Power Government Departments Closing in 10 days TDR #56696370

Tender For Fixing Of Rate Contract For Handling Of Various Material In Divisional Stores At Dharmound Of Electric Division Jpdcl Batote During The Year 2026-27 Or Till The Next Year Tender Is Finalized.

Issued by Government Departments · Doda, Jammu and Kashmir
Tender Value
Ref. Documents
Estimated cost
Bid Submission
10 Aug 2026
10 days left
EMD
30000
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Doda → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Fixing Of Rate Contract For Handling Of Various Material In Divisional Stores At Dharmound Of Electric Division Jpdcl Batote During The Year 2026-27 Or Till The Next Year Tender Is Finalized.

BOQ

Name of Work:- Fixing of Rate Contract for handling of various material in Divisional stores at Dharmound of Electric Division JPDCL Batote during the year 2026-27 or till the next year tender is finalized.
Sl. No. Item Description
1Rates for handling of various material in Divisional stores at Dharmound of Electric Division JPDCL Batote during the year 2026-27 or till the next year tender is finalized.
2Unloading of PCC Poles 11 Mtr Long
3Unloading of PCC Poles 9 Mtr Long
4Unloading of PCC Poles 8 Mtr Long
5Unloading of ST Poles 13 Mtr Long
6Unloading of ST Poles 11Mtr Long
7Unloading of ST Poles 9 Mtr Long
8Unloading of ST Poles 8 Mtr Long
9Loading of PCC Poles 11 Mtr Long
10Loading of PCC Poles 9 Mtr Long
11Loading of PCC Poles 8 Mtr Long
12Loading of ST Poles 13 Mtr Long
13Loading of ST Poles 11Mtr Long
14Loading of ST Poles 9 Mtr Long
15Loading of ST Poles 8 Mtr Long
16Shifting/Dragging of PCC Pole 11 mtr long at an average distance upto 25 mtr for stacking to accessible place for loading/Unloading Purpose and its stacking
17Shifting/Dragging of PCC Pole 9 mtr long at an average distance upto 25 mtr for stacking to accessible place for loading/Unloading Purpose and itsstacking
18Shifting/Dragging of PCC Pole 8 mtr long at an average distance upto 25 mtr for stacking to accessible place for loading/Unloading Purpose and its stacking
19Shifting/Dragging of ST Pole 13 mtr long at an average distance upto 25 mtr for stacking to accessible place for loading/Unloading Purpose and itsstacking
20Shifting/Dragging of ST Pole 11 mtr long at an average distance upto 25 mtr for stacking to accessible place for loading/Unloading Purpose and its stacking
21Shifting/Dragging of ST Pole 9 mtr long at an average distance upto 25 mtr forstacking to accessible place for loading/Unloading Purpose and its stacking
22Shifting/Dragging of ST Pole 8 mtr long at an average distance upto 25 mtr for stacking to accessible place for loading/Unloading Purpose and its stacking
23Unloading of ACSR Conductor Dog/Rabbit/Squirrel/Weasel (New)
24Loading of ACSR Conductor Dog/Rabbit/Squirrel/Weasel (New)
25Shifting of ACSR Conductor Dog/Rabbit/Squirrel/Weasel (New) from unloading site to safe stacking site at an average distance upto 25 mtr and its stacking
26Shifting of ACSR Conductor Dog/Rabbit/Squirrel/Weasel (New) from safe stacking site to loading site at an average distance upto 25 mtr and its stacking
27Shifting of ACSR Conductor Dog/Rabbit/Squirrel/Weasel (New) to other place for making space for other store material at an average distance upto 25 mtr and its stacking
28Unreeling of the ACSR Conductor Dog/Rabbit/Squirrel/Weasel (New)
29Cutting of the ACSR Conductor Dog/Rabbit/Squirrel/Weasel (New) and making bundles of conductor and stacking within 25 mtr
30Unloading of old ACSR Conductor
31Loading of old ACSR Conductor
32Shifting of old ACSR Conductor from unloading site to safe stacking site at an average distance upto 25 mtr and its stacking
33Shifting of old ACSR Conductor from safe stacking site to loading site at an average distance upto 25 mtr and its stacking
34Shifting of Old ACSR Conductor to other place for making space for other store material at an average distance upto 25 mtr Mtr and its stacking
35Making bundles of old loose ACSR Conductor and stacking within 25 mtr
36Unloading of Channel/Angle/Flat/Round Iron (MS/GI)
37Loading of Channel/Angle/Flat/Round Iron (MS/GI)
38Shifting of Channel/Angle/Flat/Round (MS/GI) Iron at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
39Shifting of Channel/Angle/Flat/Round (MS/GI) Iron at an average distance upto 25 mtr from safe stacking site to loading site and its stacking properly
40Shifting of Channel/Angle/Flat/Round Iron (MS/GI) at an average distance upto 25 mtr for making space for other store material and its stacking
41Fabrication of Channel Cross Arms of sorts/Angle cross arms of sorts /Angle braces of sorts/Flat Iron Braces of sorts from Channel/Angle/Flat Iron (MS/GI)
42Fabrication of Clamps of sorts from Flat Iron (MS/GI)
43Fabrication of Guy Rods
44Making of Holes for fabrication of Channel/Flat/Angles
45Painting (Red oxide/Aluminium Paint) of Fabricated Material.
46Unloading of Disc Insulator/Pin Insulator/Shackle Insulator/Bus Bar Insulator/Guy Insulator
47Loading of Disc Insulator/Pin Insulator/Shackle Insulator/Bus Bar Insulator/Guy Insulator
48Shifting of Disc Insulator/Pin Insulator/Shackle Insulator/Bus Bar Insulator/Guy Insulator at an average distance upto 25 mtr from unloading site to safe stacking site and its stacking properly
49Shifting of Disc Insulator/Pin Insulator/Shackle Insulator/Bus Bar Insulator/Guy Insulator at an average distance upto 25 mtr from safe stacking site to loading site and its stacking properly
50Shifting of Disc Insulator/Pin Insulator/Shackle Insulator/Bus Bar Insulator/Guy Insulator at an average distance upto 25 mtr for making space for other store material and its stacking
51Unloading of Guy Rod/Earthing Rod/Earthing Pipe/Earthing Spike
52Loading of Guy Rod/Earthing Rod/Earthing Pipe/Earthing Spike
53Shifting of Guy Rod/Earthing Rod/Earthing Pipe/Earthing Spike at an average distance upto 25 mtr from unloading site to safe stacking site and its stacking properly
54Shifting of Guy Rod/Earthing Rod/Earthing Pipe/Earthing Spike at an average distance upto 25 mtr from safe stacking site to loading site and its stacking properly
55Shifting of Guy Rod/Earthing Rod/Earthing Pipe/Earthing Spike at an average distance upto 25 Mtr for making space for other store material and its stacking
56Unloading of Al Thimbles of sizes
57Loading of Al Thimbles of sizes
58Shifting of Al Thimbles of sizes at an average distance upto 25 mtr from unloading site to safe stacking site and its stacking properly
59Shifting of Al Thimbles of sizes at an average distance upto 25 mtr from safe stacking site to loading site and its stacking properly
60Shifting of Al Thimbles of sizes at an average distance upto 25 mtr for making space for other store material and its stacking
61Unloading of Nut & Bolts of sizes
62Loading of Nut & Bolts of sizes
63Shifting of Nut & Bolts of sizes at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
64Shifting of Nut & Bolts of sizes at an average distance upto 25 mtr from from safe stacking site to loading site and its stacking properly
65Shifting of Nut & Bolts of sizes at an average distance upto 25 mtr for making space for other store material and its stacking
66Unloading of allied material for HT/LT Line/Substations/workshop material (i.e. Al Busbar/GI/Guy wire/Cu/Al Wire /Bush rods etc)
67Loading of allied material for HT/LT Line/Substations/workshop material (i.e. Al Busbar/GI/Guy wire/Cu/Al Wire /Bush rods etc)
68Shifting of allied material for HT/LT Line/Substations/workshop material (i.e. Al Busbar/GI/Guy wire/Cu/Al Wire /Bush rods etc) at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
69Shifting of allied material for HT/LT Line/Substations/workshop material (i.e. Al Busbar/GI/Guy wire/Cu/Al Wire /Bush rods etc) at an average distance upto 25 mtr from stacking site and to loading site its stacking properly
70Shifting of allied material for HT/LT Line/Substations/workshop material (i.e. Al Busbar/GI/Guy wire/Cu/Al Wire /Bush rods etc) at an average distance upto 25 mtr for making space for other store material and its stacking
71Unloading of 11kV Link/Knife Set
72Unloading of 11kV HG/DO Set
73Unloading of 11kV LA Set
74Unloading of 11kV GO Set
75Loading of 11kV Link/Knife Set
76Loading of 11kV HG/DO Set
77Loading of 11kV LA Set
78Loading of 11kV GO Set
79Shifting of 11kV link/knife/hg/do/go/la set at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
80Shifting of 11kV link/knife/hg/do/go/la set at an average distance upto 25 mtr from from stacking site and its stacking properly
81Shifting of 11kV link/knife/hg/do/go/la set at an average distance upto 25 mtr for making space for other store material and its stacking
82Unloading/Loading of Bammboo Ladder/Aluminium Ladder
83Shifting of Bamboo Ladder/Aluminium Ladder at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
84Shifting of Bamboo Ladder/Aluminium Ladder at an average distance upto 25 mtr for making space for other store material and its stacking
85Unloading/Loading of Single/Three Phase Meter/Prodigy Meter
86Carrigae of Single/Three Phase Meter/Prodigy Meter from unloading site to stacking site (Upto 25 mtr)
87Carrigae of Single/Three Phase Meter/Prodigy Meter from stacking site to loading site (Upto 25 mtr)
88Carrigae of Single/Three Phase Meter/Prodigy Meter from stacking site to loading site (Upto 25 mtr)
89Stacking of Single/Three phase meters/Prodigy Meter at an average distance upto 25 mtr for making space for other store material and its stacking
90Unloading of PVC Twin Core Cable 4/6/10/16 sq mm (Unarmored/Armored)
91Loading of PVC Twin Core Cable 4/6/10/16 sq mm (Unarmored/Armored)
92Shifting of PVC Twin Core Cable 4/6/10/16 sq mm (Unarmored/Armored) from unloading site to stacking site and stacking properly at an average distance upto 25 mtr
93Shifting of PVC Twin Core Cable 4/6/10/16 sq mm (Unarmored/Armored) from stacking site to loading site and stacking properly at an average distance upto 25 mtr
94Shifting of PVC Twin Core Cable 4/6/10/16 sq mm (Unarmored/Armored) for making space for other store material at an average distance upto 25 mtr
95Unreeling of PVC Twin Core Cable 4/6/10/16 sq mm (Unarmored/Armored)
96Cutting of the PVC Twin Core Cable 4/6/10/16 sq mm (Unarmored/Armored) measuring and making bundles and stacking within 25 mtr
97Unloading of PVC Cable single core 95/120/150/185/240/300 sq mm
98Loading of PVC Cable single core 95/120/150/185/240/300 sq mm
99Shifting of PVC Cable single core 95/120/150/185/240/300 sq mm from unloading site to stacking site and stacking properly
100Shifting of PVC Cable single core 95/120/150/185/240/300 sq mm from stacking site to loading site and stacking properly
101Shifting of PVC Cable single core 95/120/150/185/240/300 sq mm for making space for other store material at an average distance upto 25 mtr
102Unreeling of PVC Cable single core 95/120/150/185/240/300 sq mm
103Cutting of the PVC Cable single core 95/120/150/185/240/300 sq mm measuring and making bundles and stacking within 25 mtr
104Unloading of AB/XLPE 25/35/50/70/95/120/185 sq mm Cable for HT/LT Lines
105Loading of AB/XLPE 25/35/50/70/95/120/185 sq mm Cable for HT/LT Lines
106Shifting of AB/XLPE 25/35/50/70/95/120/185 sq mm Cable for HT/LT Lines fromunloading site to stacking site and stacking properly
107Shifting of AB/XLPE 25/35/50/70/95/120/185 sq mm Cable for HT/LT Lines from stacking site loading site and stacking properly
108Shifting of AB/XLPE 25/35/50/70/95/120/185 sq mm for making space for other store material at an average distance upto 25 mtr
109Unreeling of AB/XLPE 25/35/50/70/95/120/185 sq mm Cable for HT/LT Lines
110Cutting of the AB/XLPE 25/35/50/70/95/120/185 sq mm Cable for HT/LT Lines measuring and making bundles and stacking within 25 mtr
111Unloading/Loading of Straight jointer kit/Heat shrinkable Kit forAB/XLPE cables of HT/LT Lines
112Unloading of Cement Bags
113Loading of Cement Bags
114Carriage of Cement Bags from unloading site to stacking site (Upto 25 mtr)
115Stacking of Cement bags
116Unloading of Transformer oil
117Loading of Transformer oil
118Shifting ofTransformer oil at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
119Shifting of Transformer oil at an average distance upto 25 mtr from stacking site to unloading site and its stacking properly
120Shifting of Transformer oil at an average distance upto 25 mtr for making space for other store material and its stacking
121Unloading of T&P items
122Loading of T&P items
123Carriage of T&P items at an average distance upto 25 mtr for stacking to accessible place for loading/Unloading Purpose and its stacking
124Unloading of 25 KVA Transformer
125Unloading of 63 KVA Transformer
126Unloading of 100 KVA Transformer
127Unloading of 250 KVA Transformer
128Unloading of 400 KVA Transformer
129Unloading of 630 KVA Transformer
130Loading of 25 KVA Transformer
131Loading of 63 KVA Transformer
132Loading of 100 KVA Transformer
133Loading of 250 KVA Transformer
134Loading of 400 KVA Transformer
135Loading of 630 KVA Transformer
136Dragging/Shifting of 25 KVA Transformer at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
137Dragging/Shifting of 63 KVA Transformer at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
138Dragging/Shifting of 100 KVA Transformer at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
139Dragging/Shifting of 250 KVA Transformer at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
140Dragging/Shifting of existing 400 KVA Transformer at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
141Dragging/Shifting of 630 KVA Transformer at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
142Dragging/Shifting of 25 KVA Transformer at an average distance upto 25 mtr from stacking site to loading site and its stacking properly
143Dragging/Shifting of 63 KVA Transformer at an average distance upto 25 mtr from stacking site to loading site and its stacking properly
144Dragging/Shifting of 100 KVA Transformer at an average distance upto 25 mtr from stacking site to loading site and its stacking properly
145Dragging/Shifting of 250 KVA Transformer at an average distance upto 25 mtr from stacking site to loading site and its stacking properly
146Dragging/Shifting of existing 400 KVA Transformer at an average distance upto 25 mtr from stacking site to loading site and its stacking properly
147Dragging/Shifting of 630 KVA Transformer at an average distance upto 25 mtr from stacking site to loading site and its stacking properly
148Dragging/Shifting of 25 KVA Transformer at an average distance upto 25 mtrfor making space for other store material and its stacking
149Dragging/Shifting of 63 KVA Transformer at an average distance upto 25 mtrfor making space for other store material and its stacking
150Dragging of 100 KVA Transformer at an average distance upto 25 mtr for making space for other store material and its stacking
151Dragging of 250 KVA Transformer at an average distance upto 25 mtr for making space for other store material and its stacking
152Dragging of 400KVA Transformer at an average distance upto 25 mtrfor making space for other store material and its stacking
153Dragging of 630KVA Transformer at an average distance upto 25 mtr for making space for other store material and its stacking
154Testing of Xmer (25/62/100/250/400/630)
155Unloading of DG Set (up to 5kVA)
156Loading of DG Set (up to 5kVA)
157Dragging/Shifting of DG Set (up to 5kVA) at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
158Dragging/Shifting of DG Set (up to 5kVA) at an average distance upto 25 mtr from stacking site to loading site and its stacking properly
159Dragging of DG Set (up to 5kVA) at an average distance upto 25 mtr for making space for other store material and its stacking
160Unloading of DG Set (25kVA)
161Loading of DG Set (25kVA)
162Dragging/Shifting of DG Set (25kVA) at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
163Dragging/Shifting of DG Set (25kVA) at an average distance upto 25 mtr from stacking site to loading site and its stacking properly
164Dragging of DG Set (25kVA) at an average distance upto 25 mtr for making space for other store material and its stacking
165Unloading of CT/PT Unit
166Loading of CT/PT Unit
167Dragging of CT/PT Unit at an average distance upto 25 mtr fromunloading site to stacking site and its stacking properly
168Dragging of CT/PT Unit at an average distance upto 25 mtr from stacking site to loading site and its stacking properly
169Cutting of Green Vegetable Bushes , Wild Grass, trees in the store to avoid any mishappening of untoward incidents
170Carriage of Green Vegetable Bushes , Wild Grass, trees after cutting and dumping away from store
171Straightening of tilted fencing posts in the store premises for repair of fencing
172Insertion of new fencing Posts in the store for repair of fencing
173Dismantling of existing mesh fencing
174Fixing of mesh Fencing
175Fixing of CGI Sheets
176Dismantling of CGI sheets
177Lifting of Unserviceable items like, Damaged Transformers (Outer frame of DTs), Broken Insulators of sorts, Al/ Cu/ Scrap/ Bush rods of sorts, Empty Barrells, Broken CGI Sheets, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking
178Checking & meggering of 11Kv LA set HG /DOset GO set CT/PT unit
179Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators with fittings, Pin insulators with pins etc
180Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc.
181Meggering, tightening of nuts and bolts, oil seals, breathers checking,visual inspections of Transformers 25/63/100 KVA
182Meggering, tightening of nuts and bolts, oil seals, breathers checking, visual inspections of Transformers 250/400/630KVA
183Unloading of Cu/Al Wire
184Loading of of Cu/Al Wire
185Shifting of of Cu/Al Wire at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
186Shifting of of Cu/Al Wire at an average distance upto 25 mtr from from safe stacking site to loading site and its stacking properly
187Shifting of of Cu/Al Wire at an average distance upto 25 mtr for making space for other store material and its stacking
188loading of Bush Rods and other allied Workshop material
189Unloading of Bush Rods and other allied workshop material
190Shifting of of Bush Rods and other allied Workshop material at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly
191Shifting of of Bush Rods and other allied Workshop material at an average distance upto 25 mtr from from safe stacking site to loading site and its stacking properly
192Shifting of of Bush Rods and other allied Workshop material at an average distance upto 25 mtr for making space for other store material and its stacking Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56696370
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 10-08-2026
Authority
Authority Name Power Development Department
Work Description Tender for Fixing Of Rate Contract For Handling Of Various Material In Divisional Stores At Dharmound Of Electric Division Jpdcl Batote During The Year 2026-27 Or Till The Next Year Tender Is Finalized.
Basic Detail
Tender No eNIT 24 of 2026-27
Bidding Type Tender
Location
City Doda
State Jammu and Kashmir
Key Dates
Publish Date 28 Jul 2026
Submission Date 10 Aug 2026
Open Date 11 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee 1000
EMD 30000
Exemption Not Available
Document List
BOQ_1047449.xls
f70247e3-165f-428d-8c67-777a5558543b.html
SBDEnit24pdf.pdf
Tendernotice_1 (10).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 28, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 10, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 10 days
Aug 11, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 11 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_1047449.xls

html

f70247e3-165f-428d-8c67-777a5558543b.html

pdf

SBDEnit24pdf.pdf

pdf

Tendernotice_1 (10).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders