Tender For Replacement Of Existing Fire Fighting Pipelines At Berth No. 11
Tender Overview
Project Description
Tender for Replacement Of Existing Fire Fighting Pipelines At Berth No. 11
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 17-Aug-2026 | CORRIGENDUM1 | Date | 25-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | BILL OF QUANTITES FOR FIRE-FIGHTING SYSTEM AND DUST SUPPRESSION SYSTEM (Sl. No. 1 to 94)BOQ FOR FIRE FIGHTING SYSTEM - MECHANICAL (Sl. No. 1 to 45) Fire Pump house Supplying, installation, testing and commissioning of Fire pump diesel engine driven horizontal end suction, centrifugal type confirming to IS-12469:2019 with CI casing, bronze impeller and stainless-steel shaft mounted on heavy duty bearings suitable for continuous operation with range of operation 0% to 150% of rated capacity, 90 m Head.4550 LPM discharge. |
| 2 | Supplying, installation, testing and commissioning of Fire pump electrically driven horizontal end suction, centrifugal type confirming to IS-12469:2019 with CI casing, bronze impeller and stainless-steel shaft mounted on heavy duty bearings suitable for continuous operation with range of operation 0% to 150% of rated capacity for 440 V, 3 phase,50 Hz, 90 m Head.4550 LPM discharge. |
| 3 | Supplying, installation, testing and commissioning of Jockey pump horizontal end suction, centrifugal type confirming to IS-12469:2019 with CI casing, bronze impeller and stainless-steel shaft mounted on heavy duty bearings suitable for automatic operation with non over loading power characteristics for frequent start / stop operations for 440 V, 3 phase,50 Hz 90 m Head.180 LPM discharge |
| 4 | Supply, Installation, Testing and commissioning of system controller to control operation of main electric fire pump, diesel pump in sequence as per specification consisting of relays, timers. Sensors, annunciation window for fault indication, complete as per specification |
| 5 | Supply, erection, testing and commissioning of MS ERW Heavy Class pipe (conforming to IS: 3589/1239 Part I) with Welding, fittings like elbows, tees, flanges, tapers, nuts bolts, gaskets etc. and fixing the pipe on the wall/ceiling with suitable pedestal/clamp/support frame and painting with two or more coats of synthetic enamel paint of required shade complete as required and the following sizes.(Sl. No.5 to 11) DN300 |
| 6 | DN250 |
| 7 | DN200 |
| 8 | DN 80 |
| 9 | DN 65 |
| 10 | DN 50 |
| 11 | DN 25 |
| 12 | Supply, erection, testing and commissioning of Gate valve of cast iron body (conforming to IS: 14846) with matching flanges (Conforming to IS: 6392 Table-17), bolts, nuts and gaskets, etc. .(Sl No.12 to 16)DN 300 |
| 13 | DN 250 |
| 14 | DN 200 |
| 15 | DN 65 |
| 16 | DN 50 |
| 17 | Supply, erection, testing and commissioning of DN 80 Butterfly valve of cast iron body, conforming to IS:13095 / BS5155 including matching flanges (Conforming to IS: 6392 Table-17), bolts, nuts and gaskets etc. |
| 18 | Supply, erection, testing and commissioning of Y-Type Strainer of cast iron body and SS304 mesh including matching flanges, bolts, nuts and gaskets etc..(Sl No.18 to 19)DN 300 |
| 19 | DN 65 |
| 20 | Supply, erection, testing and commissioning of NRV conforming IS:5312, Class 150, of RF end connection as per 16.5, MOC: C.I. IS:210 Gr. FG200, including matching flanges with nuts, bolts & gaskets of following sizes.(Sl No.20 to 21)DN 250 |
| 21 | DN 50 |
| 22 | Supply, erection, testing and commissioning of DN 25 Ball Valve of size 1\\" (25mm) |
| 23 | Supply, erection, testing and commissioning of SS body Pressure gauge 4\\"dial 0-14 kgs rating |
| 24 | Supply, erection, testing and commissioning of pressure switch in M.S. pipe line including connection etc. as required. |
| 25 | Supply, erection, testing and commissioning of flow switch in following sizes M.S. pipe including connection etc. as required. |
| 26 | Fire Hydrant System Supply, erection, testing and commissioning of Single headed Landing hydrant valves with instantaneous stainless-steel couplings of 63mmdia with cast iron wheel ISI marked conforming to IS-5290 (Type-A) |
| 27 | Supply, erection, testing and commissioning of SS stand post type Water Monitor conforming to IS: 8442: 2008 of Size 65mm, discharge capacity 1750 lpm and 100mm inlet flange as per ANSI B16.5 150# with suitable table Orifice plate to reduce pressure from 10.5 kg/cm2 to 7 kg/cm2 at monitor. |
| 28 | Supply, erection, testing and commissioning of 63 mm dia, 15 m length RRL hose conforming to IS 636: 2018 with 63 mm dia male and female delivery hose couplings (Instantaneous spring lock type coupling at both ends) duly bound with GI wire, rivets etc confirming to IS: 903, MOC: Stainless steel 304 (IS: 3444 Gr.1). |
| 29 | Supply, erection, testing and commissioning of Universal Branch Pipe & Nozzles confirming to IS: 2871, MOC: Stainless Steel conforms to IS: 3444 Gr.1 |
| 30 | Supply, erection, testing and commissioning of Spanner for Universal Branch pipe & Nozzle confirming to IS: 903 of Steel of grade C-40 to IS: 1570 (Part 5) and Chromium or zinc plated. |
| 31 | Supply, erection, testing and commissioning of M.S Hose cabinet with powder coating of postal red color fabricated from 18 G M.S. sheet with 6mm thick glazed glass doors including necessary locking arrangement with all accessories suitable to accommodate 2 nos. of 15m length Fire hoses, 1 no. universal branch pipe with nozzle and 1 No. of spanner. |
| 32 | Supply, erection, testing and commissioning of MS ERW Heavy Class pipe (conforming to IS: 3589/1239 Part I) with Welding, fittings like elbows, tees, flanges, tapers, nuts bolts, gaskets etc. in ground including welding, excavation & providing cement concrete blocks as supports, anticorrosive treatment with coal tar/asphalt tape as per IS 10221, refilling the trench etc. of following sizes complete as required and fixing the pipe on the wall/ceiling with suitable clamp/support frame and painting with two or more coats of synthetic enamel paint of required shade complete as required and the following sizes.(Sl No.32 to 36)DN 200 |
| 33 | DN 150 |
| 34 | DN100 |
| 35 | DN 80 |
| 36 | DN 25 |
| 37 | Supply, erection, testing and commissioning of Gate valve of cast iron body (conforming to IS: 14846) with matching flanges (Conforming to IS: 6392 Table-17), bolts, nuts and gaskets, etc. (Sl No.37 to 38)DN 200 |
| 38 | DN 150 |
| 39 | Supply, erection, testing and commissioning of Butterfly valve of cast iron body, conforming to IS:13095 / BS5155 including matching flanges (Conforming to IS: 6392 Table-17), bolts, nuts and gaskets etc.(Sl. No.39 to 40)DN 80 |
| 40 | DN 100 |
| 41 | Supply, erection, testing and commissioning of DN 25 Ball Valve of size 1\\"(25mm) |
| 42 | Construction Valve pit of Size 1.2mX1.2mX1.2m(D) |
| 43 | Supply, erection, testing and commissioning of Portable Fire ExtinguishersSupply, erection, testing and commissioning of CO2 type fire extinguisher of capacity 4.5 kg conforming to IS 15683-2018, wall mounted type with brackets and accessories etc. |
| 44 | Supply, erection, testing and commissioning of ABC Stored Pressure Dry Chemical Powder (Mono Ammonium Phosphate) type fire extinguisher of capacity 6 kg conforming to IS 15683:2018, wall mounted type with accessories etc. |
| 45 | Supply, erection, testing and commissioning of Mechanical foam stored pressure type 9ltrs capacity fire extinguishers conforming to IS 15683-2018, wall mounted type with brackets and accessories etc. |
| 46 | BOQ FOR PLAIN WATER DUST SUPPRESSION SYSTEMS (PWDS) - MECHANICAL (Sl. No. 46 to 55)Supply, installation, testing and commissioning of Horizontal / vertical multi stage centrifugal pumps with single suction and single volute type with horizontal shaft. Pump shall be of direct driven type and coupled to motor with flexible coupling. The pumps shall include Mechanical seal, Bronze Impeller, butterfly valves, bellows, non-return valves, y-strainers, drain valve, base frame, coupling, coupling guard, foundation bolts, washers and other accessories and all necessary accessories. All pumps shall be aligned properly as required. The pumps motor shall be TEFC electric motor (IE3 motor) along with starter, base plate, accessories & suitable for 415 ± 10% volts, 50 cycles, 3 phase power supply and the Pumps with flow rates as given below: - Capacity = 60 m3/hr and head ~ 100 m WC |
| 47 | Supply, installation, testing and commissioning of Duplex filter between water tank and pump inlet line with drain and vent connection as per TS |
| 48 | Supply, installation, testing and commissioning of all the required Sprinklers, Solenoid Valves/ boxes, Globe Valves at Sprinkler posts as per TS |
| 49 | Supply, installation, testing and commissioning of all the required Ball valves, Gate valves. Globe Valves, NRV, Motorized valves, Pressure relief valves, Pump inlet gate valve of requisite size, etc. as per the TS |
| 50 | Supply, erection, testing and commissioning of Gate valve with solenoid Valve in series and one gate valve in parallel in by pass arrangement at main supply header piping and at RCC tank |
| 51 | Supply, installation, testing and commissioning of Rubber Expansion Joints of requisite size at pump inlets & outlets |
| 52 | Supply, installation, testing and commissioning of all the required instruments like Pressure transmitters, Flow transmitters, Level transmitters, differential pressure transmitters, Pressure & compound gauge, level switches, etc. with all the accessories as per the TS at pump house, in the field and at the RCC tank. |
| 53 | Supply, installation, testing and commissioning of MS ERW Heavy class pipes. Piping shall be as per IS:1239 / IS: 3289 & shall include all the required pipe fittings & supporting structure as per TS |
| 54 | Supply, installation, testing and commissioning of electrical panel and sequential control panel as per the TS along with all the necessary power & control cables, cable trays/supports, etc. |
| 55 | Supply, installation, testing and commissioning of RO plant as per the TS. It shall be designed to suit the input water quality to dust suppression system and as per the instructions of the Engineer-in-charge (OPTIONAL) |
| 56 | BOQ FOR CIVIL WORKS FOR FIRE FIGHTING & DUST SUPPRESSION SYSTEM (INCLUDES COMBINED WATER SUMP & PUMP HOUSE). (Sl. No. 56 to 94)EW : EARTH WORKClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical means |
| 57 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soil upto 300mm depth |
| 58 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the works. In all kinds of soil up to depth of 3m |
| 59 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. Please Enable Macros to View BoQ information Compatibility Report for BOQ123.xls Run on 7/28/2026 17:40 If the workbook is saved in an earlier file format or opened in an earlier version of Microsoft Excel, the listed features will not be available. Significant loss of functionality # of occurrences Version Any effects on this object will be removed. Any text that overflows the boundaries of this graphic will appear truncated. 3.0 Excel 97-2003 Some cells in this workbook contain data validation rules, which refer to values on other worksheets. These rules won't be saved. 4.0 Excel 97-2003 Minor loss of fidelity Some cells or styles in this workbook contain formatting that is not supported by the selected file format. These formats will be converted to the closest format available. 13.0 Excel 97-2003 |
| 60 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. Please Enable Macros to View BoQ information Compatibility Report for BOQ123.xls Run on 7/28/2026 17:40 If the workbook is saved in an earlier file format or opened in an earlier version of Microsoft Excel, the listed features will not be available. Significant loss of functionality # of occurrences Version Any effects on this object will be removed. Any text that overflows the boundaries of this graphic will appear truncated. 3.0 Excel 97-2003 Some cells in this workbook contain data validation rules, which refer to values on other worksheets. These rules won't be saved. 4.0 Excel 97-2003 Minor loss of fidelity Some cells or styles in this workbook contain formatting that is not supported by the selected file format. These formats will be converted to the closest format available. 13.0 Excel 97-2003 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 2 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender