Tender For Rate Contract Of Industrial And Electrical Safety Shoe For All Work Centres For A Period Of 3 Years.
Tender Overview
Project Description
Tender for Rate Contract Of Industrial And Electrical Safety Shoe For All Work Centres For A Period Of 3 Years. = Limited
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 03-Sep-2026 | TBO extension Corrigendum dated 03.09.2026 | Date | 29-Sep-2026 |
| 2 | 24-Sep-2026 | TBO extension Corrigendum dated 24.09.2026 | Date | 20-Oct-2026 |
| 3 | 03-Sep-2026 | TBO extension Corrigendum dated 03.09.2026 | Date | 29-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Group - I : Industrial Safety Shoes as per Scope of Supply. |
| 2 | Industrial Safety Shoes |
| 3 | Group - II : Electrical Safety Shoes as per Scope of Supply. |
| 4 | Electrical Safety Shoes Notes to Annexure-V (A) BOQ/ PRICE FORMAT: |
| 5 | Bidder (Manufacturer) can quote for item either at Sl. No. 1 or 2 or both. |
| 6 | Bid shall be evaluated item-wise (i.e. Industrial and Electrical separately) FOR destination price basis. |
| 7 | FOR Destination: As per Annexure - A |
| 8 | Unit Price quoted at M.14 & M.16 are FOR Destination price inclusive of all taxes, duties, fees, levies, all expenses including Packing & forwarding charges, transit, insurance, freight charges of whatsoever nature or kind for entire scope of work other than GST. |
| 9 | Bidders are advised to check applicable GST on their own before quoting. ONGC will not take any responsibility in this regards. GST reimbursement will be as per quoted rates or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %. |
| 10 | The quantities indicated above shall be considered for evaluation purposes only. Bidder should accordingly note that the said quantities only an ESTIMATE, and may vary after award of Rate contract. ONGC does not guarantee any minimum quantity to be purchased and bidder shall not be entitled for any compensation on this account. |
| 11 | Order placed against the rate contract at the price accepted by ONGC at the time of award of rate contract shall be binding on the bidder during entire duration of rate contract irrespective of order quantity. Annexure - A ONGC Work Centre’s locations for destination price. Sl. No. ONGC Office Locations Industrial Safety Shoe (Pairs) Electrical Safety Shoe (Pairs) |
| 12 | AGARTALA |
| 13 | AHMEDABAD |
| 14 | ANKLESHWAR |
| 15 | BARODA |
| 16 | BOKARO |
| 17 | CAMBAY |
| 18 | CHENNAI |
| 19 | DEHRADUN |
| 20 | HAZIRA |
| 21 | JODHPUR |
| 22 | JORHAT |
| 23 | KAKINADA |
| 24 | KARAIKAL |
| 25 | KOLKATA |
| 26 | MEHSANA |
| 27 | MUMBAI |
| 28 | NAZIRA |
| 29 | NEW DELHI |
| 30 | RAJAHMUNDRY |
| 31 | SIBSAGAR |
| 32 | SILCHAR Total 56815.0 8741.0 Note for Work Centres: - |
| 33 | Work Centre shall implement staggered delivery to prevent inventory accumulation and lag |
| 34 | Each work centres/locations/units of ONGC to place order of safety shoes from the Rate contract in Maximum of 4 (Four) lots. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
TodayCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 21 daysCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
TodayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 21 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 22 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender