Housing Urban and Rular Development Government Departments Closing in 12 days TDR #56737419

Tender For Supply, Installation, Testing And Commissioning Of 11 Kv Dedicated Feeder For Providing Power Supply To Industries At Indranipatna Industrial Estate, Choudwar, Cuttack.

Issued by Government Departments · Cuttack, Odisha
Tender Value
2.20 Crore
Estimated cost
Bid Submission
13 Aug 2026
12 days left
EMD
2.20 Lakhs
Bank guarantee accepted
Document Fee
11800
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Cuttack → Odisha
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Supply, Installation, Testing And Commissioning Of 11 Kv Dedicated Feeder For Providing Power Supply To Industries At Indranipatna Industrial Estate, Choudwar, Cuttack.

BOQ

Name of Work:- Supply, Installation, Testing and Commissioning of 11 KV dedicated feeder for providing power supply to Industries at Indranipatna Industrial Estate, Choudwar, Cuttack.
Sl. No. Item Description
1Part A- Cost of Supply Of Materials.
2Supply of materials for 11kV, 3Core, 400sqmm Aluminium, XLPE insulation armoured UG cable with Spare and accessories.
3Length of 11kV 3C, 400sqmm cable (Open trench - 80 Mtr)
4Length of 11kV 3C, 400sqmm cable (HDD - 1520 Mtr)
5Supply of 11kV, 3Core, 400sqmm, XLPE insulation armoured UG cable (SC rating of cable in kA- 37.7kA and SC rating of Armour in kA- 15kA) as per the approved technical specification and direction of EIC.
6Supply of Straight through jointing kits Heat Shrinkable type suitable for 11kV, 3Core, 400 sqmm, aluminium UG cable kits. as per the approved technical specification and direction of EIC.
7Supply of Indoor termination kits Heat Shrinkable type suitable for 11kV 3Core, 400 sqmm, HT UG cable kits. as per the approved technical specification and direction of EIC.
8Supply of Outdoor termination kits Heat Shrinkable type suitable for 11kV 3Core, 400 sqmm, HT UG cable kits. as per the approved technical specification and direction of EIC.
9Supply of materials for High Density Polyethelene (HDPE) pipe 200mm diameter, PE 80- PN8 for laying of 11kV UG cable. as per the approved technical specification and direction of EIC.
10Supply of 11 KV RMU
11Supply of 11 KV 4way 2x630A LLVV BKR O/D. as per the approved technical specification and direction of EIC.
12Earthing
13Supply of Earthing Conductor: 50X6 mm (2.4kg./mtr.) GI Flat for equipment, structure etc as per the approved technical specification and direction of EIC.
14Supply Pipe Earthing 40mm. GI Pipe as per the approved technical specification and direction of EIC.
15Part A- Cost of Erection Of Materials.
16Erection, Commissioning, Testing of 11kV new line by 3core, 400sqmm, aluminium, XLPE UG cable.
17Laying, Commissioning & Testing of 11kV, 3Core, 400sqmm XLPE insulation (extruted type) UG cable by open trench method. as per direction of EIC.
18Erection of Straight through jointing Kits/ Outdoor termination kits/Indoor termination Kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG cable kits. as per direction of EIC.
19Installation, Laying, Commissioning & Testing of 11kV, 3Core, 400sqmm, XLPE U/G cable by HDD method with HDPE pipe (200mm dia, PN8 PE80) including suply of HDPE Pipe. Complete as per the approved technical specification and direction of EIC.
20Laying of 200mm dia PE 80-PN8, HDPE pipe inside open trench.as per direction of EIC.
21Erection, Commissioning, Wiring and Testing of 11kV RMU
22Erection of 11KV 4WAY 2 x 630A LLVV BKR O/D.as per direction of EIC.
23Part A- Cost of Civil Works.
24Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P, etc for UG Cable Trench
25Earth work excavation of soil (1mtr. width X 1mtr. depth)- Route Length
26Earth work excavation of soil. complete as per the direction of EIC.
27Earth work excavation of hard rock. complete as per the direction of EIC.
28Back flling with excavated soil outside and above the trench. complete as per the direction of EIC.
29Civil works for Prefabricated RCC foundation with supply of all materials
30Prefabricated RCC foundation of 11kV RMU. complete as per the direction of EIC.
31SITC of GI Fencing with Gate around each RMU as per the direction of EIC.
32Construction Earthing chamber including installation of earthing pipe. Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe as per the specification of TPCODL.
33Supply and erection of GI Pipe of dia. 150mm, Class-B (8Mtr.).Complete as per the approved technical specification and direction of EIC.
34Supply and Erection of Cable Route Marker along the cable route at an interval of 30mtrs with civil works.Complete as per the approved technical specification and direction of EIC.
35Part B- Cost of Material For 11KV DP With Isolator & Earth Switch - 2 No.
36Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long , 30.44KG/Mr.) (Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC.
37Supply & installation of Top Channel(GI) 100X50 X6mm, 9.56 KG/Mtr., each channel(GI) length 3 mtr.,2 no's channel(GI) required =(2x9.56x3). Complete in all respect as per the approved technical specification and direction of EIC.
38Supply & installation of Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr.,each 0.280 mtr. length,6 no's reguired =(6x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC.
39Supply & installation of Isolator Mounting Channel(GI) 75X40X4.8mm, 7.14KG/Mtr, each Channel(GI) length 3 Mtr., 2 no's Channel(GI) required =( 7.14x3x2).Complete in all respect as per the approved technical specification and direction of EIC.
40Supply & installation of Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.81x7.14).Complete in all respect as per the approved technical specification and direction of EIC.
41Supply & installation of Angle(GI) for Cantilever arrrangement for HT MU 50 x 50 x 6 - 1282 mm.each 2 nos.(4.5 K.g. per mtr.).Complete in all respect as per the approved technical specification and direction of EIC.
42Supply & installation of MU and Isolator Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 4 no's Channel(GI) required =( 9.56x4x0.35). Complete in all respect as per the approved technical specification and direction of EIC.
43Supply & installation of Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1). Complete in all respect as per the approved technical specification and direction of EIC.
44Supply & installation of Double Pole Belting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 3 Mtr., 2 no's Channel(GI) required =( 7.14x3x2). Complete in all respect as per the approved technical specification and direction of EIC.
45Supply and installation of 50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 3.512 mtr., 2 nos Angle(GI) required = (4.5x3.512x2).Complete in all respect as per the approved technical specification and direction of EIC.
46Supply and installation of Danger Plate,2 no's. Complete in all respect as per the approved technical specification and direction of EIC.
47Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's= (2x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC.
48Supply and installation of 55mm2 ACSR - PVC Insulated for Jumpering .Complete in all respect as per the approved technical specification and direction of EIC.
49Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC.
50Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC.
51Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC.
52Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC.
53Supply & installation of GI Pipe Earthing 40mm. 3 Mtr. Long. Complete in all respect as per the approved technical specification and direction of EIC.
54Supply & installation of 50x6mm GI Flat for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36. Complete in all respect as per the approved technical specification and direction of EIC.
55Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required = (2 x 3 Kg). Complete in all respect as per the approved technical specification and direction of EIC.
56Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 8 no's =(8x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC.
57SITC of Lightning Arrester (12KV,10KA) (Station Class,class-2). Complete in all respect as per the approved technical specification and direction of EIC.
58SITC of 11 KV 630 Amp Motorized Isolator with Earth Switch. Complete in all respect as per the approved technical specification and direction of EIC.
59Supply & installation of Gl Nut, Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch). Complete in all respect as per the approved technical specification and direction of EIC.
60Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC.
61Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC.
62Part B- Cost of Civil Works.
63Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing & Standard.
64Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC.
65Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC.
66Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe as per the specification of TPCODL.
67Part C- Cost of Materials for 11KV Cut Point With 180 Degree Angle - 1 No.
68Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC.
69Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr. each channel(GI) length 1.2 mtr, 2no's channel(GI) required =( 2x9.56x1.2). Complete in all respect as per the approved technical specification and direction of EIC.
70Supply & installation of Fish Plate(GI) 50x6mm., 2.36 kg/Mtr. each 0.280 mtr length,8 no's required =(8x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC.
71Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel(GI) length 0.306 mtr. 2no's channel(GI) required =(2x9.56x0.306). Complete in all respect as per the approved technical specification and direction of EIC.
72Supply and installation of Danger Plate,1 no's. Complete in all respect as per the approved technical specification and direction of EIC.
73Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's= (1x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC.
74Supply & installation of GI barbed wire anticlimbing device 3 Kg. per support. Complete in all respect as per the approved technical specification and direction of EIC.
75Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 4 no's =(4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC.
76Supply & installation of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC.
77Supply & installation of H W fitting (B&S) 70KN,3Bolt. Complete in all respect as per the specification and direction of EIC.
78Supply & installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC.
79Supply & installation of Earthing of support(Coil Type). Complete in all respect as per the approved technical specification and direction of EIC.
80Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/Mtr- 2Mtr for connecting pole with coil earthing. Complete in all respect as per the approved technical specification and direction of EIC.
81Supply & installation of NON METALLIC TIES-11KV 100SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC.
82Supply & installation of IPC for 100 sq.mm AAA conductor (For covered conductor)-11kV. Complete in all respect as per the approved technical specification and direction of EIC.
83Supply & installation of Spike (GI ) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC.
84Supply & installation of GI Nut, Bolt & Washer of different sizes (3.55 Kg each Cut Pole). Complete in all respect as per the approved technical specification and direction of EIC.
85Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC.
86Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC.
87Part C- Cost of Civil Works.
88Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC.
89Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC.
90Part D- Cost of Materials for 11 KV Cut Point with 90 Degree Angle- 2 No.
91Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC.
92Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr. each channel(GI) length 1.2 mtr, 4no's channel(GI) required =( 4x9.56x1.2). Complete in all respect as per the approved technical specification and direction of EIC.
93Supply & installation of Fish Plate(GI) 50x6mm., 2.36 kg/Mtr. each 0.280 mtr length,16 no's required =(16x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC.
94Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel(GI) length 0.306 mtr. 4no's channel(GI) required =(4x9.56x0.306). Complete in all respect as per the approved technical specification and direction of EIC.
95Supply and installation of Danger Plate,1 no's. Complete in all respect as per the approved technical specification and direction of EIC.
96Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's= (1x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC.
97Supply & installation of GI barbed wire anticlimbing device 3 Kg. per support. Complete in all respect as per the approved technical specification and direction of EIC.
98Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 4 no's =(4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC.
99Supply & installation of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC.
100Supply & installation of H W fitting (B&S) 70KN,3Bolt. Complete in all respect as per the approved technical specification and direction of EIC.
101Supply & installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC.
102Supply & installation of Earthing of support(Coil Type). Complete in all respect as per the approved technical specification and direction of EIC.
103Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/Mtr- 2Mtr for connecting pole with coil earthing. Complete in all respect as per the approved technical specification and direction of EIC.
104Supply & installation of NON METALLIC TIES-11KV 100SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC.
105Supply & installation of IPC for 100 sq.mm AAA conductor (For covered conductor)-11kV. Complete in all respect as per the approved technical specification and direction of EIC.
106Supply & installation of Spike (GI ) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC.
107Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC.
108Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC.
109Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC.
110Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC.
111Supply & installation of GI Nut, Bolt & Washer of different sizes (7.433 Kg each Cut Pole). Complete in all respect as per the approved technical specification and direction of EIC.
112Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC.
113Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC.
114Part D- Cost of Civil Works.
115Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing & Standard.
116Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC.
117Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC.
118Part E- Cost of Materials for 11 KV Pin Points With WPB - 0.55CKM.
119Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mtr)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. ComComplete in all respect as per the approved technical specification and direction of EIC.
120Supply & installation of 11KV V cross Arm(GI) (10.2 Kg. each). Complete in all respect as per the approved technical specification and direction of EIC.
121Supply & installation of Top bracket 100x50X6 mm Gl channel (2kg each).Complete in all respect as per the approved technical specification and direction of EIC.
122Supply & installation of Danger Plate,1 no's. for each pole. Complete in all respect as per the approved technical specification and direction of EIC.
123Supply & installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's =(1x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC.
124Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support. Complete in all respect as per the approved technical specification and direction of EIC.
125Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr Iength 4 no's =(4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC.
126Supply & installation of 11 KV pin insulator polymer, 3 Nos. required for each support. Complete in all respect as per the approved technical specification and direction of EIC.
127Supply & installation of Earthing of Support Coil Type. Complete in all respect as per the approved technical specification and direction of EIC.
128Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing. Complete in all respect as per the approved technical specification and direction of EIC.
129Supply & installation of GI Nut, Bolt & Washer of different sizes (1.45 Kg/ Pin Point). Complete in all respect as per the approved technical specification and direction of EIC.
130Supply & Stringing of 100 SQ.MM. AAAC XLPE Covered Conductor-11kV. Complete in all respect as per the approved technical specification and direction of EIC.
131Supply & Stringing of 100 SQ.MM. AAAC XLPE Covered Conductor-11kV (Augmentation). Complete in all respect as per the approved technical specification and direction of EIC.
132Supply & installation of NON METALLIC TIES-11KV 100SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC.
133Supply & installation of Spike (GI ) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC.
134Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC.
135Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC.
136Part E- Cost of Civil Works.
137Concreting ratio 1:1.5:3 (500mmX500mm X1800mm) = 0.45Cu.mtr(Per pole).Complete in all respect as per the direction of EIC.
138Couping ratio 1:1.5:3 with dimension (500X 500X450)= 0.1125 Cu mtr(Per pole).Complete in all respect as per the direction of EIC.
139Part F- Cost of meterial for Line protecting Guarding for road crossing - 2 nos
140Supply and Installation of Guarding Channel(GI) 75x40 x4.8 mm, 7.14 KG/Mtr,, each Channe(GI) length 2.2 mtr., 4 no's Channel(Gl) required =( 4x7.14x2.2) ( For Single Pole). Complete in all respect as per the approved technical specification and direction of EIC.
141Supply and Installation of No-6 GI wire (0.192 kg/mtr.) for Main String.Complete in all respect as per the approved technical specification and direction of EIC.
142Supply and Installation of No-8 GI wire (0.131 kg/mtr.) for lacing.Complete in all respect as per the approved technical specification and direction of EIC.
143Supply and Installation of Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.). Complete in all respect as per the approved technical specification and direction of EIC.
144Supply and Installation of GI pipe earthing 40mm ,3mtr long. Complete in all respect as per the approved technical specification and direction of EIC.
145Supply and Installation of 50x6mm,Flat(GI) for earthing, 2.36kg/mtr,( 10.7 meter for rising) =10.7x2.36 .Complete in all respect as per the approved technical specification and direction of EIC.
146Part F: Cost of Civil Work
147Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powdercalculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/ 50mm including welding of Flat(GI) around pipe.Complete in all respect as per the direction of EIC.
148Part G- Cost of dismantling of old materials.
149Dismantling of ACSR/AAAC 34/ 55mm2 from overhead line. complete as per the direction of EIC.
150N.B: The bidders are required to Quote theire rates excluding of Goods & Service Tax (GST). GST as applicable will be paid extra. The existing rule of Govt. and any amendment made in future will be followed. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56737419
AUTHORITY Government Departments
TENDER VALUE 2.20 Crore
LAST DATE 13-08-2026
Authority
Authority Name Orissa Industrial Infrastructure Development Corporation
Work Description Tender for Supply, Installation, Testing And Commissioning Of 11 Kv Dedicated Feeder For Providing Power Supply To Industries At Indranipatna Industrial Estate, Choudwar, Cuttack.
Basic Detail
Tender No PC/EST/E-14/2026-27
Bidding Type Tender
Location
City Cuttack
State Odisha
Key Dates
Publish Date 30 Jul 2026
Submission Date 13 Aug 2026
Open Date 14 Aug 2026
Finance
Tender Value 2.20 Crore
Tender Fee 11800
EMD 2.20 Lakhs
Exemption Available
Document List
784652e0-da56-49e1-bdef-272edea0e6a7.html
BID.pdf
BOQ_603786.xls
Tendernotice_1 (10).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 30, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 13, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 12 days
Aug 14, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 13 days

Tender Documents

Download All (ZIP) ↓
html

784652e0-da56-49e1-bdef-272edea0e6a7.html

pdf

BID.pdf

xls

BOQ_603786.xls

pdf

Tendernotice_1 (10).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders