Tender For Construction Of Reinforced Cement Concrete Box Drain In Front Of St. Pauls School To Ad Nagar Road No-6 Both Side/ Sh: Development & Construction Of Drain Work Under annual maintenance contract Ward No.39 & 40.
Tender Overview
Project Description
Tender for Construction Of Reinforced Cement Concrete Box Drain In Front Of St. Pauls School To Ad Nagar Road No-6 Both Side/ Sh: Development & Construction Of Drain Work Under annual maintenance contract Ward No.39 & 40.
BOQ
| Sl. No. | Item Description |
| 1 | Flat brick solingProviding and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 2 | Brick edging laid length wiseProviding and laying brick edging laid lengthwise on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 KN as per MoRD Technical Specification Clause 412. |
| 3 | WBM Gr-3Providing, laying, spreading and compacting brick aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density 'Grading 3' as per MoRD Technical Specification Clause 405. By Manual Means |
| 4 | Maintenance of bituminous surface road using Jhama brick aggregateRepair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method, filled with B.M (using jhama brick aggregate & bitumen of VG-30), after applying prime coat at the bottom and tack coat on sides and on bottom (using bitumen emulsion) and compacting, trimming & finishing the surface to form a smooth continuous surface, all as per MoRD technical specification Clauses 1900, 502, 503 and 504. |
| 5 | Prime Coat (SS-1)(i) Low porosityProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granularbase including cleaning of road surface andspraying primer at the rate of 0.70- 1.00 kg/sqmusing mechanical means as per MoRD TechnicalSpecification Clause 502. |
| 6 | Tack CoatProviding and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per MoRD Technical Specification Clause 503. |
| 7 | Tack Coat (RS-1)Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with primer & c leaned with Hydraulic broom as per MoRD Technical Specification Clause 503. |
| 8 | 20 mm thick open Graded premix carpet using bituminous (Viscosity grade/ modified bitumen) binder.Providing,laying and rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve a wearing course on a previously prepared base including mixing in a suitable plant laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat of either Type-A or Type-B or Type-C or Type-D as per MORD technical specification clause 508.Case –II. By Manual Means(i) Bitumen of VG-30 |
| 9 | Seal coatProviding and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross full using Type-A or Type-B or Type-C or Type-D as per MORD technical specification clause 510.A.By manual means.Case-IV Type –D (Premix with fine sand) Bitumen of VG-30 |
| 10 | Excavation for StructuresWith dewatering.Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.Ordinary SoilUpto 3 m depth |
| 11 | Sand FillingFilling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.Sand filling |
| 12 | Providing concrete for plain/reinforced concrete in open foundations complete including formworkasperdrawings &MoRD technical specifications Clauses 802, 803, 900, 1202 and1203 (including centering, shuttering, staging etc. but excluding reinforcement). P.C.C grade M 10 (i) Nominal mix 1:3:6 |
| 13 | Providing concrete for plain/reinforced concrete in open foundations complete including formwork as perdrawings &MoRD technical specifications Clauses 802, 803, 900, 1202 and1203 (including centering, shuttering, staging etc. but excluding reinforcement).R.C.C grade M-20 |
| 14 | Providing concrete for plain/reinforced concrete in open foundations complete including formwork as perdrawings &MoRD technical specifications Clauses 802, 803, 900, 1202 and1203 (including centering, shuttering, staging etc. but excluding reinforcement).R.C.C grade M-25 |
| 15 | Supplying, fitting&placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in foundation complete as per drawings &MoRD technical specifications Clauses 1000 & 1202. |
| 16 | Providing weep holes in brick masonry/ stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe or uPVC pipe (110 mm OD of 6.0 kg/cm2 pressure) extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MoRD technical specification clauses 614, 709, 1204.3.7. |
| 17 | Dismantling Brick/Tile Work as per MoRD Technical Specification No. 202.Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry including disposal of unserviceable material and stacking the serviceable material with all lift and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.(I) By Manual MeansB) Cement mortar |
| 18 | Removal of Telephone/ Electric Poles and LinesRemoval of telephone/ electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRD Technical Specification Clause 202. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender