Tender For Fixing Of Rate Contract For Handling Of Various Material In Divisional Stores At Dharmound Of Electric Division Jpdcl Batote During The Year 2026-27 Or Till The Next Year Tender Is Finalized.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
10 Aug 2026
10 days left
EMD
30000
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Doda → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Fixing Of Rate Contract For Handling Of Various Material In Divisional Stores At Dharmound Of Electric Division Jpdcl Batote During The Year 2026-27 Or Till The Next Year Tender Is Finalized.
BOQ
| Sl. No. | Item Description |
| 1 | Rates for handling of various material in Divisional stores at Dharmound of Electric Division JPDCL Batote during the year 2026-27 or till the next year tender is finalized. |
| 2 | Unloading of PCC Poles 11 Mtr Long |
| 3 | Unloading of PCC Poles 9 Mtr Long |
| 4 | Unloading of PCC Poles 8 Mtr Long |
| 5 | Unloading of ST Poles 13 Mtr Long |
| 6 | Unloading of ST Poles 11Mtr Long |
| 7 | Unloading of ST Poles 9 Mtr Long |
| 8 | Unloading of ST Poles 8 Mtr Long |
| 9 | Loading of PCC Poles 11 Mtr Long |
| 10 | Loading of PCC Poles 9 Mtr Long |
| 11 | Loading of PCC Poles 8 Mtr Long |
| 12 | Loading of ST Poles 13 Mtr Long |
| 13 | Loading of ST Poles 11Mtr Long |
| 14 | Loading of ST Poles 9 Mtr Long |
| 15 | Loading of ST Poles 8 Mtr Long |
| 16 | Shifting/Dragging of PCC Pole 11 mtr long at an average distance upto 25 mtr for stacking to accessible place for loading/Unloading Purpose and its stacking |
| 17 | Shifting/Dragging of PCC Pole 9 mtr long at an average distance upto 25 mtr for stacking to accessible place for loading/Unloading Purpose and itsstacking |
| 18 | Shifting/Dragging of PCC Pole 8 mtr long at an average distance upto 25 mtr for stacking to accessible place for loading/Unloading Purpose and its stacking |
| 19 | Shifting/Dragging of ST Pole 13 mtr long at an average distance upto 25 mtr for stacking to accessible place for loading/Unloading Purpose and itsstacking |
| 20 | Shifting/Dragging of ST Pole 11 mtr long at an average distance upto 25 mtr for stacking to accessible place for loading/Unloading Purpose and its stacking |
| 21 | Shifting/Dragging of ST Pole 9 mtr long at an average distance upto 25 mtr forstacking to accessible place for loading/Unloading Purpose and its stacking |
| 22 | Shifting/Dragging of ST Pole 8 mtr long at an average distance upto 25 mtr for stacking to accessible place for loading/Unloading Purpose and its stacking |
| 23 | Unloading of ACSR Conductor Dog/Rabbit/Squirrel/Weasel (New) |
| 24 | Loading of ACSR Conductor Dog/Rabbit/Squirrel/Weasel (New) |
| 25 | Shifting of ACSR Conductor Dog/Rabbit/Squirrel/Weasel (New) from unloading site to safe stacking site at an average distance upto 25 mtr and its stacking |
| 26 | Shifting of ACSR Conductor Dog/Rabbit/Squirrel/Weasel (New) from safe stacking site to loading site at an average distance upto 25 mtr and its stacking |
| 27 | Shifting of ACSR Conductor Dog/Rabbit/Squirrel/Weasel (New) to other place for making space for other store material at an average distance upto 25 mtr and its stacking |
| 28 | Unreeling of the ACSR Conductor Dog/Rabbit/Squirrel/Weasel (New) |
| 29 | Cutting of the ACSR Conductor Dog/Rabbit/Squirrel/Weasel (New) and making bundles of conductor and stacking within 25 mtr |
| 30 | Unloading of old ACSR Conductor |
| 31 | Loading of old ACSR Conductor |
| 32 | Shifting of old ACSR Conductor from unloading site to safe stacking site at an average distance upto 25 mtr and its stacking |
| 33 | Shifting of old ACSR Conductor from safe stacking site to loading site at an average distance upto 25 mtr and its stacking |
| 34 | Shifting of Old ACSR Conductor to other place for making space for other store material at an average distance upto 25 mtr Mtr and its stacking |
| 35 | Making bundles of old loose ACSR Conductor and stacking within 25 mtr |
| 36 | Unloading of Channel/Angle/Flat/Round Iron (MS/GI) |
| 37 | Loading of Channel/Angle/Flat/Round Iron (MS/GI) |
| 38 | Shifting of Channel/Angle/Flat/Round (MS/GI) Iron at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 39 | Shifting of Channel/Angle/Flat/Round (MS/GI) Iron at an average distance upto 25 mtr from safe stacking site to loading site and its stacking properly |
| 40 | Shifting of Channel/Angle/Flat/Round Iron (MS/GI) at an average distance upto 25 mtr for making space for other store material and its stacking |
| 41 | Fabrication of Channel Cross Arms of sorts/Angle cross arms of sorts /Angle braces of sorts/Flat Iron Braces of sorts from Channel/Angle/Flat Iron (MS/GI) |
| 42 | Fabrication of Clamps of sorts from Flat Iron (MS/GI) |
| 43 | Fabrication of Guy Rods |
| 44 | Making of Holes for fabrication of Channel/Flat/Angles |
| 45 | Painting (Red oxide/Aluminium Paint) of Fabricated Material. |
| 46 | Unloading of Disc Insulator/Pin Insulator/Shackle Insulator/Bus Bar Insulator/Guy Insulator |
| 47 | Loading of Disc Insulator/Pin Insulator/Shackle Insulator/Bus Bar Insulator/Guy Insulator |
| 48 | Shifting of Disc Insulator/Pin Insulator/Shackle Insulator/Bus Bar Insulator/Guy Insulator at an average distance upto 25 mtr from unloading site to safe stacking site and its stacking properly |
| 49 | Shifting of Disc Insulator/Pin Insulator/Shackle Insulator/Bus Bar Insulator/Guy Insulator at an average distance upto 25 mtr from safe stacking site to loading site and its stacking properly |
| 50 | Shifting of Disc Insulator/Pin Insulator/Shackle Insulator/Bus Bar Insulator/Guy Insulator at an average distance upto 25 mtr for making space for other store material and its stacking |
| 51 | Unloading of Guy Rod/Earthing Rod/Earthing Pipe/Earthing Spike |
| 52 | Loading of Guy Rod/Earthing Rod/Earthing Pipe/Earthing Spike |
| 53 | Shifting of Guy Rod/Earthing Rod/Earthing Pipe/Earthing Spike at an average distance upto 25 mtr from unloading site to safe stacking site and its stacking properly |
| 54 | Shifting of Guy Rod/Earthing Rod/Earthing Pipe/Earthing Spike at an average distance upto 25 mtr from safe stacking site to loading site and its stacking properly |
| 55 | Shifting of Guy Rod/Earthing Rod/Earthing Pipe/Earthing Spike at an average distance upto 25 Mtr for making space for other store material and its stacking |
| 56 | Unloading of Al Thimbles of sizes |
| 57 | Loading of Al Thimbles of sizes |
| 58 | Shifting of Al Thimbles of sizes at an average distance upto 25 mtr from unloading site to safe stacking site and its stacking properly |
| 59 | Shifting of Al Thimbles of sizes at an average distance upto 25 mtr from safe stacking site to loading site and its stacking properly |
| 60 | Shifting of Al Thimbles of sizes at an average distance upto 25 mtr for making space for other store material and its stacking |
| 61 | Unloading of Nut & Bolts of sizes |
| 62 | Loading of Nut & Bolts of sizes |
| 63 | Shifting of Nut & Bolts of sizes at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 64 | Shifting of Nut & Bolts of sizes at an average distance upto 25 mtr from from safe stacking site to loading site and its stacking properly |
| 65 | Shifting of Nut & Bolts of sizes at an average distance upto 25 mtr for making space for other store material and its stacking |
| 66 | Unloading of allied material for HT/LT Line/Substations/workshop material (i.e. Al Busbar/GI/Guy wire/Cu/Al Wire /Bush rods etc) |
| 67 | Loading of allied material for HT/LT Line/Substations/workshop material (i.e. Al Busbar/GI/Guy wire/Cu/Al Wire /Bush rods etc) |
| 68 | Shifting of allied material for HT/LT Line/Substations/workshop material (i.e. Al Busbar/GI/Guy wire/Cu/Al Wire /Bush rods etc) at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 69 | Shifting of allied material for HT/LT Line/Substations/workshop material (i.e. Al Busbar/GI/Guy wire/Cu/Al Wire /Bush rods etc) at an average distance upto 25 mtr from stacking site and to loading site its stacking properly |
| 70 | Shifting of allied material for HT/LT Line/Substations/workshop material (i.e. Al Busbar/GI/Guy wire/Cu/Al Wire /Bush rods etc) at an average distance upto 25 mtr for making space for other store material and its stacking |
| 71 | Unloading of 11kV Link/Knife Set |
| 72 | Unloading of 11kV HG/DO Set |
| 73 | Unloading of 11kV LA Set |
| 74 | Unloading of 11kV GO Set |
| 75 | Loading of 11kV Link/Knife Set |
| 76 | Loading of 11kV HG/DO Set |
| 77 | Loading of 11kV LA Set |
| 78 | Loading of 11kV GO Set |
| 79 | Shifting of 11kV link/knife/hg/do/go/la set at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 80 | Shifting of 11kV link/knife/hg/do/go/la set at an average distance upto 25 mtr from from stacking site and its stacking properly |
| 81 | Shifting of 11kV link/knife/hg/do/go/la set at an average distance upto 25 mtr for making space for other store material and its stacking |
| 82 | Unloading/Loading of Bammboo Ladder/Aluminium Ladder |
| 83 | Shifting of Bamboo Ladder/Aluminium Ladder at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 84 | Shifting of Bamboo Ladder/Aluminium Ladder at an average distance upto 25 mtr for making space for other store material and its stacking |
| 85 | Unloading/Loading of Single/Three Phase Meter/Prodigy Meter |
| 86 | Carrigae of Single/Three Phase Meter/Prodigy Meter from unloading site to stacking site (Upto 25 mtr) |
| 87 | Carrigae of Single/Three Phase Meter/Prodigy Meter from stacking site to loading site (Upto 25 mtr) |
| 88 | Carrigae of Single/Three Phase Meter/Prodigy Meter from stacking site to loading site (Upto 25 mtr) |
| 89 | Stacking of Single/Three phase meters/Prodigy Meter at an average distance upto 25 mtr for making space for other store material and its stacking |
| 90 | Unloading of PVC Twin Core Cable 4/6/10/16 sq mm (Unarmored/Armored) |
| 91 | Loading of PVC Twin Core Cable 4/6/10/16 sq mm (Unarmored/Armored) |
| 92 | Shifting of PVC Twin Core Cable 4/6/10/16 sq mm (Unarmored/Armored) from unloading site to stacking site and stacking properly at an average distance upto 25 mtr |
| 93 | Shifting of PVC Twin Core Cable 4/6/10/16 sq mm (Unarmored/Armored) from stacking site to loading site and stacking properly at an average distance upto 25 mtr |
| 94 | Shifting of PVC Twin Core Cable 4/6/10/16 sq mm (Unarmored/Armored) for making space for other store material at an average distance upto 25 mtr |
| 95 | Unreeling of PVC Twin Core Cable 4/6/10/16 sq mm (Unarmored/Armored) |
| 96 | Cutting of the PVC Twin Core Cable 4/6/10/16 sq mm (Unarmored/Armored) measuring and making bundles and stacking within 25 mtr |
| 97 | Unloading of PVC Cable single core 95/120/150/185/240/300 sq mm |
| 98 | Loading of PVC Cable single core 95/120/150/185/240/300 sq mm |
| 99 | Shifting of PVC Cable single core 95/120/150/185/240/300 sq mm from unloading site to stacking site and stacking properly |
| 100 | Shifting of PVC Cable single core 95/120/150/185/240/300 sq mm from stacking site to loading site and stacking properly |
| 101 | Shifting of PVC Cable single core 95/120/150/185/240/300 sq mm for making space for other store material at an average distance upto 25 mtr |
| 102 | Unreeling of PVC Cable single core 95/120/150/185/240/300 sq mm |
| 103 | Cutting of the PVC Cable single core 95/120/150/185/240/300 sq mm measuring and making bundles and stacking within 25 mtr |
| 104 | Unloading of AB/XLPE 25/35/50/70/95/120/185 sq mm Cable for HT/LT Lines |
| 105 | Loading of AB/XLPE 25/35/50/70/95/120/185 sq mm Cable for HT/LT Lines |
| 106 | Shifting of AB/XLPE 25/35/50/70/95/120/185 sq mm Cable for HT/LT Lines fromunloading site to stacking site and stacking properly |
| 107 | Shifting of AB/XLPE 25/35/50/70/95/120/185 sq mm Cable for HT/LT Lines from stacking site loading site and stacking properly |
| 108 | Shifting of AB/XLPE 25/35/50/70/95/120/185 sq mm for making space for other store material at an average distance upto 25 mtr |
| 109 | Unreeling of AB/XLPE 25/35/50/70/95/120/185 sq mm Cable for HT/LT Lines |
| 110 | Cutting of the AB/XLPE 25/35/50/70/95/120/185 sq mm Cable for HT/LT Lines measuring and making bundles and stacking within 25 mtr |
| 111 | Unloading/Loading of Straight jointer kit/Heat shrinkable Kit forAB/XLPE cables of HT/LT Lines |
| 112 | Unloading of Cement Bags |
| 113 | Loading of Cement Bags |
| 114 | Carriage of Cement Bags from unloading site to stacking site (Upto 25 mtr) |
| 115 | Stacking of Cement bags |
| 116 | Unloading of Transformer oil |
| 117 | Loading of Transformer oil |
| 118 | Shifting ofTransformer oil at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 119 | Shifting of Transformer oil at an average distance upto 25 mtr from stacking site to unloading site and its stacking properly |
| 120 | Shifting of Transformer oil at an average distance upto 25 mtr for making space for other store material and its stacking |
| 121 | Unloading of T&P items |
| 122 | Loading of T&P items |
| 123 | Carriage of T&P items at an average distance upto 25 mtr for stacking to accessible place for loading/Unloading Purpose and its stacking |
| 124 | Unloading of 25 KVA Transformer |
| 125 | Unloading of 63 KVA Transformer |
| 126 | Unloading of 100 KVA Transformer |
| 127 | Unloading of 250 KVA Transformer |
| 128 | Unloading of 400 KVA Transformer |
| 129 | Unloading of 630 KVA Transformer |
| 130 | Loading of 25 KVA Transformer |
| 131 | Loading of 63 KVA Transformer |
| 132 | Loading of 100 KVA Transformer |
| 133 | Loading of 250 KVA Transformer |
| 134 | Loading of 400 KVA Transformer |
| 135 | Loading of 630 KVA Transformer |
| 136 | Dragging/Shifting of 25 KVA Transformer at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 137 | Dragging/Shifting of 63 KVA Transformer at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 138 | Dragging/Shifting of 100 KVA Transformer at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 139 | Dragging/Shifting of 250 KVA Transformer at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 140 | Dragging/Shifting of existing 400 KVA Transformer at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 141 | Dragging/Shifting of 630 KVA Transformer at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 142 | Dragging/Shifting of 25 KVA Transformer at an average distance upto 25 mtr from stacking site to loading site and its stacking properly |
| 143 | Dragging/Shifting of 63 KVA Transformer at an average distance upto 25 mtr from stacking site to loading site and its stacking properly |
| 144 | Dragging/Shifting of 100 KVA Transformer at an average distance upto 25 mtr from stacking site to loading site and its stacking properly |
| 145 | Dragging/Shifting of 250 KVA Transformer at an average distance upto 25 mtr from stacking site to loading site and its stacking properly |
| 146 | Dragging/Shifting of existing 400 KVA Transformer at an average distance upto 25 mtr from stacking site to loading site and its stacking properly |
| 147 | Dragging/Shifting of 630 KVA Transformer at an average distance upto 25 mtr from stacking site to loading site and its stacking properly |
| 148 | Dragging/Shifting of 25 KVA Transformer at an average distance upto 25 mtrfor making space for other store material and its stacking |
| 149 | Dragging/Shifting of 63 KVA Transformer at an average distance upto 25 mtrfor making space for other store material and its stacking |
| 150 | Dragging of 100 KVA Transformer at an average distance upto 25 mtr for making space for other store material and its stacking |
| 151 | Dragging of 250 KVA Transformer at an average distance upto 25 mtr for making space for other store material and its stacking |
| 152 | Dragging of 400KVA Transformer at an average distance upto 25 mtrfor making space for other store material and its stacking |
| 153 | Dragging of 630KVA Transformer at an average distance upto 25 mtr for making space for other store material and its stacking |
| 154 | Testing of Xmer (25/62/100/250/400/630) |
| 155 | Unloading of DG Set (up to 5kVA) |
| 156 | Loading of DG Set (up to 5kVA) |
| 157 | Dragging/Shifting of DG Set (up to 5kVA) at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 158 | Dragging/Shifting of DG Set (up to 5kVA) at an average distance upto 25 mtr from stacking site to loading site and its stacking properly |
| 159 | Dragging of DG Set (up to 5kVA) at an average distance upto 25 mtr for making space for other store material and its stacking |
| 160 | Unloading of DG Set (25kVA) |
| 161 | Loading of DG Set (25kVA) |
| 162 | Dragging/Shifting of DG Set (25kVA) at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 163 | Dragging/Shifting of DG Set (25kVA) at an average distance upto 25 mtr from stacking site to loading site and its stacking properly |
| 164 | Dragging of DG Set (25kVA) at an average distance upto 25 mtr for making space for other store material and its stacking |
| 165 | Unloading of CT/PT Unit |
| 166 | Loading of CT/PT Unit |
| 167 | Dragging of CT/PT Unit at an average distance upto 25 mtr fromunloading site to stacking site and its stacking properly |
| 168 | Dragging of CT/PT Unit at an average distance upto 25 mtr from stacking site to loading site and its stacking properly |
| 169 | Cutting of Green Vegetable Bushes , Wild Grass, trees in the store to avoid any mishappening of untoward incidents |
| 170 | Carriage of Green Vegetable Bushes , Wild Grass, trees after cutting and dumping away from store |
| 171 | Straightening of tilted fencing posts in the store premises for repair of fencing |
| 172 | Insertion of new fencing Posts in the store for repair of fencing |
| 173 | Dismantling of existing mesh fencing |
| 174 | Fixing of mesh Fencing |
| 175 | Fixing of CGI Sheets |
| 176 | Dismantling of CGI sheets |
| 177 | Lifting of Unserviceable items like, Damaged Transformers (Outer frame of DTs), Broken Insulators of sorts, Al/ Cu/ Scrap/ Bush rods of sorts, Empty Barrells, Broken CGI Sheets, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking |
| 178 | Checking & meggering of 11Kv LA set HG /DOset GO set CT/PT unit |
| 179 | Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators with fittings, Pin insulators with pins etc |
| 180 | Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc. |
| 181 | Meggering, tightening of nuts and bolts, oil seals, breathers checking,visual inspections of Transformers 25/63/100 KVA |
| 182 | Meggering, tightening of nuts and bolts, oil seals, breathers checking, visual inspections of Transformers 250/400/630KVA |
| 183 | Unloading of Cu/Al Wire |
| 184 | Loading of of Cu/Al Wire |
| 185 | Shifting of of Cu/Al Wire at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 186 | Shifting of of Cu/Al Wire at an average distance upto 25 mtr from from safe stacking site to loading site and its stacking properly |
| 187 | Shifting of of Cu/Al Wire at an average distance upto 25 mtr for making space for other store material and its stacking |
| 188 | loading of Bush Rods and other allied Workshop material |
| 189 | Unloading of Bush Rods and other allied workshop material |
| 190 | Shifting of of Bush Rods and other allied Workshop material at an average distance upto 25 mtr from unloading site to stacking site and its stacking properly |
| 191 | Shifting of of Bush Rods and other allied Workshop material at an average distance upto 25 mtr from from safe stacking site to loading site and its stacking properly |
| 192 | Shifting of of Bush Rods and other allied Workshop material at an average distance upto 25 mtr for making space for other store material and its stacking Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 28, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 10, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysAug 11, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender