Tender For Fault Attending, Repairing And Maintenance Of Submersible/Centrifugal Pump Sets Installed At Different Te/Sq/Admn Bldgs Under Cuttack Ba For The Fy 2026-27.
Tender Value
2.78 Lakhs
Estimated cost
Bid Submission
10 Aug 2026
7 days left
EMD
5566
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Cuttack → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Fault Attending, Repairing And Maintenance Of Submersible/Centrifugal Pump Sets Installed At Different Te/Sq/Admn Bldgs Under Cuttack Ba For The Fy 2026-27.
BOQ
| Sl. No. | Item Description |
| 1 | Sub Head-I (Repairing and maintenance of Submersible pump sets) |
| 2 | Withdrawing a 3HP/4HP/5HP submersible pump set from the Bore well along with delivery pipe lines after disconnection of power supply cable, delivery pipes etc. complete as required. |
| 3 | Withdrawing of 3HP/4HP/5HP open well submersible pump set from the UG sump after disconnection of power supply cable, delivery pipes etc. complete as required. |
| 4 | Transportation of the faulty pump set from site to nearest authorized service centre and bring back to site after repairing i/c loading and unloading etc. as required. |
| 5 | Dismantling the submersible Pump motor set, checking and fault finding, preparation of bill of materials/defect list etc. complete as required. |
| 6 | Servicing of the 3HP/4HP/5 HP, 3 phase 415 volts 50 Hz bore well submersible pump set i/c cleaning of mud depositions, servicing and re-assembling after rewinding and reapring/replacement of existing defective/worn out parts/components etc. as required. |
| 7 | Rewinding of the 2HP/3 HP Single phase / 3 phase 240 Volt/ 415 volts, 8.4 Amps, 50 Hz vertical type submersible pump motor (Make :KSB) with bright annealed high conducting electrolytic copper PVC insulated copper wire of suitable size and quantity etc. complete as required. (The dismantled materials may be retained by the Contractor) |
| 8 | Rewinding of the 4 HP/ 3 KW, 3 phase 415 volts, 8.4 Amps, 50 Hz vertical type submersible pump motor (Make :KSB CORA 100/12C+UMA100) with bright annealed high conducting electrolytic copper PVC insulated copper wire of suitable size and quantity etc. complete as required. (The dismantled materials may be retained by the Contractor) |
| 9 | Rewinding of the 5 HP/ 3.75 KW, 3 phase 415 volts, 50 Hz vertical type submersible pump motor with bright annealed high conducting electrolytic copper PVC insulated copper wire of suitable size and quantity etc. complete as required. (The dismantled materials may be retained by the Contractor) |
| 10 | Rewinding of the 5 HP, 3 phase 415 volts, 50 Hz horizontal type Open well submersible pump motor (Model: MR 5.0 HH, 3.7 Kw, 9.3A, Make- Kirloskar Brothers Ltd) with bright annealed high conducting electrolytic copper PVC insulated copper wire of suitable size and quantity etc. complete as required. (The dismantled materials may be retained by the Contractor) |
| 11 | Replacement of the following defective parts /components of 3/4/5 HP submersible pump set by new ones of approved make etc. as required. |
| 12 | Motor Bush i/c lathe works |
| 13 | Thrust Plate |
| 14 | Impeller |
| 15 | Stainless Steel Strainer with 3\\" Short piece pipe i/c lathe works |
| 16 | Oil seal |
| 17 | Tie Rods with nuts and washers etc. |
| 18 | Lnkey Screw |
| 19 | Brass water plug |
| 20 | Re-installation of the repaired 3HP/4HP/5HP submersible pump set along with delivery pipe lines etc. in the bore well i/c reconnection of delivery pipe, electrical power supply cable, testing and trial run etc. complete as required. |
| 21 | Re-installation of the repaired 3HP/4HP/5HP submersible pump set in UG sump i/c reconnection of delivery pipe, electrical power supply cable, testing and trial run etc. complete as required. |
| 22 | Replacement of the following damaged pipe lines with accessories by new ones of following sizes i/c all plumbing works etc. as required. |
| 23 | 50mm dia UPVC pipe (medium class) |
| 24 | 50mm dia UPVC Elbow |
| 25 | 50mm UPVC Union |
| 26 | 50mm dia UPVC Socket |
| 27 | 50mm UPVC FTA/MTA |
| 28 | 50mm UPVC \\"T\\" |
| 29 | 50mm UPVC Ball Valve |
| 30 | 50mm UPVC Foot Valve |
| 31 | Replacement of the defective and damaged water line valves by new ones of the following types and sizes i/c fixing and testing etc. as required. |
| 32 | 50mm Brass Ball Valve |
| 33 | 50mm CI Foot Valve |
| 34 | 50mm Brass Non Return valve |
| 35 | 10mm thick MS bore well cover plate and MS flat clamps for holding the bore well pipe & pump |
| 36 | Replacement of the burnt out/faulty/damaged/worn out Submersible cable and nylon ropes by new pne of following types and sizes i/c fixing, connection and testing etc. as required. |
| 37 | 3 core 1.5sqmm weather proof copper conductor submersible flat cable |
| 38 | 3 core 2.5sqmm weather proof copper conductor submersible flat cable |
| 39 | 8mm Nylon Rope |
| 40 | Replacement of faulty pump starter by new one having 20Amps AC3 duty 3 pole contactor with wide band coil voltage varying from 190V to 400 Volts and bi-metallic thermal overload relay range from 8.9 to 13.5Amps, phase loss sensitive and ambient temperature compensated trip class 10, single phasing and unbalanced voltage protection, housed in a powder coated deep drawn sheet steel enclosure (IP54) enclosure with START and STOP push buttons, 0-500 volt AC volt meter and 0-30VA AC Ammeter with selector switches, motor Run and Stop indicators etc. complied with IEC-64947-4-1 i/c connection and testing etc. as required. (Make: BCH model- CPEYSAKZ or equivalent of Siemens/L&T/ABB) |
| 41 | Rectification of faults of 5HP Centrifugal Pump set i/c replacement of gland packings, closing of water leakage, replacement of priming short piece pipe, testing and making operational for lifting water from UG sump to Bldg/S Qtrs etc. as required. etc. as required. |
| 42 | Lathe work for rotor polish and bush fixing etc complete as required. |
| 43 | Dismantling of the submersible motor coil and cleaning of the core etc complete as required. |
| 44 | Servicing of the starter panel and painting of the Pump and starter panel etc complete as required. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 30, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 10, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysAug 12, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender