Tender for I) Repairing / Rewinding Of 630 Kva /3.3 Kv/440 Volt , Transwitch Unit Sl. No.02/92/033, Make- Andrew Yule Installed At Officers Club (Rest House) Substation And Ii) Repairing / Rewinding Of 1000 Kva / 11Kv/415 Volt, Power Transformer, Make The Hindustan Electric Co. Ltd. Sl. No.Missing, Local Sl. No.4200 (Ppr Colony) Installed At Vasant Vihar C Type Substation In Bachra Township Under Gm Unit, Piparwar Area.
BOQ
| Sl. No. | Item Description |
| 1 | Repairing Rewinding of 630 KVA TranswitchCopper Winding Strip for H.T & LT side |
| 2 | Cost of Insulating material 15% of item no 01 |
| 3 | Cost of Labour Charge 15% of item no.01 |
| 4 | Assembling and dismantling of top corner, unit conservator, oil indicator, breather, fins, buchholz relay etc work by new gas kit changing work |
| 5 | Replacement of Cork Gasket Set 1-8mm thickness |
| 6 | Replacement of Breather pot with silica gel |
| 7 | Heating of transformer unit to improve its insulation value |
| 8 | Spraying of varnish of transformer unit and inner side transformer body |
| 9 | Filtration of old transformer Oil |
| 10 | Installation Testing and commissioning of the repaired Trasnsformer at Site. |
| 11 | Repairing / Rewinding of 1000KVA / 11KV/415 Power TransformerCopper Winding Strip for H.T & LT side |
| 12 | Cost of Insulating material 15% of item no 01 |
| 13 | Cost of Labour Charge 15% of item no.01 |
| 14 | Assembling and dismantling of top corner, unit conservator, oil indicator, breather, fins, buchholz relay etc work by new gas kit changing work |
| 15 | Replacement of Cork Gasket Set 1-8mm thickness |
| 16 | Replacement of Breather pot with silica gel |
| 17 | Heating of transformer unit to improve its insulation value |
| 18 | Spraying of varnish of transformer unit and inner side transformer body |
| 19 | Filtration of old transformer Oil |
| 20 | Installation Testing and commissioning of the repaired Trasnsformer at Site. |
| 21 | Less Crap value @60% of Item No.1 & 11 (183559.20 & 210553.20) |
| 22 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender