Bids Are invited for Custom Bid For Services - Earthing Of Mobile Bts (Zone-1) , Custom Bid For Services - Earthing Of Mobile Bts (Zone-2) , Custom Bid For Services - Earthing Of Mobile Bts (Zone-3) - Hot Dipped Galvanized Iron Plates ( Size 600 Mm X
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Earthing Of Mobile Bts (Zone-1) , Custom Bid For Services - Earthing Of Mobile Bts (Zone-2) , Custom Bid For Services - Earthing Of Mobile Bts (Zone-3) - Hot Dipped Galvanized Iron Plates ( Size 600 Mm X 600 Mm X 8 Mm ) , Hot Dipped G.I Strip Of Size 50Mm X 3Mm (Length As Per Site Requirement) , Charcoal Medium Size (For 4 Nos Of Gi Plate Earthing Pits ) , Salt/Earthing Powder (For 4 Nos Of Gi Plate Earthing Pits ) , Soft Soils Say Approx. 3 Brasses Per Site (Requirement As Per Site To Refill By Removing Rockey/Hard Soil) , Copper Earth Bus Bar 60Mm (Breadth) X 300 Mm (Length) X 8Mm (Thick) Fitted On Insulated Material At Appropriate Suitable Place. , Gi Pipe 1 (I.E. Intl Dia. 20Mm And Extl Dia. 24Mm To 25Mm) 3 Mtr Piece. With Appropriate Elbow Couplers Etc. (Length Qty. Will Be As Per Site Requirement) , Copper Lugs 16 Sq.Mm. , Water Tanker Of Min.6,000 Ltr. Capacity , Brass Bolts With Nut & Washer ¼ Length 50Cm. , Excavation Of Pit/Pits Soft Soi/Murum. Except Hard Rock Pit Size – 3Mtrs X 3Mtrs X 3 Mtrs For Exch. Site Along With Cleaning Of Site , Excavation Of Pit/Pits Soft Soi/Murum. Except Hard Rock Pit Size 2 Mtrs X 2 Mtrs X 3 Mtrs For Bts Site Along With Cleaning Of Site , Treanching In Between Pit To Equipment Room. (If Required ) And Reinstating The Trench Work Per Site Trench Size: 30 Cm Breadth X 60 Cm Depth Soft Soil/Murum Except Hard Rock For Length Of Approx. 10 Mtrs. ( Trench Length May Varies As Per The Site Location (Length As Per Site Requirement)) , Laying Of Length Cable Wire In Trench In Between Earth Pit To Equipment Room (Though 1 G.I. Pipe ) To The Extent Of Appropriate Length Per Meter Length Upto 20 Mtrs With Protection (Concrete)(Length As Per Site Requirement) (Including Materials To Be Supplied Like Gi Pipe Etc.) , Fitting Of Earth Distribution Bus Bar In The Equipment Room Proper Cladding Arrangement At Suitable Location As Per Specification. , Connecting Of Earth Cable To The Earth Pit & Earth Bus Bar With Proper Lunging & Creating Testing Point At The Center Point Of Earth Pit (This Includes Erection Of Hot Dipped Gi Earth Plates & Interconnection Between Them With Multi-Standard Copper Wire 16Sq Mm. , Installation Of 1 G.I. Pipe Upto The Top Of The Pit From Bottom Of The Pit & Arrangement Thereof. , Construction Of 300 Mm (Breadth) X 300 Mm(Length) X 300 Mm (Depth) X 2 Thick Cementconcrete Chamber Built In Brick With Opening And Closing Arrangement Of Pit By Cement Concrete Lid Of Sufficient Strength. (For This Item Required Material For Chamber Including Rcc Frame & Lid Thereof Is To Be Supplied By The Contractors) , Reinstating With Charcoal, Soil, Salt ( Layer By Layer) Layer Of 0.30 Meters Each. , Lifting Of Extra Excavated Earth Material & Residual Garbage From The Site To Be Shifted On Completion Of Work As Per Instruction From The Field Officer
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Hot Dipped Galvanized Iron Plates ( Size 600 mm X 600 mm X 8 mm ) | Hot Dipped Galvanized Iron Plates ( Size 600 mm X 600 mm X 8 mm ) |
| 2 | Hot Dipped G.I Strip of Size 50mm X 3mm (Length as per site requirement) | Hot Dipped G.I Strip of Size 50mm X 3mm (Length as per site requirement) |
| 3 | Charcoal Medium Size (for 4 nos of GI plate earthing pits ) | Charcoal Medium Size (for 4 nos of GI plate earthing pits ) |
| 4 | Salt/earthing powder (for 4 nos of GI plate earthing pits ) | Salt/earthing powder (for 4 nos of GI plate earthing pits ) |
| 5 | Soft Soils say approx. 3 brasses per site (requirement as per site to refill by removing rockey/hard soil) | Soft Soils say approx. 3 brasses per site (requirement as per site to refill by removing rockey/hard soil) |
| 6 | Copper Earth Bus Bar 60mm (Breadth) X 300 mm (Length) X 8mm (Thick) Fitted on insulated material at appropriate suitable Place. | Copper Earth Bus Bar 60mm (Breadth) X 300 mm (Length) X 8mm (Thick) Fitted on insulated material at appropriate suitable Place. |
| 7 | GI Pipe 1” (i.e. Intl Dia. 20mm and Extl Dia. 24mm to 25mm) 3 Mtr Piece. With appropriate elbow couplers etc. (Length Qty. will be as per site requirement) | GI Pipe 1” (i.e. Intl Dia. 20mm and Extl Dia. 24mm to 25mm) 3 Mtr Piece. With appropriate elbow couplers etc. (Length Qty. will be as per site requirement) |
| 8 | Copper Lugs 16 sq.mm. | Copper Lugs 16 sq.mm. |
| 9 | Water Tanker of min.6,000 Ltr. Capacity | Water Tanker of min.6,000 Ltr. Capacity |
| 10 | Brass bolts with Nut & Washer ¼” Length 50cm. | Brass bolts with Nut & Washer ¼” Length 50cm. |
| 11 | Excavation of Pit/Pits soft soi/Murum. Except Hard rock Pit Size – 3mtrs X 3mtrs X 3 mtrs for Exch. Site along with cleaning of site | Excavation of Pit/Pits soft soi/Murum. Except Hard rock Pit Size – 3mtrs X 3mtrs X 3 mtrs for Exch. Site along with cleaning of site |
| 12 | Excavation of Pit/Pits soft soi/Murum. Except Hard rock Pit Size 2 mtrs X 2 mtrs X 3 mtrs for BTS Site along with cleaning of site | Excavation of Pit/Pits soft soi/Murum. Except Hard rock Pit Size 2 mtrs X 2 mtrs X 3 mtrs for BTS Site along with cleaning of site |
| 13 | Treanching in between Pit to Equipment Room. (if required ) and reinstating the trench work per site Trench size: 30 cm breadth X 60 cm Depth soft soil/murum except Hard Rock for length of Approx. 10 Mtrs. ( Trench Length may Varies as per the site location (Length as per site requirement)) | Treanching in between Pit to Equipment Room. (if required ) and reinstating the trench work per site Trench size: 30 cm breadth X 60 cm Depth soft soil/murum except Hard Rock for length of Approx. 10 Mtrs. ( Trench Length may Varies as per the site location (Length as per site requirement)) |
| 14 | Laying of length cable Wire in trench in between earth pit to Equipment Room (though 1” G.I. Pipe ) to the extent of appropriate length per meter length upto 20 mtrs with protection (Concrete)(Length as per site requirement) (INCLUDING MATERIALS TO BE SUPPLIED LIKE GI PIPE ETC.) | Laying of length cable Wire in trench in between earth pit to Equipment Room (though 1” G.I. Pipe ) to the extent of appropriate length per meter length upto 20 mtrs with protection (Concrete)(Length as per site requirement) (INCLUDING MATERIALS TO BE SUPPLIED LIKE GI PIPE ETC.) |
| 15 | Fitting of Earth distribution bus bar in the equipment room proper cladding arrangement at suitable location as per specification. | Fitting of Earth distribution bus bar in the equipment room proper cladding arrangement at suitable location as per specification. |
| 16 | Connecting of Earth cable to the Earth pit & Earth bus bar with proper lunging & creating testing point at the center point of earth pit (This includes erection of Hot dipped GI earth Plates & interconnection between them with multi-standard copper wire 16sq mm. | Connecting of Earth cable to the Earth pit & Earth bus bar with proper lunging & creating testing point at the center point of earth pit (This includes erection of Hot dipped GI earth Plates & interconnection between them with multi-standard copper wire 16sq mm. |
| 17 | Installation of 1” G.I. Pipe upto the top of the Pit from bottom of the pit & Arrangement thereof. | Installation of 1” G.I. Pipe upto the top of the Pit from bottom of the pit & Arrangement thereof. |
| 18 | Construction of 300 mm (Breadth) X 300 mm(Length) X 300 mm (Depth) X 2” Thick cementConcrete Chamber built in Brick with opening and closing arrangement of pit by cement concrete lid of sufficient strength. (For this item required material for chamber including RCC Frame & Lid thereof is to be supplied by the contractors) | Construction of 300 mm (Breadth) X 300 mm(Length) X 300 mm (Depth) X 2” Thick cementConcrete Chamber built in Brick with opening and closing arrangement of pit by cement concrete lid of sufficient strength. (For this item required material for chamber including RCC Frame & Lid thereof is to be supplied by the contractors) |
| 19 | Reinstating with Charcoal, Soil, Salt ( Layer by Layer) Layer of 0.30 meters each. | Reinstating with Charcoal, Soil, Salt ( Layer by Layer) Layer of 0.30 meters each. |
| 20 | Lifting of Extra excavated earth material & Residual garbage from the site to be shifted on completion of work as per instruction from the field officer | Lifting of Extra excavated earth material & Residual garbage from the site to be shifted on completion of work as per instruction from the field officer |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 16 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender