Supply Of 3 Phase EOG / HOG Sequence Testing Kit
Tender Overview
Project Description
Supply Of 3 phase eog / hog sequence testing kit , supply and installation of 3 phase eog / hog sequence testing kit with 60kva transformer f or inspection of lhb ac and non-ac coaches with following specifications. 1) hog sequence testing kit shal l be suitable for input supply of 3 phase, 415v with neutral ,125a four poles mccb shall be provided for inp ut supply side protection along with suitable rated supply chord (pvc) of length 5 meters. 2) hog sequence testing kit shall be having output supply provision of 3 phase, with neutral, 750v, ac with iv coupler socket . 3) uic jumper coupler shall be having 16 pin male connector to suit conventional power car socket, the ca ble length shall be 3 meters. 4) hog sequence testing kit shall be having auto over voltage shut down facili ty. 5) hog sequence testing kit shall be having the output capacity of 60kva for power side and 72 to 110 v dc for control side. 6) hog sequence testing kit shall have in built surge protection. 7) hog sequence tes ting kit shall be having 4 pole mccb protection at 750v side, with current rating 125a. 750v ac grade not a vailable 690v mccb shall be used. 8) hog sequence testing kit shall be havingindependent on/off and re st provision for each output. 9) hog sequence testing kit shall be having proper earthing protection. 10) th e power circuit and control circuit arrangement shall be loco part of drawing entered in annexure i. 11) ho g sequence testing kit shall be supplied with four wheels heavy duty trolley two revolving and two fixed on e. 12) hog sequence testing kit shall be powder coated paint of aqua green colour. 13) hog sequence tes ting kit shall be supplied along with user manual. 14) demonstration shall be arranged free of cost at your side. 15) hog sequence testing kit shall be suitably designed at both sides. 16) hog sequence testing kit s hall be labeled with necessary danger/safety precaution instructions wherever necessary with motorised ve hicle. [ warranty period: 30 months after the date of delivery ] ]
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 22 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender