Bids Are invited for Amc For Repair Of Air Conditioner
Tender Overview
Project Description
Bids Are invited for Amc For Repair Of Air Conditioner Item No. 1 - Annual Maintenance Charges For Split/ Window Ac Works With Following Works -(A) Servicing Once In A Year. (B) Quarterly Preventive Maintainance (C) Checking Selector Switch , Thermostat, Relays, Remote Controle, Motor Bushing, Tightening Of Nuts & Bolts, Drivemotors And Fans, Cooling Efficiency, Firmness Of The Suppportng Arraneent For The Compressor, Blower Motor, Air Conditioners Casing And Fixing Of The Air Conditioners Etc. (D) Replacement Of Any Component Of Air Conditioners (Outdoor And Indoor Uits, Inlet And Outlet Pipelines, Electrical Connections Etc) Found Defective After The Abvoe Checks And Tests.(E) Charging Of Refgrigerant Gas, Oiling The Motors, Chemical Washing , Item No. 2 - The Spares Replaced Under Comprehensive Maintenance Shall Be Measured And Paid Oem Tax Invoice If Same Company Spare Not Avl In Market Then Spares Will Be Paid On Company Invoice With 15% Contractor Profit. (A) Compressor (B) Running Capacitor (C) Fan Capacitor (D) Fan Motor (E) Grill (F) Chasis (G) Remote (H) Brass Pipe (J) Pcb Board (K) Thermostate (L) Drain Pipe (M) Pipe Insulation (M) Power Cord (M) Air Filer (N) Wall Bracket (O) Condensor Of Out Door Unit. , Item No. 3 - Installation Of New Split Air Conditiner Stand On Wall, Connect Inlet Ac Assembly To Air Conditioner , Connect Electricity Supply To Air Conditioner And Making Insect Proof The Wall Hole With White Cement And Check Split Ac Functions After Installation , Item No. 4 - Dismantle Of Ac Stand From Wall, Dismantly/Fixed Front Air Grill, Disconnect Electricity Supply To Air Conditioner And Re-Installtion Split Air Conditiner Stand On Wall, Connect Inlet Ac Assembly To Air Conditioner , Connect Electricity Supply To Air Conditioner And Making Insect Proof The Wall Hole With White Cement And Check Split Ac Functions After Installation , Item No. 5 - Re-Filling The Ac Gas, First Check The Compressor, Connect Valve On The Compressor Process Tube, Fil Gas According To Air Conditioner Check Leakage After Refill Gas
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Item No. 1 | Annual maintenance charges for split/ Window AC works with following works -(a) servicing once in a year. (b) Quarterly Preventive maintainance (c) Checking selector switch , thermostat, relays, remote controle, motor bushing, tightening of nuts & bolts, drivemotors and fans, cooling efficiency, firmness of the suppportng arraneent for the compressor, blower motor, air conditioners casing and fixing of the air conditioners etc. (d) Replacement of any component of air conditioners (Outdoor and indoor uits, inlet and outlet pipelines, electrical connections etc) found defective after the abvoe checks and tests.(e) Charging of refgrigerant gas, Oiling the motors, chemical washing |
| 2 | Item No. 2 | The spares replaced under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Compressor (b) Running Capacitor (c) Fan Capacitor (d) Fan Motor (e) Grill (F) Chasis (G) Remote (h) Brass Pipe (j) PCB Board (k) Thermostate (l) Drain Pipe (m) Pipe insulation (m) Power Cord (m) Air Filer (n) Wall Bracket (o) Condensor of out door Unit. |
| 3 | Item No. 3 | Installation of New split Air conditiner stand on wall, connect inlet AC assembly to Air conditioner , connect electricity supply to Air conditioner and making insect proof the wall hole with white cement and Check split AC functions after installation |
| 4 | Item No. 4 | Dismantle of AC stand from wall, Dismantly/Fixed Front air grill, disconnect electricity supply to Air conditioner and re-installtion split Air conditiner stand on wall, connect inlet AC assembly to Air conditioner , connect electricity supply to Air conditioner and making insect proof the wall hole with white cement and Check split AC functions after installation |
| 5 | Item No. 5 | Re-filling the AC Gas, first check the compressor, connect valve on the compressor process tube, fil Gas according to air conditioner check leakage after refill gas |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender