Tender For Tender For Supply Of Material, Transportation ,Design, Erection, Testing, Commissioning For Sop To Jsv Sewage Treatment Plant At Kalu Di Hatti By Providing 11 Kv Ht Line, 11/0.4 Kv, 250 Kva Dtr And 3 Phase Lt Line In (E) Section Rajpur Und
Tender Overview
Project Description
Tender for Tender For Supply Of Material, Transportation ,Design, Erection, Testing, Commissioning For Sop To Jsv Sewage Treatment Plant At Kalu Di Hatti By Providing 11 Kv Ht Line, 11/0.4 Kv, 250 Kva Dtr And 3 Phase Lt Line In (E) Section Rajpur Under Electrical Sub Division No. Ii, Hpsebl Pal Ur Under Ed Pal Ur. (Seop-06/2026-27)
BOQ
| Sl. No. | Item Description |
| 1 | 11KV HT Line |
| 2 | Prov. Steel Tubular pole 9 mtr long |
| 3 | Prov.RCC Muff with concerete feeling |
| 4 | Prov. C.I.X-arm (2400x 100x50x5)x2x2 mm for Double pole Str. |
| 5 | Prov. A.I. X-Arm (2800x50x50x6)x2mm for guarding of D/P |
| 6 | Prov. C.I.X-arm (1500x 100x50x5) mm for Single pole Str. |
| 7 | Prov. A.I. X-Arm (1800x50x50x6)mm for S/P guarding |
| 8 | Prov. A.I. X-Bracing Set (2800x50x50x6) (1500x50x50x6)x2x2 mm for Double pole Str. |
| 9 | Prov. C.I. (2400x 100x50x5) mm for GO Switch (Length 2x2400)mm |
| 10 | Prov. C.I. (2400x 75x40x6) mm for D.O Fuse Unit (Length 2x2400)mm |
| 11 | Prov. GO Switch Handle Supporting: Channel Iron (460x75x40x6)mm |
| 12 | Prov. Pin Insulator with pin hellically formed fitting |
| 13 | Prov. Discs Insulator set cleaves with tongue helically formed(Porcelain: 12 kV, BS, 90 KN) |
| 14 | Prov. Ibell/Bosch/Procapital or any similar make Tree cutter |
| 15 | Prov. Megger BM5500 5000V Insulation tester, Digital/Analog Display, 100 Gohm, Cat III 600 V |
| 16 | Prov. H.T.Stay set Complete |
| 17 | Prov.Stay Clamp for Stay Set |
| 18 | Prov. Half Clamp for Cross arms |
| 19 | Prov. Fuse wire Tinned copper (16-200 Amp.) |
| 20 | Prov. Stay wire 7/3.15 mm (@ 8.0 kg Per Stay set ) |
| 21 | Prov G.I.wire 8 SWG for guarding Across the road |
| 22 | Danger Plate ( 203x200x1.6mm) |
| 23 | Prov. Nut & Bolt ( off sizes ) |
| 24 | Barbed wire |
| 25 | Aluminum Paint |
| 26 | Prov.AAAC 7/3.15mm (50mm2 ) |
| 27 | Prov. Earth Hook HT 8\\" Long |
| 28 | Prov. 11 KV GO Switch |
| 29 | Prov. DO Fuse unit |
| 30 | Prov. Egg insulator HT |
| 31 | Transportation Charges complete in all respect |
| 32 | Erection charges of AAAC 7/3.15 mm sq. as per cost data 2025-26 i.e. Laying, Stringing and sagging, Binding with insulator for 0.160 kM complete in all respect |
| 33 | 11/0.4 KV 250 KVA Distribution Sub-Station |
| 34 | 11/0.4 KV 250 KVA Distribution Transformer |
| 35 | S/T Pole 9Mtr. W/L 200 kg |
| 36 | RCC Muff |
| 37 | X-Arm {C.I. (100X50X6 mm) length 2800mm x2} for incomer line |
| 38 | M.S Angle Iron (50x50x6 mm) length (2800mm)x1 Nos. for LA's |
| 39 | X-Arm {C.I. (75x40x6 mm) length 2800mm x4} for supporting DO fuse unit & GO switch |
| 40 | Transformer Bed Belting and Knee Bracing |
| 41 | X-Arm {C.I. (100X50X6 mm) length 2800mm x2} for Transformer Bed |
| 42 | X-Arm {C.I. (100X50X6 mm) length 460mm x2} for supporting main channel of the Transformer |
| 43 | M.S Angle Iron (50x50x6 mm) length (2800mm)x2 Nos. |
| 44 | M.S Angle Iron (35x35x5 mm) length (460mm)x2 Nos. |
| 45 | M.S Angle Iron (50x50x6 mm) length (950mm)x2 Nos. |
| 46 | Transformer LT Distt. Box and GO Switch fixing Assembly |
| 47 | MS Angle Iron (50x50x6 mm) length 2800mm x2 |
| 48 | MS Angle Iron (50x50x6 mm) length 450mm x1 |
| 49 | GO Switch Handle Supporting (C.I. 75x40x5 mm) length 460mm |
| 50 | G.O.Switch AB Switch unit (11 kV, 400 A,, 25 kA) Triple Pole O/D type |
| 51 | D.O.Fuse unit |
| 52 | Surge Arrestors 9 kV Station Class (Porcelain type) |
| 53 | Disc Insulator Sets (Comprising 1 No. Disc (Porcelain BS, 152 kV, 90 kN) including Dead end Clamps etc.) |
| 54 | Stay Set complete |
| 55 | Stay Wire 7/3.15 mm ( @ 8.0 kg Per Stay Set) |
| 56 | HP/Lenovo/Acer/Asus/Dell on any similar makeAll-in-One, 13th Gen Intel Core i3-1315U (8GB DDR4, 512GB SSD) IPS,300 nits, Anti-Glare, FHD, 27''(68.6cm), Win11, M365* Office 24, Shell White, 6.42kg, FHD IR tilt Camera, 27-cr0902in/cr0906in |
| 57 | LT Distribution Panel Box with MCCB (400A, 50 kA, 3P, 1No. ICU and MCCB 250 Amp. 36 kA=3 Nos |
| 58 | Pipe Earthing Set |
| 59 | Half Clamp (M.S. Flat 50X6 mm) |
| 60 | Full Clamp (M.S. Flat 50X6 mm) |
| 61 | M.S. Nuts and Bolts (Off Sizes) |
| 62 | A. Thimble |
| 63 | Copper Thimble 200A |
| 64 | Danger Plate |
| 65 | Barbed Wire |
| 66 | LT Cable (3.5 Core)300mm2 for incomer |
| 67 | AAAC 7/3.15 50 mm2 for tapping, jumpers & Connections |
| 68 | Aluminium Paint. |
| 69 | CT/PT Unit PT(1 Unit,11KV/110V) CT (3 No,10-400/5A) |
| 70 | 3 Phase 4 Wire CT/PT operated Static Trivector HT Meter |
| 71 | Control Cable for HT metering 2.5mm2 PVC(1.1 kV, 10C, HR FRLS, Cu, Screen) |
| 72 | CT/PT Unit Belting & Knee Bracing |
| 73 | Channel Iron (75x40x6mm) Length 2800mm for CT/PT Unit |
| 74 | MS Angle Iron (50x50x6 mm) length 2800mm x4 |
| 75 | MS Angle Iron (35x35x5 mm) length 460mm x2 |
| 76 | Civil work i.e Transformer plinth/Bed |
| 77 | Civil work i.e Chain Link Fencing, Angle iron, Gate etc. for transformer fencing |
| 78 | Transporation Charges complete in all respect |
| 79 | Erection Charges complete in all respect |
| 80 | 3-phase LT Line |
| 81 | Steel Tubular Pole 8 Mtr. Long |
| 82 | RCC Muff |
| 83 | Prov. Shackle insulator with D-Iron for double ckt. |
| 84 | Prov. Egg Insulator |
| 85 | Prov. Eye Hook Bolt |
| 86 | LT Earthing Complete |
| 87 | LT Stay Set Complete |
| 88 | Stay Wire 7/3.15mm @ 6.0Kg.Per Stay Set |
| 89 | Prov. Fuse wire Tinned copper (16-200 Amp.) |
| 90 | Prov. G.I wire 8 SWG |
| 91 | Prov. AAAC 7/3.15 mm (55mm2) for double ckt. |
| 92 | Prov. Full Clamp |
| 93 | M.S Nuts & Bolts (off sizes) |
| 94 | Prov. Aluminium Paint |
| 95 | Erection charges of AAAC 7/3.15 mm sq i.e string & sagging, binding with insulator for 0.415 km |
| 96 | Erection charges of AAAC 7/3.15 mm sq i.e string & sagging, binding with insulator for 0.400x4=1.600 km |
| 97 | Transportation charges complete in all respect Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender