Tender For Design, Supply, Transportation, Construction, Installation, Testing, And Commissioning Of 3 Nos. Of Sewage Treatment Plants (Stps) Of Total 3.5 Mld Capacity At K Ur Mb (1 Mld) Using Waste Stabilization Pond (Wsp), Digboi Mb (1.5 Mld) And T

Issued by Government Departments · Kamrup, Assam
Tender Value
14.78 Crore
Estimated cost
Bid Submission
19 Aug 2026
18 days left
EMD
29.56 Lakhs
Bank guarantee accepted
Document Fee
20000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kamrup → Assam
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Design, Supply, Transportation, Construction, Installation, Testing, And Commissioning Of 3 Nos. Of Sewage Treatment Plants (Stps) Of Total 3.5 Mld Capacity At K Ur Mb (1 Mld) Using Waste Stabilization Pond (Wsp), Digboi Mb (1.5 Mld) And Titabar Mb (1.0 Mld) ) Using Activated Sludge Process (Asp) Or Extended Aeration (Ea) Or Any Mechanized Technology As Per Cpheeo Manual On Design, Build, And Operate (Dbo) Basis With Sewage Pumping Station, Nallah/Drain Outfall Interceptor And Diversion Works, Along With All Associated Civil, Electrical, Mechanical, Piping, And Instrumentation Works, As Well As Operation And Maintenance (O&M) Of The Complete System For A Period Of Five (05) Years After Successful Commissioning Under Sbm (U) 2.0.

BOQ

Name of Work:- Design, Supply, Transportation, Construction, Installation, Testing, and Commissioning of 3 Nos. of Sewage Treatment Plants (STPS) of total 3.5 MLD Capacity at K ur MB (1 MLD) using Waste Stabilization Pond (WSP), Digboi MB (1.5 MLD) and Titabar MB (1.0 MLD) ) using Activated Sludge Process (ASP) or Extended Aeration (EA) or any Mechanized Technology as per CPHEEO Manual On Design, Build, And Operate (DBO) Basis with Sewage Pumping Station, Nallah/Drain Outfall Interceptor and Diversion works, along with all associated Civil, Electrical, Mechanical, Piping, and Instrumentation works, as well as Operation And Maintenance (O&M) of the complete system for a period of Five (05) Years after successful commissioning under SBM (U) 2.0.
Sl. No. Item Description
1Stage I: Construction of 1.0 MLD Capacity STP in Waste Stabilzation Pond (WSP) Technology and 5 KLD FSTP at Kampur ULB
2Schedule I: Engineering Services : Design Services
3Sub Soil Investigation & Survey, Design, Drawings work based on the guidelines laid down in the Manual published by CPHEEO, Ministry of Housing & Urban Affairs and SBM (Urban) 2.0 as per socpe of the work of tender document..
4Schedule II: Civil Works for STP of 1.0 MLD Capacity in Waste Stabilzation Pond Technology
5Design, supply, construction, installation, testing and commissioning of Coarse screen chamber & Wetwell
6Design, supply, construction, installation, testing and commissioning of Inlet Chamber
7Design, supply, construction, installation, testing and commissioning of Bar Screen Chamber
8Design, supply, construction, installation, testing and commissioning of Grit Chamber
9Design, supply, construction, installation, testing and commissioning of Parshall Flume
10Design, supply, construction, installation, testing and commissioning of Anaerobic Pond
11Design, supply, construction, installation, testing and commissioning of Facultative Pond
12Design, supply, construction, installation, testing and commissioning of Disinfection Tank
13Schedule III: Civil Works for FSTP of 5 KLD Capacity
14Design, supply, construction, installation, testing and commissioning of Sludge Receiving Chamber
15Design, supply, construction, installation, testing and commissioning of Inlet Chamber
16Design, supply, construction, installation, testing and commissioning of Sludge Drying Bed
17Design, supply, construction, installation, testing and commissioning of Leachate Sump
18Design, supply, construction, installation, testing and commissioning of Anaerobic Baffled Reactor
19Schedule IV: Electrical Work for STP and FSTP
20Design, supply, erection, testing and commissioning of all Electrical works for STP including electric cables, MCC panel, main panel, earthing, Cable trench, Cable tray, Gland and lugs, internal lighting & exhaust system external lighting, campus lighting, etc and all other associated works as per Employer's Requirements
21Schedule V :Power Connection for STP & FSTP
22Providing electrical power connection of required kVA to STP & Lifting station site including drawal of electrical power line from the nearby APDCL Grid, setting up of required capacity Sub-Station, providing electrical control panel & metering unit etc. and obtaining necessary approval & load sanction from APDCL and payment of supervision & other charges to APDCL
23Schedule VI: Electro Mechanical works for STP and FSTP
24Design, supply, erection, testing and commissioning of all Mechanical works for STP including Coarse Bar Screen, Fine Stainless-Steel Screen, Raw Sewage Transfer pump from STP Inlet Wet Well to Pre-treatment Units, Chlorine Dosing Pump, Chlorine Dosing tank agitator, Electro-Magnetic Flow Meter, Pen stock gate/sluice gate valve for inlet sewage For Coarse Screen Chamber Inlet Gate, Pressure Gauge, Level Sensors (For All Pumps), Pipe & fittings with all accessories, PH meter, Dissolved Oxygen Meter, Valve & fittings, etc and all associated components installed and completed in accordance with the Employer's Requirements.
25Schedule VII: Interception and Diversion (I&D) Work
26Design, Construction, testing & Commissioning of Coarse Screen Chamber and Sump Well for Convey System with required dimensions for STP as per design specification Including Excavation in all types of Strata, filling available excavated earth excluding rock, disposing of material, dewatering with providing & supplying, binding, reinforcement as per design requirement for Construction of R.C.C M30 Well staining internal & external surface, railing, MS ladder, etc. complete and any other works as directed by Engineer in charge/employer.
27Design and construction of Pump house in B.B. Masonry common bricks in C.M. 1:4, including 15 mm cement plaster, M.S. shutters, Doors, Windows, with oil bound washable distemper internal & external surface with all complete as per Employer's Requirements.
28Design, supply, laying, hydro-testing, and comissioning of Raw Sewerage Main line for STP for required length which includes RISING MAIN, GRAVITY MAIN and Manhole Chamber (Bricks & RCC) including excavation in trenches, dismantling of all type of pavements, sand bedding as required, backfilling of trenches and foundations with approved grade excavated materials and approved graded river sand as required including loading and unloading , Shuttering and shoring the earth at different levels in foundations where necessary with required prop, struts, planks, timbers, nails etc. including dewatering if necessary, hydro-testing complete for I&D system as per Technical Specifications and direction of Engineer/Employer.
29Road Restoration for interception and Diversion, laying of Raw Sewer line with all respect as per specification of concerned authority and as per the direction of Engineer-in-Charge.
30Schedule VIII : Construction of Community Level Soak Pit System.
31Design and Construction of Community Level Soak Pit System at ward no- 8, 9 and 10 with Screen Chamber, Settling Tank, Soak Pit as per the standard engineering practice outlined in the CPHEEO Manual and IS 2470 & all complete as per Employer's Requirements.
32Schedule IX: Infrastructure Works
33Design, installation, testing and commissioning of the Deep Tube Well arrangement as per site requirements, complete in all respects, as directed by the Engineer-in-Charge/Employer.
34Design & Construction of Internal Path and Approach Road, complete in all respects, as directed by the Engineer-in-Charge/Employer.
35Design & Construction of Boundary Wall / Fencing along with Entrance Gate at Treatment plant, as directed by the Engineer-in-Charge/Employer.
36Design & Construction of office building including Panel, DG and Store Room as per site requirements, complete in all respects, as directed by the Engineer-in-Charge/Employer.
37Schedule X: Five Year O&M (Operation and Maintenance after completion of Capex work and trial & satisfactory commissioning of complete project)
38Operation & Maintenance of the entire Sewerage Treatement project including Manpower, chemicals and material, repairing of all components as required, repair to pipeline leakages, road restoration for the repairing works, painting of civil or non-civil structures (if any), retrofitting works of the civil structure wherever necessary and management of STP, pumps and motors, pumping stations including mechanical, electrical panels, necessary accessories. It also includes activities for maintenance of campus development, laboratory, etc. for 5(Five) years.(APDCL Energy Charges will be borne by the ULB)
391st year of Operation and Maintenance
402nd year of Operation and Maintenance
413rd year of Operation and Maintenance
424th year of Operation and Maintenance
435th year of Operation and Maintenance
44SStage II: Construction of 1.5 MLD Capacity STP in Capacity in Activated Sludge Process(ASP) at Digboi ULB
45Schedule I: Engineering Services : Design Services
46Sub Soil Investigation & Survey, Design, Drawings work based on the guidelines laid down in the Manual published by CPHEEO, Ministry of Housing & Urban Affairs and SBM (Urban) 2.0 as per scope of the work of tender document.
47Schedule II: Civil Works for STP of 1.5 MLD Capacity in Aerobic Process.
48Design, supply, construction, installation, testing and commisioning of Coarse Screen Chamber and Wet Well
49Design, supply, construction, installation, testing and commisioning of Inlet Chamber
50Design, supply, construction, installation, testing and commisioning of Bar Screen Chamber
51Design, supply, construction, installation, testing and commisioning of Grit Chamber
52Design, supply, construction, installation, testing and commisioning of Parshall Flume
53Design, supply, construction, installation, testing and commisioning of Equalization Tank
54Design, supply, construction, installation, testing and commisioning of Aeration Tank
55Design, supply, construction, installation, testing and commisioning of Secondary Settling Tank
56Design, supply, construction, installation, testing and commisioning of Disinfection Tank
57Design, supply, construction, installation, testing and commisioning of Filter Press Housing
58Schedule III: Electrical Works for STP
59Design, supply, erection, testing and commisioning of all Electrical works for STP including electric cables, MCC panel, main panel, earthing, cable trench, cable tray, gland & lugs, internal lighting & exhaust system, external lighting, etc and all other associated works as per Employer's requirements.
60Schedule IV: Electro Mechanical works for STP
61Design, supply,erection, testing and commisioning of all Mechanical works for STP including Coarse Bar Screen, Fine Stainless Steel Screen, Raw Sewage Transfer Pump from STP Inlet Wet Well to Inlet Chamber, Equalized Sewage Transfer Pump to Aeration Tank, Air Bower for Equalization Tank, Air Blower for Aeration tank, Diffuser System for Equalization Tank, Diffuser System for Aeration tank, Secondary Tank Scraping Mechanism, Return of Activated Sludge Tranfer Pump, Waste of Activated Sludge Transfer Pump, Chlorine Dosing Pump, Chlorine Dosing Tank Agitator, Electro-Magnetic Flow Meter, Pen Stock Gate / Sluice gate Valve for Inlet Sewage for Coarse Screen Chamber Inlet Gate, Pressure Gauge, Level Sensors (for all Pumps), Pipe and Fittings with all Accessories, pH Meter, Dissolved Oxygen Meter, Valve & Fittings, etc and all associated components installed in accordance with the Employer's requirements.
62Schedule V: Interception and Diversion (I&D) Works for STP
63Design, construction, testing and commisioning of Coarse Screen Chamber and Wet Well for Convey System with required dimensions for STP as per design specification including Excavation in al types of Strata, filling available excavated earth excluding rock, disposing of material, dewatering with providing & supplying, binding, reinforcement as per design requirement for construction of R.C.C. M30 well staining internal & external surface, railing, MD ladder, MS Sluice gate, etc. complete and any other works as directed by Engineer in charge/employer.
64Supply, erection, testing and commisioning of Sewage Submersible pump as per design specification of Non Clog type Sewage water. Design, supply, erection, construction and commisioning of Pumphouse as per design in BB Masonary common bricks in C.M. 1:4, including 15 mm cement plaster, MS shutters, doors, windows, with oil bound washable distemper internal and external surface with all complete as per Employer's Requirements.
65Design, supply, laying, hydro-testing, and comissioning of Raw Sewerage Main line for STP for the length as per the site requirement which includes RISING MAIN, GRAVITY MAIN and Manhole Chamber (Bricks & RCC) including excavation in trenches, dismantling of all type of pavements, sand bedding as required, backfilling of trenches and foundations with approved graed excavated materials and approved graded river sand as required including loading and unloading , Shuttering and shoring the earth at different levels in foundations where necessary with required prop, struts, planks, timbers, nails etc. including dewatering if necessary, hydro-testing completefor distribution system as per Technical Specifications and direction of Engineer:
66Road Restoration as per requirement including filling of earth, graded aggregates,compaction, concrete casting and bitumen topping.
67Schedule VI: Power Connection for STP
68Providing electrical power connection to STP of required KVA to STP site + transmission line for I&D pumps including drawal of electrical power line from the nearby APDCL Grid, setting up of required capacity Sub-Station, providing electrical control panel & metering unit etc. and obtaining necessary approval & load sanction from APDCL and payment of supervision & other charges to APDCL
69Schedule VII: Infrastructure Works for STP
70Design, installation, testing and commissioning of the Deep Tube Well arrangement as per site requirements, complete in all respects, as directed by the Engineer-in-Charge/Employer.
71Design & Construction of Internal Path and Approach Road, complete in all respects, as directed by the Engineer-in-Charge/Employer.
72Design & Construction of Boundary Wall / Fencing along with Entrance Gate at Treatment plant, as directed by the Engineer-in-Charge/Employer.
73Design & Construction of office building including Panel, DG and Store Room as per site requirements, complete in all respects, as directed by the Engineer-in-Charge/Employer.
74Schedule VIII : Construction of Community Level Soak Pit System.
75Design and Construction of Community Level Soak Pit System at ward no- 1 with Screen Chamber, Settling Tank, Soak Pit as per the standard engineering practice outlined in the CPHEEO Manual and IS 2470 & all complete as per Employer's Requirements.
76Design and Construction of Community Level Soak Pit System at ward no- 2 with Screen Chamber, Settling Tank, Soak Pit as per the standard engineering practice outlined in the CPHEEO Manual and IS 2470 & all complete as per Employer's Requirements.
77Schedule IX: Five Year O&M (Operation and Maintenance (after completion of Capex work and trial & satisfactory commissioning of complete project)
78Operation & Maintenance of the entire Sewerage Treatement project including Manpower, chemicals and material, repairing of all components as required, repair to pipeline leakages, road restoration for the repairing works, painting of civil or non-civil structures (if any), retrofitting works of the civil structure wherever necessary and management of STP, pumps and motors, pumping stations including mechanical, electrical panels, necessary accessories. It also includes activities for maintenance of campus development, laboratory, etc. for 5(Five) years.(APDCL Energy Charges will be borne by the ULB)
791st year of Operation and Maintenance
802nd year of Operation and Maintenance
813rd year of Operation and Maintenance
824th year of Operation and Maintenance
835th year of Operation and Maintenance
84SStage III: Construction of 1.0 MLD Capacity STP in Activated Sludge Process(ASP) at Titabar ULB
85Schedule I: Engineering Services : Design Services
86Sub Soil Investigation & Survey, Design, Drawings work based on the guidelines laid down in the Manual published by CPHEEO, Ministry of Housing & Urban Affairs and SBM (Urban) 2.0 as per scope of the work of tender document.
87Schedule II: Civil Works for STP in Aerobic Process.
88Design, supply, construction, installation, testing and commisioning of Coarse Screen Chamber and Wet Well
89Design, supply, construction, installation, testing and commisioning of Inlet Chamber
90Design, supply, construction, installation, testing and commisioning of Bar Screen Chamber
91Design, supply, construction, installation, testing and commisioning of Grit Chamber
92Design, supply, construction, installation, testing and commisioning of Parshall Flume
93Design, supply, construction, installation, testing and commisioning of Equalization Tank
94Design, supply, construction, installation, testing and commisioning of Aeration Tank
95Design, supply, construction, installation, testing and commisioning of Secondary Settling Tank
96Design, supply, construction, installation, testing and commisioning of Disinfection Tank
97Design, supply, construction, installation, testing and commisioning of Filter Press Housing
98Schedule III: Electrical Works for STP
99Design, supply, erection, testing and commisioning of all Electrical works for STP including electric cables, MCC panel, main panel, earthing, cable trench, cable tray, gland & lugs, internal lighting & exhaust system, external lighting, etc and all other associated works as per Employer's requirements.
100Schedule IV: Electro Mechanical works for STP
101Design, supply,erection, testing and commisioning of all Mechanical works for STP including Coarse Bar Screen, Fine Stainless Steel Screen, Raw Sewage Transfer Pump from STP Inlet Wet Well to Inlet Chamber, Equalized Sewage Transfer Pump to Aeration Tank, Air Bower for Equalization Tank, Air Blower for Aeration tank, Diffuser System for Equalization Tank, Diffuser System for Aeration tank, Secondary Tank Scraping Mechanism, Return of Activated Sludge Tranfer Pump, Waste of Activated Sludge Transfer Pump, Chlorine Dosing Pump, Chlorine Dosing Tank Agitator, Electro-Magnetic Flow Meter, Pen Stock Gate / Sluice gate Valve for Inlet Sewage for Coarse Screen Chamber Inlet Gate, Pressure Gauge, Level Sensors (for all Pumps), Pipe and Fittings with all Accessories, pH Meter, Dissolved Oxygen Meter, Valve & Fittings, etc and all associated components installed in accordance with the Employer's requirements.
102Schedule V: Interception and Diversion (I&D) Works for STP
103Design, construction, testing and commisioning of Coarse Screen Chamber and Wet Well for Convey System with required dimensions for STP as per design specification including Excavation in al types of Strata, filling available excavated earth excluding rock, disposing of material, dewatering with providing & supplying, binding, reinforcement as per design requirement for construction of R.C.C. M30 well staining internal & external surface, railing, MD ladder, MS Sluice gate, etc. complete and any other works as directed by Engineer in charge/employer.
104Supply, erection, testing and commisioning of Sewage Submersible pump as per design specification of Non Clog type Sewage water. Design, supply, erection, construction and commisioning of Pumphouse as per design in BB Masonary common bricks in C.M. 1:4, including 15 mm cement plaster, MS shutters, doors, windows, with oil bound washable distemper internal and external surface with all complete as per Employer's Requirements.
105Design, supply, laying, hydro-testing, and comissioning of Raw Sewerage Main line for STP for the length as per the site requirement which includes RISING MAIN ,GRAVITY MAIN and Manhole Chamber (Bricks & RCC) including excavation in trenches, dismantling of all type of pavements, sand bedding as required, backfilling of trenches and foundations with approved graed excavated materials and approved graded river sand as required including loading and unloading , Shuttering and shoring the earth at different levels in foundations where necessary with required prop, struts, planks, timbers, nails etc. including dewatering if necessary, hydro-testing completefor distribution system as per Technical Specifications and direction of Engineer:
106Road Restoration as per requirement including filling of earth, graded aggregates,compaction, concrete casting and bitumen topping.
107Schedule VI: Power Connection for STP
108Providing electrical power connection of required kVA to STP site + transmission line for I&D pumps including drawal of electrical power line from the nearby APDCL Grid, setting up of required capacity Sub-Station, providing electrical control panel & metering unit etc. and obtaining necessary approval & load sanction from APDCL and payment of supervision & other charges to APDCL
109Schedule VII: Infrastructure Works for STP
110Design, installation, testing and commissioning of the Deep Tube Well arrangement as per site requirements, complete in all respects, as directed by the Engineer-in-Charge/Employer.
111Design & Construction of Internal Path and Approach Road, complete in all respects, as directed by the Engineer-in-Charge/Employer.
112Design & Construction of Boundary Wall / Fencing along with Entrance Gate at Treatment plant, as directed by the Engineer-in-Charge/Employer.
113Design & Construction of office building including Panel, DG and Store Room as per site requirements, complete in all respects, as directed by the Engineer-in-Charge/Employer.
114Schedule VIII : Construction of Community Level Soak Pit System.
115Design and Construction of Community Level Soak Pit System at ward no- 1,3,6 & * with Screen Chamber, Settling Tank, Soak Pit as per the standard engineering practice outlined in the CPHEEO Manual and IS 2470 & all complete as per Employer's Requirements.
116Schedule IX: Five Year O&M (Operation and Maintenance (after completion of Capex work and trial & satisfactory commissioning of complete project)
117Operation & Maintenance of the entire Sewerage Treatement project including Manpower, chemicals and material, repairing of all components as required, repair to pipeline leakages, road restoration for the repairing works, painting of civil or non-civil structures (if any), retrofitting works of the civil structure wherever necessary and management of STP, pumps and motors, pumping stations including mechanical, electrical panels, necessary accessories. It also includes activities for maintenance of campus development, laboratory, etc. for 5(Five) years.(APDCL Energy Charges will be borne by the ULB)
1181st year of Operation and Maintenance
1192nd year of Operation and Maintenance
1203rd year of Operation and Maintenance
1214th year of Operation and Maintenance
1225th year of Operation and Maintenance Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56716615
AUTHORITY Government Departments
TENDER VALUE 14.78 Crore
LAST DATE 19-08-2026
Authority
Authority Name Municipality
Work Description Tender for Design, Supply, Transportation, Construction, Installation, Testing, And Commissioning Of 3 Nos. Of Sewage Treatment Plants (Stps) Of Total 3.5 Mld Capacity At K Ur Mb (1 Mld) Using Waste Stabilization Pond (Wsp), Digboi Mb (1.5 Mld) And Titabar Mb (1.0 Mld) ) Using Activated Sludge Process (Asp) Or Extended Aeration (Ea) Or Any Mechanized Technology As Per Cpheeo Manual On Design, Build, And Operate (Dbo) Basis With Sewage Pumping Station, Nallah/Drain Outfall Interceptor And Diversion Works, Along With All Associated Civil, Electrical, Mechanical, Piping, And Instrumentation Works, As Well As Operation And Maintenance (O&M) Of The Complete System For A Period Of Five (05) Years After Successful Commissioning Under Sbm (U) 2.0.
Basic Detail
Tender No SBM(U) 282/2025/28 Dt. 24-07-2026
Bidding Type Tender
Location
City Kamrup
State Assam
Key Dates
Publish Date 28 Jul 2026
Submission Date 19 Aug 2026
Open Date 20 Aug 2026
Finance
Tender Value 14.78 Crore
Tender Fee 20000
EMD 29.56 Lakhs
Exemption Not Available
Document List
13fd6f8c-1e77-479c-8b4e-e49fb5d7e510.html
BidDocument.pdf
BOQ_83864.xls
DPRs.rar
Drawings.rar
Tendernotice_1 (17).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 28, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 19, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Aug 20, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 19 days

Tender Documents

Download All (ZIP) ↓
html

13fd6f8c-1e77-479c-8b4e-e49fb5d7e510.html

pdf

BidDocument.pdf

xls

BOQ_83864.xls

rar

DPRs.rar

rar

Drawings.rar

pdf

Tendernotice_1 (17).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders