Power Boards / Undertakings / PSU Closing in 11 days TDR #56741343

Tender For Supply And Work For Shifting Of 11 Kv, Lt Line And 25 Kva T/F Near Vill Sutinya On Request Of Ee Pwd Under Edsd Bhikiyasain Under Head Deposit.

Issued by Boards / Undertakings / PSU · Almora, Uttarakhand
Tender Value
Ref. Documents
Estimated cost
Bid Submission
11 Aug 2026
11 days left
EMD
2000
Bank guarantee accepted
Document Fee
118
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Almora → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Supply And Work For Shifting Of 11 Kv, Lt Line And 25 Kva T/F Near Vill Sutinya On Request Of Ee Pwd Under Edsd Bhikiyasain Under Head Deposit.

BOQ

Name of Work:- Supply and Work for Shifting of 11 KV, LT line and 25 KVA T/F near Vill Sutinya on request of EE PWD under EDSD Bhikiyasain under Head Deposit.
Sl. No. Item Description
1Top Chennel Clamp For SP-23 With N&B
2STAY CLAMP FOR SP-23 WITH NUT & BOLT
3HT Stay Insulator
4SHACKLE INSULATOR 100X115 mm WITH N&B
5BRACING CLAMP BOTTOM FOR SP-23 WITH N/B
6LT Clamp SP-21 With Nut & Bolt
7ERECTION OF EARTHING ROD
8FABRICATION OF STEEL
9EXCAVATION OF PIT FOR STAY SET
10ERECTION OF 11 KV STAY SET
11GROUTING OF STAY SET
12EXCAVATION OF PIT FOR POLE
13ERECTION OF SINGLE SP-21 POLE
14ERECTION OF SINGLE SP-23 POLE
15ERECTION OF SP-23 DOUBLE POLE
16GROUTING OF POLE
17MUFFING OF POLE
18DISMANTLING OF SP-21/SP-23 SINGLE POLE
19DISMANTLING OF SP-23 DOUBLE POLE
20DISMANTLING OF 25 KVA DTR
21INST. OF 25 KVA DTR ON POLE STRUCTURE
22LAYING OF RABBIT CONDUCTOR IN HT LINE
23LAYING OF 1P 2W LT LINE(WEASEL)
24CARTAGE SP-21/23 POLE, 0-20 KM
25CARTAGE OF PETTY MATERIAL,0-20 KM
26HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM)
27HEADLOAD CARTAGE OF MATERIAL(0-1 KM)
28HEADLOAD CARTAGE OF 25 KVA DTR(0-1 KM)
29BACK CARTAGE OF PETTY MATERIAL,0-20 KM
30BACK HEAD LOAD CART. OF PETTY MAT. 0-1KM Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56741343
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 11-08-2026
Authority
Authority Name Uttarakhand Power Corporation Limited
Work Description Tender for Supply And Work For Shifting Of 11 Kv, Lt Line And 25 Kva T/F Near Vill Sutinya On Request Of Ee Pwd Under Edsd Bhikiyasain Under Head Deposit.
Basic Detail
Tender No 12/EDD(B)/2026-27
Bidding Type Tender
Location
City Almora
State Uttarakhand
Key Dates
Publish Date 30 Jul 2026
Submission Date 11 Aug 2026
Open Date 12 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee 118
EMD 2000
Exemption Not Available
Document List
12EEDDB.pdf
81d6093a-e71f-435d-871b-863a7daedc4f.html
BOQ_115963.xls
Tendernotice_1 (17).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 30, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 11, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 11 days
Aug 12, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 12 days

Tender Documents

Download All (ZIP) ↓
pdf

12EEDDB.pdf

html

81d6093a-e71f-435d-871b-863a7daedc4f.html

xls

BOQ_115963.xls

pdf

Tendernotice_1 (17).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders