drain / canals/ nala/ marshy lands/ ponds/ other water crossings etc. (except at crossings by HDD method, Cased crossings, Crossings by machine moling and by open cut conventional method that are specifically covered separately elsewhere in the SOR) by open cut after prehydrotest of the section, if required, including re-storation of the banks to original conditions (in case of waterbody crossings) duly accepted by Competent Authority as defined as per specification.
15Supply of coating materials for all field joints, Long Radius Bends, Burried Fittings, Valves, etc. including heat shrinkable sleeves and high build liquid epoxy etc. as per specifications compatible with 3-Layer PE Coating as per tender specifications with prior approval of Engineer-in-charge.
16Coating of all field weld joints, long radius bends, buried fittings, valves etc.;
17Training and diversions of streams in steep slope areas, wherever required.
18Crossing all the foreign pipeline / HT line / Power lines/ cable / any other utilities etc. with necessary concrete / PVC protection including coordination with all agencies.
19For seismic area - the trenching and backfilling shall be carried out as per specification and drawing no. MEC/05/28/E/0079/M/SD/0001 - Trench dimensions and cohesion less select backfill for pipeline in seismic zone (excluding backfilling with selected soil for seismic area covered separately).
20Lowering the pipelines in trench as per specification and standard drawing including providing sand bag separators for parallel pipelines at the specified spacing (when applicable), providing padding around pipe as per specifications/codes/guidleines with sand/graded material approved by Engineer-In-Charge, over and around the pipeline, OFC & HDPE Duct, in rocky areas, including supply of sand/ graded material. In addition to padding, rock shield to be supplied and installed over the pipeline in rocky areas, backfilling with available, approved excavated material and/or other suitable soil approved by Engineer-In-Charge;
21Taking DGPS coordinates of each weld joint (including tie in joints) and including the same in field inspection report. The coordinate must have X,Y,Z (ground level) along with depth of cover.
22Supply and installation of slope breaker as per specifications and drawings in steep slope areas, wherever required;
23Installation of LR Bend, as per specification wherever required depending on site condition.
24Supply and installation of warning mat as per relevant clause mentioned in PJS and specifications enclosed in the bid document.
25Carrying out cleaning, pigging and hydrostatic testing including air cleaning, flushing, filling, gauging, pressurization of complete pipeline in various test sections as approved by Engineer-In-Charge to the specified test pressure, providing all equipment, pumps, fittings, instruments, dead weight tester, test headers, pressure recorder, all types of pigs etc., and services, supervision, labour, consumables, water including supply of corrosion inhibitor, air, etc. as required, locating of leaks, if any, occured during hydrotesting attributable to contractor either by further sectionalising or any other suitable standard recommended practice with due approval of Engineer-in-Charge and rectification of defects, retesting after rectification, successful completion of hydrotesting of pipeline to acceptance criteria defined in the specifications.
26(Note : Leak detection, its rectification and successfully re-hydrotesting shall be carried out by Contractor with a view that completion of all activity for successful hydrotesting is not inordinately extended, which will hamper the overall project schedule. Further, no extra payment claim shall be entertained for re-hydrotesting and leak detection if defects found attributable to Contractor.
27All tie-ins, including the tie-in(s) of the pipeline / piping installed with the adjacent section of pipeline by others including cutting of test header, re-beveling as required , radiography and other NDT examination, joint coating as per specification.
28Carrying out all temporary, ancillary, auxiliary works and all incidental works required to make the pipeline ready for pre-commissioning;
29Repair of defects recorded during EGP/gauge plate run or otherwise including cutting, beveling, welding, radiography, field joint coating etc; as applicable,
30Final clean-up and restoration of right of way/ right of use including disposal of debris and returning all surplus material to defined disposal areas and storage yards as mentioned in Annexure-2 to SCC, as directed by Engineer-In-Charge;
31Restoration of land, facilities, boundary wall and roads etc. and associated facilities dismantled/ damaged by the Contractor during construction to the original condition / satisfaction of concerned authority and obtaining NOC from concerned authorities/ landowners/ farmers etc.
32Obtaining work permits/ NOC from various statutory authorities having jurisdiction, before and after execution of the work and complying with all stipulation/conditions/recommendation of the said authorities.
33Preparation of as-built drawings, pipe-book and other records as specified in the specifications. SOR shall be read in conjuction with scope of work, job specific requirements, specifications, standards, drawings and other provision of contract document. All above works, line pipe laying and installation all above works for buried pipeline as per following details:
34Installation of Coated Line Pipes as per following details:
35Line pipe details
36Size Thk. Grade Coating Type Length of each Pipe Type of Soil Terrain/ Area
37mm(OD) (mm)
38For All Type of Soil Excluding Hard Rock (Refer Notes )
39406.4 6.4 API 5L Gr X-70 3 Layer PE Double random (approx. All type of soil Flat / Slightly Undulating/
40PSL-2 Coating 11.5 to 12.5 mtr.) & (excluding hard rock) Undulating
41Bevel End (Refer note-16)
42406.4 7.9 API 5L Gr. X-70 3 Layer PE Double random (approx. All type of soil Flat / Slightly Undulating/
43PSL-2 Coating 11.5 to 12.5 mtr.) & (excluding hard rock) Undulating
44Bevel End (Refer note-16)
45406.4 9.5 API 5L Gr. X-60 3 Layer PE Double random (approx. All type of soil Flat / Slightly Undulating/
46PSL-2 Coating 11.5 to 12.5 mtr.) & (excluding hard rock) Undulating
47Bevel End (Refer note-16)
48406.4 8.7 API 5L Gr. X-70 3 Layer PE Double random (approx. All type of soil Flat / Slightly Undulating/
49PSL-2 Coating 11.5 to 12.5 mtr.) & (excluding hard rock) Undulating
50Bevel End (Refer note-16)
51For Hard Rock/Soil with Hard Rock Strata (Refer Notes )
52406.4 6.4 API 5L Gr.X-70 3 Layer PE Double random (approx. Hard Rock/Soil with hard rock Flat / Slightly Undulating/
53PSL-2 Coating 11.5 to 12.5 mtr.) & (Refer note-16) Undulating
54Bevel End
55406.4 7.9 API 5L Gr.X-70 3 Layer PE Double random (approx. Hard Rock/Soil with hard rock Flat / Slightly Undulating/
56PSL-2 Coating 11.5 to 12.5 mtr.) & (Refer note-16) Undulating
57Bevel End
58406.4 9.5 API 5L Gr.X-60 3 Layer PE Double random (approx. Hard Rock/Soil with hard rock Flat / Slightly Undulating/
59PSL-2 Coating 11.5 to 12.5 mtr.) & (Refer note-16) Undulating
60Bevel End
61406.4 8.7 API 5L Gr. X-70 3 Layer PE Double random (approx. Hard Rock/Soil with hard rock Flat / Slightly Undulating/
62PSL-2 Coating 11.5 to 12.5 mtr.) & (Refer note-16) Undulating
63Bevel End
64Notes : 1. This item rate is applicable for complete work of laying of underground pipeline of 16\\" x 111.608 Km ( Approx.) - From DT Vijaipur to RT at Bina Refinary as per Schematic Route Diagram (Refer Drg. No.: MEC/05/28/E/0079/M/0021 enclosed as APPENDIX-IV to PJS) including installation of aboveground insulating joint & flow tee and station approach pipeline but excluding aboveground & underground installation of SV Station & Tap-off (tie-in to tie-in with mainline) which are covered separately. 2. The length of pipeline are tentative.3. Rate for laying of OFC & duct shall be quoted in relevant Schedule of Rates (SOR) of Telecom works, hence not to be included in Pipeline Laying works. 4. For soil strata details, refer Alignment Sheets, Soil Investigation Report and Detailed engineering survey report enclosed with Bid. 5.The above rate shall be inclusive of hydrotesting of complete pipeline including hydrotesting of all crossing sections (including those of HDDs performed by separate agency, if any) along-with the mainline.6. Payment for Preparation of as-built drawings, pipe-book and other records as specified in the specifications is to be covered in this SOR rate.7. List of crossings indicating tentative crossing methodology is enclosed as APPENDIX-VIII to PJS in tender document. Bidders are advised to visit the site for actual assessment of various crossings. Payment shall be made as per approved crossing methodology as per relevant SOR item.8.In case of change of crossing methodology (as indicated in APPENDIX-VIII to PJS) by EIC, the rates shall be payable as per relevant SOR item. In case, Contractor changes crossing methodology from open cut to trenchless/any other method on his own, then, no additonal payment shall be admissible on this account.9. Contractor shall return all surplus material to defined storage yard as mentioned in Annexure-2 to SCC, as directed by Engineer-In-Charge.10. Payment for supply & application of continuous concrete weight coating will be made as per other relevant SOR item.11.The above item rate excludes crossings by HDD, Cased crossings, crossings by Open cut conventional method and Crossings by Moling technique (which are covered separately in relevant SOR items). For other crossings, it is deemed to be inclusive in above item rate. Please Enable Macros to View BoQ information
65Notes : 1. This item rate is applicable for complete work of laying of underground pipeline of 16\\" x 111.608 Km ( Approx.) - From DT Vijaipur to RT at Bina Refinary as per Schematic Route Diagram (Refer Drg. No.: MEC/05/28/E/0079/M/0021 enclosed as APPENDIX-IV to PJS) including installation of aboveground insulating joint & flow tee and station approach pipeline but excluding aboveground & underground installation of SV Station & Tap-off (tie-in to tie-in with mainline) which are covered separately. 2. The length of pipeline are tentative.3. Rate for laying of OFC & duct shall be quoted in relevant Schedule of Rates (SOR) of Telecom works, hence not to be included in Pipeline Laying works. 4. For soil strata details, refer Alignment Sheets, Soil Investigation Report and Detailed engineering survey report enclosed with Bid. 5.The above rate shall be inclusive of hydrotesting of complete pipeline including hydrotesting of all crossing sections (including those of HDDs performed by separate agency, if any) along-with the mainline.6. Payment for Preparation of as-built drawings, pipe-book and other records as specified in the specifications is to be covered in this SOR rate.7. List of crossings indicating tentative crossing methodology is enclosed as APPENDIX-VIII to PJS in tender document. Bidders are advised to visit the site for actual assessment of various crossings. Payment shall be made as per approved crossing methodology as per relevant SOR item.8.In case of change of crossing methodology (as indicated in APPENDIX-VIII to PJS) by EIC, the rates shall be payable as per relevant SOR item. In case, Contractor changes crossing methodology from open cut to trenchless/any other method on his own, then, no additonal payment shall be admissible on this account.9. Contractor shall return all surplus material to defined storage yard as mentioned in Annexure-2 to SCC, as directed by Engineer-In-Charge.10. Payment for supply & application of continuous concrete weight coating will be made as per other relevant SOR item.11.The above item rate excludes crossings by HDD, Cased crossings, crossings by Open cut conventional method and Crossings by Moling technique (which are covered separately in relevant SOR items). For other crossings, it is deemed to be inclusive in above item rate. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56779945
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 21-08-2026
Authority
Authority Name Gas Authority Of India Limited
Work Description Tender for Laying And Construction Of Steel Gas Pipeline And Terminals Along With Associated Facilities For Vijaipur - Bina Pipeline (Vbpl) Project
Basic Detail
Tender No GAIL/NOIDA/CnP/PROJ/ VBPL/LAYING/26-33
Bidding Type Tender
Location
City Ghaziabad
State Uttar Pradesh
Key Dates
Publish Date 31 Jul 2026
Submission Date 21 Aug 2026
Open Date 24 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 1.02 Crore
Exemption Available
Document List
VOLIV_Part11.pdf
VOLIV_Part12.pdf
VOLIV_Part13.pdf
VOLIV_Part14.pdf
VOLIV_Part15.pdf
VOLIV_Part2.pdf
VOLIV_Part3.pdf
VOLIV_Part4.pdf
VOLIV_Part5.pdf
VOLIV_Part6.pdf
VOLIV_Part7.pdf
VOLIV_Part8.pdf
VOLIV_Part9.pdf
BOQ_333909.xls
c2e373df-4fd0-4cb9-9074-18433b8b1ff4.html
COMMECI.pdf
KML.rar
Tendernotice_1.pdf
VOLIII_Part1.pdf
VOLIII_Part2.pdf
VOLII_Part1.pdf
VOLII_Part2.pdf
VOLII_Part3.pdf
VOLII_Part4.pdf
VOLIV_Part1.pdf
VOLIV_Part10.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 31, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 21, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 19 days
Aug 24, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 22 days

Tender Documents

Download All (ZIP) ↓
pdf

VOLIV_Part11.pdf

pdf

VOLIV_Part12.pdf

pdf

VOLIV_Part13.pdf

pdf

VOLIV_Part14.pdf

pdf

VOLIV_Part15.pdf

pdf

VOLIV_Part2.pdf

pdf

VOLIV_Part3.pdf

pdf

VOLIV_Part4.pdf

pdf

VOLIV_Part5.pdf

pdf

VOLIV_Part6.pdf

pdf

VOLIV_Part7.pdf

pdf

VOLIV_Part8.pdf

pdf

VOLIV_Part9.pdf

xls

BOQ_333909.xls

html

c2e373df-4fd0-4cb9-9074-18433b8b1ff4.html

pdf

COMMECI.pdf

rar

KML.rar

pdf

Tendernotice_1.pdf

pdf

VOLIII_Part1.pdf

pdf

VOLIII_Part2.pdf

pdf

VOLII_Part1.pdf

pdf

VOLII_Part2.pdf

pdf

VOLII_Part3.pdf

pdf

VOLII_Part4.pdf

pdf

VOLIV_Part1.pdf

pdf

VOLIV_Part10.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders