Tender For Design, Supply, Transportation, Construction, Installation, Testing, And Commissioning Of 3 Nos. Of Sewage Treatment Plants (Stps) Of Total 3.5 Mld Capacity At K Ur Mb (1 Mld) Using Waste Stabilization Pond (Wsp), Digboi Mb (1.5 Mld) And T
Tender Overview
Project Description
Tender for Design, Supply, Transportation, Construction, Installation, Testing, And Commissioning Of 3 Nos. Of Sewage Treatment Plants (Stps) Of Total 3.5 Mld Capacity At K Ur Mb (1 Mld) Using Waste Stabilization Pond (Wsp), Digboi Mb (1.5 Mld) And Titabar Mb (1.0 Mld) ) Using Activated Sludge Process (Asp) Or Extended Aeration (Ea) Or Any Mechanized Technology As Per Cpheeo Manual On Design, Build, And Operate (Dbo) Basis With Sewage Pumping Station, Nallah/Drain Outfall Interceptor And Diversion Works, Along With All Associated Civil, Electrical, Mechanical, Piping, And Instrumentation Works, As Well As Operation And Maintenance (O&M) Of The Complete System For A Period Of Five (05) Years After Successful Commissioning Under Sbm (U) 2.0.
BOQ
| Sl. No. | Item Description |
| 1 | Stage I: Construction of 1.0 MLD Capacity STP in Waste Stabilzation Pond (WSP) Technology and 5 KLD FSTP at Kampur ULB |
| 2 | Schedule I: Engineering Services : Design Services |
| 3 | Sub Soil Investigation & Survey, Design, Drawings work based on the guidelines laid down in the Manual published by CPHEEO, Ministry of Housing & Urban Affairs and SBM (Urban) 2.0 as per socpe of the work of tender document.. |
| 4 | Schedule II: Civil Works for STP of 1.0 MLD Capacity in Waste Stabilzation Pond Technology |
| 5 | Design, supply, construction, installation, testing and commissioning of Coarse screen chamber & Wetwell |
| 6 | Design, supply, construction, installation, testing and commissioning of Inlet Chamber |
| 7 | Design, supply, construction, installation, testing and commissioning of Bar Screen Chamber |
| 8 | Design, supply, construction, installation, testing and commissioning of Grit Chamber |
| 9 | Design, supply, construction, installation, testing and commissioning of Parshall Flume |
| 10 | Design, supply, construction, installation, testing and commissioning of Anaerobic Pond |
| 11 | Design, supply, construction, installation, testing and commissioning of Facultative Pond |
| 12 | Design, supply, construction, installation, testing and commissioning of Disinfection Tank |
| 13 | Schedule III: Civil Works for FSTP of 5 KLD Capacity |
| 14 | Design, supply, construction, installation, testing and commissioning of Sludge Receiving Chamber |
| 15 | Design, supply, construction, installation, testing and commissioning of Inlet Chamber |
| 16 | Design, supply, construction, installation, testing and commissioning of Sludge Drying Bed |
| 17 | Design, supply, construction, installation, testing and commissioning of Leachate Sump |
| 18 | Design, supply, construction, installation, testing and commissioning of Anaerobic Baffled Reactor |
| 19 | Schedule IV: Electrical Work for STP and FSTP |
| 20 | Design, supply, erection, testing and commissioning of all Electrical works for STP including electric cables, MCC panel, main panel, earthing, Cable trench, Cable tray, Gland and lugs, internal lighting & exhaust system external lighting, campus lighting, etc and all other associated works as per Employer's Requirements |
| 21 | Schedule V :Power Connection for STP & FSTP |
| 22 | Providing electrical power connection of required kVA to STP & Lifting station site including drawal of electrical power line from the nearby APDCL Grid, setting up of required capacity Sub-Station, providing electrical control panel & metering unit etc. and obtaining necessary approval & load sanction from APDCL and payment of supervision & other charges to APDCL |
| 23 | Schedule VI: Electro Mechanical works for STP and FSTP |
| 24 | Design, supply, erection, testing and commissioning of all Mechanical works for STP including Coarse Bar Screen, Fine Stainless-Steel Screen, Raw Sewage Transfer pump from STP Inlet Wet Well to Pre-treatment Units, Chlorine Dosing Pump, Chlorine Dosing tank agitator, Electro-Magnetic Flow Meter, Pen stock gate/sluice gate valve for inlet sewage For Coarse Screen Chamber Inlet Gate, Pressure Gauge, Level Sensors (For All Pumps), Pipe & fittings with all accessories, PH meter, Dissolved Oxygen Meter, Valve & fittings, etc and all associated components installed and completed in accordance with the Employer's Requirements. |
| 25 | Schedule VII: Interception and Diversion (I&D) Work |
| 26 | Design, Construction, testing & Commissioning of Coarse Screen Chamber and Sump Well for Convey System with required dimensions for STP as per design specification Including Excavation in all types of Strata, filling available excavated earth excluding rock, disposing of material, dewatering with providing & supplying, binding, reinforcement as per design requirement for Construction of R.C.C M30 Well staining internal & external surface, railing, MS ladder, etc. complete and any other works as directed by Engineer in charge/employer. |
| 27 | Design and construction of Pump house in B.B. Masonry common bricks in C.M. 1:4, including 15 mm cement plaster, M.S. shutters, Doors, Windows, with oil bound washable distemper internal & external surface with all complete as per Employer's Requirements. |
| 28 | Design, supply, laying, hydro-testing, and comissioning of Raw Sewerage Main line for STP for required length which includes RISING MAIN, GRAVITY MAIN and Manhole Chamber (Bricks & RCC) including excavation in trenches, dismantling of all type of pavements, sand bedding as required, backfilling of trenches and foundations with approved grade excavated materials and approved graded river sand as required including loading and unloading , Shuttering and shoring the earth at different levels in foundations where necessary with required prop, struts, planks, timbers, nails etc. including dewatering if necessary, hydro-testing complete for I&D system as per Technical Specifications and direction of Engineer/Employer. |
| 29 | Road Restoration for interception and Diversion, laying of Raw Sewer line with all respect as per specification of concerned authority and as per the direction of Engineer-in-Charge. |
| 30 | Schedule VIII : Construction of Community Level Soak Pit System. |
| 31 | Design and Construction of Community Level Soak Pit System at ward no- 8, 9 and 10 with Screen Chamber, Settling Tank, Soak Pit as per the standard engineering practice outlined in the CPHEEO Manual and IS 2470 & all complete as per Employer's Requirements. |
| 32 | Schedule IX: Infrastructure Works |
| 33 | Design, installation, testing and commissioning of the Deep Tube Well arrangement as per site requirements, complete in all respects, as directed by the Engineer-in-Charge/Employer. |
| 34 | Design & Construction of Internal Path and Approach Road, complete in all respects, as directed by the Engineer-in-Charge/Employer. |
| 35 | Design & Construction of Boundary Wall / Fencing along with Entrance Gate at Treatment plant, as directed by the Engineer-in-Charge/Employer. |
| 36 | Design & Construction of office building including Panel, DG and Store Room as per site requirements, complete in all respects, as directed by the Engineer-in-Charge/Employer. |
| 37 | Schedule X: Five Year O&M (Operation and Maintenance after completion of Capex work and trial & satisfactory commissioning of complete project) |
| 38 | Operation & Maintenance of the entire Sewerage Treatement project including Manpower, chemicals and material, repairing of all components as required, repair to pipeline leakages, road restoration for the repairing works, painting of civil or non-civil structures (if any), retrofitting works of the civil structure wherever necessary and management of STP, pumps and motors, pumping stations including mechanical, electrical panels, necessary accessories. It also includes activities for maintenance of campus development, laboratory, etc. for 5(Five) years.(APDCL Energy Charges will be borne by the ULB) |
| 39 | 1st year of Operation and Maintenance |
| 40 | 2nd year of Operation and Maintenance |
| 41 | 3rd year of Operation and Maintenance |
| 42 | 4th year of Operation and Maintenance |
| 43 | 5th year of Operation and Maintenance |
| 44 | SStage II: Construction of 1.5 MLD Capacity STP in Capacity in Activated Sludge Process(ASP) at Digboi ULB |
| 45 | Schedule I: Engineering Services : Design Services |
| 46 | Sub Soil Investigation & Survey, Design, Drawings work based on the guidelines laid down in the Manual published by CPHEEO, Ministry of Housing & Urban Affairs and SBM (Urban) 2.0 as per scope of the work of tender document. |
| 47 | Schedule II: Civil Works for STP of 1.5 MLD Capacity in Aerobic Process. |
| 48 | Design, supply, construction, installation, testing and commisioning of Coarse Screen Chamber and Wet Well |
| 49 | Design, supply, construction, installation, testing and commisioning of Inlet Chamber |
| 50 | Design, supply, construction, installation, testing and commisioning of Bar Screen Chamber |
| 51 | Design, supply, construction, installation, testing and commisioning of Grit Chamber |
| 52 | Design, supply, construction, installation, testing and commisioning of Parshall Flume |
| 53 | Design, supply, construction, installation, testing and commisioning of Equalization Tank |
| 54 | Design, supply, construction, installation, testing and commisioning of Aeration Tank |
| 55 | Design, supply, construction, installation, testing and commisioning of Secondary Settling Tank |
| 56 | Design, supply, construction, installation, testing and commisioning of Disinfection Tank |
| 57 | Design, supply, construction, installation, testing and commisioning of Filter Press Housing |
| 58 | Schedule III: Electrical Works for STP |
| 59 | Design, supply, erection, testing and commisioning of all Electrical works for STP including electric cables, MCC panel, main panel, earthing, cable trench, cable tray, gland & lugs, internal lighting & exhaust system, external lighting, etc and all other associated works as per Employer's requirements. |
| 60 | Schedule IV: Electro Mechanical works for STP |
| 61 | Design, supply,erection, testing and commisioning of all Mechanical works for STP including Coarse Bar Screen, Fine Stainless Steel Screen, Raw Sewage Transfer Pump from STP Inlet Wet Well to Inlet Chamber, Equalized Sewage Transfer Pump to Aeration Tank, Air Bower for Equalization Tank, Air Blower for Aeration tank, Diffuser System for Equalization Tank, Diffuser System for Aeration tank, Secondary Tank Scraping Mechanism, Return of Activated Sludge Tranfer Pump, Waste of Activated Sludge Transfer Pump, Chlorine Dosing Pump, Chlorine Dosing Tank Agitator, Electro-Magnetic Flow Meter, Pen Stock Gate / Sluice gate Valve for Inlet Sewage for Coarse Screen Chamber Inlet Gate, Pressure Gauge, Level Sensors (for all Pumps), Pipe and Fittings with all Accessories, pH Meter, Dissolved Oxygen Meter, Valve & Fittings, etc and all associated components installed in accordance with the Employer's requirements. |
| 62 | Schedule V: Interception and Diversion (I&D) Works for STP |
| 63 | Design, construction, testing and commisioning of Coarse Screen Chamber and Wet Well for Convey System with required dimensions for STP as per design specification including Excavation in al types of Strata, filling available excavated earth excluding rock, disposing of material, dewatering with providing & supplying, binding, reinforcement as per design requirement for construction of R.C.C. M30 well staining internal & external surface, railing, MD ladder, MS Sluice gate, etc. complete and any other works as directed by Engineer in charge/employer. |
| 64 | Supply, erection, testing and commisioning of Sewage Submersible pump as per design specification of Non Clog type Sewage water. Design, supply, erection, construction and commisioning of Pumphouse as per design in BB Masonary common bricks in C.M. 1:4, including 15 mm cement plaster, MS shutters, doors, windows, with oil bound washable distemper internal and external surface with all complete as per Employer's Requirements. |
| 65 | Design, supply, laying, hydro-testing, and comissioning of Raw Sewerage Main line for STP for the length as per the site requirement which includes RISING MAIN, GRAVITY MAIN and Manhole Chamber (Bricks & RCC) including excavation in trenches, dismantling of all type of pavements, sand bedding as required, backfilling of trenches and foundations with approved graed excavated materials and approved graded river sand as required including loading and unloading , Shuttering and shoring the earth at different levels in foundations where necessary with required prop, struts, planks, timbers, nails etc. including dewatering if necessary, hydro-testing completefor distribution system as per Technical Specifications and direction of Engineer: |
| 66 | Road Restoration as per requirement including filling of earth, graded aggregates,compaction, concrete casting and bitumen topping. |
| 67 | Schedule VI: Power Connection for STP |
| 68 | Providing electrical power connection to STP of required KVA to STP site + transmission line for I&D pumps including drawal of electrical power line from the nearby APDCL Grid, setting up of required capacity Sub-Station, providing electrical control panel & metering unit etc. and obtaining necessary approval & load sanction from APDCL and payment of supervision & other charges to APDCL |
| 69 | Schedule VII: Infrastructure Works for STP |
| 70 | Design, installation, testing and commissioning of the Deep Tube Well arrangement as per site requirements, complete in all respects, as directed by the Engineer-in-Charge/Employer. |
| 71 | Design & Construction of Internal Path and Approach Road, complete in all respects, as directed by the Engineer-in-Charge/Employer. |
| 72 | Design & Construction of Boundary Wall / Fencing along with Entrance Gate at Treatment plant, as directed by the Engineer-in-Charge/Employer. |
| 73 | Design & Construction of office building including Panel, DG and Store Room as per site requirements, complete in all respects, as directed by the Engineer-in-Charge/Employer. |
| 74 | Schedule VIII : Construction of Community Level Soak Pit System. |
| 75 | Design and Construction of Community Level Soak Pit System at ward no- 1 with Screen Chamber, Settling Tank, Soak Pit as per the standard engineering practice outlined in the CPHEEO Manual and IS 2470 & all complete as per Employer's Requirements. |
| 76 | Design and Construction of Community Level Soak Pit System at ward no- 2 with Screen Chamber, Settling Tank, Soak Pit as per the standard engineering practice outlined in the CPHEEO Manual and IS 2470 & all complete as per Employer's Requirements. |
| 77 | Schedule IX: Five Year O&M (Operation and Maintenance (after completion of Capex work and trial & satisfactory commissioning of complete project) |
| 78 | Operation & Maintenance of the entire Sewerage Treatement project including Manpower, chemicals and material, repairing of all components as required, repair to pipeline leakages, road restoration for the repairing works, painting of civil or non-civil structures (if any), retrofitting works of the civil structure wherever necessary and management of STP, pumps and motors, pumping stations including mechanical, electrical panels, necessary accessories. It also includes activities for maintenance of campus development, laboratory, etc. for 5(Five) years.(APDCL Energy Charges will be borne by the ULB) |
| 79 | 1st year of Operation and Maintenance |
| 80 | 2nd year of Operation and Maintenance |
| 81 | 3rd year of Operation and Maintenance |
| 82 | 4th year of Operation and Maintenance |
| 83 | 5th year of Operation and Maintenance |
| 84 | SStage III: Construction of 1.0 MLD Capacity STP in Activated Sludge Process(ASP) at Titabar ULB |
| 85 | Schedule I: Engineering Services : Design Services |
| 86 | Sub Soil Investigation & Survey, Design, Drawings work based on the guidelines laid down in the Manual published by CPHEEO, Ministry of Housing & Urban Affairs and SBM (Urban) 2.0 as per scope of the work of tender document. |
| 87 | Schedule II: Civil Works for STP in Aerobic Process. |
| 88 | Design, supply, construction, installation, testing and commisioning of Coarse Screen Chamber and Wet Well |
| 89 | Design, supply, construction, installation, testing and commisioning of Inlet Chamber |
| 90 | Design, supply, construction, installation, testing and commisioning of Bar Screen Chamber |
| 91 | Design, supply, construction, installation, testing and commisioning of Grit Chamber |
| 92 | Design, supply, construction, installation, testing and commisioning of Parshall Flume |
| 93 | Design, supply, construction, installation, testing and commisioning of Equalization Tank |
| 94 | Design, supply, construction, installation, testing and commisioning of Aeration Tank |
| 95 | Design, supply, construction, installation, testing and commisioning of Secondary Settling Tank |
| 96 | Design, supply, construction, installation, testing and commisioning of Disinfection Tank |
| 97 | Design, supply, construction, installation, testing and commisioning of Filter Press Housing |
| 98 | Schedule III: Electrical Works for STP |
| 99 | Design, supply, erection, testing and commisioning of all Electrical works for STP including electric cables, MCC panel, main panel, earthing, cable trench, cable tray, gland & lugs, internal lighting & exhaust system, external lighting, etc and all other associated works as per Employer's requirements. |
| 100 | Schedule IV: Electro Mechanical works for STP |
| 101 | Design, supply,erection, testing and commisioning of all Mechanical works for STP including Coarse Bar Screen, Fine Stainless Steel Screen, Raw Sewage Transfer Pump from STP Inlet Wet Well to Inlet Chamber, Equalized Sewage Transfer Pump to Aeration Tank, Air Bower for Equalization Tank, Air Blower for Aeration tank, Diffuser System for Equalization Tank, Diffuser System for Aeration tank, Secondary Tank Scraping Mechanism, Return of Activated Sludge Tranfer Pump, Waste of Activated Sludge Transfer Pump, Chlorine Dosing Pump, Chlorine Dosing Tank Agitator, Electro-Magnetic Flow Meter, Pen Stock Gate / Sluice gate Valve for Inlet Sewage for Coarse Screen Chamber Inlet Gate, Pressure Gauge, Level Sensors (for all Pumps), Pipe and Fittings with all Accessories, pH Meter, Dissolved Oxygen Meter, Valve & Fittings, etc and all associated components installed in accordance with the Employer's requirements. |
| 102 | Schedule V: Interception and Diversion (I&D) Works for STP |
| 103 | Design, construction, testing and commisioning of Coarse Screen Chamber and Wet Well for Convey System with required dimensions for STP as per design specification including Excavation in al types of Strata, filling available excavated earth excluding rock, disposing of material, dewatering with providing & supplying, binding, reinforcement as per design requirement for construction of R.C.C. M30 well staining internal & external surface, railing, MD ladder, MS Sluice gate, etc. complete and any other works as directed by Engineer in charge/employer. |
| 104 | Supply, erection, testing and commisioning of Sewage Submersible pump as per design specification of Non Clog type Sewage water. Design, supply, erection, construction and commisioning of Pumphouse as per design in BB Masonary common bricks in C.M. 1:4, including 15 mm cement plaster, MS shutters, doors, windows, with oil bound washable distemper internal and external surface with all complete as per Employer's Requirements. |
| 105 | Design, supply, laying, hydro-testing, and comissioning of Raw Sewerage Main line for STP for the length as per the site requirement which includes RISING MAIN ,GRAVITY MAIN and Manhole Chamber (Bricks & RCC) including excavation in trenches, dismantling of all type of pavements, sand bedding as required, backfilling of trenches and foundations with approved graed excavated materials and approved graded river sand as required including loading and unloading , Shuttering and shoring the earth at different levels in foundations where necessary with required prop, struts, planks, timbers, nails etc. including dewatering if necessary, hydro-testing completefor distribution system as per Technical Specifications and direction of Engineer: |
| 106 | Road Restoration as per requirement including filling of earth, graded aggregates,compaction, concrete casting and bitumen topping. |
| 107 | Schedule VI: Power Connection for STP |
| 108 | Providing electrical power connection of required kVA to STP site + transmission line for I&D pumps including drawal of electrical power line from the nearby APDCL Grid, setting up of required capacity Sub-Station, providing electrical control panel & metering unit etc. and obtaining necessary approval & load sanction from APDCL and payment of supervision & other charges to APDCL |
| 109 | Schedule VII: Infrastructure Works for STP |
| 110 | Design, installation, testing and commissioning of the Deep Tube Well arrangement as per site requirements, complete in all respects, as directed by the Engineer-in-Charge/Employer. |
| 111 | Design & Construction of Internal Path and Approach Road, complete in all respects, as directed by the Engineer-in-Charge/Employer. |
| 112 | Design & Construction of Boundary Wall / Fencing along with Entrance Gate at Treatment plant, as directed by the Engineer-in-Charge/Employer. |
| 113 | Design & Construction of office building including Panel, DG and Store Room as per site requirements, complete in all respects, as directed by the Engineer-in-Charge/Employer. |
| 114 | Schedule VIII : Construction of Community Level Soak Pit System. |
| 115 | Design and Construction of Community Level Soak Pit System at ward no- 1,3,6 & * with Screen Chamber, Settling Tank, Soak Pit as per the standard engineering practice outlined in the CPHEEO Manual and IS 2470 & all complete as per Employer's Requirements. |
| 116 | Schedule IX: Five Year O&M (Operation and Maintenance (after completion of Capex work and trial & satisfactory commissioning of complete project) |
| 117 | Operation & Maintenance of the entire Sewerage Treatement project including Manpower, chemicals and material, repairing of all components as required, repair to pipeline leakages, road restoration for the repairing works, painting of civil or non-civil structures (if any), retrofitting works of the civil structure wherever necessary and management of STP, pumps and motors, pumping stations including mechanical, electrical panels, necessary accessories. It also includes activities for maintenance of campus development, laboratory, etc. for 5(Five) years.(APDCL Energy Charges will be borne by the ULB) |
| 118 | 1st year of Operation and Maintenance |
| 119 | 2nd year of Operation and Maintenance |
| 120 | 3rd year of Operation and Maintenance |
| 121 | 4th year of Operation and Maintenance |
| 122 | 5th year of Operation and Maintenance Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysBid Opening Date
Technical bids will be opened and evaluated.