Defence Statutory Bodies & Commissions/Committees Closing in 11 days TDR #56745002

Tender For Repair Maintenace Servicing Of Standby Diesel Engine Driven Generating Sets And Its Connected Misc Items At Certain Location And Repair/Maint Of Mechnical Transport Of Age E/M-Ii Under Ge (Army) No 2 Jodhpur As Per Cpp Ser No 33 And 37

Issued by Statutory Bodies & Commissions/Committees · Jodhpur, Rajasthan
Tender Value
49.50 Lakhs
Estimated cost
Bid Submission
20 Aug 2026
11 days left
EMD
99000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Jodhpur → Rajasthan
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Repair Maintenace Servicing Of Standby Diesel Engine Driven Generating Sets And Its Connected Misc Items At Certain Location And Repair/Maint Of Mechnical Transport Of Age E/M-Ii Under Ge (Army) No 2 Jodhpur As Per Cpp Ser No 33 And 37

BOQ

Name of Work:- REPAIR MAINTENACE SERVICING OF STANDBY DIESEL ENGINE DRIVEN GENERATING SETS AND ITS CONNECTED MISC ITEMS AT CERTAIN LOCATION AND REPAIR/MAINT OF MECHNICAL TRANSPORT OF AGE E/M-II UNDER GE (ARMY) NO 2 JODHPUR AS PER CPP SER NO 33 AND 37
Sl. No. Item Description
1Comprehensive maint with material and servicing of the Vehicle Checking the serviceability of the vehicle oiling, Engine tuning, overhauling fixture accessories replacement of first moving parts changing oil/fuel filters, replacement of bulbs, fuses, repairing of wiring, replacement/topuping of Engine oil and Air Filter/Air Cleaner, maint of battery with electrolyte solution, distilled water, Checking of the Battery Charging system, Cotton waste, as per make and model required complete all as directed by the Engineer-in-Charge.Note - (i) All spare parts, oil etc items shall be measured and paid Separately under ser this Schedule 'A'.
2Supply only engine Oil (20W40)
3Supply only Oil filter.
4Supply only Air filter.
5S& F In replacement Break shoe (Front & Rear)
6S& F In replacement spark plug
7S& F In replacement Indicator lamp complete.
8S& F In replacement Head light bulb
9S& F In replacement Side view mirror
10S& F In replacement Seat cover
11S& F In replacement Chain sprocket
12S& F In replacement Clutch plate complete
13S& F In replacement Clutch cable/wire
14S& F In replacement accelator cable
15S& F In replacement Odometer Cable
16S& F In replacement Front wheel bearing
17S& F In replacement Rear wheel bearing
18S& F In replacement Front Shocker seal
19S& F In replacement Rear Shocker seal
20S& F In replacement Foot rest
21S& F In replacement Horn assembly
22S& F In replacement Self starter motor assembly
23S& F In replacement carburator kit
24M&L for dismantling of front and rear wheels for alignment, and replacement of spokes if necessary and make it serviceable all as directed by engineer-in-charge
25M&L for removing wheel of motorcycle complete with tyre and tube, taking out tube repair, puncture of tube and refixing properly complete all specified and directed
26M&L for carrying out general periodical servicing and checking of MARUTI EECO VAN complete engine / transmission system / suspension system / exhaust system /cooling system / Electrical system and braking system complete greasing of wheel bearings and rectify the minor complaints defects as per manufacturer's recommendations / particular specification including along with replacement of required necessary minor spares such as nut, bolts, fuses tuning and testing of engine under ideal and load conditions and any type of leakage all as specified and directedNote - (i) All spare parts, oil etc items shall be measured and paid Separately under this Schedule.
27Supply only Engine Oil of standard grade (vehicle specific)
28Supply only Oil filter
29Supply only Fuel filter
30Supply only Air filter
31Supply only Brake oil
32Supply only Gear oil
33S& F In replacement clutch plate complete
34Supply only Coolant
35S& F In replacement Wiper assembly with blade
36S& F In replacement Head Light bulb with holder
37S& F In replacement Side view mirror
38S& F In replacement Mud flap
39S& F In replacement Fender lining
40M&L for removing wheel if required for EECO van in case of puncture and refixing properly complete all specified and directed
41M&L for wheel alignment and balancing complete
42S& F In replacement Door Handle outer
43S& F In replacement steering bush
44S& F In replacement lower Suspension arm and stablizer bush set
45S& F In replacement Alternator Brush, bushing set
46S& F In replacement Alternator relay
47S& F In replacement Alternator bearing set
48M&L for carrying out general periodical servicing and checking of DI. TATA 207/ TATA Yodha complete engine / transmission system / suspension system / exhaust system /cooling system / Electrical system and braking system complete greasing of wheel bearings and rectify the minor complaints defects as per manufacturer's recommendations / particular specification including along with replacement of required necessary minor spares such as nut, bolts, fuses tuning and testing of engine under ideal and load conditions and any type of leakage all as specified and directedNote - (i) All spare parts, oil etc items shall be measured and paid Separately under this Schedule.
49Supply only Engine Oil of standard grade (vehicle specific)
50Supply only Oil filter
51Supply only Fuel filter
52Supply only Air filter
53Supply only water separator
54Supply only Brake oil
55Supply only Gear oil
56Supply only Power steering oil
57Supply only Coolant
58Supply only Grease
59S& F In replacement Wiper assembly with blade
60S& F In replacement Head Light bulb with holder
61S& F In replacement Side view mirror
62S& F In replacement Mud flap
63S& F In replacement Fender lining
64M&L for removing wheel if required for Tata Yodha / DI 207 in case of puncture and refixing properly complete all specified and directed
65M&L for wheel alignment and balancing complete
66S& F In replacement Fan Belt
67S& F In replacement Door lock assembly
68S& F In replacement Door Handle outer
69S& F In replacement Glass machine and regulator
70S& F In replacement Door rubber
71S& F In replacement Door Hinges
72S& F In replacement Wind Screen
73S& F In replacement Window glass
74S& F In replacement Ball Suspension joint
75S& F In replacement Indicator lamp complete.
76S& F In replacement steering bush
77S& F In replacement Tie rod end with lock nut
78S& F In replacement front suspension bush kit
79S& F In replacement rear suspension bush kit
80S& F In replacement shock absorber and bush set
81S& F In replacement Speedo meter cable
82S& F In replacement Accelarator cable
83S& F In replacement Silencer rubber and packing
84S& F In replacement Clutch release bearing
85S& F In replacement Timing belt
86S& F In replacement oil sump with gasket
87S& F In replacement Connecting bearing set
88S& F In replacement Flywheel ring
89S& F In replacement Engine mounting
90S& F In replacement Brake Shoe / Pad
91S& F In replacement Wheel cyl. Kit,Wheel cyl. Assy.& W. Oil seal
92S& F In replacement wheel bearing rear with oil seal
93S& F In replacement wheel bearing front with oil seal
94M&L for reinforcement of leafspring
95S& F In replacement Suspension lower arm and stablizer bush set
96S& F In replacement Alternator Brush, bushing set
97S& F In replacement Alternator relay
98S& F In replacement Alternator bearing set
99M&L for carrying out general periodical servicing and checking of Mahindra Bollero Camper complete engine / transmission system / suspension system / exhaust system /cooling system / Electrical system and braking system complete greasing of wheel bearings and rectify the minor complaints defects as per manufacturer's recommendations / particular specification including along with replacement of required necessary minor spares such as nut, bolts, fuses tuning and testing of engine under ideal and load conditions and any type of leakage all as specified and directedNote - (i) All spare parts, oil etc items shall be measured and paid Separately under this Schedule.
100Supply only Engine Oil of standard grade (vehicle specific)
101Supply only Oil filter
102Supply only Fuel filter
103Supply only Air filter
104Supply only water separator
105Supply only Brake oil
106Supply only Gear oil
107Supply only Power steering oil
108Supply only Coolant
109Supply only Grease
110S& F In replacement Wiper assembly with blade
111S& F In replacement Head Light bulb with holder
112S& F In replacement Side view mirror
113S& F In replacement Mud flap
114S& F In replacement Fender lining
115M&L for removing wheel if required for Mahindra Bollero Camper in case of puncture and refixing properly complete all specified and directed
116M&L for wheel alignment and balancing complete
117S& F In replacement Fan Belt
118S& F In replacement Door lock assembly
119S& F In replacement Door Handle outer
120S& F In replacement Glass machine and regulator
121S& F In replacement Door rubber
122S& F In replacement Door Hinges
123S& F In replacement Window glass
124S& F In replacement Ball Suspension joint
125S& F In replacement Indicator lamp complete.
126S& F In replacement steering bush
127S& F In replacement Tie rod end with lock nut
128S& F In replacement front suspension bush kit
129S& F In replacement rear suspension bush kit
130S& F In replacement shock absorber and bush set
131S& F In replacement Speedo meter cable
132S& F In replacement Accelarator cable
133S& F In replacement Silencer rubber and packing
134S& F In replacement Clutch release bearing
135S& F In replacement Timing belt
136S& F In replacement oil sump with gasket
137S& F In replacement Connecting bearing set
138S& F In replacement Flywheel ring
139S& F In replacement Engine mounting
140S& F In replacement Brake Shoe / Pad
141S& F In replacement Wheel cyl. Kit,Wheel cyl. Assy.& W. Oil seal
142S& F In replacement wheel bearing rear with oil seal
143S& F In replacement wheel bearing front with oil seal
144M&L for reinforcement of leafspring
145S& F In replacement Suspension lower arm and stablizer bush set
146S& F In replacement Alternator Brush, bushing set
147S& F In replacement Alternator relay
148S& F In replacement Alternator bearing set
149M&L for carrying out general periodical servicing and checking of Maruti Suzuki Ertiga / Swift Dzire / Ciaz complete engine / transmission system / suspension system / exhaust system /cooling system / Electrical system and braking system complete greasing of wheel bearings and rectify the minor complaints defects as per manufacturer's recommendations / particular specification including along with replacement of required necessary minor spares such as nut, bolts, fuses tuning and testing of engine under ideal and load conditions and any type of leakage all as specified and directedNote - (i) All spare parts, oil etc items shall be measured and paid Separately under this Schedule.
150Supply only Engine Oil of standard grade (vehicle specific)
151Supply only Oil filter
152Supply only Fuel filter
153Supply only Air filter
154Supply only Brake oil
155Supply only Gear oil
156Supply only Power steering oil
157Supply only Coolant
158Supply only Grease
159S& F In replacement Wiper assembly with blade
160S& F In replacement Head Light bulb with holder
161S& F In replacement Side view mirror
162S& F In replacement Mud flap
163S& F In replacement Fender lining
164M&L for removing wheel if required for Maruti Suzuki Ertiga / Swift Dzire / Ciaz in case of puncture and refixing properly complete all specified and directed
165M&L for wheel alignment and balancing complete
166S& F In replacement Fan Belt
167S& F In replacement Door lock assembly
168S& F In replacement Door Handle outer
169S& F In replacement Glass machine and regulator
170S& F In replacement Door rubber
171S& F In replacement Door Hinges
172S& F In replacement Wind Screen
173S& F In replacement Window glass
174S& F In replacement Ball Suspension joint
175S& F In replacement Indicator lamp complete.
176S& F In replacement steering bush
177S& F In replacement Tie rod end with lock nut
178S& F In replacement front suspension bush kit
179S& F In replacement rear suspension bush kit
180S& F In replacement shock absorber and bush set
181S& F In replacement Speedo meter cable
182S& F In replacement Accelarator cable
183S& F In replacement Silencer rubber and packing
184S& F In replacement Clutch release bearing
185S& F In replacement Timing belt
186S& F In replacement oil sump with gasket
187S& F In replacement Connecting bearing set
188S& F In replacement Flywheel ring
189S& F In replacement Engine mounting
190S& F In replacement Brake Shoe / Pad
191S& F In replacement Wheel cyl. Kit,Wheel cyl. Assy.& W. Oil seal
192S& F In replacement wheel bearing rear with oil seal
193S& F In replacement wheel bearing front with oil seal
194S& F In replacement Suspension lower arm and stablizer bush set
195S& F In replacement Alternator Brush, bushing set
196S& F In replacement Alternator relay
197S& F In replacement Alternator bearing set
198M&L for carrying out general periodical servicing and checking of Eicher 10.75 complete engine / transmission system / suspension system / exhaust system /cooling system / Electrical system and braking system complete greasing of wheel bearings and rectify the minor complaints defects as per manufacturer's recommendations / particular specification including along with replacement of required necessary minor spares such as nut, bolts, fuses tuning and testing of engine under ideal and load conditions and any type of leakage all as specified and directedNote - (i) All spare parts, oil etc items shall be measured and paid Separately under this Schedule.
199Supply only Engine Oil of standard grade (vehicle specific)
200Supply only Oil filter
201Supply only Fuel filter and water seperator
202Supply only Air filter
203Supply only Brake oil
204Supply only Gear oil
205Supply only Power steering oil
206Supply only Coolant
207Supply only Grease
208S& F In replacement Wiper assembly with blade
209S& F in replacement Head Lamp bulb set with holder
210S& F In replacement Side view mirror
211S& F In replacement Mud flap
212S& F In replacement Fender lining
213M&L for removing wheel if required for Eicher10.75 in case of puncture and refixing properly complete all specified and directed
214M&L for wheel alignment and balancing complete
215S& F In replacement Fan Belt
216S& F In replacement Door lock assembly
217S& F In replacement Door Handle outer
218S& F In replacement Glass machine and regulator
219S& F In replacement Door rubber
220S& F In replacement Door Hinges
221S& F In replacement Window glass
222S& F In replacement Ball Suspension joint
223S& F In replacement Indicator lamp complete.
224S& F In replacement steering bush
225S& F In replacement Tie rod end with lock nut
226S& F In replacement front suspension bush kit
227S& F In replacement rear suspension bush kit
228S& F In replacement shock absorber and bush set
229S& F In replacement Speedo meter cable
230S& F In replacement Accelarator cable
231S& F In replacement Silencer rubber and packing
232S& F In replacement Clutch release bearing
233S& F In replacement Timing belt
234S& F In replacement oil sump with gasket
235S& F In replacement Connecting bearing set
236S& F In replacement Flywheel ring
237S& F In replacement Engine mounting
238S& F In replacement Brake Shoe / Pad
239S& F In replacement Wheel cyl. Kit,Wheel cyl. Assy.& W. Oil seal
240S& F In replacement wheel bearing rear with oil seal
241S& F In replacement wheel bearing front with oil seal
242M&L for reinforcement of leafspring
243S& F in replacement lower suspension arm and stablizer bush set
244S& F in replacement Alternator Brush, bushing set
245S& F in replacement Alternator relay and diode plate
246S& F in replacement Alternator bearing set
247Cost of Labour for Removing ,Overhauling & refitting of Gear box Assy EICHER 10.75& 20.75 ( Model of 2010,2015,2024) and re-installing after repair/replacement of unserviceable parts complete to entire satisfaction of Engr-in-ChargeNote - (i) All spare parts, oil etc items shall be measured and paid Separately under this Schedule.
248Supply only Gear wheel 3rd
249Supply only Synchronizer ring 3rd gear
250Supply only Oil seal Set
251Supply only Packing/gasket set
252Supply only Cheknut
253Supply only 2nd Gear wheel
254Supply only Synchronizer ring 2nd gear
255Removing the Self startor Assembly from engine of the vehicle. Reparing and overhauing the same with replacement of following items along with the wiper and electrical checkup of the veh and removing of whole veh wireloom set and refitting the same of same model EICHER 10.75 & 20.75 ( Model of 2010,2015,2024) and re-installing after repair/replacement of unserviceable parts complete to entire satisfaction of Engr-in-ChargeNote - (i) All spare parts, oil etc items shall be measured and paid Separately under this Schedule.
256Supply only Starter bush and brush set
257Supply only Battery main wire and terminal
258Supply only Starter solenoid switch
259Supply only Brush plate
260Supply only Bendix starter assy
261S& F in replacement Diesel tank Lock
262M&L for fixing of minor dents and scratches and matching the prepared area with existing colour for all the vehicles pertaining to GE (Army) No 2 Jodhpur as directed by Engr-in-Charge.
263M&L for periodical service of Air compressor complete along with its connected electric panel board and Tyre Inflator system.Note - (i) All spare parts, oil etc items shall be measured and paid Separately under this Schedule.
264Supply only of intake / suction side Air Filter
265Supply only of compressor oil
266Supply only of compressor oil filter
267S& F in replacement of compressor piston rings
268S& F in replacement of compressor Reed Valves
269S& F in replacement of compressor pressure switch
270S& F in replacement of compressor safety valve
271S& F in replacement of compressor drain valve
272S& F in replacement of compressor drive belts
273S& F in replacement of air compressor hose pipe
274S& F in replacement of air chuck & valve of tyre inflator machine
275S& F in replacement of pressure sensor as per existing make
276M&L in replacement or repair of circuit board/display (PCB) as per existing make
277M&L for periodical service of 3HP cash washer , connected 2HP motor along with its connected electric panel board.Note - (i) All spare parts, oil etc items shall be measured and paid Separately under this Schedule.
278Supply only of O Rings and rubber washer kit
279Supply only of water and oil seal (V ring)
280S& F in replacement of Check and Spring Valve
281S& F in replacement of Plunger \ Piston of existing size
282Supply only of pump oil as per specification
283S& F in replacement of Capacitor for motor of existing capacity.
284S& F in replacement of Cooling fan
285S& F in replacement of Power Cable
286S& F in replacement of Flywheel belt
287Supply only of Inlet Filter
288S& F in replacement of compressor armored water washing pipe with fitting of suitable length as directed by Engr-in-Charge
289S& F in replacement of Spray Nozzle
290M&L for steering column of a Swift Dzire depending on the issue, mechanic can either repair the existing unit using a steering column repair kit, lubricate the internal shafts to fix sticking, or replace specific internal components (like sensors or bushes) or replaced all as specified & directed by Enginr-in charge.
291M&L for repair or replacement of Eicher urea pump (DEF/AdBlue dosing pump) depending on the model and whether it is an OEM assembly or a replacement part
292M&L for replacement of catalytic converter in Mahindra bolero camper designed to capture and store harmful soot particles from the exhaust, reducing emissions all as specified & directed by Enginr-in charge.
293M&L for replacement of new AC compressor of Tata 207 , including the new compressor, labor, and AC gas refilling all as specified & directed by Enginr-in charge.
294M&L for AC gas filling of suitable type for cars including Gas filling ensuring system cools the cabin space efficiently all as specified & directed by Enginr-in charge.
295M&L for cylinder head ovehhaul and top end restoration of TATA 207 DI including repair of cylinder head, replacement of inlet and exaust valves, valve guide, valve stem oil seal, cylinder head bolt kit, rocker cover gasket, exaust & inlet manifold packing, thermostate valve including head surface facing / grinding, valve guide fitting and reaming , valve seat cutting and lapping and pressure testing along with block cleaning, torque sequence execution, tappet clearance adjustment, timing alignment and final testing all as specified & directed by Enginr-in charge. Please Enable Macros to View BoQ information
296M&L for cylinder head ovehhaul and top end restoration of TATA 207 DI including repair of cylinder head, replacement of inlet and exaust valves, valve guide, valve stem oil seal, cylinder head bolt kit, rocker cover gasket, exaust & inlet manifold packing, thermostate valve including head surface facing / grinding, valve guide fitting and reaming , valve seat cutting and lapping and pressure testing along with block cleaning, torque sequence execution, tappet clearance adjustment, timing alignment and final testing all as specified & directed by Enginr-in charge. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56745002
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 49.50 Lakhs
LAST DATE 20-08-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Repair Maintenace Servicing Of Standby Diesel Engine Driven Generating Sets And Its Connected Misc Items At Certain Location And Repair/Maint Of Mechnical Transport Of Age E/M-Ii Under Ge (Army) No 2 Jodhpur As Per Cpp Ser No 33 And 37
Basic Detail
Tender No 8800/26-27/49/05/E8
Bidding Type Tender
Location
City Jodhpur
State Rajasthan
Key Dates
Publish Date 30 Jul 2026
Submission Date 20 Aug 2026
Open Date 22 Aug 2026
Finance
Tender Value 49.50 Lakhs
Tender Fee 500
EMD 99000
Exemption Available
Document List
b53f46b2-61d9-49db-98dc-fa0db8a8909c.html
BOQ_875717.xls
TENDER.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 30, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 20, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 11 days
Aug 22, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 13 days

Tender Documents

Download All (ZIP) ↓
html

b53f46b2-61d9-49db-98dc-fa0db8a8909c.html

xls

BOQ_875717.xls

pdf

TENDER.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders