Bids Are invited for Sitc Of Pcu
Tender Overview
Project Description
Bids Are invited for Sitc Of Pcu Supply Of Pcu-15Kva - Supply Of Pcu-15Kva- Manufacturing Testing Supply Installation And Commissioning Of 15Kva Power Conditioning Units As Per Attached Technical Specifications To The Retail Outlets As Advised By Engineer-In-Charge In Release Order. Warranty To Be Provided For 2 Years From Date Of Acceptance/Commissioning Of The Equipment Third Party Inspection Is In The Scope Of Vendor And The Selected Party To Dispatch The Materials Only After Completion And Submission Of Third-Party Inspection Report. , Supply Of Pcu-30Kva - Supply Of Pcu-30Kva- Manufacturing Testing Supply Installation And Commissioning Of 30Kva Power Conditioning Units As Per Attached Technical Specifications To The Retail Outlets As Advised By Engineer-In-Charge In Release Order. Warranty To Be Provided For 2 Years From Date Of Acceptance/Commissioning Of The Equipment. Third Party Inspection Is In The Scope Of Vendor And The Selected Party To Dispatch The Materials Only After Completion And Submission Of Third-Party Inspection Report , Camc Of Pcu-15 Kva 1St Year - 1.Camc Includes All Spares Of Pcu.2.Camc Shall Include Supply The Replacement Of All Defective Parts/Components. 3. Service Calls For Malfunction Of Pcu.4.Cost Of Labour And Travel Included 5.Complaints Attended By Trained Engineers 6. Payment Terms Half Yearly Basis On Submission Of Bills.7. Cleaning Of Equipment To Be Done 8. Check Svr Connections Input/Output/Dc/Control . 9. Check I/O Voltage. 10. Check/Replace Svr/Filter Cards Display Mcb Power Supply Fan Contactor.11. Submit Service Report. 12. Attend Breakdown Within 48Hrs. 13. Bidders To Quote Camc Charges For Complete Year. , Camc Of Pcu-15 Kva 2Nd Year - 1.Camc Includes All Spares Of Pcu.2.Camc Shall Include Supply The Replacement Of All Defective Parts/Components. 3. Service Calls For Malfunction Of Pcu.4.Cost Of Labour And Travel Included 5.Complaints Attended By Trained Engineers 6. Payment Terms Half Yearly Basis On Submission Of Bills.7. Cleaning Of Equipment To Be Done 8. Check Svr Connections Input/Output/Dc/Control . 9. Check I/O Voltage. 10. Check/Replace Svr/Filter Cards Display Mcb Power Supply Fan Contactor.11. Submit Service Report. 12. Attend Breakdown Within 48Hrs. 13. Bidders To Quote Camc Charges For Complete Year. , Camc Of Pcu-15 Kva 3Rd Year - 1.Camc Includes All Spares Of Pcu.2.Camc Shall Include Supply The Replacement Of All Defective Parts/Components. 3. Service Calls For Malfunction Of Pcu.4.Cost Of Labour And Travel Included 5.Complaints Attended By Trained Engineers 6. Payment Terms Half Yearly Basis On Submission Of Bills.7. Cleaning Of Equipment To Be Done 8. Check Svr Connections Input/Output/Dc/Control . 9. Check I/O Voltage. 10. Check/Replace Svr/Filter Cards Display Mcb Power Supply Fan Contactor.11. Submit Service Report. 12. Attend Breakdown Within 48Hrs. 13. Bidders To Quote Camc Charges For Complete Year. , Camc Of Pcu-30 Kva 1St Year - 1.Camc Includes All Spares Of Pcu.2.Camc Shall Include Supply The Replacement Of All Defective Parts/Components. 3. Service Calls For Malfunction Of Pcu.4.Cost Of Labour And Travel Included 5.Complaints Attended By Trained Engineers 6. Payment Terms Half Yearly Basis On Submission Of Bills.7. Cleaning Of Equipment To Be Done 8. Check Svr Connections Input/Output/Dc/Control . 9. Check I/O Voltage. 10. Check/Replace Svr/Filter Cards Display Mcb Power Supply Fan Contactor.11. Submit Service Report. 12. Attend Breakdown Within 48Hrs. 13. Bidders To Quote Camc Charges For Complete Year. , Camc Of Pcu-30 Kva 2Nd Year - 1.Camc Includes All Spares Of Pcu.2.Camc Shall Include Supply The Replacement Of All Defective Parts/Components. 3. Service Calls For Malfunction Of Pcu.4.Cost Of Labour And Travel Included 5.Complaints Attended By Trained Engineers 6. Payment Terms Half Yearly Basis On Submission Of Bills.7. Cleaning Of Equipment To Be Done 8. Check Svr Connections Input/Output/Dc/Control . 9. Check I/O Voltage. 10. Check/Replace Svr/Filter Cards Display Mcb Power Supply Fan Contactor.11. Submit Service Report. 12. Attend Breakdown Within 48Hrs. 13. Bidders To Quote Camc Charges For Complete Year. , Camc Of Pcu-30 Kva 3Rd Year - 1.Camc Includes All Spares Of Pcu.2.Camc Shall Include Supply The Replacement Of All Defective Parts/Components. 3. Service Calls For Malfunction Of Pcu.4.Cost Of Labour And Travel Included 5.Complaints Attended By Trained Engineers 6. Payment Terms Half Yearly Basis On Submission Of Bills.7. Cleaning Of Equipment To Be Done 8. Check Svr Connections Input/Output/Dc/Control . 9. Check I/O Voltage. 10. Check/Replace Svr/Filter Cards Display Mcb Power Supply Fan Contactor.11. Submit Service Report. 12. Attend Breakdown Within 48Hrs. 13. Bidders To Quote Camc Charges For Complete Year.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | SUPPLY OF PCU-15KVA | SUPPLY OF PCU-15KVA- Manufacturing Testing Supply Installation and commissioning of 15KVA power conditioning units as per attached technical specifications to the retail outlets as advised by Engineer-in-Charge in release order. Warranty to be provided for 2 years from date of acceptance/commissioning of the equipment Third party inspection is in the scope of vendor and the selected party to dispatch the materials only after completion and submission of third-party inspection report. |
| 2 | SUPPLY OF PCU-30KVA | SUPPLY OF PCU-30KVA- Manufacturing Testing Supply Installation and commissioning of 30KVA power conditioning units as per attached technical specifications to the retail outlets as advised by Engineer-in-Charge in release order. Warranty to be provided for 2 years from date of acceptance/commissioning of the equipment. Third party inspection is in the scope of vendor and the selected party to dispatch the materials only after completion and submission of third-party inspection report |
| 3 | CAMC OF PCU-15 KVA 1St year | 1.CAMC includes all spares of PCU.2.CAMC shall include supply the replacement of all defective parts/components. 3. Service calls for malfunction of PCU.4.Cost of Labour and travel included 5.Complaints attended by Trained Engineers 6. Payment Terms Half yearly basis on submission of bills.7. Cleaning of Equipment to be done 8. Check SVR connections Input/Output/DC/Control . 9. Check I/O Voltage. 10. Check/replace SVR/Filter Cards Display MCB Power Supply Fan Contactor.11. Submit service report. 12. Attend breakdown within 48hrs. 13. Bidders to quote CAMC charges for complete year. |
| 4 | CAMC OF PCU-15 KVA 2nd Year | 1.CAMC includes all spares of PCU.2.CAMC shall include supply the replacement of all defective parts/components. 3. Service calls for malfunction of PCU.4.Cost of Labour and travel included 5.Complaints attended by Trained Engineers 6. Payment Terms Half yearly basis on submission of bills.7. Cleaning of Equipment to be done 8. Check SVR connections Input/Output/DC/Control . 9. Check I/O Voltage. 10. Check/replace SVR/Filter Cards Display MCB Power Supply Fan Contactor.11. Submit service report. 12. Attend breakdown within 48hrs. 13. Bidders to quote CAMC charges for complete year. |
| 5 | CAMC OF PCU-15 KVA 3rd Year | 1.CAMC includes all spares of PCU.2.CAMC shall include supply the replacement of all defective parts/components. 3. Service calls for malfunction of PCU.4.Cost of Labour and travel included 5.Complaints attended by Trained Engineers 6. Payment Terms Half yearly basis on submission of bills.7. Cleaning of Equipment to be done 8. Check SVR connections Input/Output/DC/Control . 9. Check I/O Voltage. 10. Check/replace SVR/Filter Cards Display MCB Power Supply Fan Contactor.11. Submit service report. 12. Attend breakdown within 48hrs. 13. Bidders to quote CAMC charges for complete year. |
| 6 | CAMC OF PCU-30 KVA 1St year | 1.CAMC includes all spares of PCU.2.CAMC shall include supply the replacement of all defective parts/components. 3. Service calls for malfunction of PCU.4.Cost of Labour and travel included 5.Complaints attended by Trained Engineers 6. Payment Terms Half yearly basis on submission of bills.7. Cleaning of Equipment to be done 8. Check SVR connections Input/Output/DC/Control . 9. Check I/O Voltage. 10. Check/replace SVR/Filter Cards Display MCB Power Supply Fan Contactor.11. Submit service report. 12. Attend breakdown within 48hrs. 13. Bidders to quote CAMC charges for complete year. |
| 7 | CAMC OF PCU-30 KVA 2nd Year | 1.CAMC includes all spares of PCU.2.CAMC shall include supply the replacement of all defective parts/components. 3. Service calls for malfunction of PCU.4.Cost of Labour and travel included 5.Complaints attended by Trained Engineers 6. Payment Terms Half yearly basis on submission of bills.7. Cleaning of Equipment to be done 8. Check SVR connections Input/Output/DC/Control . 9. Check I/O Voltage. 10. Check/replace SVR/Filter Cards Display MCB Power Supply Fan Contactor.11. Submit service report. 12. Attend breakdown within 48hrs. 13. Bidders to quote CAMC charges for complete year. |
| 8 | CAMC OF PCU-30 KVA 3rd Year | 1.CAMC includes all spares of PCU.2.CAMC shall include supply the replacement of all defective parts/components. 3. Service calls for malfunction of PCU.4.Cost of Labour and travel included 5.Complaints attended by Trained Engineers 6. Payment Terms Half yearly basis on submission of bills.7. Cleaning of Equipment to be done 8. Check SVR connections Input/Output/DC/Control . 9. Check I/O Voltage. 10. Check/replace SVR/Filter Cards Display MCB Power Supply Fan Contactor.11. Submit service report. 12. Attend breakdown within 48hrs. 13. Bidders to quote CAMC charges for complete year. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender