Tender For Supply, Installation, Testing And Commissioning Of 11 Kv Dedicated Feeder For Providing Power Supply To Industries At Indranipatna Industrial Estate, Choudwar, Cuttack.
Tender Value
2.20 Crore
Estimated cost
Bid Submission
13 Aug 2026
12 days left
EMD
2.20 Lakhs
Bank guarantee accepted
Document Fee
11800
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Cuttack → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Supply, Installation, Testing And Commissioning Of 11 Kv Dedicated Feeder For Providing Power Supply To Industries At Indranipatna Industrial Estate, Choudwar, Cuttack.
BOQ
| Sl. No. | Item Description |
| 1 | Part A- Cost of Supply Of Materials. |
| 2 | Supply of materials for 11kV, 3Core, 400sqmm Aluminium, XLPE insulation armoured UG cable with Spare and accessories. |
| 3 | Length of 11kV 3C, 400sqmm cable (Open trench - 80 Mtr) |
| 4 | Length of 11kV 3C, 400sqmm cable (HDD - 1520 Mtr) |
| 5 | Supply of 11kV, 3Core, 400sqmm, XLPE insulation armoured UG cable (SC rating of cable in kA- 37.7kA and SC rating of Armour in kA- 15kA) as per the approved technical specification and direction of EIC. |
| 6 | Supply of Straight through jointing kits Heat Shrinkable type suitable for 11kV, 3Core, 400 sqmm, aluminium UG cable kits. as per the approved technical specification and direction of EIC. |
| 7 | Supply of Indoor termination kits Heat Shrinkable type suitable for 11kV 3Core, 400 sqmm, HT UG cable kits. as per the approved technical specification and direction of EIC. |
| 8 | Supply of Outdoor termination kits Heat Shrinkable type suitable for 11kV 3Core, 400 sqmm, HT UG cable kits. as per the approved technical specification and direction of EIC. |
| 9 | Supply of materials for High Density Polyethelene (HDPE) pipe 200mm diameter, PE 80- PN8 for laying of 11kV UG cable. as per the approved technical specification and direction of EIC. |
| 10 | Supply of 11 KV RMU |
| 11 | Supply of 11 KV 4way 2x630A LLVV BKR O/D. as per the approved technical specification and direction of EIC. |
| 12 | Earthing |
| 13 | Supply of Earthing Conductor: 50X6 mm (2.4kg./mtr.) GI Flat for equipment, structure etc as per the approved technical specification and direction of EIC. |
| 14 | Supply Pipe Earthing 40mm. GI Pipe as per the approved technical specification and direction of EIC. |
| 15 | Part A- Cost of Erection Of Materials. |
| 16 | Erection, Commissioning, Testing of 11kV new line by 3core, 400sqmm, aluminium, XLPE UG cable. |
| 17 | Laying, Commissioning & Testing of 11kV, 3Core, 400sqmm XLPE insulation (extruted type) UG cable by open trench method. as per direction of EIC. |
| 18 | Erection of Straight through jointing Kits/ Outdoor termination kits/Indoor termination Kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG cable kits. as per direction of EIC. |
| 19 | Installation, Laying, Commissioning & Testing of 11kV, 3Core, 400sqmm, XLPE U/G cable by HDD method with HDPE pipe (200mm dia, PN8 PE80) including suply of HDPE Pipe. Complete as per the approved technical specification and direction of EIC. |
| 20 | Laying of 200mm dia PE 80-PN8, HDPE pipe inside open trench.as per direction of EIC. |
| 21 | Erection, Commissioning, Wiring and Testing of 11kV RMU |
| 22 | Erection of 11KV 4WAY 2 x 630A LLVV BKR O/D.as per direction of EIC. |
| 23 | Part A- Cost of Civil Works. |
| 24 | Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P, etc for UG Cable Trench |
| 25 | Earth work excavation of soil (1mtr. width X 1mtr. depth)- Route Length |
| 26 | Earth work excavation of soil. complete as per the direction of EIC. |
| 27 | Earth work excavation of hard rock. complete as per the direction of EIC. |
| 28 | Back flling with excavated soil outside and above the trench. complete as per the direction of EIC. |
| 29 | Civil works for Prefabricated RCC foundation with supply of all materials |
| 30 | Prefabricated RCC foundation of 11kV RMU. complete as per the direction of EIC. |
| 31 | SITC of GI Fencing with Gate around each RMU as per the direction of EIC. |
| 32 | Construction Earthing chamber including installation of earthing pipe. Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe as per the specification of TPCODL. |
| 33 | Supply and erection of GI Pipe of dia. 150mm, Class-B (8Mtr.).Complete as per the approved technical specification and direction of EIC. |
| 34 | Supply and Erection of Cable Route Marker along the cable route at an interval of 30mtrs with civil works.Complete as per the approved technical specification and direction of EIC. |
| 35 | Part B- Cost of Material For 11KV DP With Isolator & Earth Switch - 2 No. |
| 36 | Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long , 30.44KG/Mr.) (Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC. |
| 37 | Supply & installation of Top Channel(GI) 100X50 X6mm, 9.56 KG/Mtr., each channel(GI) length 3 mtr.,2 no's channel(GI) required =(2x9.56x3). Complete in all respect as per the approved technical specification and direction of EIC. |
| 38 | Supply & installation of Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr.,each 0.280 mtr. length,6 no's reguired =(6x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 39 | Supply & installation of Isolator Mounting Channel(GI) 75X40X4.8mm, 7.14KG/Mtr, each Channel(GI) length 3 Mtr., 2 no's Channel(GI) required =( 7.14x3x2).Complete in all respect as per the approved technical specification and direction of EIC. |
| 40 | Supply & installation of Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.81x7.14).Complete in all respect as per the approved technical specification and direction of EIC. |
| 41 | Supply & installation of Angle(GI) for Cantilever arrrangement for HT MU 50 x 50 x 6 - 1282 mm.each 2 nos.(4.5 K.g. per mtr.).Complete in all respect as per the approved technical specification and direction of EIC. |
| 42 | Supply & installation of MU and Isolator Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 4 no's Channel(GI) required =( 9.56x4x0.35). Complete in all respect as per the approved technical specification and direction of EIC. |
| 43 | Supply & installation of Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1). Complete in all respect as per the approved technical specification and direction of EIC. |
| 44 | Supply & installation of Double Pole Belting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 3 Mtr., 2 no's Channel(GI) required =( 7.14x3x2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 45 | Supply and installation of 50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 3.512 mtr., 2 nos Angle(GI) required = (4.5x3.512x2).Complete in all respect as per the approved technical specification and direction of EIC. |
| 46 | Supply and installation of Danger Plate,2 no's. Complete in all respect as per the approved technical specification and direction of EIC. |
| 47 | Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's= (2x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 48 | Supply and installation of 55mm2 ACSR - PVC Insulated for Jumpering .Complete in all respect as per the approved technical specification and direction of EIC. |
| 49 | Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 50 | Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC. |
| 51 | Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC. |
| 52 | Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC. |
| 53 | Supply & installation of GI Pipe Earthing 40mm. 3 Mtr. Long. Complete in all respect as per the approved technical specification and direction of EIC. |
| 54 | Supply & installation of 50x6mm GI Flat for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36. Complete in all respect as per the approved technical specification and direction of EIC. |
| 55 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required = (2 x 3 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 56 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 8 no's =(8x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 57 | SITC of Lightning Arrester (12KV,10KA) (Station Class,class-2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 58 | SITC of 11 KV 630 Amp Motorized Isolator with Earth Switch. Complete in all respect as per the approved technical specification and direction of EIC. |
| 59 | Supply & installation of Gl Nut, Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch). Complete in all respect as per the approved technical specification and direction of EIC. |
| 60 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 61 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 62 | Part B- Cost of Civil Works. |
| 63 | Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing & Standard. |
| 64 | Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC. |
| 65 | Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC. |
| 66 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe as per the specification of TPCODL. |
| 67 | Part C- Cost of Materials for 11KV Cut Point With 180 Degree Angle - 1 No. |
| 68 | Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC. |
| 69 | Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr. each channel(GI) length 1.2 mtr, 2no's channel(GI) required =( 2x9.56x1.2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 70 | Supply & installation of Fish Plate(GI) 50x6mm., 2.36 kg/Mtr. each 0.280 mtr length,8 no's required =(8x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 71 | Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel(GI) length 0.306 mtr. 2no's channel(GI) required =(2x9.56x0.306). Complete in all respect as per the approved technical specification and direction of EIC. |
| 72 | Supply and installation of Danger Plate,1 no's. Complete in all respect as per the approved technical specification and direction of EIC. |
| 73 | Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's= (1x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 74 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. per support. Complete in all respect as per the approved technical specification and direction of EIC. |
| 75 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 4 no's =(4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 76 | Supply & installation of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 77 | Supply & installation of H W fitting (B&S) 70KN,3Bolt. Complete in all respect as per the specification and direction of EIC. |
| 78 | Supply & installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 79 | Supply & installation of Earthing of support(Coil Type). Complete in all respect as per the approved technical specification and direction of EIC. |
| 80 | Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/Mtr- 2Mtr for connecting pole with coil earthing. Complete in all respect as per the approved technical specification and direction of EIC. |
| 81 | Supply & installation of NON METALLIC TIES-11KV 100SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC. |
| 82 | Supply & installation of IPC for 100 sq.mm AAA conductor (For covered conductor)-11kV. Complete in all respect as per the approved technical specification and direction of EIC. |
| 83 | Supply & installation of Spike (GI ) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC. |
| 84 | Supply & installation of GI Nut, Bolt & Washer of different sizes (3.55 Kg each Cut Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 85 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 86 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 87 | Part C- Cost of Civil Works. |
| 88 | Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC. |
| 89 | Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC. |
| 90 | Part D- Cost of Materials for 11 KV Cut Point with 90 Degree Angle- 2 No. |
| 91 | Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC. |
| 92 | Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr. each channel(GI) length 1.2 mtr, 4no's channel(GI) required =( 4x9.56x1.2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 93 | Supply & installation of Fish Plate(GI) 50x6mm., 2.36 kg/Mtr. each 0.280 mtr length,16 no's required =(16x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 94 | Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel(GI) length 0.306 mtr. 4no's channel(GI) required =(4x9.56x0.306). Complete in all respect as per the approved technical specification and direction of EIC. |
| 95 | Supply and installation of Danger Plate,1 no's. Complete in all respect as per the approved technical specification and direction of EIC. |
| 96 | Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's= (1x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 97 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. per support. Complete in all respect as per the approved technical specification and direction of EIC. |
| 98 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 4 no's =(4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 99 | Supply & installation of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 100 | Supply & installation of H W fitting (B&S) 70KN,3Bolt. Complete in all respect as per the approved technical specification and direction of EIC. |
| 101 | Supply & installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 102 | Supply & installation of Earthing of support(Coil Type). Complete in all respect as per the approved technical specification and direction of EIC. |
| 103 | Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/Mtr- 2Mtr for connecting pole with coil earthing. Complete in all respect as per the approved technical specification and direction of EIC. |
| 104 | Supply & installation of NON METALLIC TIES-11KV 100SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC. |
| 105 | Supply & installation of IPC for 100 sq.mm AAA conductor (For covered conductor)-11kV. Complete in all respect as per the approved technical specification and direction of EIC. |
| 106 | Supply & installation of Spike (GI ) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC. |
| 107 | Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 108 | Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC. |
| 109 | Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC. |
| 110 | Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC. |
| 111 | Supply & installation of GI Nut, Bolt & Washer of different sizes (7.433 Kg each Cut Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 112 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 113 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 114 | Part D- Cost of Civil Works. |
| 115 | Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing & Standard. |
| 116 | Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC. |
| 117 | Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC. |
| 118 | Part E- Cost of Materials for 11 KV Pin Points With WPB - 0.55CKM. |
| 119 | Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mtr)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. ComComplete in all respect as per the approved technical specification and direction of EIC. |
| 120 | Supply & installation of 11KV V cross Arm(GI) (10.2 Kg. each). Complete in all respect as per the approved technical specification and direction of EIC. |
| 121 | Supply & installation of Top bracket 100x50X6 mm Gl channel (2kg each).Complete in all respect as per the approved technical specification and direction of EIC. |
| 122 | Supply & installation of Danger Plate,1 no's. for each pole. Complete in all respect as per the approved technical specification and direction of EIC. |
| 123 | Supply & installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's =(1x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 124 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support. Complete in all respect as per the approved technical specification and direction of EIC. |
| 125 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr Iength 4 no's =(4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 126 | Supply & installation of 11 KV pin insulator polymer, 3 Nos. required for each support. Complete in all respect as per the approved technical specification and direction of EIC. |
| 127 | Supply & installation of Earthing of Support Coil Type. Complete in all respect as per the approved technical specification and direction of EIC. |
| 128 | Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing. Complete in all respect as per the approved technical specification and direction of EIC. |
| 129 | Supply & installation of GI Nut, Bolt & Washer of different sizes (1.45 Kg/ Pin Point). Complete in all respect as per the approved technical specification and direction of EIC. |
| 130 | Supply & Stringing of 100 SQ.MM. AAAC XLPE Covered Conductor-11kV. Complete in all respect as per the approved technical specification and direction of EIC. |
| 131 | Supply & Stringing of 100 SQ.MM. AAAC XLPE Covered Conductor-11kV (Augmentation). Complete in all respect as per the approved technical specification and direction of EIC. |
| 132 | Supply & installation of NON METALLIC TIES-11KV 100SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC. |
| 133 | Supply & installation of Spike (GI ) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC. |
| 134 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 135 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 136 | Part E- Cost of Civil Works. |
| 137 | Concreting ratio 1:1.5:3 (500mmX500mm X1800mm) = 0.45Cu.mtr(Per pole).Complete in all respect as per the direction of EIC. |
| 138 | Couping ratio 1:1.5:3 with dimension (500X 500X450)= 0.1125 Cu mtr(Per pole).Complete in all respect as per the direction of EIC. |
| 139 | Part F- Cost of meterial for Line protecting Guarding for road crossing - 2 nos |
| 140 | Supply and Installation of Guarding Channel(GI) 75x40 x4.8 mm, 7.14 KG/Mtr,, each Channe(GI) length 2.2 mtr., 4 no's Channel(Gl) required =( 4x7.14x2.2) ( For Single Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 141 | Supply and Installation of No-6 GI wire (0.192 kg/mtr.) for Main String.Complete in all respect as per the approved technical specification and direction of EIC. |
| 142 | Supply and Installation of No-8 GI wire (0.131 kg/mtr.) for lacing.Complete in all respect as per the approved technical specification and direction of EIC. |
| 143 | Supply and Installation of Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.). Complete in all respect as per the approved technical specification and direction of EIC. |
| 144 | Supply and Installation of GI pipe earthing 40mm ,3mtr long. Complete in all respect as per the approved technical specification and direction of EIC. |
| 145 | Supply and Installation of 50x6mm,Flat(GI) for earthing, 2.36kg/mtr,( 10.7 meter for rising) =10.7x2.36 .Complete in all respect as per the approved technical specification and direction of EIC. |
| 146 | Part F: Cost of Civil Work |
| 147 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powdercalculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/ 50mm including welding of Flat(GI) around pipe.Complete in all respect as per the direction of EIC. |
| 148 | Part G- Cost of dismantling of old materials. |
| 149 | Dismantling of ACSR/AAAC 34/ 55mm2 from overhead line. complete as per the direction of EIC. |
| 150 | N.B: The bidders are required to Quote theire rates excluding of Goods & Service Tax (GST). GST as applicable will be paid extra. The existing rule of Govt. and any amendment made in future will be followed. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 30, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 13, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysAug 14, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender