Tender For Operation And Maintenance Of E/M Installation For Technical Area, Guest House At Drl Tezpur, Guwahati & Misa Assam .
Tender Value
1.43 Crore
Estimated cost
Bid Submission
12 Aug 2026
13 days left
EMD
2.86 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Chandigarh → Chandigarh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Operation And Maintenance Of E/M Installation For Technical Area, Guest House At Drl Tezpur, Guwahati & Misa Assam .
BOQ
| Sl. No. | Item Description |
| 1 | Part - A (PERCENTAGE TO BE QUOTED ON THIS AMOUNT ONLY WHICH IS INCLUSIVE OF CP&OH)\\"OPERATION AND MAINTENANCE OF E/M INSTALLATION FOR TECHNICAL AREA, GUEST HOUSE AT DRL TEZPUR, GUWAHATI & MISA ASSAM.\\" by providing following Manpower :-(i) Supervisor (Highly-Skilled) For Tezpur- 01(ii) Supervisor (Highly-Skilled) For Guwahati- 01(iii) AC Technician (Skilled) For Tezpur- 01 (iv) DG Set/Pump Operator/ Fire Fighting Operator (Skilled) For Tezpur (One for New Animal House) - 04(v) HVAC Operator (Skilled) For Tezpur(One for New Animal House) - 02(vi) DG Set Operator (Skilled) For Guwahati - 02(vii) Electricain (Skilled) For Tezpur - 03 (viii) Electricain/ AC Tech (Skilled) For Guwahati - 02(ix) Electricain/ AC Tech (Skilled) For Misa - 01 (x) Plumber (Skilled) For Tezpur - 01 (xi) Plumber (Skilled) For Guwahati -01 (xii) Plumber (Skilled) For Misa -01 (xiii) Lift Operator (Skilled) For Tezpur- 02 (xiv) Helper (Un-Skilled) For Tezpur -06(xv) Helper (Un-Skilled) For Guwahati- 02 (xvi) Helper (Un-Skilled) For Misa-01 Total Manpower - 31 NosOperation and Maintenance of Equipment/ Installation at Site and provision of maintenance services by positioning required manpower as per the scope of work (Refer Appendix-A of NIT) for 12 (Twelve) Months and as per direction of Engineer-in-Charge. The following points mentioned under |
| 2 | \\"Note\\" from Sl No. (i) to (iv) shall be considered while quoting the rate (Refer Appendix-B of NIT for details). NOTE:(i) The estimated cost is inclusive the following:-(a) The Current Minimum Fair Wages of the above Manpower (Refer to Letter No. F. No. 1/6(3)/2025-LS-II of office of Chief Labour Commissioner (C), Dated : 30 Mar 2026).(b) For remote/bad climate area: Additional Special Pay for Highly Skilled @3000PM and Un-Skilled @2500PM Per Person.(c) EPF (Employer’s share only) – 13.00% (But not on more than ceiling limit of wages prescribed by EPFO i.e, presently restricted to Rs 15000/-) (d) ESI (Employer’s share only) – 3.25% (only for employees whose total monthly wages is less than or equal to =Rs 21000/-). For employees having salary more than Rs. 21,000/- per month Group Health Insurance shall be provided out of CP & OH being quoted by contractor.(e) Bonus @ 8.33% per month (only for employees whose total monthly wages is less than or equal to =Rs 21000/-)(ii) The bidder shall quote (%) percentage above : More than or equal to 5% (Five) percent charges (upto two decimal) over estimated cost of tender for services charges/contractor profit and overhead. If the bidder/firm quotes less than 5% charges, the bid shall be treated as unresponsive and will not be considered for acceptance. No representation in this regard will be entertained.(iii) However, Only the actual variation in VDA (Increase / Decrease) during contract period and extended period as applicable as notified by Chief Labour Commissioner, Ministry of Labour and Employment, Govt. of India shall be paid seperately as per actual alongwith associated EPF/ESI and Applicable GST on above increased amounts.(iv) Any variation in the above elements promulgated by the government from time to time shall be paid or deducted accordingly. |
| 3 | GST @ 18 % on Part A amount of Rs 86,88,027.95 |
| 4 | Part - B (PERCENTAGE NOT TO BE QUOTED ON THIS AMOUNT)Uniform and Accessories: Two sets of normal Uniforms (Shirt & Trouser duly engraved name of particular company on the left pocket of Shirt as approved by Estate Manager) to each and every manpower including Shoes/Boots/Protective Gear/Gloves and winter clothing etc. as applicable to all O&M Staff @ Rs 4720.00 per annum per head. NOTE: i) The amount will be reimbursed/ paid against actual expenditure made (restricted to the estimate amount on not exceedable basis) on submission of paid vouchers submitted by contractor of payments duly defaced by Engineer-in-charge / Project Manager to the con-cerned authorities.ii) The Amount is inclusive of CP & OH, GST@18% will be paid i.e. Rs. 4720.00 Refer Appendix - B. |
| 5 | Part - C : Maintenance of E/M Assets at Guwahati, Misa & Tezpur through AMC (Non-Comprehensive AMC) (PERCENTAGE NOT TO BE QUOTED ON THIS AMOUNT)Brief scope :The annual maintenance contract covers regular servicing, periodical checks to all components, greasing / lubrication to all parts, rectification / tightening of all electrical connections, replacement of gasket and oil seal, and including cleaning and dusting of all components complete all as directed by Engineer-in-Charge to keep the equipment in functional condition. Services further included are complete servicing, replacement of defective /damaged parts, expert assistance for non-performing systems, maintenance scheduling, and annual calibration by carrying General Servicing and maintenance as per standard practices/guidelines to keep the system functional. The modalities would include attending the complaints / breakdowns as and when arisen , repair / replacement of consumables as required for smooth operation of the system. Payment of consumables will be made as per terms and conditions given in the BOQ.AMC would typically cover entire original / extended contract period and will include regular maintenance visits, labour, etc. Annual maintenance contracts include Monthly / Quarterly preventive maintenance and breakdown maintenance as and when required as per periodicity. Only original spare parts as per approved make list duly approved by Estate manager will be permitted to be used for the maintenance during the entire contract Period. The agency shall have to do agreement with OEM / authorised vendor of OEM / any expert agency approved by CCE (R&D) Estates North Chandigarh based on recommendations of Estate Manager within One (01) month from the date of issue of LOI.Periodical Checks has to be carried out by Service Engineer of OEM / OEM authorised Vendor /any Expert Agency as approved by CCE(R&D) Estates North based on recommendations of Estate Manager. The Service Engineer will visit once every 03 months (Quarterly) and as and when required for attending breakdown calls and will submit the service report duly signed by stake holders including recommendations / repairs / replacements of any components if required (The rates in the BOQ are inclusive of periodic visit of Service Engineer as referred above). The OEM/OEM authorised system engineer shall inspect quarterly starting 1st month of commencement of contract.( Continued in 3.001 to 3.055 ) |
| 6 | Tezpur |
| 7 | Transformer (1000 KVA) , Make - Kirloskar, Volts HV - 11KV , Load LV - 433 , Amps - HV 52.5, LV 1333.37, Phase 3 HV Delta , LV 3 Star , Frequency-50HZ, SL. No. 1327564-1 No |
| 8 | HT/VCB Panel 11 KVA Kirloskar, Type A12650 VCB , OANo. - 6010213, SL. No. - 1401P009, System Voltage - 11KV , Frequency - 50 HZ , Control Supply- AC -240V/ DC -110V , Busbar Rating - 630 A , REF. DRG – 38429113-1 No |
| 9 | DG Synchronizing Panel, ACB Breaker Main LT Panel 2000 AMPS (ACPPT), Make - Associated control panels Pvt. Ltd., ACB 2000 Amps ACB (LR), SL. No. CX570159-1 No |
| 10 | ACB Breaker Main LT Panel 2000 AMPS (ACPPL), Make- Associated Control Panels Pvt. Ltd., 2000 AMPS ACB (LR), SL.No. - JW546936-1 No |
| 11 | ACB Breaker Main LT Panel 2000 AMPS (ACPPL), Make- Associated Control Panels Pvt. Ltd., 2000 AMPS ACB (B/E), SL.No. - JW546935-1 No |
| 12 | ACB Breaker Main LT Panel 2000 AMPS (ACPPL), Make- Associated Control Panels Pvt. Ltd., 2000 AMPS ACB (DG), SL.No. - JW546931-1 No |
| 13 | APFC Panel , Make - Larsen & Toubro Limited, India , AMPS-800, 50KVAR X 6, 10 KVAR X 2, 5 KVAR X 2, (Total 330 KMR / Incomer MCCB 330 AMP-1 No |
| 14 | DG Synchronizing Panel , Make - Jackson , Type - 3x380 KVA Auto Load Sharing Panel, Voltage - 415 V , Frequency - 50 HZ , SL.No. - 1023364A001 , So No. - 82026498/100-1-No |
| 15 | Control Panel A.K Engineering - 1 No |
| 16 | Stater Panel , A.K Engineering – 1 No |
| 17 | Motor Stater Panel , Make - Associated Control Panels PVT.LTD. (ACPPL) – 1 No |
| 18 | DG Sets 380 KVA , Make - Cummins India Ltd. , Engine No. - NTA - 14 -G3, Rated HP - 450, RPM - 1500, Engine SL.No. 25400628, Base Rating KW/KVA-304/380.-1 No |
| 19 | DG Sets 380 KVA , Make - Cummins India Ltd. , Engine No. - NTA - 14 -G3, Rated HP - 450, RPM - 1500, Engine SL.No. 25400517, Base Rating KW/KVA-304/380.-1 No |
| 20 | Moter (15 Hp), Make - KSB Siemens , SL.No. - 9972492308/600/2, No. SDF/1310.2633547-1 No |
| 21 | Moter (15 Hp), Make - KSB Siemens , SL.No. - 9972492308/500/2, No. SDF/1305.2571480-1 No |
| 22 | Moter (15 Hp), Make - KSB Siemens , SL.No. - 9972492308/400/2, No. SDF/1312.2655431-1 No |
| 23 | Moter (15 Hp), Make - KSB Siemens , SL.No. - 9972492308/700/2, No. SDF/1312.2655432-1 No |
| 24 | Motor ( 5 Hp), Make - KSB Siemens, SL.No. - 9972521460/400/1, No. SDF / 1309-2622812-1 No |
| 25 | Motor ( 5 Hp), Make - KSB Siemens, SL.No. - 9972521460/400/2, No. SDF / 1312 . 2655289-1 No |
| 26 | Submersible Water Pump 5 HP, Make - KSB Siemens- 1 No |
| 27 | LT Panel ( Silver Jubilee & Library), Make - A.Square Engineering Enterprice Pvt. Ltd.-1 No |
| 28 | RO Plant (1000 Ltr.)-1 No |
| 29 | LT Panel , P-1 Building , Make - Associated Control Panels Pvt. Ltd.-1 No |
| 30 | LT Panel, (Canteen/Animal House) , A.K. Engineerings-1 No |
| 31 | Admin Building LT Panel ACPPL-1 No |
| 32 | P-9 Building LT Panel ACPPL -2 No |
| 33 | P-61 Building LT Panel ACPPL-2 No |
| 34 | NRC LT Panel Khandelwal Metal IND.-1 No |
| 35 | LT Panel ( New Officers Guest House), Make - Power Media-1 No |
| 36 | LTDB Panel Scientist Hostel-1 No |
| 37 | DRL House Motor 2 HP , Make - Cri Pump Private Limited, SL.No.- 10410H22210-1 No |
| 38 | Garden Pump 2 HP NGH -1 No |
| 39 | LTDB Panel P-92 Building ORC-1 No |
| 40 | LTDB Panel P-91 Building NRC-1 No |
| 41 | Street Light Pole 9 Mtr.-88 No |
| 42 | Footh Path Lamp LED With Pole 3 Mtr.-6 No |
| 43 | Garden Lights-37 No |
| 44 | Guwahati |
| 45 | Transformer 125 KVA, Make - Power Engineers, Volts HV 11000, Load LV 433, AMPS HV 6.56, AMPS LV 166.68, Phase HV 3, Phase LV 3, Frequency - 50 HZ -1 No |
| 46 | DG Set 40 KVA, Make Cummins India Limited , Engine Model - 53.8G4, Rated HP - 58, RPM 1500 , Engine Sl. No.- 100630560, Rating KW/KVA - 32/40-1 No |
| 47 | LT Panel Associated Control Panels Pvt. Ltd-1 No |
| 48 | APFC Panel Associated Control Panels Pvt. Ltd-1 No |
| 49 | DG Panel Associated Control Panels Pvt. Ltd-1 No |
| 50 | Submersible Pump 4HP Make – Kirloskar-1 No |
| 51 | Filter Motor 1.5HP Make - Kirloskar -1 No |
| 52 | Water treatment plant Panel Mfg. by - Chaya Switchgears 24-92/70,-1 No |
| 53 | Two Pole Structure-1 No |
| 54 | Four Pole Structure-1 No |
| 55 | Feeder Panel Associated Control Panels Pvt. Ltd-1 No |
| 56 | Over Head Motor 1 HP Make – Kirloskar-1 No |
| 57 | Street Light 9Mtr. Pole 150 Watt (HPSV)-1 No |
| 58 | Footh Path Lamp 14 Watt 2.5 Mtr. Pole (LED)-1 No |
| 59 | Main gate LED Lamp 14 Watt-1 No |
| 60 | LT PANEL Make - Associated Control Panels PVT. LTD.-2 No |
| 61 | STREET LIGHTS-11 No |
| 62 | Garden Lights- 8 No |
| 63 | NOTE: i) The overall amount earmarked for expenditure in this head is Rs. 8,65,507.00 including CP&OH and @ 18% GST.ii) Expenditure on account of Consumables Items, Spare Part & Prime Cost Sum will be booked in this amount.iii) The amount will be reimbursed/ paid against actual expenditure made (restricted to the estimate amount on not exceedable basis) on submission of paid vouchers submitted by contractor of payments duly defaced by Engineer-in-charge / Project Manager to the con-cerned authorities.iv) The list of spares is not exhaustive the associated accessories of the above listed E/M assets as per Appendix - 'H' of NIT are also to be maintained under this contract as a part of scope of work.v) Spares not part of the BOQ will be measured and paid separately against original paid vouchers submitted under Prime Cost Sum. |
| 64 | Consumables(PERCENTAGE NOT TO BE QUOTED ON THIS AMOUNT)NOTE: i) The overall amount earmarked for expenditure under this subhead is Rs 5,19,304.40.00/-.ii) The prepriced list of spares including OH & CP @ 10% and 18% GST is given below.iii) The amount will be reimbursed/ paid against actual expediture made (restricted to the estimate/ eligible amount) on submission of paid vouchers submitted by contractor of payments duly defaced by Engineer-in-charge / Project Manager to the concerned authorities subject to rates given in pre priced list.iv) The list of spares is not exhaustive the associated accessories of the above listed E/M assets as per Appendix - 'H' are also to be maintained under this contract as a part of scope of work. |
| 65 | Transformer 1000 KVA Make - Kirloskar, Volts HV - 11KV , Load LV - 433 , Amps - HV 52.5, LV 1333.37, Phase 3 HV Delta |
| 66 | LT Brass fitting 20mm (Each @ Rs. 2250.00) |
| 67 | LT Brass fitting 42mm (Each @ Rs. 7250.00) |
| 68 | HT Brass fitting 12mm (Each @ Rs. 750.00) |
| 69 | Gastek Washer upto 380KVA (Each @ Rs. 1750.00) |
| 70 | Gastek Washer 200KVA to 500 KVA (Each @ Rs. 2600.00) |
| 71 | Gastek Tap Cover 200 KVA to 500 KVA (Each @ Rs. 2220.00) |
| 72 | Oil Seal 200 KVA to 500 KVA (Each @ Rs. 880.00) |
| 73 | Rewinding or Replacement of Coil (Cu) (Per Kg. @ Rs. 850.00)) |
| 74 | Rewinding or Replacement of Coil (Alu) (Per Kg. @ Rs. 530.00) |
| 75 | New Transformer Oil (Per Ltr. @ Rs. 185.00) |
| 76 | 380 KVA DG Set Cumminns 02 Nos Tezpur) |
| 77 | 380 KVA DG Set : |
| 78 | Belt, V Ribbed (Each @ Rs. 28,270.00) |
| 79 | Belt, V (Each @ Rs. 8542.59) |
| 80 | Belt V Ribbed – 217638 part No (Each Rs. @ 3709.18) |
| 81 | Water Pump & Idler (Each Rs.@ 64994.60) |
| 82 | Hose Flexible Product no. AK 5045 SS (Each Rs.@ 3717.98) |
| 83 | Hose Flexible, Product no. AK 5075 SS (Each Rs.@ 4781.68) |
| 84 | Clamp, Hose ( Each Rs.@ 1742.334) |
| 85 | Hose Plain Product No. 4104829 (Each @ Rs. 3348.37) |
| 86 | Hose Plain Product No. 4104832 (Each @ Rs. 11224.37) |
| 87 | Clamp, Hose Product No. 4950440 ( Each Rs.@ 8280.72) |
| 88 | Alternator (Each @ Rs. 68,343.00) |
| 89 | Valve, Shutoff (Each @ Rs.67,929.38) |
| 90 | Kit, Turbocharger ( Each @ Rs. 7,24,591.98) |
| 91 | Sensor , Pressure ( Each @ Rs. 52,079.50) |
| 92 | Sensor , Temprature ( Each @ Rs. 2020.68) |
| 93 | Sensor, Coolant Level ( Each @ Rs. 28,263.38) |
| 94 | Box- Control ( Powercom) ( Each @ Rs. 1,28,907.13) |
| 95 | Control Assy ( C-Power base board) (Each @ Rs. 1,02,903.09) |
| 96 | Control Assy (AC-Module) (Each @ Rs. 54,881.06) |
| 97 | Lower Engine Gasket Kit (Each @ Rs. 64,135.48) |
| 98 | 40 KVA DG Set Cummins (Guwahati) |
| 99 | Kit Spare for FIP & NOZZLE ( Each @ Rs. 49973.29) |
| 100 | Transportation Charges ( Each @ Rs. 11,682.00) |
| 101 | Fip & Nozzle repair and Calibration Charges ( Each @ Rs. 6153.84) |
| 102 | PS- Service charge towards inspection & service of Cummins engine model no. S/X/CWC/B3 3/4B/N495 ( ONE SERVICE @ Rs. 15,160.64) |
| 103 | Belt Drive ( Each @ Rs. 1788.58) |
| 104 | Hose – Vacuum ( Each @ Rs. 570.90) |
| 105 | Hose Clamp ( Each @ Rs. 580.75) |
| 106 | Hose Coolant ( Each @ Rs. 360.78) |
| 107 | Battery Pulse_ 12V-32AH ( Each @ Rs. 17023.58) |
| 108 | Transportation Charges ( Each @ Rs.2596) |
| 109 | Element Fuel Filter ( Each @ Rs. 2821.50) |
| 110 | Element Oil Filter ( Each @ Rs. 566.50) |
| 111 | Element Air Cleaner Product No. 3814695 ( Each @ Rs. 4779.50) |
| 112 | Element Air Cleaner Product No. 3814696 ( Each @ Rs. 958.08) |
| 113 | Foil Sealed Test Strips ( Each @ Rs. 506.00) |
| 114 | Inhibitor , Corrosion ( Each @ Rs. 5607.80) |
| 115 | Valvo LINE Premium Blue 7800 Plus 1/10 lTR ( Each @ Rs. 6783.70) |
| 116 | Pump Spare PartsBearing (Each @ Rs. 8500.00) |
| 117 | Impeller (Each @ Rs. 10500.00) |
| 118 | Coupling rubber bush (Each @ Rs. 2500.00) |
| 119 | Shaft Sleeves (Each @ Rs. 4500.00) |
| 120 | Gland Packing (Each @ Rs. 1200.00) |
| 121 | Pump gastek Set (Each @ Rs. 4000.00) |
| 122 | Pipes and Valves FittingsGate Valves (Each @ Rs. 25000.00) |
| 123 | Air Vent (Each @ Rs. 1500.00) |
| 124 | Drain Cock (Each @ Rs. 1950.00) |
| 125 | Pipe flanges (Each @ Rs. 1650.00) |
| 126 | Rubber gasket (Each @ Rs. 50.00) |
| 127 | PTFE Tape (Each @ Rs. 20.00) |
| 128 | Relay- Control (Each @ Rs. 2500.00) |
| 129 | Hose Plain (Each @ Rs. 1720.00) |
| 130 | Electrical Spare PartsContactor No. 1 + 1 MC (Each @ Rs. 6500.00) |
| 131 | CT / PT (Each @ Rs. 3500.00) |
| 132 | Capacitor 4 mfd (Each @ Rs. 150.00) |
| 133 | Thermostat Controller (Each @ Rs. 5500.00) |
| 134 | Indicator Lamp (Each @ Rs. 450.00) |
| 135 | Fuse (Each @ Rs. 200.00) |
| 136 | (II) Prime Cost Sum: (PERCENTAGE NOT TO BE QUOTED ON THIS AMOUNT)Prime cost sum for supply of spare parts, consumables items, overhauling repair of equipments not covered in any of the schedule whose specifications, requirements and quantity that cannot be foreseen are covered under prime cost sum and as directed by Engr-in-Charge. All prime cost sum shall be reserved for the supply of material or the execution of work by the OEM or agency approved by department. Payment for these items shall be made based on invoices and purchase voucher from OEM/authorised dealers as per Note (ii) below. Notes:-(i) The total estimated amount in Prime cost sum is Rs. 3,46,202.93 is on not exceeding basis (This amount is fixed and inclusive of CP&OH and GST@18%).(ii) The amount will be reimbursed/ paid against actual expenditure made (restricted to the estimate amount on not exceeding basis) on submission of paid vouchers submitted by contractor of payments duly defaced by Engineer-in-charge / Project Manager to the concerned authorities with base price + @18% GST + 10% CP. |
| 137 | Part - D (PERCENTAGE NOT TO BE QUOTED ON THIS AMOUNT)(I) Cost of DieselProcurement of Diesel For contracts involving operation of DG Set(s) s and / or any other equipment, the diesel required for day-to-day running of DG sets shall preferably be supplied by the Department / User. In case of non-supply of diesel by the department / user, the contractor shall procure the diesel at the prevailing market rates as per the requirement of diesel from time to time after prior approval of CCE(R&D) Estates North. The total quantity of the diesel used during the period of contract shall not exceed the estimated quantity of the diesel given in BOQ. The payment towards the procurement of diesel shall be made on actuals on production of original purchase invoice (to be signed by the users) plus Handling Charges per litre of diesel supplied as quoted by the contactor in the BOQ to cover loading / unloading, transportation, storage, handling, contractor’s profit, & overheads etc. The cost of diesel will be accounted for as a part of the CA / JWO amount, without levying of any GST as the same is not applicable as per prevailing Govt of India norms. The contractor will be paid / reimbursed Only the actual procurement of the diesel on the Govt fixed prices on production of original computer-generated Invoice and verified by concerned seller with stamp of concerned fuel pump duly signed by the users. The Log book and consumption / utilization records of the diesel used vis-à-vis DG set(s), Central Heating Plants and / or any other equipment shall be maintained and submitted to the department / user.NOTE: i) This amount is fixed and will be reimbursed/ paid against actual expenditure made (restricted to the estimate/ eligible amount) on submission of paid vouchers submitted by contractor for payments duly defaced by Estate Manager / Engineer-in-charge. |
| 138 | (II) Handling charges of diesel (RATE TO BE QUOTED)Bidders to quote Diesel Handling Charges including loading / unloading transportation Storage etc. per litre, subject to maximum ceiling of Rs. 10/- per litre and should be greater than ZERO. Note : a) Bid for Zero rate is not acceptable and will be treated invalid.b) Rate is inclusive of CP & OH. c) GST @18% will be paid on the quoted amount. |
| 139 | Periodical Maintenance/Services: 01 B check of 380 KVA 02 DG Set and 40 KVA 01 DG Set as per Part 'E'. (PERCENTAGE NOT TO BE QUOTED ON THIS AMOUNT)NOTE: i) This amount is fixed and inclusive of CP&OH and GST@18%.ii) The amount will be reimbursed/ paid against actual expenditure made (restricted to the estimate amount on not exceedable basis) on submission of paid vouchers submitted by contractor of payments duly defaced by Engineer-in-charge / Project Manager to the con-cerned authorities.(iii) Refer Para 2 of Appendix 'A' & 'G' of NIT for Scope of Work for B Check / C Check of DG set. |
| 140 | 01 B check of 380 KVA 02 DG Set Scope of work : 'B' Check of DG Sets upto the time of 500 Hrs / 6 Months whichever comes earlier with including the activity like changing of Fuel Filter, Lube Oil Filter, Separator, Fuel Water, Premix Coolent, Engine Oil, Corrosion inhibitor etc. as per OEM Standrads and direction of Engineer-in-charge. Note:-(i) B-Check maintenance of Diesel Generator (DG) Sets shall be carried out by the Original Equipment Manufacturer (OEM) or its authorized service representatives or any expert agency as approved by the CCE as per recommendations of Estate Manager.(For detail refer to Appendix-A & G of NIT). |
| 141 | 01 B check of 40 KVA 01 DG Set Scope of work : 'B' Check of DG Sets upto the time of 500 Hrs / 6 Months whichever comes earlier with including the activity like changing of Fuel Filter, Lube Oil Filter, Separator, Fuel Water, Premix Coolent, Engine Oil, Corrosion inhibitor etc. as per OEM Standrads and direction of Engineer-in-charge. Note:-(i) B-Check maintenance of Diesel Generator (DG) Sets shall be carried out by the Original Equipment Manufacturer (OEM) or its authorized service representatives or any expert agency as approved by the CCE as per recommendations of Estate Manager.(For detail refer to Appendix-A & G of NIT). Quoted Percentage (+) and Total Amount in Figures Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 28, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 12, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysAug 14, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender