Drinking Water Supply and Sanitation Local Bodies Closing in 14 days TDR #56765800

Tender For Motor Maintenance At W.No.1 To W.No.18 In Kangeyam Municipality

Issued by Local Bodies · Tiruppur, Tamil Nadu
Tender Value
5 Lakhs
Estimated cost
Bid Submission
17 Aug 2026
14 days left
EMD
5000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Tiruppur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Motor Maintenance At W.No.1 To W.No.18 In Kangeyam Municipality- 1 Air Compressor Motor 2 Motor Rewinding Charges Including Cost Of Necessary Winding Materials And All Labour Charges Etc., Complete Including Cost Of Copper Coil (Less The Cost Of Old Burnt Copper Coil)(Less The Cost Of Old Materials) 5 Hp 3 Motor Rewinding Charges Including Cost Of Necessary Winding Materials And All Labour Charges Etc., Complete Including Cost Of Copper Coil (Less The Cost Of Old Burnt Copper Coil)(Less The Cost Of Old Materials) 7.5 Hp 4 Labour Charges For The Rectification Of Loose Connect In The Motor Winding And Wiring Varnishing The Winding Including Cost Of Materials 5 Hp 5 Labour Charges For The Rectification Of Loose Connect In The Motor Winding And Wiring Varnishing The Winding Including Cost Of Materials 7.5 Hp 6 Labour Charges For Removing Air Pipe & Water Line Rectifying The Leakage Of Blockingd In The Pipe Line And Re-Erection Of 5 Hp 7 Labour Charges For Removing Air Pipe & Water Line Rectifying The Leakage Of Blockingd In The Pipe Line And Re-Erection Of 7.5 Hp 8 Labour Charges For Cylinder Boring Work 5 Hp 9 Labour Charges For Cylinder Boring Work 7.5 Hp 10 Labour Charge For Dismandling Of Air Compressor With Motor, Removing Of Damaged Parts And New Sparts Fixing Including Conveyance Lathe Works And All Labour Charges Etc Complete.., 11 Supply And Fixing Of Following Air Compressor Motor Materials Including Cost And Conveyance And All Labour Charges Etc Complete..,(Less The Cost Of Old Materials) 12 5 Hp Web Assemble Housing 13 7.5 Hp Web Assemble Housing 14 5 Hp Motor Bearing Set 15 7.5 Hp Motor Bearing Set 16 5 Hp Piston Connecting Shaft 17 7.5 Hp Piston Connecting Shaft 18 5 Hp Compressor Pully 19 7.5 Hp Compressor Pully 20 5 Hp Grease Cup 21 7.5 Hp Grease Cup 22 5 Hp Cooling Fan Aluminium 23 7.5 Hp Cooling Fan Aluminium 24 5 Hp V-Belt 25 7.5 Hp V-Belt 26 5 Hp Crank Shaft 27 7.5 Hp Crank Shaft 28 5 Hp Connecting Rod 29 7.5 Hp Connecting Rod 30 5 Hp Cylinder Sleeve Fitting 31 7.5 Hp Cylinder Sleeve Fitting 32 5 Hp Compressor Bearing Set 33 7.5 Hp Compressor Bearing Set 34 5 Hp Piston 35 7.5 Hp Piston 36 5 Hp Piston Ring Set 37 7.5 Hp Piston Ring Set 38 5 Hp Head Plate 39 7.5 Hp Head Plate 40 5 Hp Oil Seal 41 7.5 Hp Oil Seal 42 5 Hp Packing 43 7.5 Hp Packing 44 5 Hp Oil Class 45 7.5 Hp Oil Class 46 5 Hp Brass Bush 47 7.5 Hp Brass Bush 48 5 Hp Cylinder 49 7.5 Hp Cylinder 50 5 Hp Pully Shaft Pin 51 7.5 Hp Pully Shaft Pin 52 5 Hp Distance Bush 53 7.5 Hp Distance Bush 54 5 Hp Fly Cover 55 7.5 Hp Fly Cover 56 5 Hp Free Cover 57 7.5 Hp Free Cover 58 5 Hp Bearing Washer 59 7.5 Hp Bearing Washer 60 5 Hp Tipper 61 7.5 Hp Tipper 62 5 Hp Cutter Pin 63 7.5 Hp Cutter Pin 64 5 Hp End Disk 65 7.5 Hp End Disk 66 5 Hp Preather 67 7.5 Hp Preather 68 5 Hp Cylinder Head 69 7.5 Hp Cylinder Head 70 5 Hp Cylinder Plate 71 7.5 Hp Cylinder Plate 72 5 Hp Air Cooler Union 73 7.5 Hp Air Cooler Union 74 5 Hp Air Cooler 75 7.5 Hp Air Cooler 76 5 Hp Air Cock 77 7.5 Hp Air Cock 78 5 Hp Air Cock Nipple 79 7.5 Hp Air Cock Nipple 80 5 Hp Air Filter 81 7.5 Hp Air Filter 82 5 Hp Blade 83 7.5 Hp Blade 84 Ii. Monoblock 85 Dismandling The Pump Set For Checking In Ther Open Well(Less The Cost Of Old Materials) 5 Hp 86 Dismandling The Pump Set For Checking In Ther Open Well(Less The Cost Of Old Materials) 7.5 Hp 87 Motor Rewinding Coil Charges With Necessary Insulation Varnishing Etc., Complete Including Cost Of Enamled Copper Coil (Less The Cost Of Burnt Copper Coil)(Less The Cost Of Old Materials) 5 Hp 88 Motor Rewinding Coil Charges With Necessary Insulation Varnishing Etc., Complete Including Cost Of Enamled Copper Coil (Less The Cost Of Burnt Copper Coil)(Less The Cost Of Old Materials) 7.5 Hp 89 Labour Charges For The Rect Loose Contacks In The Motor Winding And Wiring Retapping And Varnishing The Winding Including Cost Of Materials 5 Hp 90 Labour Charges For The Rect Loose Contacks In The Motor Winding And Wiring Retapping And Varnishing The Winding Including Cost Of Materials 7.5 Hp 91 Labour Charges For Removing Suction Pipes, Rectifying Leakage In Foot Valve An Refitting 5 Hp 92 Labour Charges For Removing Suction Pipes, Rectifying Leakage In Foot Valve An Refitting 7.5 Hp 93 Labour Charges For Reconditioning The Pump Shaft 5 Hp 94 Labour Charges For Reconditioning The Pump Shaft 7.5 Hp 95 Supply And Fixing Of Following Monoblock Motor Materials Including Cost And Conveyance And All Labour Charges Etc Complete..,(Less The Cost Of Old Materials) 96 5 Hp Motor Bearing Set 97 7.5 Hp Motor Bearing Set 98 5 Hp Pump Packing 99 7.5 Hp Pump Packing 100 5 Hp Pump Impeller 101 7.5 Hp Pump Impeller 102 5 Hp Pump Shaft Sleeves (G.M.) 103 7.5 Hp Pump Shaft Sleeves (G.M.) 104 5 Hp Oil Seal 105 7.5 Hp Oil Seal 106 5 Hp Motor Cooling Fan (Aluminium) 107 7.5 Hp Motor Cooling Fan (Aluminium) 108 5 Hp Bearing Cup 109 7.5 Hp Bearing Cup 110 5 Hp Rotor 111 7.5 Hp Rotor 112 5 Hp Rotor Winding Charges 113 7.5 Hp Rotor Winding Charges 114 Iii. Borewell Sub Mercible 115 Removing And Reerection Of Pump Set From The Well And Dismanding For Checking(Less The Cost Of Old Materials) 1.5 Hp 116 Removing And Reerection Of Pump Set From The Well And Dismanding For Checking(Less The Cost Of Old Materials) 5 Hp 117 Removing And Reerection Of Pump Set From The Well And Dismanding For Checking(Less The Cost Of Old Materials) 7.5 Hp 118 Motor Coil Rewinding Charges With Necessary Insulation Varnishing Etc., Complete Including Cost Of Enameled Copper Wire (Less The Cost Of Burnt Copper Coil)(Less The Cost Of Old Materials) 1.5 Hp 119 Motor Coil Rewinding Charges With Necessary Insulation Varnishing Etc., Complete Including Cost Of Enameled Copper Wire (Less The Cost Of Burnt Copper Coil)(Less The Cost Of Old Materials) 5 Hp 120 Motor Coil Rewinding Charges With Necessary Insulation Varnishing Etc., Complete Including Cost Of Enameled Copper Wire (Less The Cost Of Burnt Copper Coil)(Less The Cost Of Old Materials) 7.5 Hp 121 Labour Charges For The Rectification Of Loose Contacts In The Motor Winding And Wiring Retapping And Varnishing The Winding Including Cost Of Materials 1.5 Hp 122 Labour Charges For The Rectification Of Loose Contacts In The Motor Winding And Wiring Retapping And Varnishing The Winding Including Cost Of Materials 5 Hp 123 Labour Charges For The Rectification Of Loose Contacts In The Motor Winding And Wiring Retapping And Varnishing The Winding Including Cost Of Materials 7.5 Hp 124 Labour Charges For Re-Conditioning The Pump Shaft 1.5 Hp 125 Labour Charges For Re-Conditioning The Pump Shaft 5 Hp 126 Labour Charges For Re-Conditioning The Pump Shaft 7.5 Hp 127 Supply And Fixing Of Following Submersible Motor Materials Including Cost And Conveyance And All Labour Charges Etc Complete..,(Less The Cost Of Old Materials) 128 1.5 Hp Motor Thrust Bearing Unit 1 Set 129 5 Hp Motor Thrust Bearing Unit 1 Set 130 7.5 Hp Motor Thrust Bearing Unit 1 Set 131 1.5 Hp Motor Housing Bush 132 5 Hp Motor Housing Bush 133 7.5 Hp Motor Housing Bush 134 1.5 Hp Pump Bush 135 5 Hp Pump Bush 136 7.5 Hp Pump Bush 137 1.5 Hp Ss Pump Impeller 138 5 Hp Ss Pump Impeller 139 7.5 Hp Ss Pump Impeller 140 1.5 Hp Pump Defusser 141 5 Hp Pump Defusser 142 7.5 Hp Pump Defusser 143 1.5 Hp Non-Return Valve 144 5 Hp Non-Return Valve 145 7.5 Hp Non-Return Valve 146 1.5 Hp Ci Pump Bowl 147 5 Hp Ci Pump Bowl 148 7.5 Hp Ci Pump Bowl 149 1.5 Hp Motor Shaft 150 5 Hp Motor Shaft 151 7.5 Hp Motor Shaft 152 1.5 Hp Rotor 153 5 Hp Rotor 154 7.5 Hp Rotor 155 1.5 Hp Motor Cover (Cashing) 156 5 Hp Motor Cover (Cashing) 157 7.5 Hp Motor Cover (Cashing) 158 1.5 Hp S.S. Bolt And Nut 159 5 Hp S.S. Bolt And Nut 160 7.5 Hp S.S. Bolt And Nut 161 1.5 Hp Rubber \O\ Ring 162 5 Hp Rubber \O\ Ring 163 7.5 Hp Rubber \O\ Ring 164 1.5 Hp Pump Cashing 165 5 Hp Pump Cashing 166 7.5 Hp Pump Cashing 167 1.5 Hp Bowl 168 5 Hp Bowl 169 7.5 Hp Bowl 170 1.5 Hp Back Cover 171 5 Hp Back Cover 172 7.5 Hp Back Cover 173 1.5 Hp 6\ Circlip 174 5 Hp 6\ Circlip 175 7.5 Hp 6\ Circlip 176 1.5 Hp Ss Bolt Nut 177 5 Hp Ss Bolt Nut 178 7.5 Hp Ss Bolt Nut 179 1.5 Hp Pump Shaft Cover 180 5 Hp Pump Shaft Cover 181 7.5 Hp Pump Shaft Cover 182 1.5 Hp Pump Buttom Cover 183 5 Hp Pump Buttom Cover 184 7.5 Hp Pump Buttom Cover 185 1.5 Hp Shaft Union Bush 186 5 Hp Shaft Union Bush 187 7.5 Hp Shaft Union Bush 188 Iv.Open Submersible 5Hp 189 Motor Rewinding Charges Including Cost Of Necessary Winding Materials And All Labour Charges Etc., Complete Including Cost Of Copper Coil (Less The Cost Of Old Burnt Copper Coil)(Less The Cost Of Old Materials) 190 Supply And Fixing Of Following 5Hp Openwell Submersible Motor Materials Including Cost And Conveyance And All Labour Charges Etc Complete..,(Less The Cost Of Old Materials) 191 Motor Brass Bush 192 Motor Trust Bearing 193 Ci Impiller 194 Oil Seel 195 Bruss Nut 196 V.Dol Starter 197 Labour Charges For Checking The Wirinig Diagram Complete And Relay Setting 198 Labour Charges For Replacement Of Damaged Spares And All Labour Charges Etc Complete.., 199 Supply And Fixing Of Following Dol Starter Materials Including Cost And Conveyance And All Labour Charges Etc Complete..,(Less The Cost Of Old Materials)

BOQ

Name of Work:- Motor Maintenance at W.No.1 to W.No.18 in Kangeyam Municipality
Sl. No. Item Description
1Air Compressor Motor
2Motor Rewinding charges including cost of necessary winding materials and all labour charges etc., complete including cost of copper coil (Less the cost of old burnt copper coil)(Less the Cost of Old Materials) 5 HP
3Motor Rewinding charges including cost of necessary winding materials and all labour charges etc., complete including cost of copper coil (Less the cost of old burnt copper coil)(Less the Cost of Old Materials) 7.5 HP
4Labour charges for the Rectification of Loose connect in the Motor winding and wiring varnishing the winding including cost of materials 5 HP
5Labour charges for the Rectification of Loose connect in the Motor winding and wiring varnishing the winding including cost of materials 7.5 HP
6Labour charges for Removing Air Pipe & water line rectifying the Leakage of blockingd in the pipe line and Re-erection of 5 HP
7Labour charges for Removing Air Pipe & water line rectifying the Leakage of blockingd in the pipe line and Re-erection of 7.5 HP
8Labour charges for Cylinder Boring work 5 HP
9Labour charges for Cylinder Boring work 7.5 HP
10Labour Charge for Dismandling of Air Compressor with Motor, Removing of Damaged parts and new sparts fixing including conveyance lathe works and all labour charges etc complete..,
11Supply and fixing of following Air Compressor Motor Materials including cost and conveyance and all Labour charges etc complete..,(Less the Cost of Old Materials)
125 HP Web assemble housing
137.5 HP Web assemble housing
145 HP Motor Bearing Set
157.5 HP Motor Bearing Set
165 HP Piston connecting shaft
177.5 HP Piston connecting shaft
185 HP Compressor pully
197.5 HP Compressor pully
205 HP Grease cup
217.5 HP Grease cup
225 HP Cooling Fan Aluminium
237.5 HP Cooling Fan Aluminium
245 HP V-Belt
257.5 HP V-Belt
265 HP Crank Shaft
277.5 HP Crank Shaft
285 HP Connecting rod
297.5 HP Connecting rod
305 HP Cylinder sleeve fitting
317.5 HP Cylinder sleeve fitting
325 HP Compressor Bearing Set
337.5 HP Compressor Bearing Set
345 HP Piston
357.5 HP Piston
365 HP Piston Ring Set
377.5 HP Piston Ring Set
385 HP Head plate
397.5 HP Head plate
405 HP Oil Seal
417.5 HP Oil Seal
425 HP Packing
437.5 HP Packing
445 HP Oil Class
457.5 HP Oil Class
465 HP Brass Bush
477.5 HP Brass Bush
485 HP Cylinder
497.5 HP Cylinder
505 HP Pully shaft pin
517.5 HP Pully shaft pin
525 HP Distance bush
537.5 HP Distance bush
545 HP Fly cover
557.5 HP Fly cover
565 HP Free Cover
577.5 HP Free Cover
585 HP Bearing Washer
597.5 HP Bearing Washer
605 HP Tipper
617.5 HP Tipper
625 HP Cutter Pin
637.5 HP Cutter Pin
645 HP End disk
657.5 HP End disk
665 HP Preather
677.5 HP Preather
685 HP Cylinder head
697.5 HP Cylinder head
705 HP Cylinder plate
717.5 HP Cylinder plate
725 HP Air cooler union
737.5 HP Air cooler union
745 HP Air cooler
757.5 HP Air cooler
765 HP Air Cock
777.5 HP Air Cock
785 HP Air Cock Nipple
797.5 HP Air Cock Nipple
805 HP Air filter
817.5 HP Air filter
825 HP Blade
837.5 HP Blade
84II. Monoblock
85Dismandling the Pump set for checking in ther open well(Less the Cost of Old Materials) 5 HP
86Dismandling the Pump set for checking in ther open well(Less the Cost of Old Materials) 7.5 HP
87Motor Rewinding coil charges with necessary insulation varnishing etc., complete including cost of enamled copper coil (Less the cost of burnt copper coil)(Less the Cost of Old Materials) 5 HP
88Motor Rewinding coil charges with necessary insulation varnishing etc., complete including cost of enamled copper coil (Less the cost of burnt copper coil)(Less the Cost of Old Materials) 7.5 HP
89Labour charges for the rect loose contacks in the motor winding and wiring retapping and varnishing the winding including cost of materials 5 HP
90Labour charges for the rect loose contacks in the motor winding and wiring retapping and varnishing the winding including cost of materials 7.5 HP
91Labour charges for removing suction pipes, rectifying leakage in foot valve an refitting 5 HP
92Labour charges for removing suction pipes, rectifying leakage in foot valve an refitting 7.5 HP
93Labour charges for Reconditioning the Pump Shaft 5 HP
94Labour charges for Reconditioning the Pump Shaft 7.5 HP
95Supply and fixing of following Monoblock Motor Materials including cost and conveyance and all Labour charges etc complete..,(Less the Cost of Old Materials)
965 HP Motor Bearing Set
977.5 HP Motor Bearing Set
985 HP Pump Packing
997.5 HP Pump Packing
1005 HP Pump Impeller
1017.5 HP Pump Impeller
1025 HP Pump Shaft Sleeves (G.M.)
1037.5 HP Pump Shaft Sleeves (G.M.)
1045 HP Oil Seal
1057.5 HP Oil Seal
1065 HP Motor Cooling fan (Aluminium)
1077.5 HP Motor Cooling fan (Aluminium)
1085 HP Bearing Cup
1097.5 HP Bearing Cup
1105 HP Rotor
1117.5 HP Rotor
1125 HP Rotor Winding charges
1137.5 HP Rotor Winding charges
114III. Borewell Sub Mercible
115Removing and Reerection of Pump set from the well and dismanding for checking(Less the Cost of Old Materials) 1.5 HP
116Removing and Reerection of Pump set from the well and dismanding for checking(Less the Cost of Old Materials) 5 HP
117Removing and Reerection of Pump set from the well and dismanding for checking(Less the Cost of Old Materials) 7.5 HP
118Motor Coil Rewinding charges with necessary Insulation varnishing etc., complete including cost of enameled copper wire (Less the cost of burnt copper coil)(Less the Cost of Old Materials) 1.5 HP
119Motor Coil Rewinding charges with necessary Insulation varnishing etc., complete including cost of enameled copper wire (Less the cost of burnt copper coil)(Less the Cost of Old Materials) 5 HP
120Motor Coil Rewinding charges with necessary Insulation varnishing etc., complete including cost of enameled copper wire (Less the cost of burnt copper coil)(Less the Cost of Old Materials) 7.5 HP
121Labour charges for the Rectification of Loose contacts in the Motor winding and wiring retapping and varnishing the winding including cost of materials 1.5 HP
122Labour charges for the Rectification of Loose contacts in the Motor winding and wiring retapping and varnishing the winding including cost of materials 5 HP
123Labour charges for the Rectification of Loose contacts in the Motor winding and wiring retapping and varnishing the winding including cost of materials 7.5 HP
124Labour charges for re-conditioning the Pump Shaft 1.5 HP
125Labour charges for re-conditioning the Pump Shaft 5 HP
126Labour charges for re-conditioning the Pump Shaft 7.5 HP
127Supply and fixing of following Submersible Motor Materials including cost and conveyance and all Labour charges etc complete..,(Less the Cost of Old Materials)
1281.5 HP Motor thrust Bearing unit 1 Set
1295 HP Motor thrust Bearing unit 1 Set
1307.5 HP Motor thrust Bearing unit 1 Set
1311.5 HP Motor Housing Bush
1325 HP Motor Housing Bush
1337.5 HP Motor Housing Bush
1341.5 HP Pump Bush
1355 HP Pump Bush
1367.5 HP Pump Bush
1371.5 HP SS Pump Impeller
1385 HP SS Pump Impeller
1397.5 HP SS Pump Impeller
1401.5 HP Pump Defusser
1415 HP Pump Defusser
1427.5 HP Pump Defusser
1431.5 HP Non-Return Valve
1445 HP Non-Return Valve
1457.5 HP Non-Return Valve
1461.5 HP CI Pump Bowl
1475 HP CI Pump Bowl
1487.5 HP CI Pump Bowl
1491.5 HP Motor Shaft
1505 HP Motor Shaft
1517.5 HP Motor Shaft
1521.5 HP Rotor
1535 HP Rotor
1547.5 HP Rotor
1551.5 HP Motor Cover (Cashing)
1565 HP Motor Cover (Cashing)
1577.5 HP Motor Cover (Cashing)
1581.5 HP S.S. Bolt and Nut
1595 HP S.S. Bolt and Nut
1607.5 HP S.S. Bolt and Nut
1611.5 HP Rubber \\"O\\" Ring
1625 HP Rubber \\"O\\" Ring
1637.5 HP Rubber \\"O\\" Ring
1641.5 HP Pump Cashing
1655 HP Pump Cashing
1667.5 HP Pump Cashing
1671.5 HP Bowl
1685 HP Bowl
1697.5 HP Bowl
1701.5 HP Back Cover
1715 HP Back Cover
1727.5 HP Back Cover
1731.5 HP 6\\" Circlip
1745 HP 6\\" Circlip
1757.5 HP 6\\" Circlip
1761.5 HP SS Bolt nut
1775 HP SS Bolt nut
1787.5 HP SS Bolt nut
1791.5 HP Pump Shaft Cover
1805 HP Pump Shaft Cover
1817.5 HP Pump Shaft Cover
1821.5 HP Pump Buttom Cover
1835 HP Pump Buttom Cover
1847.5 HP Pump Buttom Cover
1851.5 HP Shaft Union bush
1865 HP Shaft Union bush
1877.5 HP Shaft Union bush
188IV.Open Submersible 5HP
189Motor Rewinding charges including cost of necessary winding materials and all labour charges etc., complete including cost of copper coil (Less the cost of old burnt copper coil)(Less the Cost of Old Materials)
190Supply and fixing of following 5Hp Openwell Submersible Motor Materials including cost and conveyance and all Labour charges etc complete..,(Less the Cost of Old Materials)
191Motor brass bush
192Motor trust bearing
193CI Impiller
194Oil Seel
195Bruss nut
196V.DOL Starter
197Labour Charges for Checking the wirinig diagram complete and relay setting
198Labour charges for Replacement of Damaged Spares and all labour charges etc complete..,
199Supply and fixing of following DOL Starter Materials including cost and conveyance and all Labour charges etc complete..,(Less the Cost of Old Materials)
200L & T Starter Relay (16A, 440V)
201L & T - Kit - Contactor (16A, 440V)
202Ammeter
203Volt Meter
204Indicator
205On - Off - Button
2069 Culter Hammer Relay
207Cutler Hammer Kit Set
208120 / 100 - Capactor
209Capactor
210Contact Point
211Novoit Coil
212Delta - Timer
213Preventer
214Panel Box
215Supply and Delivery of DOL Starter with Single phasing preventor with ammeter and sutable panel board including all cost of conveyance charges etc complete (TWAD SOR 2025-26, Pg No.135, Unique Code WD-M1921)
216Supply and fixing of 32A TPN metal clad switch on suitable angle iron frame work with MS cable entry boxes with PWD earthing (Electrical SOR 2025-26, Pg No.61 SD 147)
217Supply and fixing of 62A TPN metal clad switch on suitable angle iron frame work with MS cable entry boxes with PWD earthing (Electrical SOR 2025-26, Pg No.62 SD 149)
218Supply and fixing of 32 Amps fuse unit including all cost and Conveyance of materials and labour charges etc complete as per std specification
219Supply and run of 2 of 1.5sq.mm. PVC insulated SC unsheathed FRLS copper conductor of 1100V grade on 7/20 GI bearer wire for service connection mains (Electrical SOR 2025-26, Pg No.32 SD 64)
220Supply and run of 4 of 4 sqmm (56/0.3) PVC insulated Single core unsheathed Cu.Conductor of 1100 v grade on 7/20 GI bearer wire for service connection mains (Electrical SOR 2025-26, Pg No.34 SD 67)
221Supply of 20mm dia flex HDPE PIPES FOR SUB-MERSIBLE PUMP IN BOREWELL Class-5 (1 MPa or 10 kg./cm2 pressure) suitable for air compressure motor with water line including cost and conveyance of pipe to the site etc complete as per std spn (PWD SOR 2025-26, Pg No.168, Unique Code: M-1054)
222Labour Charges for removing and refixing of Borewell Hdpe pipe including cost of borewell hdpe pipe removing and refixing charges for crane charges and testing the pipe line and trail run. including all cost of fixing materials and cost of conveyance charges etc,..
223Supply and Fixing of 2.5 Sq.mm PVC INSULATED AND SHEATHED 3 CORE FLAT TYPE COPPER CABLE Including Cost and conveyance charges, loading and unloading charges etc complete.., (TWAD 2025-26 Pg No.140, Unique Code WD-M1974)
224Supply and Fixing of 4 Sq.mm PVC INSULATED AND SHEATHED 3 CORE FLAT TYPE COPPER CABLE Including Cost and conveyance charges, loading and unloading charges etc complete.., (TWAD 2025-26 Pg No.140, Unique Code WD-M1975)
225GST 18% Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56765800
AUTHORITY Local Bodies
TENDER VALUE 5 Lakhs
LAST DATE 17-08-2026
Authority
Authority Name Municipal Adminitration And Water Supply Department
Work Description Tender For Motor Maintenance At W.No.1 To W.No.18 In Kangeyam Municipality- 1 Air Compressor Motor 2 Motor Rewinding Charges Including Cost Of Necessary Winding Materials And All Labour Charges Etc., Complete Including Cost Of Copper Coil (Less The Cost Of Old Burnt Copper Coil)(Less The Cost Of Old Materials) 5 Hp 3 Motor Rewinding Charges Including Cost Of Necessary Winding Materials And All Labour Charges Etc., Complete Including Cost Of Copper Coil (Less The Cost Of Old Burnt Copper Coil)(Less The Cost Of Old Materials) 7.5 Hp 4 Labour Charges For The Rectification Of Loose Connect In The Motor Winding And Wiring Varnishing The Winding Including Cost Of Materials 5 Hp 5 Labour Charges For The Rectification Of Loose Connect In The Motor Winding And Wiring Varnishing The Winding Including Cost Of Materials 7.5 Hp 6 Labour Charges For Removing Air Pipe & Water Line Rectifying The Leakage Of Blockingd In The Pipe Line And Re-Erection Of 5 Hp 7 Labour Charges For Removing Air Pipe & Water Line Rectifying The Leakage Of Blockingd In The Pipe Line And Re-Erection Of 7.5 Hp 8 Labour Charges For Cylinder Boring Work 5 Hp 9 Labour Charges For Cylinder Boring Work 7.5 Hp 10 Labour Charge For Dismandling Of Air Compressor With Motor, Removing Of Damaged Parts And New Sparts Fixing Including Conveyance Lathe Works And All Labour Charges Etc Complete.., 11 Supply And Fixing Of Following Air Compressor Motor Materials Including Cost And Conveyance And All Labour Charges Etc Complete..,(Less The Cost Of Old Materials) 12 5 Hp Web Assemble Housing 13 7.5 Hp Web Assemble Housing 14 5 Hp Motor Bearing Set 15 7.5 Hp Motor Bearing Set 16 5 Hp Piston Connecting Shaft 17 7.5 Hp Piston Connecting Shaft 18 5 Hp Compressor Pully 19 7.5 Hp Compressor Pully 20 5 Hp Grease Cup 21 7.5 Hp Grease Cup 22 5 Hp Cooling Fan Aluminium 23 7.5 Hp Cooling Fan Aluminium 24 5 Hp V-Belt 25 7.5 Hp V-Belt 26 5 Hp Crank Shaft 27 7.5 Hp Crank Shaft 28 5 Hp Connecting Rod 29 7.5 Hp Connecting Rod 30 5 Hp Cylinder Sleeve Fitting 31 7.5 Hp Cylinder Sleeve Fitting 32 5 Hp Compressor Bearing Set 33 7.5 Hp Compressor Bearing Set 34 5 Hp Piston 35 7.5 Hp Piston 36 5 Hp Piston Ring Set 37 7.5 Hp Piston Ring Set 38 5 Hp Head Plate 39 7.5 Hp Head Plate 40 5 Hp Oil Seal 41 7.5 Hp Oil Seal 42 5 Hp Packing 43 7.5 Hp Packing 44 5 Hp Oil Class 45 7.5 Hp Oil Class 46 5 Hp Brass Bush 47 7.5 Hp Brass Bush 48 5 Hp Cylinder 49 7.5 Hp Cylinder 50 5 Hp Pully Shaft Pin 51 7.5 Hp Pully Shaft Pin 52 5 Hp Distance Bush 53 7.5 Hp Distance Bush 54 5 Hp Fly Cover 55 7.5 Hp Fly Cover 56 5 Hp Free Cover 57 7.5 Hp Free Cover 58 5 Hp Bearing Washer 59 7.5 Hp Bearing Washer 60 5 Hp Tipper 61 7.5 Hp Tipper 62 5 Hp Cutter Pin 63 7.5 Hp Cutter Pin 64 5 Hp End Disk 65 7.5 Hp End Disk 66 5 Hp Preather 67 7.5 Hp Preather 68 5 Hp Cylinder Head 69 7.5 Hp Cylinder Head 70 5 Hp Cylinder Plate 71 7.5 Hp Cylinder Plate 72 5 Hp Air Cooler Union 73 7.5 Hp Air Cooler Union 74 5 Hp Air Cooler 75 7.5 Hp Air Cooler 76 5 Hp Air Cock 77 7.5 Hp Air Cock 78 5 Hp Air Cock Nipple 79 7.5 Hp Air Cock Nipple 80 5 Hp Air Filter 81 7.5 Hp Air Filter 82 5 Hp Blade 83 7.5 Hp Blade 84 Ii. Monoblock 85 Dismandling The Pump Set For Checking In Ther Open Well(Less The Cost Of Old Materials) 5 Hp 86 Dismandling The Pump Set For Checking In Ther Open Well(Less The Cost Of Old Materials) 7.5 Hp 87 Motor Rewinding Coil Charges With Necessary Insulation Varnishing Etc., Complete Including Cost Of Enamled Copper Coil (Less The Cost Of Burnt Copper Coil)(Less The Cost Of Old Materials) 5 Hp 88 Motor Rewinding Coil Charges With Necessary Insulation Varnishing Etc., Complete Including Cost Of Enamled Copper Coil (Less The Cost Of Burnt Copper Coil)(Less The Cost Of Old Materials) 7.5 Hp 89 Labour Charges For The Rect Loose Contacks In The Motor Winding And Wiring Retapping And Varnishing The Winding Including Cost Of Materials 5 Hp 90 Labour Charges For The Rect Loose Contacks In The Motor Winding And Wiring Retapping And Varnishing The Winding Including Cost Of Materials 7.5 Hp 91 Labour Charges For Removing Suction Pipes, Rectifying Leakage In Foot Valve An Refitting 5 Hp 92 Labour Charges For Removing Suction Pipes, Rectifying Leakage In Foot Valve An Refitting 7.5 Hp 93 Labour Charges For Reconditioning The Pump Shaft 5 Hp 94 Labour Charges For Reconditioning The Pump Shaft 7.5 Hp 95 Supply And Fixing Of Following Monoblock Motor Materials Including Cost And Conveyance And All Labour Charges Etc Complete..,(Less The Cost Of Old Materials) 96 5 Hp Motor Bearing Set 97 7.5 Hp Motor Bearing Set 98 5 Hp Pump Packing 99 7.5 Hp Pump Packing 100 5 Hp Pump Impeller 101 7.5 Hp Pump Impeller 102 5 Hp Pump Shaft Sleeves (G.M.) 103 7.5 Hp Pump Shaft Sleeves (G.M.) 104 5 Hp Oil Seal 105 7.5 Hp Oil Seal 106 5 Hp Motor Cooling Fan (Aluminium) 107 7.5 Hp Motor Cooling Fan (Aluminium) 108 5 Hp Bearing Cup 109 7.5 Hp Bearing Cup 110 5 Hp Rotor 111 7.5 Hp Rotor 112 5 Hp Rotor Winding Charges 113 7.5 Hp Rotor Winding Charges 114 Iii. Borewell Sub Mercible 115 Removing And Reerection Of Pump Set From The Well And Dismanding For Checking(Less The Cost Of Old Materials) 1.5 Hp 116 Removing And Reerection Of Pump Set From The Well And Dismanding For Checking(Less The Cost Of Old Materials) 5 Hp 117 Removing And Reerection Of Pump Set From The Well And Dismanding For Checking(Less The Cost Of Old Materials) 7.5 Hp 118 Motor Coil Rewinding Charges With Necessary Insulation Varnishing Etc., Complete Including Cost Of Enameled Copper Wire (Less The Cost Of Burnt Copper Coil)(Less The Cost Of Old Materials) 1.5 Hp 119 Motor Coil Rewinding Charges With Necessary Insulation Varnishing Etc., Complete Including Cost Of Enameled Copper Wire (Less The Cost Of Burnt Copper Coil)(Less The Cost Of Old Materials) 5 Hp 120 Motor Coil Rewinding Charges With Necessary Insulation Varnishing Etc., Complete Including Cost Of Enameled Copper Wire (Less The Cost Of Burnt Copper Coil)(Less The Cost Of Old Materials) 7.5 Hp 121 Labour Charges For The Rectification Of Loose Contacts In The Motor Winding And Wiring Retapping And Varnishing The Winding Including Cost Of Materials 1.5 Hp 122 Labour Charges For The Rectification Of Loose Contacts In The Motor Winding And Wiring Retapping And Varnishing The Winding Including Cost Of Materials 5 Hp 123 Labour Charges For The Rectification Of Loose Contacts In The Motor Winding And Wiring Retapping And Varnishing The Winding Including Cost Of Materials 7.5 Hp 124 Labour Charges For Re-Conditioning The Pump Shaft 1.5 Hp 125 Labour Charges For Re-Conditioning The Pump Shaft 5 Hp 126 Labour Charges For Re-Conditioning The Pump Shaft 7.5 Hp 127 Supply And Fixing Of Following Submersible Motor Materials Including Cost And Conveyance And All Labour Charges Etc Complete..,(Less The Cost Of Old Materials) 128 1.5 Hp Motor Thrust Bearing Unit 1 Set 129 5 Hp Motor Thrust Bearing Unit 1 Set 130 7.5 Hp Motor Thrust Bearing Unit 1 Set 131 1.5 Hp Motor Housing Bush 132 5 Hp Motor Housing Bush 133 7.5 Hp Motor Housing Bush 134 1.5 Hp Pump Bush 135 5 Hp Pump Bush 136 7.5 Hp Pump Bush 137 1.5 Hp Ss Pump Impeller 138 5 Hp Ss Pump Impeller 139 7.5 Hp Ss Pump Impeller 140 1.5 Hp Pump Defusser 141 5 Hp Pump Defusser 142 7.5 Hp Pump Defusser 143 1.5 Hp Non-Return Valve 144 5 Hp Non-Return Valve 145 7.5 Hp Non-Return Valve 146 1.5 Hp Ci Pump Bowl 147 5 Hp Ci Pump Bowl 148 7.5 Hp Ci Pump Bowl 149 1.5 Hp Motor Shaft 150 5 Hp Motor Shaft 151 7.5 Hp Motor Shaft 152 1.5 Hp Rotor 153 5 Hp Rotor 154 7.5 Hp Rotor 155 1.5 Hp Motor Cover (Cashing) 156 5 Hp Motor Cover (Cashing) 157 7.5 Hp Motor Cover (Cashing) 158 1.5 Hp S.S. Bolt And Nut 159 5 Hp S.S. Bolt And Nut 160 7.5 Hp S.S. Bolt And Nut 161 1.5 Hp Rubber \O\ Ring 162 5 Hp Rubber \O\ Ring 163 7.5 Hp Rubber \O\ Ring 164 1.5 Hp Pump Cashing 165 5 Hp Pump Cashing 166 7.5 Hp Pump Cashing 167 1.5 Hp Bowl 168 5 Hp Bowl 169 7.5 Hp Bowl 170 1.5 Hp Back Cover 171 5 Hp Back Cover 172 7.5 Hp Back Cover 173 1.5 Hp 6\ Circlip 174 5 Hp 6\ Circlip 175 7.5 Hp 6\ Circlip 176 1.5 Hp Ss Bolt Nut 177 5 Hp Ss Bolt Nut 178 7.5 Hp Ss Bolt Nut 179 1.5 Hp Pump Shaft Cover 180 5 Hp Pump Shaft Cover 181 7.5 Hp Pump Shaft Cover 182 1.5 Hp Pump Buttom Cover 183 5 Hp Pump Buttom Cover 184 7.5 Hp Pump Buttom Cover 185 1.5 Hp Shaft Union Bush 186 5 Hp Shaft Union Bush 187 7.5 Hp Shaft Union Bush 188 Iv.Open Submersible 5Hp 189 Motor Rewinding Charges Including Cost Of Necessary Winding Materials And All Labour Charges Etc., Complete Including Cost Of Copper Coil (Less The Cost Of Old Burnt Copper Coil)(Less The Cost Of Old Materials) 190 Supply And Fixing Of Following 5Hp Openwell Submersible Motor Materials Including Cost And Conveyance And All Labour Charges Etc Complete..,(Less The Cost Of Old Materials) 191 Motor Brass Bush 192 Motor Trust Bearing 193 Ci Impiller 194 Oil Seel 195 Bruss Nut 196 V.Dol Starter 197 Labour Charges For Checking The Wirinig Diagram Complete And Relay Setting 198 Labour Charges For Replacement Of Damaged Spares And All Labour Charges Etc Complete.., 199 Supply And Fixing Of Following Dol Starter Materials Including Cost And Conveyance And All Labour Charges Etc Complete..,(Less The Cost Of Old Materials)
Basic Detail
Tender No 1557-1/2026/E1
Bidding Type Tender
Location
City Tiruppur
State Tamil Nadu
Key Dates
Publish Date 30 Jul 2026
Submission Date 17 Aug 2026
Open Date 17 Aug 2026
Finance
Tender Value 5 Lakhs
Tender Fee Ref. Documents
EMD 5000
Exemption Not Available
Document List
BOQ_829117.xls
Tendernotice_1 (10).pdf
919dc458-0fde-43fd-8910-776b9cd98991.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 30, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 17, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 14 days
Aug 17, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 14 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_829117.xls

pdf

Tendernotice_1 (10).pdf

html

919dc458-0fde-43fd-8910-776b9cd98991.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders