Defence Statutory Bodies & Commissions/Committees Closing in 19 days TDR #56695460

Tender For Repair To Certain Wooden Furniture Including Polishing At Babina Cantt Under Ge Babina.

Issued by Statutory Bodies & Commissions/Committees · Jhansi, Uttar Pradesh
Tender Value
50 Lakhs
Estimated cost
Bid Submission
17 Aug 2026
19 days left
EMD
1 Lakhs
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Jhansi → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For Repair To Certain Wooden Furniture Including Polishing At Babina Cantt Under Ge Babina.- 1 Table 3’X2’ With / Without Drawer: Dismantling And Removing The Following Existing Unserviceable Components Of Table 3X2 With/Without Drawer And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No.(Fd-231, Fd-224, Fd-234, Fd-283 & Fd-284) 2 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 3 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 4 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 5 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 6 Supply And Fixing In Replacement Of Old Unserviceable Table Long Stiffener, Including Dismantling And Removal Of The Damaged/Defective Long Stiffener. The New Long Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 7 Supply And Fixing In Replacement Of Old Unserviceable Table Short Stiffener, Including Dismantling And Removal Of The Damaged/Defective Short Stiffener. The New Short Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 8 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Table, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 18 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete. Irrespective Of What Ever Is Shown On Drawing All As Specified And As Directed.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 9 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 75 Mm × 30 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed 10 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 11 Table Writing: Dismantling And Removing The Following Existing Unserviceable Components Of Table Writing And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No.( Fd- 33, Fd-249, Fd-275) 12 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 13 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 14 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 15 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 16 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 17 Supply And Fixing In Replacement Of Old Unserviceable Table Bottom Rail, Including Dismantling And Removal Of The Damaged/Defective Bottom Rail. The New Bottom Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 18 Supply And Fixing In Replacement Of The Old, Unserviceable Cabinet (Complete), Including Dismantling And Removal Of The Damaged/Defective Cabinet (Complete). The New Cabinet (Complete) Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Cabinet Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw, 04 Lever Lock With Duplicate Keys Of Make Godrej/Link/Harrison (As Approved) & Magnetic Cather All As Directed.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 19 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Table, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 18 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 20 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 75 Mm × 30 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed 21 Supply And Fixing In Replacement Of Old Unserviceable Lock, Including Dismantling And Removal Of The Damaged/Defective Lock. The New Lock Shall Be, With Duplicate Keys Of Make Godrej/Link/Harrison (As Approved), And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 22 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 23 Table 900X900X760Mm: Dismantling And Removing The Following Existing Unserviceable Components Of Table 900X900X760Mm And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No. (Fd- 88,Fd- 291) 24 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 25 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 26 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 27 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 28 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 29 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 75 Mm × 30 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed 30 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 31 Table Dining 4 Pers: Dismantling And Removing The Following Existing Unserviceable Components Of Table Dining 4 Pers And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No. (Fd/Map-Ii/03) 32 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 33 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 34 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 35 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 36 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 37 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 150 Mm × 30 Mm × 5 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed. 38 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 39 Table Dining 6 Pers: Dismantling And Removing The Following Existing Unserviceable Components Of Table Dining 6 Pers And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No. (Fd -30, Fd-239, Fd-273, Db-1108 & Fd/Map-Ii/03) 40 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 41 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 42 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 43 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 44 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 45 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 150 Mm × 30 Mm × 5 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed 46 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 47 Table Dining 8 Pers: Dismantling And Removing The Following Existing Unserviceable Components Of Table Dining 8 Pers And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No.(Fd-376) 48 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 49 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 50 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 51 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 52 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 53 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 150 Mm × 30 Mm × 5 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed 54 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 55 Table Bed Side: Dismantling And Removing The Following Existing Unserviceable Components Of Table Bed Side And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge.Drg No.(Fd-276, Fd-210 & Fd-248) 56 Supply And Fixing In Replacement Of The Old Unserviceable Table Bed Side Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 57 Supply And Fixing In Replacement Of The Old Unserviceable Table Bed Side Sides, Including Dismantling And Removal Of The Damaged/Defective Sides. The New Side Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 58 Supply And Fixing In Replacement Of The Old Unserviceable Table Bed Side Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 59 Supply And Fixing In Replacement Of The Old Unserviceable Table Bed Side Shelf, Including Dismantling And Removal Of The Damaged/Defective Shelf. The New Shelf Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 60 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 61 Table Centre: Dismantling And Removing The Following Existing Unserviceable Components Of Table Centre And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge.Drg No.(Fd-235, Fd-274 & Fd-384) 62 Supply And Fixing In Replacement Of The Old Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 63 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 64 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 65 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 66 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 67 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New Cleat Shall Be Of Size: 50 Mm × 30 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed. 68 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 69 Table Dressing Gents: Dismantling And Removing The Following Existing Unserviceable Components Of Table Dressing Gents And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No. (Fd-230 & Fd-379) 70 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Table Dressing Gents, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 10 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 71 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Gents Mirror With Frame, Including Dismantling And Removal Of The Damaged/Defective Mirror. The New Mirror Shall Be Make Of Modiguard/Atul/Saint-Gobain Of Thickness 5.5 Mm Nominal Float Glass Mirror (Silvered Reflective Coating With Copper And Protective Backing Paint), Edges Shall Be Machine-Cut, Polished Or Beveled Edges. The Back Of Mirror Shall Be Covered With 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Mirror Frame Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 72 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Gents Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 73 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Gents Bottom, Including Dismantling And Removal Of The Damaged/Defective Bottom. The New Bottom Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 74 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Gents Sides, Including Dismantling And Removal Of The Damaged/Defective Side. The New Side Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 75 Table Dressing Ladies : Dismantling And Removing The Following Existing Unserviceable Components Of Table Dressing Ladies And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge.Drg No.( Fd-251, Fd-265 & Fd-378) 76 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 77 Supply And Fixing In Replacement Of Old Unserviceable Sliding Glass With Aluminium Channel And All As Shown On Drawing And As Directed.Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Sliding Glass With Aluminium Channel, Including Dismantling And Removal Of The Damaged/Defective Glass And Channel. The New Mirror Shall Be Make Of Modiguard/Atul/Saint-Gobain Of Thickness 5 Mm Nominal Clear Float Glass / Toughened Glass, Edges Shall Be Machine-Cut, Polished Or Beveled Edges With Nylon/Steel Ball-Bearing Rollers For Smooth Operation And Flush Handles.The New Aluminium Channel Shall Be Double Track Sliding System, Aluminium Alloy Grade, As Per Design And Functional Requirement, Powder-Coated/Anodized In Approved Colour (Natural/Black/Bronze/As Approved) Make Of Jindal / Hindalco / Bhoruka Or Equivalent Approved Make. This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 78 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge 79 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Mirror With Frame, Including Dismantling And Removal Of The Damaged/Defective Mirror. The New Mirror Shall Be Make Of Modiguard/Atul/Saint-Gobain Of Thickness 5.5 Mm Nominal Float Glass Mirror (Silvered Reflective Coating With Copper And Protective Backing Paint), Edges Shall Be Machine-Cut, Polished Or Beveled Edges. The Back Of Mirror Shall Be Covered With 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Mirror Frame Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 80 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Table Dressing Ladies, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 10 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 81 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Bottom, Including Dismantling And Removal Of The Damaged/Defective Bottom. The New Bottom Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 82 Supply And Fixing In Replacement Of Old Unserviceable Table Dressing Ladies Bottom Frame Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 83 Supply And Fixing In Replacement Of Old Unserviceable Table Dressing Ladies Bottom Frame, Including Dismantling And Removal Of The Damaged/Defective Frame. The New Frame Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 84 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 85 Peg Table Drg No.(Fd-277, Fd-236, Fd-266 & Fd-384): Dismantling And Removing The Following Existing Unserviceable Components Of Peg Table And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 86 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 87 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge 88 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 89 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 90 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 91 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 50 Mm × 30 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed 92 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 93 Teapoy: Dismantling And Removing The Following Existing Unserviceable Components Of Teapoy And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No.(Fd-278 & Fd-382) 94 Supply And Fixing In Replacement Of The Old, Unserviceable Teapoy Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 95 Supply And Fixing In Replacement Of Old Unserviceable Teapoy Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 96 Supply And Fixing In Replacement Of Old Unserviceable Teapoy Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 97 Supply And Fixing In Replacement Of Old Unserviceable Teapoy Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 98 Supply And Fixing In Replacement Of Old Unserviceable Teapoy Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 99 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 50 Mm × 30 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed 100 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 101 Table Dressing Ladies With Stool Cushioned : Dismantling And Removing The Following Existing Unserviceable Components Of Table Dressing Ladies With Stool Cushioned And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No. (Fd/Map-Ii/07) 102 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Mirror With Frame, Including Dismantling And Removal Of The Damaged/Defective Mirror. The New Mirror Shall Be Make Of Modiguard/Atul/Saint-Gobain Of Thickness 5.5 Mm Nominal Float Glass Mirror (Silvered Reflective Coating With Copper And Protective Backing Paint), Edges Shall Be Machine-Cut, Polished Or Beveled Edges. The Back Of Mirror Shall Be Covered With 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Mirror Frame Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 103 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 104 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Sides, Including Dismantling And Removal Of The Damaged/Defective Side. The New Side Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 105 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 106 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Table Dressing Ladies, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 10 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 107 Supply And Fixing In Replacement Of The Old, Unserviceable Dressing Stool, Including Dismantling And Removal Of The Damaged/Defective Stool. The New Stool Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Bottom Of The Stool Shall Be Fabricated From 18Mm Thick, Bwr Ply Of Grade -A, Conforming To Is: 303 With 04 (Nos) X Swivel Castor As Approved.Make Of Plywood: Archid/ Greenply /Century Or Equivalent As Approved. 108 Supply And Fixing In Replacement Of Old, Unserviceable Drawer Channel, Including Dismantling And Removal Of The Damaged/Defective Channel. The New Drawer Channel Shall Be Of 12 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco With Screw As Approved Shall Be Provided And All As Shown On Drawing And As Directed. 109 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Bottom, Including Dismantling And Removal Of The Damaged/Defective Bottom. The New Bottom Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 110 Supply And Fixing In Replacement Of Old, Unserviceable Knob/Handles, Including Dismantling And Removal Of The Damaged/Defective Knob/Handles. The New Knob (As Per Sample)/Handles 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw As Approved Shall Be Provided And All As Shown On Drawing And As Directed. 111 Supply And Fixing In Replacement Of Old, Unserviceable Cushion Seat, Including Dismantling And Removal Of The Damaged/Defective Cushion Seat. The New Cushion Seat Shall Be Made Of 75 Mm Thick, 40 Density Cushion (Make:Sleepwell/Kurlon) With Hot Pressed 12Mm Bwr Plywood Seat Covered With Superior Quality (Make: Bombay Dying/DDecor/Raymond) Tapestry Cloth Or Premium Leatherette (As Approved, Cost Of Tapestry Cloth Shall Not Be Less Than Rs 350.00 Per Meter) Complete All As Specified In Drawing And Directed. 112 Supply And Fixing In Replacement Of Old Unserviceable Swivel Castor As Approved Shall Be Provided And All As Shown On Drawing And As Directed. 113 Table Office Clerk Drg O. (Db- 4121/292): Dismantling And Removing The Following Existing Unserviceable Components Of Table Office Clerk And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 114 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 115 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Table Office Clerk, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 18 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 116 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 117 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 118 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 119 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 120 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 121 Table Office Officer : Dismantling And Removing The Following Existing Unserviceable Components Of Table Office Officer And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No. (Wdf- 32/Fd- 139) 122 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 123 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Table Office Officer, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 18 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete. This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 124 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 125 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 126 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 127 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 128 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 129 Form W/O Back: Dismantling And Removing The Following Existing Unserviceable Components Of Form Without Back And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge.Drg No.( F-73) 130 Supply And Fixing In Replacement Of Old Unserviceable Seat, Including Dismantling And Removal Of The Damaged/Defective Seat. The New Seat Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 131 Form With Back : Dismantling And Removing The Following Existing Unserviceable Components Of Form With Back And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No. (Fd-78(M)) 132 Supply And Fixing In Replacement Of Old Unserviceable Seat, Including Dismantling And Removal Of The Damaged/Defective Seat. The New Seat Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 133 Supply And Fixing In Replacement Of Old Unserviceable Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 134 Chair Dining With Long Back Drg No.( Fd-357): Dismantling And Removing The Following Existing Unserviceable Components Of Chair Dining With Long Back And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 135 Supply And Fixing In Replacement Of Old Unserviceable Seat & Back Of Chair Dining, Including Dismantling And Removal Of The Damaged/Defective Seat & Back. The New Seat & Back Shall Be Made From 75 Mm Thick, 40 Density Cushion (Make:Sleepwell/Kurlon) With Hot Pressed 12Mm Bwr Plywood Seat Covered With Superior Quality (Make: Bombay Dying/ DDecor/ Raymond) Tapestry Cloth Or Premium Leatherette (As Approved, Cost Of Tapestry Cloth Shall Not Be Less Than Rs 350.00 Per Meter) Complete All As Specified In Drawing And Directed. 136 Supply And Fixing In Replacement Of Old Unserviceable Rear/Front Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 137 Supply And Fixing In Replacement Of Old Unserviceable Side Rail, Including Dismantling And Removal Of The Damaged/Defective Side Rail. The New Side Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 138 Supply And Fixing In Replacement Of Old Unserviceable Front Rail, Including Dismantling And Removal Of The Damaged/Defective Front Rail. The New Front Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 139 Supply And Fixing In Replacement Of Old Unserviceable Side Stiffeners, Including Dismantling And Removal Of The Damaged/Defective Side Stiffener. The New Side Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 140 Supply And Fixing In Replacement Of Old Unserviceable Centre Stiffeners, Including Dismantling And Removal Of The Damaged/Defective Centre Stiffener. The New Centre Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 141 Supply And Fixing In Replacement Of Old Unserviceable Back Rest Batten, Including Dismantling And Removal Of The Damaged/Defective Back Rest Batten. The New Back Rest Batten Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 142 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 143 Chair Dining Drg No. (Fd-16, Fd-203, Fd-279, Fd-228): Dismantling And Removing The Following Existing Unserviceable Components Of Chair Dining And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 144 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 145 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 146 Supply And Fixing In Replacement Of Old Unserviceable Front Rail, Including Dismantling And Removal Of The Damaged/Defective Front Rail. The New Front Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 147 Supply And Fixing In Replacement Of Old Unserviceable Back Rail, Including Dismantling And Removal Of The Damaged/Defective Back Rail. The New Back Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 148 Supply And Fixing In Replacement Of Old Unserviceable Side Rail, Including Dismantling And Removal Of The Damaged/Defective Side Rail. The New Side Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 149 Supply And Fixing In Replacement Of Old Unserviceable Back Rest, Including Dismantling And Removal Of The Damaged/Defective Back Rest. The New Back Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 150 Supply And Fixing In Replacement Of Old Unserviceable Stiffeners, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 151 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 152 Material & Labour For Complete Removal Of Unserviceable Or Worn-Out Plastic Cane From Dining Chair. Complete Preparation Of The Surface Including: (A) Filling Of Cracks With Wood Filler, If Any, (B) Tightening Of The Wooden Frame Using Fevicol Or Equivalent Adhesive & (C) Fixing With Wooden Nails Where Necessary.Recaning Of The Chair Using New White Plastic Cane Type I (Virgin Hdpe) Only And Shall Not Be Recycled Type With Cane Size 2Mm Wide With A Border Of 4Mm Wide, 0.4Mm/0.6Mm Thick Respectively Half Round Oval Shape, In Godrej Pattern. All Caning To Be Neatly Woven, All Edges Trimmed, Joints Tight, And Beading Securely Fastened, Complete All As Specified And Directed 153 Chair Easy Drg No. (Fd-17, Fd-229, Fd-201): Dismantling And Removing The Following Existing Unserviceable Components Of Chair Easy And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 154 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 155 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 156 Supply And Fixing In Replacement Of Old Unserviceable Front Rail, Including Dismantling And Removal Of The Damaged/Defective Front Rail. The New Front Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 157 Supply And Fixing In Replacement Of Old Unserviceable Back Rail, Including Dismantling And Removal Of The Damaged/Defective Back Rail. The New Back Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 158 Supply And Fixing In Replacement Of Old Unserviceable Side Rail, Including Dismantling And Removal Of The Damaged/Defective Side Rail. The New Side Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 159 Supply And Fixing In Replacement Of Old Unserviceable Arms Rest, Including Dismantling And Removal Of The Damaged/Defective Arms Rest. The New Arms Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 160 Supply And Fixing In Replacement Of Old Unserviceable Back Frame Rail For Back, Including Dismantling And Removal Of The Damaged/Defective Back Frame Rail For Back. The New Back Frame Rail For Back Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 161 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 162 Material & Labour For Complete Removal Of Unserviceable Or Worn-Out Plastic Cane From Easy Chair. Complete Preparation Of The Surface Including: (A) Filling Of Cracks With Wood Filler, If Any, (B) Tightening Of The Wooden Frame Using Fevicol Or Equivalent Adhesive & (C) Fixing With Wooden Nails Where Necessary.Recaning Of The Chair Using New White Plastic Cane Type I (Virgin Hdpe) Only And Shall Not Be Recycled Type With Cane Size 2Mm Wide With A Border Of 4Mm Wide, 0.4Mm/0.6Mm Thick Respectively Half Round Oval Shape, In Godrej Pattern. All Caning To Be Neatly Woven, All Edges Trimmed, Joints Tight, And Beading Securely Fastened, Complete All As Specified And Directed 163 Chair Writing Fd-20, Fd-202, Fd-250, Fd-280: Dismantling And Removing The Following Existing Unserviceable Components Of Chair Writing And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 164 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 165 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 166 Supply And Fixing In Replacement Of Old Unserviceable Front Rail, Including Dismantling And Removal Of The Damaged/Defective Front Rail. The New Front Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 167 Supply And Fixing In Replacement Of Old Unserviceable Side/Back Rail, Including Dismantling And Removal Of The Damaged/Defective Side/Back Rail. The New Side/Back Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 168 Supply And Fixing In Replacement Of Old Unserviceable Back Rest, Including Dismantling And Removal Of The Damaged/Defective Back Rest. The New Back Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 169 Supply And Fixing In Replacement Of Old Unserviceable Bottom Stiffener, Including Dismantling And Removal Of The Damaged/Defective Bottom Stiffener. The New Bottom Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 170 Supply And Fixing In Replacement Of Old Unserviceable Bottom Centre Stiffener, Including Dismantling And Removal Of The Damaged/Defective Bottom Centre Stiffener. The New Bottom Centre Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 171 Supply And Fixing In Replacement Of Old Unserviceable Arms Rest, Including Dismantling And Removal Of The Damaged/Defective Arms Rest. The New Arms Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 172 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 173 Material & Labour For Complete Removal Of Unserviceable Or Worn-Out Plastic Cane From Writing Chair. Complete Preparation Of The Surface Including: (A) Filling Of Cracks With Wood Filler, If Any, (B) Tightening Of The Wooden Frame Using Fevicol Or Equivalent Adhesive & (C) Fixing With Wooden Nails Where Necessary.Recaning Of The Chair Using New White Plastic Cane Type I (Virgin Hdpe) Only And Shall Not Be Recycled Type With Cane Size 2Mm Wide With A Border Of 4Mm Wide, 0.4Mm/0.6Mm Thick Respectively Half Round Oval Shape, In Godrej Pattern. All Caning To Be Neatly Woven, All Edges Trimmed, Joints Tight, And Beading Securely Fastened, Complete All As Specified And Directed 174 Chair Dining Jcos/Or Fd/E6/Map-Ii/05 : Dismantling And Removing The Following Existing Unserviceable Components Of Chair Dining Jcos/Or And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 175 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 176 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 177 Supply And Fixing In Replacement Of Old Unserviceable Front Rail, Including Dismantling And Removal Of The Damaged/Defective Front Rail. The New Front Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 178 Supply And Fixing In Replacement Of Old Unserviceable Back Rail, Including Dismantling And Removal Of The Damaged/Defective Back Rail. The New Back Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 179 Supply And Fixing In Replacement Of Old Unserviceable Side Rail, Including Dismantling And Removal Of The Damaged/Defective Side Rail. The New Side Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 180 Supply And Fixing In Replacement Of Old Unserviceable Back Rest, Including Dismantling And Removal Of The Damaged/Defective Back Rest. The New Back Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 181 Supply And Fixing In Replacement Of Old Unserviceable Stiffeners, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 182 Supply And Fixing In Replacement Of Old Unserviceable Pvc Seat, Including Dismantling And Removal Of The Damaged/Defective Seat. The New Seat Shall Be Fabricated Of 4Mm Thick Pvc Of Size 405X390Mm (Make Amko/Cello/Milton Or Equivalent As Approved) With Holes & 4 X 10Mm Thick Ribs Moulded Alongwith Sheet In Single Piece, Place And Fix With 20Mm Long Screw Wood Steel And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 183 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 184 Chair Dining Officers (Fd/E6/Map-Ii/04) : Dismantling And Removing The Following Existing Unserviceable Components Of Chair Dining Officers And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 185 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 186 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 187 Supply And Fixing In Replacement Of Old Unserviceable Front Rail, Including Dismantling And Removal Of The Damaged/Defective Front Rail. The New Front Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 188 Supply And Fixing In Replacement Of Old Unserviceable Back Rail, Including Dismantling And Removal Of The Damaged/Defective Back Rail. The New Back Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 189 Supply And Fixing In Replacement Of Old Unserviceable Side Rail, Including Dismantling And Removal Of The Damaged/Defective Side Rail. The New Side Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 190 Supply And Fixing In Replacement Of Old Unserviceable Back Rest With Strips, Including Dismantling And Removal Of The Damaged/Defective Back Rest With Strips. The New Back Rest With Strips Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 191 Supply And Fixing In Replacement Of Old Unserviceable Stiffeners, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 192 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 193 Supply And Fixing In Replacement Of Old Unserviceable Seat Of Chair Dining Officers, Including Dismantling And Removal Of The Damaged/Defective Seat. The New Seat Shall Be Made From 75 Mm Thick, 40 Density Cushion (Make:Sleepwell/Kurlon) With Hot Pressed 12Mm Bwr Plywood Seat Covered With Superior Quality (Make: Bombay Dying/DDecor/Raymond) Tapestry Cloth Or Premium Leatherette (As Approved, Cost Of Tapestry Cloth Shall Not Be Less Than Rs 350.00 Per Meter) And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 194 Bed With Plywood Top Fd-246, Fd-247: Dismantling And Removing The Following Existing Unserviceable Components Of Bed With Plywod Top And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 195 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of Bed, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Seat Shall Be Made Of 12Mm Thick Bwr Ply Of Grade -A; Place And Fix Over The Three Equidistant Stiffener And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Make Of Plywood: Archid/Greenply/Century Or Equivalent As Approved 196 Supply And Fixing Of New Wooden Head Rests In Replacement Of Old, Unserviceable, Or Worn-Out Head Rest. Including Dismantling And Safe Removal Of The Existing Damaged Or Defective Head Rests, Followed By Installation Of New Head Rests As Per The Specifications Detailed Here As Below:-Wood Type: Seasoned Teak Wood, Free From Cracks, Knots, Or Any Other Visible Defects.Vertical Component Dimensions: 75Mm X 22Mm X 460Mm.Horizontal Component Dimensions: 30Mm X 60Mm X 900Mm (With Integrated Leg Connection).Legs: Upper Leg Section: 60Mm X 60Mm In Cross-Section. Over All Leg Length From Bottom: 660Mm. Bottom Section Of Leg: 30Mm X 30Mm In Cross-Section.Both Sides Shall Be Covered From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. All Components Shall Be Neatly Jointed And Securely Fixed, Ensuring No Sharp Edges, Splinters, Or Loose Connections. Fixing Shall Be Carried Out Using Ss Screws And Wood Adhesive Of Approved Make, And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings. This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 197 Supply And Fixing Of New Wooden Foot Rests In Replacement Of Old, Unserviceable, Or Worn-Out Foot Rest. Including Dismantling And Safe Removal Of The Existing Damaged Or Defective Foot Rests, Followed By Installation Of New Foot Rests As Per The Specifications Detailed Here As Belowwood Type: Seasoned Teak Wood, Free From Cracks, Knots, Or Any Other Visible Defects.Three (3) Nos. Battens Of Size 22Mm X 75Mm X 300Mm, Spaced Equally. Battens Shall Be Securely Joined Between The Top And Bottom Horizontal Rails Of The Footboard. Top And Bottom Horizontal Rails Shall Be Of 30Mm X 60Mm X 900 Mm Sectionlegs: Upper Leg Section: 60Mm X 60Mm In Cross-Section. Over All Leg Length From Bottom: 500Mm. Bottom Section Of Leg: 30Mm X 30Mm In Cross-Section.Both Sides Shall Be Covered From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. All Components Shall Be Neatly Jointed And Securely Fixed, Ensuring No Sharp Edges, Splinters, Or Loose Connections. Fixing Shall Be Carried Out Using Ss Screws And Wood Adhesive Of Approved Make, And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings. This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 198 Supply And Fixing In Replacement Of Old Unserviceable Stiffeners, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 199 Supply And Fixing In Replacement Of Old Unserviceable Side Plywood Of Head Rest, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Sides Shall Be Made From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 200 Supply And Fixing In Replacement Of Old Unserviceable Side Plywood Of Foot Rest, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Sides Shall Be Made From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 201 Supply And Fixing In Replacement Of Old Unserviceable Flat Iron Size 150X35X5Mm Made To Shape As Per Drg To Be Fixed With 6 Nos Of Screw Wood Steel 35Mm Long Isi Marked Duly Painted With Paint Synthetic Enamel Black Over A Coat Of Primer Of Each Corners Of Bed Hard/ Bed Plywood Top All As Specified On Drawing Or As Directed By Engineer-In-Charge. 202 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 203 Side Board Fd-241 & 1112 : Dismantling And Removing The Following Existing Unserviceable Components Of Side Board And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 204 Supply And Fixing In Replacement Of The Old, Unserviceable Side Board Sides, Including Dismantling And Removal Of The Damaged/Defective Side. The New Side Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 205 Supply And Fixing In Replacement Of The Old, Unserviceable Side Board Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 206 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Side Board, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 18 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 207 Supply And Fixing In Replacement Of The Old, Unserviceable Door Shutter Of Side Board, Including Dismantling And Removal Of The Damaged/Defective Door Shutter. The New Door Shutter Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Each Shutter Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw, Magnetic Cather And 03 X Soft Closing Concealed Intermate Hinges At Inside All As Directed.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 208 Supply And Fixing In Replacement Of The Old, Unserviceable Side Board Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 209 Supply And Fixing In Replacement Of Old Unserviceable Bottom Frame Of Side Board, Including Dismantling And Removal Of The Damaged/Defective Frame. The New Frame Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 210 Supply And Fixing In Replacement Of Old, Unserviceable Knob/Handles, Including Dismantling And Removal Of The Damaged/Defective Knob/Handles. The New Knob (As Per Sample)/Handles 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw As Approved Shall Be Provided And All As Shown On Drawing And As Directed. 211 Supply And Fixing New L Claimp Shall Be Of Size: 50 Mm × 50 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With Appropriate Size Csk Head Wood Screws As Applicable And Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Connections/Joints And Finishing Complete, All As Specified And Directed 212 Bin Soiled Multipurpose (Fd/E6/Map/09): Dismantling And Removing The Following Existing Unserviceable Components Of Bin Soiled Multipurpose And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 213 Supply And Fixing In Replacement Of The Old, Unserviceable Bin Soiled Multipurpose Sides, Including Dismantling And Removal Of The Damaged/Defective Side. The New Side Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 214 Supply And Fixing In Replacement Of The Old, Unserviceable Bin Soiled Multipurpose Sides Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 215 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Bin Soiled Multipurpose, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 18 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 216 Supply And Fixing In Replacement Of The Old, Unserviceable Door Shutter Of Bin Soiled Multipurpose, Including Dismantling And Removal Of The Damaged/Defective Door Shutter. The New Door Shutter Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Each Shutter Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw, Magnetic Cather And 03 X Soft Closing Concealed Intermate Hinges At Inside All As Directed.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 217 Supply And Fixing In Replacement Of The Old, Unserviceable Bin Soiled Multipurpose Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 218 Supply And Fixing In Replacement Of Old Unserviceable Bottom Frame Of Bin Soiled Multipurpose, Including Dismantling And Removal Of The Damaged/Defective Frame. The New Frame Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 219 Supply And Fixing In Replacement Of Old, Unserviceable Knob/Handles, Including Dismantling And Removal Of The Damaged/Defective Knob/Handles. The New Knob (As Per Sample)/Handles 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw As Approved Shall Be Provided And All As Shown On Drawing And As Directed. 220 Supply And Fixing New L Claimp Shall Be Of Size: 50 Mm × 50 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With Appropriate Size Csk Head Wood Screws As Applicable And Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Connections/Joints And Finishing Complete, All As Specified And Directed. 221 Hat Stand With Mirror (Fd- 23, Fd-361): Dismantling And Removing The Following Existing Unserviceable Components Of Hat Stand With Mirror And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 222 Supply And Fixing In Replacement Of Old Unserviceable Mirror Of Hat Stand, Including Dismantling And Removal Of The Damaged/Defective Mirror. The New Mirror Shall Be Make Of Modiguard/Atul/Saint-Gobain Of Size 440 X 300 Mm X Thickness 5.5 Mm Nominal Float Glass Mirror (Silvered Reflective Coating With Copper And Protective Backing Paint), Edges Shall Be Machine-Cut, Polished Or Beveled Edges. The Back Of Mirror Shall Be Covered With 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Mirror Frame Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 223 Supply And Fixing In Replacement Of Old, Unserviceable Pegs, Including Dismantling And Removal Of The Damaged/Defective Pegs. The New Brass Pegs (As Per Sample) With Screw As Approved Shall Be Provided And All As Shown On Drawing And As Directed. 224 Supply And Fixing In Replacement Of Old, Unserviceable Key Plate, Including Dismantling And Removal Of The Damaged/Defective Key Plate. The New Key Plate, Rwal Plug (As Per Sample) With Screw As Approved Shall Be Provided And All As Shown On Drawing And As Directed. 225 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of Hat Stand, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Front Shall Be Made From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 226 Dressing Mirror Gents Offrs/Jcos/Or (Fd/E6/Map/16): Dismantling And Removing The Following Existing Unserviceable Components Of Dressing Mirror Gents Offrs/Jcos/Or And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 227 Supply And Fixing In Replacement Of Old Unserviceable Mirror Of Dressing Mirror, Including Dismantling And Removal Of The Damaged/Defective Mirror. The New Mirror Shall Be Make Of Modiguard/Atul/Saint-Gobain Of Size 1080 X 530 Mm X Thickness 5.5 Mm Nominal Float Glass Mirror (Silvered Reflective Coating With Copper And Protective Backing Paint), Edges Shall Be Machine-Cut, Polished Or Beveled Edges. The Back Of Mirror Shall Be Covered With 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Mirror Frame Of Size 35X6Mm Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.The Each Mirror Shutter Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw, Magnetic Cather And 03 X Soft Closing Concealed Intermate Hinges At Inside All As Directed.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 228 Supply And Fixing In Replacement Of The Old, Unserviceable Dressing Mirror Bottom, Including Dismantling And Removal Of The Damaged/Defective Bottom. The New Bottom Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 229 Supply And Fixing In Replacement Of The Old, Unserviceable Dressing Mirror Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 230 Supply And Fixing In Replacement Of The Old, Unserviceable Dressing Mirror Sides, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 231 Supply And Fixing In Replacement Of The Old, Unserviceable Dressing Glass Shelf, Including Dismantling And Removal Of The Damaged/Defective Glass Shelf. The New Top Shall Be Of Modiguard/Atul/Saint-Gobain Of 496Mmx95Mm Thickness 5 Mm Nominal Clear Float Glass / Toughened Glass, Edges Shall Be Machine-Cut, Polished Or Beveled Edges.The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 232 Supply And Fixing In Replacement Of The Old, Unserviceable Dressing Mirror Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 233 Supply And Fixing New L Claimp Shall Be Of Size: 50 Mm × 50 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With Appropriate Size Csk Head Wood Screws As Applicable And Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Connections/Joints And Finishing Complete, All As Specified And Directed. 234 Trestle Sr Wooden (Fd- 86/141 ): Dismantling And Removing The Following Existing Unserviceable Components Of Trestle Store Room Wooden And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge 235 Supply And Fixing In Replacement Of Old Unserviceable Top Batten Of Size 2440X100X100Mm Of Trestle Sr Wooden, Including Dismantling And Removal Of The Damaged/Defective Batten. The New Top Batten Shall Be Of Size 2440X100X100Mm Made From Seasoned 2Nd Class Hard Wood (Sal), Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 236 Supply And Fixing In Replacement Of Old Unserviceable Top Batten Of Size 600X60X100Mm Of Trestle Sr Wooden, Including Dismantling And Removal Of The Damaged/Defective Batten. The New Top Batten Shall Be Of Size 600X60X100Mm Made From Seasoned 2Nd Class Hard Wood (Sal), Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 237 Supply And Fixing In Replacement Of Old Unserviceable Top Batten Of Size 2040X60X100Mm Of Trestle Sr Wooden, Including Dismantling And Removal Of The Damaged/Defective Batten. The New Top Batten Shall Be Of Size 2040X60X100Mm Made From Seasoned 2Nd Class Hard Wood (Sal), Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 238 Supply And Fixing In Replacement Of Old Unserviceable Leg Of Trestle Sr Wooden, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned 2Nd Class Hard Wood (Sal), Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 239 Material And Labour For Preparing Of Old Surfaces By Scrapping/Grinding Old Surface And Remove Oil And Contaminants By Solvent Cleaning By Mineral Spirits Or Alkaline Cleaners. Rinse Thoroughly And Dry If Necessary. Remove All Dust By Mechanical Means Such As Wire Brushing, Sanding Or Sandblasting/Abrasive Blasting To Creat A Rough Surface For Better Paint Adhesion. Thereafter, Primer (As Approved By Ge) Shall Be Apply With Spray Gun Machine. Synthetic Enamel Black Paint (Make:Asian Paints/ Berger/ Nerolac) Shall Be Applied One Coat With Spray Gun And Air Dried For A Minimum 08 Hours. The Second Coat Shall Then Be Applied With Spray Gun Complete All Work As Specified And Directed 240 Tv Trolley (Fd/E6/Map/04R): Dismantling And Removing The Following Existing Unserviceable Components Of Tv Trolly And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 241 Supply And Fixing In Replacement Of Old Unserviceable Wheel Of Tv Trolly, Including Dismantling And Removal Of The Damaged/Defective Wheel. The New Swivel Castor (Thread Type Or Push Type As Approved) Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 242 Supply And Fixing In Replacement Of The Old, Unserviceable Tv Trolly Sides, Including Dismantling And Removal Of The Damaged/Defective Sides. The New Sides Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 243 Supply And Fixing In Replacement Of The Old, Unserviceable Tv Trolly Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 244 Supply And Fixing In Replacement Of The Old, Unserviceable Tv Trolly Bottom, Including Dismantling And Removal Of The Damaged/Defective Bottom. The New Bottom Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 245 Supply And Fixing In Replacement Of The Old, Unserviceable Tv Trolly Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Fabricated From 12Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 246 Supply And Fixing In Replacement Of The Old, Unserviceable Glass Shutter, Including Dismantling And Removal Of The Damaged/Defective Glass Shutter. The New Glass Shutter Shall Be Of Modiguard/Atul/Saint-Gobain Of Thickness 5.5Mm Nominal Clear Float Glass, Edges Shall Be Machine-Cut, Polished Or Beveled Edges. The Glass Shutter Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And Fixed With 02 Nos (Glass Hinges) With Magnetic Catcher All As Directed By The Engineer-In-Charge. 247 Supply And Fixing New L Claimp Shall Be Of Size: 50 Mm × 50 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With Appropriate Size Csk Head Wood Screws As Applicable And Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Connections/Joints And Finishing Complete, All As Specified And Directed 248 Sofa Set 5 Seater With Cushion (Fd- 281, Fd-373 & Fd/Map-Ii/02) : Dismantling And Removing The Following Existing Unserviceable Components Of Sofa Set 5 Seater And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 249 Supply And Fixing In Replacement Of Old Unserviceable Foam Cushion, Including Dismantling And Removal Of The Damaged/Defective Foam Cushion. The New Foam Cushion (Make- Sleepwell/Kurlon) Shall Be Of Size 558Mm X 533Mm X 100Mm Thick Of 40 Density Covered With White Lining Cloth And Premium Quality Tapestry Cloth (Make: Bombay Dying/DDecor/Raymond Of Rate Not Less Than 400 Per Mtr), Shall Be Provided With Nylon Zipper At One Edge Duly Covered Under The Tapestry Cloth Flap As Approved By Ge/ Engineer-In-Charge., And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Note :- (I) Each Cushion For Seat Or Back Will Be Measured As Single Unit. 250 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of 3 Seater Sofa, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Seat Shall Be Made Of 12Mm Thick Bwr Ply Of Grade -A; Place And Fix In The Existing Pattern And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Make Of Plywood: Archid/Greenply/Century Or Equivalent As Approved. 251 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of Single Seater Sofa, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Seat Shall Be Made Of 12Mm Thick Bwr Ply Of Grade -A; Place And Fix In The Existing Pattern And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Make Of Plywood: Archid/Greenply/Century Or Equivalent As Approved. 252 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 253 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 254 Supply And Fixing In Replacement Of Old Unserviceable Arm Rest, Including Dismantling And Removal Of The Damaged/Defective Arm Rest. The New Arm Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 255 Supply And Fixing In Replacement Of Old Unserviceable Side Rail (Size 35Mmx100Mmx725Mm), Including Dismantling And Removal Of The Damaged/Defective Side Rail (Size 35Mmx100Mmx725Mm). The New Side Rail (Size 35Mmx100Mmx725Mm) Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 256 Supply And Fixing In Replacement Of Old Unserviceable Bearers (Size 40Mmx40Mmx725Mm), Including Dismantling And Removal Of The Damaged/Defective Bearers (Size 40Mmx40Mmx725Mm). The New Bearers (Size 40Mmx40Mmx725Mm) Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 257 Supply And Fixing In Replacement Of Old Unserviceable Front Rail Of 3 Seater, Including Dismantling And Removal Of The Damaged/Defective Front Rail Of 3 Seater. The New Front Rail Of 3 Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 258 Supply And Fixing In Replacement Of Old Unserviceable Rear Rail Of 3 Seater, Including Dismantling And Removal Of The Damaged/Defective Rear Rail Of 3 Seater. The New Rear Rail Of 3 Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 259 Supply And Fixing In Replacement Of Old Unserviceable Front Rail Of Single Seater (Size 35Mmx10Mmx530Mm), Including Dismantling And Removal Of The Damaged/Defective Front Rail Of Single Seater (Size 35Mmx10Mmx530Mm). The New Front Rail Of Single Seater (Size 35Mmx10Mmx530Mm) Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 260 Supply And Fixing In Replacement Of Old Unserviceable Rear Rail Of Single Seater (Size 35Mmx10Mmx530Mm), Including Dismantling And Removal Of The Damaged/Defective Rear Rail Of Single Seater (Size 35Mmx10Mmx530Mm). The New Rear Rail Of Single Seater (Size 35Mmx10Mmx530Mm) Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 261 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 262 Sofa Set 5 Seater (Fd-258) : Dismantling And Removing The Following Existing Unserviceable Components Of Sofa Set 5 Seater And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 263 Supply And Fixing In Replacement Of Old Unserviceable Seat Foam Cushion, Including Dismantling And Removal Of The Damaged/Defective Seat Foam Cushion. The New Seat Foam Cushion (Make- Sleepwell/ Kurlon) Shall Be Of 40 Density Covered With White Lining Cloth And Premium Quality Tapestry Cloth (Make: Bombay Dying/DDecor/Raymond Of Rate Not Less Than 400 Per Mtr), Shall Be Provided With Nylon Zipper At One Edge Duly Covered Under The Tapestry Cloth Flap As Approved By Ge/Engineer-In-Charge., And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Note :- (I) Each Cushion For Seat Will Be Measured As Single Unit. 264 Supply And Fixing In Replacement Of Old Unserviceable Back Foam Cushion, Including Dismantling And Removal Of The Damaged/Defective Back Foam Cushion. The New Back Foam Cushion (Make- Sleepwell/ Kurlon) Shall Be Of 40 Density Covered With White Lining Cloth And Premium Quality Tapestry Cloth (Make: Bombay Dying/DDecor/Raymond Of Rate Not Less Than 400 Per Mtr), Shall Be Provided With Nylon Zipper At One Edge Duly Covered Under The Tapestry Cloth Flap And Fix Over The Base Of Seasonned Teak Wood Frame In One Piece And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Note :- (I) Each Cushion For Back Will Be Measured As Single Unit. 265 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of 3 Seater Sofa, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Seat Shall Be Made Of 12Mm Thick Bwr Ply Of Grade -A; Place And Fix In The Existing Pattern And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Make Of Plywood: Archid/Greenply/Century Or Equivalent As Approved 266 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of Single Seater Sofa, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Seat Shall Be Made Of 12Mm Thick Bwr Ply Of Grade -A; Place And Fix In The Existing Pattern And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Make Of Plywood: Archid/Greenply/Century Or Equivalent As Approved 267 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 268 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 269 Supply And Fixing In Replacement Of Old Unserviceable Arm Rest, Including Dismantling And Removal Of The Damaged/Defective Arm Rest. The New Arm Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 270 Supply And Fixing In Replacement Of Old Unserviceable Side Rail 3 Seater, Including Dismantling And Removal Of The Damaged/Defective Side Rail 3 Seater. The New Side Rail 3 Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 271 Supply And Fixing In Replacement Of Old Unserviceable Back Rail 3 Seater, Including Dismantling And Removal Of The Damaged/Defective Back Rail 3 Seater. The New Back Rail 3 Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 272 Supply And Fixing In Replacement Of Old Unserviceable Front Rail 3 Seater, Including Dismantling And Removal Of The Damaged/Defective Front Rail 3 Seater. The New Front Rail 3 Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 273 Supply And Fixing In Replacement Of Old Unserviceable Side Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Side Rail Single Seater. The New Side Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 274 Supply And Fixing In Replacement Of Old Unserviceable Back Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Back Rail Single Seater. The New Back Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 275 Supply And Fixing In Replacement Of Old Unserviceable Front Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Front Rail Single Seater. The New Front Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 276 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 277 Sofa Set Four Seater With Cushion (Fd- 258 ) : Dismantling And Removing The Following Existing Unserviceable Components Of Sofa Set Four Seater And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 278 Supply And Fixing In Replacement Of Old Unserviceable Seat Foam Cushion, Including Dismantling And Removal Of The Damaged/Defective Seat Foam Cushion. The New Seat Foam Cushion (Make- Sleepwell/ Kurlon) Shall Be Of 40 Density Covered With White Lining Cloth And Premium Quality Tapestry Cloth (Make: Bombay Dying/DDecor/Raymond Of Rate Not Less Than 400 Per Mtr), Shall Be Provided With Nylon Zipper At One Edge Duly Covered Under The Tapestry Cloth Flap As Approved By Ge/Engineer-In-Charge., And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Note :- (I) Each Cushion For Seat Will Be Measured As Single Unit. 279 Supply And Fixing In Replacement Of Old Unserviceable Back Foam Cushion, Including Dismantling And Removal Of The Damaged/Defective Back Foam Cushion. The New Back Foam Cushion (Make- Sleepwell/ Kurlon) Shall Be Of 40 Density Covered With White Lining Cloth And Premium Quality Tapestry Cloth (Make: Bombay Dying/DDecor/Raymond Of Rate Not Less Than 600 Per Mtr), Shall Be Provided With Nylon Zipper At One Edge Duly Covered Under The Tapestry Cloth Flap And Fix Over The Base Of Seasonned Teak Wood Frame In One Piece And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. Note :- (I) Each Cushion For Back Will Be Measured As Single Unit. 280 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of Single Seater Sofa, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Seat Shall Be Made Of 12Mm Thick Bwr Ply Of Grade -A; Place And Fix In The Existing Pattern And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Make Of Plywood: Archid/Greenply/Century Or Equivalent As Approved 281 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 282 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 283 Supply And Fixing In Replacement Of Old Unserviceable Arm Rest, Including Dismantling And Removal Of The Damaged/Defective Arm Rest. The New Arm Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 284 Supply And Fixing In Replacement Of Old Unserviceable Side Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Side Rail Single Seater. The New Side Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 285 Supply And Fixing In Replacement Of Old Unserviceable Back Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Back Rail Single Seater. The New Back Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 286 Supply And Fixing In Replacement Of Old Unserviceable Front Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Front Rail Single Seater. The New Front Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 287 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 288 Sofa Set Single Seater With Cushion (Fd/Map-Ii/02) : Dismantling And Removing The Following Existing Unserviceable Components Of Sofa Set Single Seater And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 289 Supply And Fixing In Replacement Of Old Unserviceable Foam Cushion, Including Dismantling And Removal Of The Damaged/Defective Foam Cushion. The New Foam Cushion (Make- Sleepwell/ Kurlon) Shall Be Of Size 558Mm X 533Mm X 100Mm Thick Of 40 Density Covered With White Lining Cloth And Premium Quality Tapestry Cloth (Make: Bombay Dying/DDecor/Raymond Of Rate Not Less Than 400 Per Mtr), Shall Be Provided With Nylon Zipper At One Edge Duly Covered Under The Tapestry Cloth Flap As Approved By Ge/Engineer-In-Charge., And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Note :- (I) Each Cushion For Seat Or Back Will Be Measured As Single Unit. 290 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of Single Seater Sofa, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Seat Shall Be Made Of 12Mm Thick Bwr Ply Of Grade -A; Place And Fix In The Existing Pattern And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Make Of Plywood: Archid/Greenply/Century Or Equivalent As Approved 291 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 292 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 293 Supply And Fixing In Replacement Of Old Unserviceable Arm Rest, Including Dismantling And Removal Of The Damaged/Defective Arm Rest. The New Arm Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 294 Supply And Fixing In Replacement Of Old Unserviceable Side Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Side Rail Single Seater. The New Side Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 295 Supply And Fixing In Replacement Of Old Unserviceable Back Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Back Rail Single Seater. The New Back Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 296 Supply And Fixing In Replacement Of Old Unserviceable Front Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Front Rail Single Seater. The New Front Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 297 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 298 Material And Labour For Complete Surface Preparation Of Old, Existing Polished Wooden Surfaces And Re-Application Of Melamine Polish With Following Process, Ensuring A Smooth And Aesthetically Appealing Glossy Or Matte Finish All As Directed: (A) Surface Preparation:(I) Carefully Scrape/Grind The Old Polished Surface Using Appropriate Tools To Remove Loose, Flaking, Or Degraded Polish.(Ii) Clean The Surface Thoroughly By Removing All Oily Spots And Contaminants Using Mineral Spirits Or Alkaline Cleaners As Necessary.(Iii) Rinse Thoroughly With Clean Water And Ensure The Surface Is Completely Dry.(Iv) Remove All Stubborn Marks Or Deposits Using Emery Paper Or Grinder.(V) Fill All Cracks, Dents, And Pores Using High-Quality Wooden Filler/Putty Matching The Wood Texture And Shade.(Vi) Sand The Entire Surface Evenly Using 80 To 320-Grit Sandpaper To Achieve A Smooth Finish.(Vii) Clean The Surface Using A Dry, Lint-Free Cloth To Remove Dust And Debris.(Viii) Repeat The Surface Preparation Process, If Required, As Per Site Condition Or Direction Of Engineer-In-Charge.(B) Staining (If Required):(I) Apply Approved Wood Stain Evenly Across The Prepared Surface As Directed.(Ii) Allow The Stain To Dry Completely Before Further Processing.(C) Melamine Polish Application:(I) Prepare The Melamine Polish By Mixing Melamine Base And Hardener In A 9:1 Ratio.(Ii) Add Recommended Thinner To Achieve The Correct Spraying Consistency.(Iii) Mix Thoroughly Before Use.(Iii) Use A Spray Gun To Apply A Thin, Even Coat On The Surface.(Iv) Allow The First Coat To Dry For 1–2 Hours.(V) Lightly Sand With 320-Grit Sandpaper To Ensure An Even Finish.(D) Re-Coating Process:(I) Apply A Total Of 2 To 3 Coats, Sanding Lightly Between Each Coat.(Ii) Achieve The Desired Glossy Or Matte Finish As Per Site Requirements.Note: All Work Shall Be Carried Out In A Neat, Professional Manner, Adhering Strictly To Safety, Quality, And Environmental Standards. Materials Used Shall Be Of Asian Paints/Nerolac/Dulux Paints/Berger/Nippon Paints As Approved Make/Brand And Conform To Relevant Is Specifications. Work To Be Carried Out To The Entire Satisfaction Of The Ge/Engineer-In-Charge. 299 Table 3X2 With/With Out Drawer (Fd-231,224,234, 283 & 284) 300 Table Writing (Fd-33, 249 & 275) 301 Table 900X900X760Mm (Fd-88 & 291) 302 Table Dining 4 Pers (Fd/Map-Ii/03 303 Table Dining 6 Pers (Fd-30, 239, 273, Db-1108 & Fd/Map-Ii/03) 304 Table Dining 8 Pers (Fd-376) 305 Table Bed Side (Fd-276, 210 & 248) 306 Table Centre (Fd-235, 274 & 284) 307 Table Dressing Gents (Fd-230 & 379) 308 Table Dressing Ladies (Fd-251, 265 & 378) 309 Peg Table (Fd-236, 266,277 & 384) 310 Teapoy (Fd-278 & 382) 311 Table Dressing Ladies With Stool (Fd/Map-Ii/07) 312 Table Office Clerk (Db-4121/292) 313 Table Office Officer (Wdf-32/Fd-139) 314 Form With/With Out Back F-73 & Fd-78(M) 315 Chair Dining With Long Back (Fd-357) 316 Chair Dining (Fd16/203, 279 & 228) 317 Chair Easy (Fd-17, 229 & 201) 318 Chair Writing (Fd-20/202/250 & 280) 319 Chair Dining Jcos/Or (Fd/E6/Map-Ii/05) 320 Chair Dining Officers (Fd/E6/Map-Ii/04) 321 Bed With Plywood Top (Fd-246 & 247) 322 Side Board (Fd-241 & 1112) 323 Bin Soiled Multipurpose (Fd/E6/Map/09)

BOQ

Name of Work:- Repair to certain wooden furnitures including polishing at Babina Cantt under GE Babina.
Sl. No. Item Description
1Table 3’X2’ with / without drawer: Dismantling and removing the following existing unserviceable components of table 3'x2' with/without drawer and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge. Drg No.(FD-231, FD-224, FD-234, FD-283 & FD-284)
2Supply and fixing in replacement of the old, unserviceable table top, including dismantling and removal of the damaged/defective top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
3Supply and fixing in replacement of old unserviceable table leg, including dismantling and removal of the damaged/defective leg. The new leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
4Supply and fixing in replacement of old unserviceable table long rail, including dismantling and removal of the damaged/defective long rail. The new long rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
5Supply and fixing in replacement of old unserviceable table short rail, including dismantling and removal of the damaged/defective short rail. The new short rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
6Supply and fixing in replacement of old unserviceable table long stiffener, including dismantling and removal of the damaged/defective long stiffener. The new long stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
7Supply and fixing in replacement of old unserviceable table short stiffener, including dismantling and removal of the damaged/defective short stiffener. The new short stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
8Supply and Fixing in replacement of old unserviceable drawer of table, including dismantling and removal of the damaged/defective drawer. The drawer shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading. The back and bottom of the drawer shall be fabricated from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.The drawer shall be provided with 01 x 100mm long 8mm dia chrome plated Oval D Pull handles with screw & 2 x 18 inch long stainless steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel of Make: Godrej/Hettich/Ebco or as directed by GE/Engineer-in-Charge complete. Irrespective of what ever is shown on drawing all as specified and as directed.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
9Supply and fixing in replacement of old unserviceable wooden cleat, including dismantling and removal of the damaged/defective wooden cleat. The new L Claimp shall be of size: 75 mm × 30 mm × 3 mm thick L-brackets, Mild Steel (MS), zinc-coated or powder-coated with Minimum 4 fixing holes (2 on each side). Fixing shall be with 25-35 mm long CSK head wood screws as applicable, Qty 2 brackets per leg (one on each side) as directed by the Engineer-in-Charge. The work includes drilling, fitting, additional fixing accessories for table leg joints, including wooden dowels, MS screws, adhesive, and any necessary minor hardware to strengthen leg-to-frame connections and finishing complete, all as specified and directed
10Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
11Table Writing: Dismantling and removing the following existing unserviceable components of table writing and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge. Drg No.( FD- 33, FD-249, FD-275)
12Supply and fixing in replacement of the old, unserviceable table top, including dismantling and removal of the damaged/defective top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
13Supply and fixing in replacement of old unserviceable table leg, including dismantling and removal of the damaged/defective leg. The new leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
14Supply and fixing in replacement of old unserviceable table long rail, including dismantling and removal of the damaged/defective long rail. The new long rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
15Supply and fixing in replacement of old unserviceable table short rail, including dismantling and removal of the damaged/defective short rail. The new short rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
16Supply and fixing in replacement of old unserviceable table stiffener, including dismantling and removal of the damaged/defective stiffener. The new stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
17Supply and fixing in replacement of old unserviceable table bottom rail, including dismantling and removal of the damaged/defective bottom rail. The new bottom rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
18Supply and fixing in replacement of the old, unserviceable cabinet (complete), including dismantling and removal of the damaged/defective cabinet (complete). The new Cabinet (Complete) shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading. The cabinet shall be provided with 01 x 100mm long 8mm dia chrome plated Oval D Pull handles with screw, 04 lever lock with duplicate keys of Make Godrej/Link/Harrison (as approved) & Magnetic cather all as directed.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
19Supply and Fixing in replacement of old unserviceable drawer of table, including dismantling and removal of the damaged/defective drawer. The drawer shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading. The back and bottom of the drawer shall be fabricated from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.The drawer shall be provided with 01 x 100mm long 8mm dia chrome plated Oval D Pull handles with screw & 2 x 18 inch long stainless steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel of Make: Godrej/Hettich/Ebco or as directed by GE/Engineer-in-Charge complete.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
20Supply and fixing in replacement of old unserviceable wooden cleat, including dismantling and removal of the damaged/defective wooden cleat. The new L Claimp shall be of size: 75 mm × 30 mm × 3 mm thick L-brackets, Mild Steel (MS), zinc-coated or powder-coated with Minimum 4 fixing holes (2 on each side). Fixing shall be with 25-35 mm long CSK head wood screws as applicable, Qty 2 brackets per leg (one on each side) as directed by the Engineer-in-Charge. The work includes drilling, fitting, additional fixing accessories for table leg joints, including wooden dowels, MS screws, adhesive, and any necessary minor hardware to strengthen leg-to-frame connections and finishing complete, all as specified and directed
21Supply and fixing in replacement of old unserviceable lock, including dismantling and removal of the damaged/defective lock. The new lock shall be, with duplicate keys of Make Godrej/Link/Harrison (as approved), and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
22Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
23Table 900x900x760mm: Dismantling and removing the following existing unserviceable components of table 900x900x760mm and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge. Drg No. (FD- 88,FD- 291)
24Supply and fixing in replacement of the old, unserviceable table top, including dismantling and removal of the damaged/defective top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
25Supply and fixing in replacement of old unserviceable table leg, including dismantling and removal of the damaged/defective leg. The new leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
26Supply and fixing in replacement of old unserviceable table long rail, including dismantling and removal of the damaged/defective long rail. The new long rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
27Supply and fixing in replacement of old unserviceable table short rail, including dismantling and removal of the damaged/defective short rail. The new short rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
28Supply and fixing in replacement of old unserviceable table stiffener, including dismantling and removal of the damaged/defective stiffener. The new stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
29Supply and fixing in replacement of old unserviceable wooden cleat, including dismantling and removal of the damaged/defective wooden cleat. The new L Claimp shall be of size: 75 mm × 30 mm × 3 mm thick L-brackets, Mild Steel (MS), zinc-coated or powder-coated with Minimum 4 fixing holes (2 on each side). Fixing shall be with 25-35 mm long CSK head wood screws as applicable, Qty 2 brackets per leg (one on each side) as directed by the Engineer-in-Charge. The work includes drilling, fitting, additional fixing accessories for table leg joints, including wooden dowels, MS screws, adhesive, and any necessary minor hardware to strengthen leg-to-frame connections and finishing complete, all as specified and directed
30Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
31Table dining 4 pers: Dismantling and removing the following existing unserviceable components of table dining 4 pers and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge. Drg No. (FD/MAP-II/03)
32Supply and fixing in replacement of the old, unserviceable table top, including dismantling and removal of the damaged/defective top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
33Supply and fixing in replacement of old unserviceable table leg, including dismantling and removal of the damaged/defective leg. The new leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
34Supply and fixing in replacement of old unserviceable table long rail, including dismantling and removal of the damaged/defective long rail. The new long rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
35Supply and fixing in replacement of old unserviceable table short rail, including dismantling and removal of the damaged/defective short rail. The new short rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
36Supply and fixing in replacement of old unserviceable table stiffener, including dismantling and removal of the damaged/defective stiffener. The new stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
37Supply and fixing in replacement of old unserviceable wooden cleat, including dismantling and removal of the damaged/defective wooden cleat. The new L Claimp shall be of size: 150 mm × 30 mm × 5 mm thick L-brackets, Mild Steel (MS), zinc-coated or powder-coated with Minimum 4 fixing holes (2 on each side). Fixing shall be with 25-35 mm long CSK head wood screws as applicable, Qty 2 brackets per leg (one on each side) as directed by the Engineer-in-Charge. The work includes drilling, fitting, additional fixing accessories for table leg joints, including wooden dowels, MS screws, adhesive, and any necessary minor hardware to strengthen leg-to-frame connections and finishing complete, all as specified and directed.
38Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
39Table dining 6 pers: Dismantling and removing the following existing unserviceable components of table dining 6 pers and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge. Drg No. (FD -30, FD-239, FD-273, DB-1108 & FD/MAP-II/03)
40Supply and fixing in replacement of the old, unserviceable table top, including dismantling and removal of the damaged/defective top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
41Supply and fixing in replacement of old unserviceable table leg, including dismantling and removal of the damaged/defective leg. The new leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
42Supply and fixing in replacement of old unserviceable table long rail, including dismantling and removal of the damaged/defective long rail. The new long rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
43Supply and fixing in replacement of old unserviceable table short rail, including dismantling and removal of the damaged/defective short rail. The new short rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
44Supply and fixing in replacement of old unserviceable table stiffener, including dismantling and removal of the damaged/defective stiffener. The new stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
45Supply and fixing in replacement of old unserviceable wooden cleat, including dismantling and removal of the damaged/defective wooden cleat. The new L Claimp shall be of size: 150 mm × 30 mm × 5 mm thick L-brackets, Mild Steel (MS), zinc-coated or powder-coated with Minimum 4 fixing holes (2 on each side). Fixing shall be with 25-35 mm long CSK head wood screws as applicable, Qty 2 brackets per leg (one on each side) as directed by the Engineer-in-Charge. The work includes drilling, fitting, additional fixing accessories for table leg joints, including wooden dowels, MS screws, adhesive, and any necessary minor hardware to strengthen leg-to-frame connections and finishing complete, all as specified and directed
46Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
47Table dining 8 pers: Dismantling and removing the following existing unserviceable components of table dining 8 pers and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge. Drg No.(FD-376)
48Supply and fixing in replacement of the old, unserviceable table top, including dismantling and removal of the damaged/defective top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
49Supply and fixing in replacement of old unserviceable table leg, including dismantling and removal of the damaged/defective leg. The new leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
50Supply and fixing in replacement of old unserviceable table long rail, including dismantling and removal of the damaged/defective long rail. The new long rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
51Supply and fixing in replacement of old unserviceable table short rail, including dismantling and removal of the damaged/defective short rail. The new short rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
52Supply and fixing in replacement of old unserviceable table stiffener, including dismantling and removal of the damaged/defective stiffener. The new stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
53Supply and fixing in replacement of old unserviceable wooden cleat, including dismantling and removal of the damaged/defective wooden cleat. The new L Claimp shall be of size: 150 mm × 30 mm × 5 mm thick L-brackets, Mild Steel (MS), zinc-coated or powder-coated with Minimum 4 fixing holes (2 on each side). Fixing shall be with 25-35 mm long CSK head wood screws as applicable, Qty 2 brackets per leg (one on each side) as directed by the Engineer-in-Charge. The work includes drilling, fitting, additional fixing accessories for table leg joints, including wooden dowels, MS screws, adhesive, and any necessary minor hardware to strengthen leg-to-frame connections and finishing complete, all as specified and directed
54Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
55Table Bed Side: Dismantling and removing the following existing unserviceable components of table bed side and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.Drg No.(FD-276, FD-210 & FD-248)
56Supply and fixing in replacement of the old unserviceable table bed side top, including dismantling and removal of the damaged/defective top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
57Supply and fixing in replacement of the old unserviceable table bed side Sides, including dismantling and removal of the damaged/defective sides. The new Side shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
58Supply and fixing in replacement of the old unserviceable table bed side Back, including dismantling and removal of the damaged/defective Back. The new Back shall be fabricated from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
59Supply and fixing in replacement of the old unserviceable table bed side Shelf, including dismantling and removal of the damaged/defective Shelf. The new Shelf shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
60Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
61Table Centre: Dismantling and removing the following existing unserviceable components of table Centre and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.Drg No.(FD-235, FD-274 & FD-384)
62Supply and fixing in replacement of the old unserviceable table top, including dismantling and removal of the damaged/defective top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
63Supply and fixing in replacement of old unserviceable table leg, including dismantling and removal of the damaged/defective leg. The new leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
64Supply and fixing in replacement of old unserviceable table long rail, including dismantling and removal of the damaged/defective long rail. The new long rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
65Supply and fixing in replacement of old unserviceable table short rail, including dismantling and removal of the damaged/defective short rail. The new short rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
66Supply and fixing in replacement of old unserviceable table stiffener, including dismantling and removal of the damaged/defective stiffener. The new stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
67Supply and fixing in replacement of old unserviceable wooden cleat, including dismantling and removal of the damaged/defective wooden cleat. The new cleat shall be of size: 50 mm × 30 mm × 3 mm thick L-brackets, Mild Steel (MS), zinc-coated or powder-coated with Minimum 4 fixing holes (2 on each side). Fixing shall be with 25-35 mm long CSK head wood screws as applicable, Qty 2 brackets per leg (one on each side) as directed by the Engineer-in-Charge. The work includes drilling, fitting, additional fixing accessories for table leg joints, including wooden dowels, MS screws, adhesive, and any necessary minor hardware to strengthen leg-to-frame connections and finishing complete, all as specified and directed.
68Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
69Table dressing Gents: Dismantling and removing the following existing unserviceable components of table dressing gents and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge. Drg No. (FD-230 & FD-379)
70Supply and Fixing in replacement of old unserviceable drawer of table dressing gents, including dismantling and removal of the damaged/defective drawer. The drawer shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading. The back and bottom of the drawer shall be fabricated from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.The drawer shall be provided with 01 x 100mm long 8mm dia chrome plated Oval D Pull handles with screw & 2 x 10 inch long stainless steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel of Make: Godrej/Hettich/Ebco or as directed by GE/Engineer-in-Charge complete.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
71Supply and fixing in replacement of the old, unserviceable table dressing gents Mirror with frame, including dismantling and removal of the damaged/defective Mirror. The new Mirror shall be make of Modiguard/Atul/Saint-Gobain of thickness 5.5 mm nominal Float Glass Mirror (Silvered reflective coating with copper and protective backing paint), edges shall be Machine-cut, polished or beveled edges. The Back of Mirror shall be covered with 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.The Mirror frame shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
72Supply and fixing in replacement of the old, unserviceable table dressing gents top, including dismantling and removal of the damaged/defective top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
73Supply and fixing in replacement of the old, unserviceable table dressing gents bottom, including dismantling and removal of the damaged/defective bottom. The new bottom shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
74Supply and fixing in replacement of the old, unserviceable table dressing gents sides, including dismantling and removal of the damaged/defective Side. The new Side shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
75Table dressing Ladies : Dismantling and removing the following existing unserviceable components of table dressing ladies and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.Drg No.( FD-251, FD-265 & FD-378)
76Supply and fixing in replacement of the old, unserviceable table dressing ladies top, including dismantling and removal of the damaged/defective top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
77Supply and Fixing in replacement of old unserviceable sliding Glass with Aluminium channel and all as shown on drawing and as directed.Supply and fixing in replacement of the old, unserviceable table dressing ladies sliding glass with aluminium channel, including dismantling and removal of the damaged/defective glass and channel. The new mirror shall be make of Modiguard/Atul/Saint-Gobain of thickness 5 mm nominal Clear Float Glass / Toughened Glass, edges shall be Machine-cut, polished or beveled edges with Nylon/steel ball-bearing rollers for smooth operation and flush handles.The new Aluminium channel shall be Double track sliding system, Aluminium Alloy Grade, as per design and functional requirement, Powder-coated/Anodized in approved Colour (Natural/Black/Bronze/as approved) make of Jindal / Hindalco / Bhoruka or equivalent approved make. This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
78Supply and fixing in replacement of the old, unserviceable table dressing ladies back, including dismantling and removal of the damaged/defective back. The new back shall be fabricated from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge
79Supply and fixing in replacement of the old, unserviceable table dressing ladies Mirror with frame, including dismantling and removal of the damaged/defective Mirror. The new Mirror shall be make of Modiguard/Atul/Saint-Gobain of thickness 5.5 mm nominal Float Glass Mirror (Silvered reflective coating with copper and protective backing paint), edges shall be Machine-cut, polished or beveled edges. The Back of Mirror shall be covered with 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.The Mirror frame shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
80Supply and Fixing in replacement of old unserviceable drawer of table dressing ladies, including dismantling and removal of the damaged/defective drawer. The drawer shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading. The back and bottom of the drawer shall be fabricated from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.The drawer shall be provided with 01 x 100mm long 8mm dia chrome plated Oval D Pull handles with screw & 2 x 10 inch long stainless steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel of Make: Godrej/Hettich/Ebco or as directed by GE/Engineer-in-Charge complete.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
81Supply and fixing in replacement of the old, unserviceable table dressing ladies bottom, including dismantling and removal of the damaged/defective bottom. The new bottom shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
82Supply and fixing in replacement of old unserviceable table dressing ladies bottom frame leg, including dismantling and removal of the damaged/defective leg. The new leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
83Supply and fixing in replacement of old unserviceable table dressing ladies bottom frame, including dismantling and removal of the damaged/defective frame. The new frame shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
84Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
85Peg Table Drg No.(FD-277, FD-236, FD-266 & FD-384): Dismantling and removing the following existing unserviceable components of peg table and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
86Supply and fixing in replacement of the old, unserviceable table top, including dismantling and removal of the damaged/defective top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
87Supply and fixing in replacement of old unserviceable table leg, including dismantling and removal of the damaged/defective leg. The new leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge
88Supply and fixing in replacement of old unserviceable table long rail, including dismantling and removal of the damaged/defective long rail. The new long rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
89Supply and fixing in replacement of old unserviceable table short rail, including dismantling and removal of the damaged/defective short rail. The new short rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
90Supply and fixing in replacement of old unserviceable table stiffener, including dismantling and removal of the damaged/defective stiffener. The new stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
91Supply and fixing in replacement of old unserviceable wooden cleat, including dismantling and removal of the damaged/defective wooden cleat. The new L Claimp shall be of size: 50 mm × 30 mm × 3 mm thick L-brackets, Mild Steel (MS), zinc-coated or powder-coated with Minimum 4 fixing holes (2 on each side). Fixing shall be with 25-35 mm long CSK head wood screws as applicable, Qty 2 brackets per leg (one on each side) as directed by the Engineer-in-Charge. The work includes drilling, fitting, additional fixing accessories for table leg joints, including wooden dowels, MS screws, adhesive, and any necessary minor hardware to strengthen leg-to-frame connections and finishing complete, all as specified and directed
92Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
93Teapoy: Dismantling and removing the following existing unserviceable components of Teapoy and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge. Drg No.(FD-278 & FD-382)
94Supply and fixing in replacement of the old, unserviceable teapoy top, including dismantling and removal of the damaged/defective top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
95Supply and fixing in replacement of old unserviceable teapoy leg, including dismantling and removal of the damaged/defective leg. The new leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
96Supply and fixing in replacement of old unserviceable teapoy long rail, including dismantling and removal of the damaged/defective long rail. The new long rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
97Supply and fixing in replacement of old unserviceable teapoy short rail, including dismantling and removal of the damaged/defective short rail. The new short rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
98Supply and fixing in replacement of old unserviceable teapoy stiffener, including dismantling and removal of the damaged/defective stiffener. The new stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
99Supply and fixing in replacement of old unserviceable wooden cleat, including dismantling and removal of the damaged/defective wooden cleat. The new L Claimp shall be of size: 50 mm × 30 mm × 3 mm thick L-brackets, Mild Steel (MS), zinc-coated or powder-coated with Minimum 4 fixing holes (2 on each side). Fixing shall be with 25-35 mm long CSK head wood screws as applicable, Qty 2 brackets per leg (one on each side) as directed by the Engineer-in-Charge. The work includes drilling, fitting, additional fixing accessories for table leg joints, including wooden dowels, MS screws, adhesive, and any necessary minor hardware to strengthen leg-to-frame connections and finishing complete, all as specified and directed
100Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
101Table dressing ladies with stool cushioned : Dismantling and removing the following existing unserviceable components of Table dressing ladies with stool cushioned and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge. Drg No. (FD/MAP-II/07)
102Supply and fixing in replacement of the old, unserviceable table dressing ladies Mirror with frame, including dismantling and removal of the damaged/defective Mirror. The new Mirror shall be make of Modiguard/Atul/Saint-Gobain of thickness 5.5 mm nominal Float Glass Mirror (Silvered reflective coating with copper and protective backing paint), edges shall be Machine-cut, polished or beveled edges. The Back of Mirror shall be covered with 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.The Mirror frame shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
103Supply and fixing in replacement of the old, unserviceable table dressing ladies top, including dismantling and removal of the damaged/defective top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
104Supply and fixing in replacement of the old, unserviceable table dressing ladies sides, including dismantling and removal of the damaged/defective Side. The new Side shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
105Supply and fixing in replacement of the old, unserviceable table dressing ladies back, including dismantling and removal of the damaged/defective back. The new back shall be fabricated from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
106Supply and Fixing in replacement of old unserviceable drawer of table dressing ladies, including dismantling and removal of the damaged/defective drawer. The drawer shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading. The back and bottom of the drawer shall be fabricated from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.The drawer shall be provided with 01 x 100mm long 8mm dia chrome plated Oval D Pull handles with screw & 2 x 10 inch long stainless steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel of Make: Godrej/Hettich/Ebco or as directed by GE/Engineer-in-Charge complete.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
107Supply and fixing in replacement of the old, unserviceable dressing stool, including dismantling and removal of the damaged/defective stool. The new stool shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading. The bottom of the stool shall be fabricated from 18mm thick, BWR ply of grade -A, conforming to IS: 303 with 04 (Nos) x swivel castor as approved.Make of Plywood: Archid/ Greenply /Century or equivalent as approved.
108Supply and Fixing in replacement of old, unserviceable Drawer channel, including dismantling and removal of the damaged/defective channel. The New Drawer channel shall be of 12 inch long stainless steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel of Make: Godrej/Hettich/Ebco with screw as approved shall be provided and all as shown on drawing and as directed.
109Supply and fixing in replacement of the old, unserviceable table dressing ladies bottom, including dismantling and removal of the damaged/defective bottom. The new bottom shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
110Supply and Fixing in replacement of old, unserviceable knob/handles, including dismantling and removal of the damaged/defective knob/Handles. The New Knob (As per sample)/Handles 100mm long 8mm dia chrome plated Oval D Pull handles with screw as approved shall be provided and all as shown on drawing and as directed.
111Supply and Fixing in replacement of old, unserviceable cushion seat, including dismantling and removal of the damaged/defective cushion seat. The New cushion seat shall be made of 75 mm thick, 40 density cushion (Make:Sleepwell/Kurlon) with hot pressed 12mm BWR plywood seat covered with Superior quality (Make: Bombay Dying/D'Decor/Raymond) tapestry cloth or Premium Leatherette (as approved, cost of tapestry cloth shall not be less than Rs 350.00 per meter) complete all as specified in drawing and directed.
112Supply and Fixing in replacement of old unserviceable Swivel Castor as approved shall be provided and all as shown on drawing and as directed.
113Table office clerk Drg o. (DB- 4121/292): Dismantling and removing the following existing unserviceable components of table office clerk and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
114Supply and fixing in replacement of the old, unserviceable table top, including dismantling and removal of the damaged/defective top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
115Supply and Fixing in replacement of old unserviceable drawer of table office clerk, including dismantling and removal of the damaged/defective drawer. The drawer shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading. The back and bottom of the drawer shall be fabricated from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.The drawer shall be provided with 01 x 100mm long 8mm dia chrome plated Oval D Pull handles with screw & 2 x 18 inch long stainless steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel of Make: Godrej/Hettich/Ebco or as directed by GE/Engineer-in-Charge complete.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
116Supply and fixing in replacement of old unserviceable table leg, including dismantling and removal of the damaged/defective leg. The new leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
117Supply and fixing in replacement of old unserviceable table long rail, including dismantling and removal of the damaged/defective long rail. The new long rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
118Supply and fixing in replacement of old unserviceable table short rail, including dismantling and removal of the damaged/defective short rail. The new short rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
119Supply and fixing in replacement of old unserviceable table stiffener, including dismantling and removal of the damaged/defective stiffener. The new stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
120Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
121Table Office Officer : Dismantling and removing the following existing unserviceable components of table office officer and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge. Drg No. (WDF- 32/FD- 139)
122Supply and fixing in replacement of the old, unserviceable table top, including dismantling and removal of the damaged/defective top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
123Supply and Fixing in replacement of old unserviceable drawer of table office officer, including dismantling and removal of the damaged/defective drawer. The drawer shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading. The back and bottom of the drawer shall be fabricated from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.The drawer shall be provided with 01 x 100mm long 8mm dia chrome plated Oval D Pull handles with screw & 2 x 18 inch long stainless steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel of Make: Godrej/Hettich/Ebco or as directed by GE/Engineer-in-Charge complete. This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
124Supply and fixing in replacement of old unserviceable table leg, including dismantling and removal of the damaged/defective leg. The new leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
125Supply and fixing in replacement of old unserviceable table long rail, including dismantling and removal of the damaged/defective long rail. The new long rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
126Supply and fixing in replacement of old unserviceable table short rail, including dismantling and removal of the damaged/defective short rail. The new short rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
127Supply and fixing in replacement of old unserviceable table stiffener, including dismantling and removal of the damaged/defective stiffener. The new stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
128Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
129Form w/o back: Dismantling and removing the following existing unserviceable components of Form without Back and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.Drg No.( F-73)
130Supply and fixing in replacement of old unserviceable Seat, including dismantling and removal of the damaged/defective Seat. The new Seat shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
131Form with back : Dismantling and removing the following existing unserviceable components of Form with Back and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge. Drg No. (FD-78(M))
132Supply and fixing in replacement of old unserviceable Seat, including dismantling and removal of the damaged/defective Seat. The new Seat shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
133Supply and fixing in replacement of old unserviceable Back, including dismantling and removal of the damaged/defective Back. The new Back shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
134Chair dining with long back Drg No.( FD-357): Dismantling and removing the following existing unserviceable components of chair dining with long back and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
135Supply and fixing in replacement of old unserviceable Seat & Back of chair dining, including dismantling and removal of the damaged/defective seat & back. The new seat & back shall be made from 75 mm thick, 40 density cushion (Make:Sleepwell/Kurlon) with hot pressed 12mm BWR plywood seat covered with Superior quality (Make: Bombay Dying/ D'Decor/ Raymond) tapestry cloth or Premium Leatherette (as approved, cost of tapestry cloth shall not be less than Rs 350.00 per meter) complete all as specified in drawing and directed.
136Supply and fixing in replacement of old unserviceable rear/front leg, including dismantling and removal of the damaged/defective leg. The new leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
137Supply and fixing in replacement of old unserviceable side rail, including dismantling and removal of the damaged/defective side rail. The new side rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
138Supply and fixing in replacement of old unserviceable front rail, including dismantling and removal of the damaged/defective front rail. The new front rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
139Supply and fixing in replacement of old unserviceable side stiffeners, including dismantling and removal of the damaged/defective side stiffener. The new side stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
140Supply and fixing in replacement of old unserviceable centre stiffeners, including dismantling and removal of the damaged/defective centre stiffener. The new centre stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
141Supply and fixing in replacement of old unserviceable back rest batten, including dismantling and removal of the damaged/defective back rest batten. The new back rest batten shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
142Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
143Chair dining Drg No. (FD-16, FD-203, FD-279, FD-228): Dismantling and removing the following existing unserviceable components of chair dining and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
144Supply and fixing in replacement of old unserviceable front leg, including dismantling and removal of the damaged/defective front leg. The new front leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
145Supply and fixing in replacement of old unserviceable rear leg, including dismantling and removal of the damaged/defective rear leg. The new rear leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
146Supply and fixing in replacement of old unserviceable front rail, including dismantling and removal of the damaged/defective front rail. The new front rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
147Supply and fixing in replacement of old unserviceable Back rail, including dismantling and removal of the damaged/defective Back rail. The new Back rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
148Supply and fixing in replacement of old unserviceable Side rail, including dismantling and removal of the damaged/defective Side rail. The new Side rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
149Supply and fixing in replacement of old unserviceable Back rest, including dismantling and removal of the damaged/defective Back rest. The new Back rest shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
150Supply and fixing in replacement of old unserviceable stiffeners, including dismantling and removal of the damaged/defective stiffener. The new stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
151Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
152Material & Labour for complete removal of unserviceable or worn-out plastic cane from Dining Chair. Complete preparation of the surface including: (a) Filling of cracks with wood filler, if any, (b) Tightening of the wooden frame using Fevicol or equivalent adhesive & (c) Fixing with wooden nails where necessary.Recaning of the chair using new white plastic cane Type I (Virgin HDPE) only and shall not be recycled type with Cane size 2mm wide with a border of 4mm wide, 0.4mm/0.6mm thick respectively half round oval shape, in godrej pattern. All caning to be neatly woven, all edges trimmed, joints tight, and beading securely fastened, complete all as specified and directed
153Chair Easy Drg No. (FD-17, FD-229, FD-201): Dismantling and removing the following existing unserviceable components of chair Easy and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
154Supply and fixing in replacement of old unserviceable front leg, including dismantling and removal of the damaged/defective front leg. The new front leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
155Supply and fixing in replacement of old unserviceable rear leg, including dismantling and removal of the damaged/defective rear leg. The new rear leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
156Supply and fixing in replacement of old unserviceable front rail, including dismantling and removal of the damaged/defective front rail. The new front rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
157Supply and fixing in replacement of old unserviceable Back rail, including dismantling and removal of the damaged/defective Back rail. The new Back rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
158Supply and fixing in replacement of old unserviceable Side rail, including dismantling and removal of the damaged/defective Side rail. The new Side rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
159Supply and fixing in replacement of old unserviceable Arms Rest, including dismantling and removal of the damaged/defective Arms Rest. The new Arms Rest shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
160Supply and fixing in replacement of old unserviceable Back frame rail for back, including dismantling and removal of the damaged/defective Back frame rail for back. The new Back frame rail for back shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
161Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
162Material & Labour for complete removal of unserviceable or worn-out plastic cane from Easy Chair. Complete preparation of the surface including: (a) Filling of cracks with wood filler, if any, (b) Tightening of the wooden frame using Fevicol or equivalent adhesive & (c) Fixing with wooden nails where necessary.Recaning of the chair using new white plastic cane Type I (Virgin HDPE) only and shall not be recycled type with Cane size 2mm wide with a border of 4mm wide, 0.4mm/0.6mm thick respectively half round oval shape, in godrej pattern. All caning to be neatly woven, all edges trimmed, joints tight, and beading securely fastened, complete all as specified and directed
163Chair writing FD-20, FD-202, FD-250, FD-280: Dismantling and removing the following existing unserviceable components of chair writing and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
164Supply and fixing in replacement of old unserviceable front leg, including dismantling and removal of the damaged/defective front leg. The new front leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
165Supply and fixing in replacement of old unserviceable rear leg, including dismantling and removal of the damaged/defective rear leg. The new rear leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
166Supply and fixing in replacement of old unserviceable front rail, including dismantling and removal of the damaged/defective front rail. The new front rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
167Supply and fixing in replacement of old unserviceable Side/Back rail, including dismantling and removal of the damaged/defective Side/Back rail. The new Side/Back rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
168Supply and fixing in replacement of old unserviceable Back Rest, including dismantling and removal of the damaged/defective Back Rest. The new Back Rest shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
169Supply and fixing in replacement of old unserviceable Bottom Stiffener, including dismantling and removal of the damaged/defective Bottom Stiffener. The new Bottom Stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
170Supply and fixing in replacement of old unserviceable Bottom Centre Stiffener, including dismantling and removal of the damaged/defective Bottom Centre Stiffener. The new Bottom Centre Stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
171Supply and fixing in replacement of old unserviceable Arms Rest, including dismantling and removal of the damaged/defective Arms Rest. The new Arms Rest shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
172Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
173Material & Labour for complete removal of unserviceable or worn-out plastic cane from Writing Chair. Complete preparation of the surface including: (a) Filling of cracks with wood filler, if any, (b) Tightening of the wooden frame using Fevicol or equivalent adhesive & (c) Fixing with wooden nails where necessary.Recaning of the chair using new white plastic cane Type I (Virgin HDPE) only and shall not be recycled type with Cane size 2mm wide with a border of 4mm wide, 0.4mm/0.6mm thick respectively half round oval shape, in godrej pattern. All caning to be neatly woven, all edges trimmed, joints tight, and beading securely fastened, complete all as specified and directed
174Chair dining JCOs/OR FD/E6/MAP-II/05 : Dismantling and removing the following existing unserviceable components of chair dining JCOs/OR and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
175Supply and fixing in replacement of old unserviceable front leg, including dismantling and removal of the damaged/defective front leg. The new front leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
176Supply and fixing in replacement of old unserviceable rear leg, including dismantling and removal of the damaged/defective rear leg. The new rear leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
177Supply and fixing in replacement of old unserviceable front rail, including dismantling and removal of the damaged/defective front rail. The new front rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
178Supply and fixing in replacement of old unserviceable Back rail, including dismantling and removal of the damaged/defective Back rail. The new Back rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
179Supply and fixing in replacement of old unserviceable Side rail, including dismantling and removal of the damaged/defective Side rail. The new Side rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
180Supply and fixing in replacement of old unserviceable Back rest, including dismantling and removal of the damaged/defective Back rest. The new Back rest shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
181Supply and fixing in replacement of old unserviceable stiffeners, including dismantling and removal of the damaged/defective stiffener. The new stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
182Supply and fixing in replacement of old unserviceable PVC Seat, including dismantling and removal of the damaged/defective Seat. The new Seat shall be fabricated of 4mm thick PVC of size 405x390mm (Make AMKO/CELLO/MILTON or equivalent as approved) with holes & 4 x 10mm thick ribs moulded alongwith sheet in single piece, place and fix with 20mm long screw wood steel and conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
183Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
184Chair dining Officers (FD/E6/MAP-II/04) : Dismantling and removing the following existing unserviceable components of chair dining Officers and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
185Supply and fixing in replacement of old unserviceable front leg, including dismantling and removal of the damaged/defective front leg. The new front leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
186Supply and fixing in replacement of old unserviceable rear leg, including dismantling and removal of the damaged/defective rear leg. The new rear leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
187Supply and fixing in replacement of old unserviceable front rail, including dismantling and removal of the damaged/defective front rail. The new front rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
188Supply and fixing in replacement of old unserviceable Back rail, including dismantling and removal of the damaged/defective Back rail. The new Back rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
189Supply and fixing in replacement of old unserviceable Side rail, including dismantling and removal of the damaged/defective Side rail. The new Side rail shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
190Supply and fixing in replacement of old unserviceable Back rest with strips, including dismantling and removal of the damaged/defective Back rest with strips. The new Back rest with strips shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
191Supply and fixing in replacement of old unserviceable stiffeners, including dismantling and removal of the damaged/defective stiffener. The new stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
192Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
193Supply and fixing in replacement of old unserviceable Seat of chair dining officers, including dismantling and removal of the damaged/defective seat. The new seat shall be made from 75 mm thick, 40 density cushion (Make:Sleepwell/Kurlon) with hot pressed 12mm BWR plywood seat covered with Superior quality (Make: Bombay Dying/D'Decor/Raymond) tapestry cloth or Premium Leatherette (as approved, cost of tapestry cloth shall not be less than Rs 350.00 per meter) and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
194BED WITH PLYWOOD TOP FD-246, FD-247: Dismantling and removing the following existing unserviceable components of Bed with plywod top and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
195Supply and fixing in replacement of old unserviceable Plywood of Bed, including dismantling and removal of the damaged/defective Plywood. The new seat shall be made of 12mm thick BWR ply of grade -A; place and fix over the three equidistant stiffener and conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.Make of Plywood: Archid/Greenply/Century or equivalent as approved
196Supply and fixing of new wooden head rests in replacement of old, unserviceable, or worn-out head rest. Including dismantling and safe removal of the existing damaged or defective head rests, followed by installation of new head rests as per the specifications detailed here as below:-Wood Type: Seasoned teak wood, free from cracks, knots, or any other visible defects.Vertical Component Dimensions: 75mm x 22mm x 460mm.Horizontal Component Dimensions: 30mm x 60mm x 900mm (with integrated leg connection).Legs: Upper Leg Section: 60mm x 60mm in cross-section. Over all Leg Length from Bottom: 660mm. Bottom Section of Leg: 30mm x 30mm in cross-section.Both sides shall be covered from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading. All components shall be neatly jointed and securely fixed, ensuring no sharp edges, splinters, or loose connections. Fixing shall be carried out using SS screws and wood adhesive of approved make, and conform to the size, shape, and finish as shown on the approved drawings. This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
197Supply and fixing of new wooden Foot rests in replacement of old, unserviceable, or worn-out foot rest. Including dismantling and safe removal of the existing damaged or defective foot rests, followed by installation of new foot rests as per the specifications detailed here as belowWood Type: Seasoned teak wood, free from cracks, knots, or any other visible defects.Three (3) Nos. Battens of size 22mm x 75mm x 300mm, spaced equally. Battens shall be securely joined between the top and bottom horizontal rails of the footboard. Top and bottom horizontal rails shall be of 30mm x 60mm x 900 mm sectionLegs: Upper Leg Section: 60mm x 60mm in cross-section. Over all Leg Length from Bottom: 500mm. Bottom Section of Leg: 30mm x 30mm in cross-section.Both sides shall be covered from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading. All components shall be neatly jointed and securely fixed, ensuring no sharp edges, splinters, or loose connections. Fixing shall be carried out using SS screws and wood adhesive of approved make, and conform to the size, shape, and finish as shown on the approved drawings. This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
198Supply and fixing in replacement of old unserviceable stiffeners, including dismantling and removal of the damaged/defective stiffener. The new stiffener shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
199Supply and fixing in replacement of old unserviceable side plywood of head rest, including dismantling and removal of the damaged/defective plywood. The new sides shall be made from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
200Supply and fixing in replacement of old unserviceable side plywood of foot rest, including dismantling and removal of the damaged/defective plywood. The new sides shall be made from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
201Supply and Fixing in replacement of old unserviceable Flat iron size 150x35x5mm made to shape as per drg to be fixed with 6 Nos of screw wood steel 35mm long ISI marked duly painted with paint synthetic enamel black over a coat of primer of each corners of Bed Hard/ Bed plywood top all as specified on drawing or as directed by Engineer-in-charge.
202Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
203Side Board FD-241 & 1112 : Dismantling and removing the following existing unserviceable components of Side Board and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
204Supply and fixing in replacement of the old, unserviceable Side Board sides, including dismantling and removal of the damaged/defective Side. The new Side shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
205Supply and fixing in replacement of the old, unserviceable Side Board back, including dismantling and removal of the damaged/defective back. The new back shall be fabricated from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
206Supply and Fixing in replacement of old unserviceable drawer of side board, including dismantling and removal of the damaged/defective drawer. The drawer shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading. The back and bottom of the drawer shall be fabricated from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.The drawer shall be provided with 01 x 100mm long 8mm dia chrome plated Oval D Pull handles with screw & 2 x 18 inch long stainless steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel of Make: Godrej/Hettich/Ebco or as directed by GE/Engineer-in-Charge complete.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
207Supply and fixing in replacement of the old, unserviceable Door Shutter of Side Board, including dismantling and removal of the damaged/defective Door Shutter. The new Door Shutter shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading. The each Shutter shall be provided with 01 x 100mm long 8mm dia chrome plated Oval D Pull handles with screw, Magnetic cather and 03 x soft closing concealed Intermate Hinges at inside all as directed.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
208Supply and fixing in replacement of the old, unserviceable Side Board Top, including dismantling and removal of the damaged/defective Top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
209Supply and fixing in replacement of old unserviceable Bottom Frame of side board, including dismantling and removal of the damaged/defective Frame. The new Frame shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
210Supply and Fixing in replacement of old, unserviceable knob/handles, including dismantling and removal of the damaged/defective knob/Handles. The New Knob (As per sample)/Handles 100mm long 8mm dia chrome plated Oval D Pull handles with screw as approved shall be provided and all as shown on drawing and as directed.
211Supply and fixing new L Claimp shall be of size: 50 mm × 50 mm × 3 mm thick L-brackets, Mild Steel (MS), zinc-coated or powder-coated with Minimum 4 fixing holes (2 on each side). Fixing shall be with appropriate size CSK head wood screws as applicable and directed by the Engineer-in-Charge. The work includes drilling, fitting, additional fixing accessories for joints, including wooden dowels, MS screws, adhesive, and any necessary minor hardware to strengthen connections/joints and finishing complete, all as specified and directed
212Bin Soiled Multipurpose (FD/E6/MAP/09): Dismantling and removing the following existing unserviceable components of Bin Soiled Multipurpose and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
213Supply and fixing in replacement of the old, unserviceable Bin Soiled Multipurpose sides, including dismantling and removal of the damaged/defective Side. The new Side shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
214Supply and fixing in replacement of the old, unserviceable Bin Soiled Multipurpose sides back, including dismantling and removal of the damaged/defective back. The new back shall be fabricated from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
215Supply and Fixing in replacement of old unserviceable drawer of Bin Soiled Multipurpose, including dismantling and removal of the damaged/defective drawer. The drawer shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading. The back and bottom of the drawer shall be fabricated from 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.The drawer shall be provided with 01 x 100mm long 8mm dia chrome plated Oval D Pull handles with screw & 2 x 18 inch long stainless steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel of Make: Godrej/Hettich/Ebco or as directed by GE/Engineer-in-Charge complete.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
216Supply and fixing in replacement of the old, unserviceable Door Shutter of Bin Soiled Multipurpose, including dismantling and removal of the damaged/defective Door Shutter. The new Door Shutter shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading. The each Shutter shall be provided with 01 x 100mm long 8mm dia chrome plated Oval D Pull handles with screw, Magnetic cather and 03 x soft closing concealed Intermate Hinges at inside all as directed.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
217Supply and fixing in replacement of the old, unserviceable Bin Soiled Multipurpose Top, including dismantling and removal of the damaged/defective Top. The new top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
218Supply and fixing in replacement of old unserviceable Bottom Frame of Bin Soiled Multipurpose, including dismantling and removal of the damaged/defective Frame. The new Frame shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
219Supply and Fixing in replacement of old, unserviceable knob/handles, including dismantling and removal of the damaged/defective knob/Handles. The New Knob (As per sample)/Handles 100mm long 8mm dia chrome plated Oval D Pull handles with screw as approved shall be provided and all as shown on drawing and as directed.
220Supply and fixing new L Claimp shall be of size: 50 mm × 50 mm × 3 mm thick L-brackets, Mild Steel (MS), zinc-coated or powder-coated with Minimum 4 fixing holes (2 on each side). Fixing shall be with appropriate size CSK head wood screws as applicable and directed by the Engineer-in-Charge. The work includes drilling, fitting, additional fixing accessories for joints, including wooden dowels, MS screws, adhesive, and any necessary minor hardware to strengthen connections/joints and finishing complete, all as specified and directed.
221Hat stand with mirror (FD- 23, FD-361): Dismantling and removing the following existing unserviceable components of Hat Stand with Mirror and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
222Supply and fixing in replacement of old unserviceable Mirror of Hat Stand, including dismantling and removal of the damaged/defective Mirror. The new Mirror shall be make of Modiguard/Atul/Saint-Gobain of size 440 x 300 mm x thickness 5.5 mm nominal Float Glass Mirror (Silvered reflective coating with copper and protective backing paint), edges shall be Machine-cut, polished or beveled edges. The Back of Mirror shall be covered with 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.The Mirror frame shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
223Supply and Fixing in replacement of old, unserviceable Pegs, including dismantling and removal of the damaged/defective Pegs. The New Brass Pegs (As per sample) with screw as approved shall be provided and all as shown on drawing and as directed.
224Supply and Fixing in replacement of old, unserviceable Key Plate, including dismantling and removal of the damaged/defective Key Plate. The New Key Plate, Rwal Plug (As per sample) with screw as approved shall be provided and all as shown on drawing and as directed.
225Supply and fixing in replacement of old unserviceable plywood of Hat Stand, including dismantling and removal of the damaged/defective plywood. The new front shall be made from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
226Dressing Mirror Gents Offrs/JCOs/OR (FD/E6/MAP/16): Dismantling and removing the following existing unserviceable components of Dressing Mirror Gents Offrs/JCOs/OR and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
227Supply and fixing in replacement of old unserviceable Mirror of Dressing Mirror, including dismantling and removal of the damaged/defective Mirror. The new Mirror shall be make of Modiguard/Atul/Saint-Gobain of size 1080 x 530 mm x thickness 5.5 mm nominal Float Glass Mirror (Silvered reflective coating with copper and protective backing paint), edges shall be Machine-cut, polished or beveled edges. The Back of Mirror shall be covered with 6mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.The Mirror frame of size 35x6mm shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.The each Mirror Shutter shall be provided with 01 x 100mm long 8mm dia chrome plated Oval D Pull handles with screw, Magnetic cather and 03 x soft closing concealed Intermate Hinges at inside all as directed.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
228Supply and fixing in replacement of the old, unserviceable dressing mirror Bottom, including dismantling and removal of the damaged/defective Bottom. The new Bottom shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
229Supply and fixing in replacement of the old, unserviceable dressing mirror Top, including dismantling and removal of the damaged/defective Top. The new Top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
230Supply and fixing in replacement of the old, unserviceable dressing mirror sides, including dismantling and removal of the damaged/defective Top. The new Top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
231Supply and fixing in replacement of the old, unserviceable dressing Glass Shelf, including dismantling and removal of the damaged/defective Glass Shelf. The new Top shall be of Modiguard/Atul/Saint-Gobain of 496mmx95mm thickness 5 mm nominal Clear Float Glass / Toughened Glass, edges shall be Machine-cut, polished or beveled edges.The work shall be carried out as specified and as directed by the Engineer-in-Charge.
232Supply and fixing in replacement of the old, unserviceable dressing mirror back, including dismantling and removal of the damaged/defective back. The new back shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
233Supply and fixing new L Claimp shall be of size: 50 mm × 50 mm × 3 mm thick L-brackets, Mild Steel (MS), zinc-coated or powder-coated with Minimum 4 fixing holes (2 on each side). Fixing shall be with appropriate size CSK head wood screws as applicable and directed by the Engineer-in-Charge. The work includes drilling, fitting, additional fixing accessories for joints, including wooden dowels, MS screws, adhesive, and any necessary minor hardware to strengthen connections/joints and finishing complete, all as specified and directed.
234Trestle SR wooden (FD- 86/141 ): Dismantling and removing the following existing unserviceable components of Trestle Store Room Wooden and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge
235Supply and fixing in replacement of old unserviceable Top batten of size 2440x100x100mm of Trestle SR Wooden, including dismantling and removal of the damaged/defective Batten. The new Top Batten shall be of size 2440x100x100mm made from seasoned 2nd class hard wood (SAL), free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
236Supply and fixing in replacement of old unserviceable Top batten of size 600x60x100mm of Trestle SR Wooden, including dismantling and removal of the damaged/defective Batten. The new Top Batten shall be of size 600x60x100mm made from seasoned 2nd class hard wood (SAL), free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
237Supply and fixing in replacement of old unserviceable Top batten of size 2040x60x100mm of Trestle SR Wooden, including dismantling and removal of the damaged/defective Batten. The new Top Batten shall be of size 2040x60x100mm made from seasoned 2nd class hard wood (SAL), free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
238Supply and fixing in replacement of old unserviceable Leg of Trestle SR Wooden, including dismantling and removal of the damaged/defective Leg. The new Leg shall be made from seasoned 2nd class hard wood (SAL), free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
239Material and Labour for preparing of old surfaces by scrapping/grinding old surface and remove oil and contaminants by solvent cleaning by mineral spirits or alkaline cleaners. Rinse thoroughly and dry if necessary. Remove all dust by mechanical means such as wire brushing, sanding or sandblasting/abrasive blasting to creat a rough surface for better paint adhesion. Thereafter, primer (as approved by GE) shall be apply with spray gun machine. Synthetic enamel Black Paint (Make:Asian Paints/ Berger/ Nerolac) shall be applied one coat with spray gun and air dried for a minimum 08 Hours. The second coat shall then be applied with spray gun complete all work as specified and directed
240TV trolley (FD/E6/MAP/04R): Dismantling and removing the following existing unserviceable components of TV Trolly and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
241Supply and fixing in replacement of old unserviceable Wheel of TV Trolly, including dismantling and removal of the damaged/defective wheel. The new swivel castor (thread type or push type as approved) shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
242Supply and fixing in replacement of the old, unserviceable tv trolly sides, including dismantling and removal of the damaged/defective sides. The new sides shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
243Supply and fixing in replacement of the old, unserviceable tv trolly Top, including dismantling and removal of the damaged/defective Top. The new Top shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
244Supply and fixing in replacement of the old, unserviceable tv trolly Bottom, including dismantling and removal of the damaged/defective Bottom. The new Bottom shall be fabricated from 18mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade with post-formed edge, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
245Supply and fixing in replacement of the old, unserviceable tv trolly Back, including dismantling and removal of the damaged/defective Back. The new Back shall be fabricated from 12mm thick, exterior grade I Medium Density Fibreboard (MDF) conforming to IS 12406:2003. It shall be both sides laminated (BSL) - one side in a super matt finish in an approved shade, and the other side with balancing white laminate. All exposed edges shall be finished with 2mm thick PVC edge beading.This specification shall be followed irrespective of what is shown on the drawing, and the work shall be carried out as specified and as directed by the Engineer-in-Charge.
246Supply and fixing in replacement of the old, unserviceable Glass Shutter, including dismantling and removal of the damaged/defective Glass Shutter. The new glass shutter shall be of Modiguard/Atul/Saint-Gobain of thickness 5.5mm nominal Clear Float Glass, edges shall be Machine-cut, polished or beveled edges. The Glass shutter shall conform to the size, shape, and finish as shown on the approved drawings and fixed with 02 Nos (glass hinges) with Magnetic catcher all as directed by the Engineer-in-Charge.
247Supply and fixing new L Claimp shall be of size: 50 mm × 50 mm × 3 mm thick L-brackets, Mild Steel (MS), zinc-coated or powder-coated with Minimum 4 fixing holes (2 on each side). Fixing shall be with appropriate size CSK head wood screws as applicable and directed by the Engineer-in-Charge. The work includes drilling, fitting, additional fixing accessories for joints, including wooden dowels, MS screws, adhesive, and any necessary minor hardware to strengthen connections/joints and finishing complete, all as specified and directed
248SOFA SET 5 SEATER WITH CUSHION (FD- 281, FD-373 & FD/MAP-II/02) : Dismantling and removing the following existing unserviceable components of Sofa Set 5 Seater and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
249Supply and fixing in replacement of old unserviceable foam cushion, including dismantling and removal of the damaged/defective foam cushion. The new foam cushion (Make- Sleepwell/Kurlon) shall be of size 558mm x 533mm x 100mm thick of 40 density covered with white lining cloth and premium quality tapestry cloth (Make: Bombay Dying/D'Decor/Raymond of rate not less than 400 per mtr), shall be provided with nylon zipper at one edge duly covered under the tapestry cloth flap as approved by GE/ Engineer-in-Charge., and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.Note :- (i) Each cushion for seat or back will be measured as single unit.
250Supply and fixing in replacement of old unserviceable Plywood of 3 seater sofa, including dismantling and removal of the damaged/defective Plywood. The new seat shall be made of 12mm thick BWR ply of grade -A; place and fix in the existing pattern and conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.Make of Plywood: Archid/Greenply/Century or equivalent as approved.
251Supply and fixing in replacement of old unserviceable Plywood of Single seater sofa, including dismantling and removal of the damaged/defective Plywood. The new seat shall be made of 12mm thick BWR ply of grade -A; place and fix in the existing pattern and conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.Make of Plywood: Archid/Greenply/Century or equivalent as approved.
252Supply and fixing in replacement of old unserviceable front leg, including dismantling and removal of the damaged/defective front leg. The new front leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
253Supply and fixing in replacement of old unserviceable rear leg, including dismantling and removal of the damaged/defective rear leg. The new rear leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
254Supply and fixing in replacement of old unserviceable Arm rest, including dismantling and removal of the damaged/defective Arm rest. The new Arm rest shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
255Supply and fixing in replacement of old unserviceable Side Rail (Size 35mmx100mmx725mm), including dismantling and removal of the damaged/defective Side Rail (Size 35mmx100mmx725mm). The new Side Rail (Size 35mmx100mmx725mm) shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
256Supply and fixing in replacement of old unserviceable Bearers (Size 40mmx40mmx725mm), including dismantling and removal of the damaged/defective Bearers (Size 40mmx40mmx725mm). The new Bearers (Size 40mmx40mmx725mm) shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
257Supply and fixing in replacement of old unserviceable Front rail of 3 seater, including dismantling and removal of the damaged/defective Front rail of 3 seater. The new Front rail of 3 seater shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
258Supply and fixing in replacement of old unserviceable Rear rail of 3 seater, including dismantling and removal of the damaged/defective Rear rail of 3 seater. The new Rear rail of 3 seater shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
259Supply and fixing in replacement of old unserviceable Front rail of Single seater (Size 35mmx10mmx530mm), including dismantling and removal of the damaged/defective Front rail of Single seater (Size 35mmx10mmx530mm). The new Front rail of Single seater (Size 35mmx10mmx530mm) shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
260Supply and fixing in replacement of old unserviceable Rear rail of Single seater (Size 35mmx10mmx530mm), including dismantling and removal of the damaged/defective Rear rail of Single seater (Size 35mmx10mmx530mm). The new Rear rail of Single seater (Size 35mmx10mmx530mm) shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
261Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
262Sofa set 5 Seater (FD-258) : Dismantling and removing the following existing unserviceable components of Sofa Set 5 Seater and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
263Supply and fixing in replacement of old unserviceable Seat foam cushion, including dismantling and removal of the damaged/defective seat foam cushion. The new seat foam cushion (Make- Sleepwell/ Kurlon) shall be of 40 density covered with white lining cloth and premium quality tapestry cloth (Make: Bombay Dying/D'Decor/Raymond of rate not less than 400 per mtr), shall be provided with nylon zipper at one edge duly covered under the tapestry cloth flap as approved by GE/Engineer-in-Charge., and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.Note :- (i) Each cushion for seat will be measured as single unit.
264Supply and fixing in replacement of old unserviceable Back foam cushion, including dismantling and removal of the damaged/defective Back foam cushion. The new Back foam cushion (Make- Sleepwell/ Kurlon) shall be of 40 density covered with white lining cloth and premium quality tapestry cloth (Make: Bombay Dying/D'Decor/Raymond of rate not less than 400 per mtr), shall be provided with nylon zipper at one edge duly covered under the tapestry cloth flap and fix over the base of seasonned teak wood frame in one piece and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.Note :- (i) Each cushion for Back will be measured as single unit.
265Supply and fixing in replacement of old unserviceable Plywood of 3 seater sofa, including dismantling and removal of the damaged/defective Plywood. The new seat shall be made of 12mm thick BWR ply of grade -A; place and fix in the existing pattern and conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.Make of Plywood: Archid/Greenply/Century or equivalent as approved
266Supply and fixing in replacement of old unserviceable Plywood of Single seater sofa, including dismantling and removal of the damaged/defective Plywood. The new seat shall be made of 12mm thick BWR ply of grade -A; place and fix in the existing pattern and conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.Make of Plywood: Archid/Greenply/Century or equivalent as approved
267Supply and fixing in replacement of old unserviceable front leg, including dismantling and removal of the damaged/defective front leg. The new front leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
268Supply and fixing in replacement of old unserviceable rear leg, including dismantling and removal of the damaged/defective rear leg. The new rear leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
269Supply and fixing in replacement of old unserviceable Arm rest, including dismantling and removal of the damaged/defective Arm rest. The new Arm rest shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
270Supply and fixing in replacement of old unserviceable Side Rail 3 seater, including dismantling and removal of the damaged/defective Side Rail 3 seater. The new Side Rail 3 seater shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
271Supply and fixing in replacement of old unserviceable Back Rail 3 seater, including dismantling and removal of the damaged/defective Back Rail 3 seater. The new Back Rail 3 seater shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
272Supply and fixing in replacement of old unserviceable Front Rail 3 seater, including dismantling and removal of the damaged/defective Front Rail 3 seater. The new Front Rail 3 seater shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
273Supply and fixing in replacement of old unserviceable Side Rail single seater, including dismantling and removal of the damaged/defective Side Rail single seater. The new Side Rail single seater shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
274Supply and fixing in replacement of old unserviceable Back Rail single seater, including dismantling and removal of the damaged/defective Back Rail single seater. The new Back Rail single seater shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
275Supply and fixing in replacement of old unserviceable Front Rail single seater, including dismantling and removal of the damaged/defective Front Rail single seater. The new Front Rail single seater shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
276Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
277SOFA SET FOUR SEATER WITH CUSHION (FD- 258 ) : Dismantling and removing the following existing unserviceable components of Sofa Set four Seater and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
278Supply and fixing in replacement of old unserviceable Seat foam cushion, including dismantling and removal of the damaged/defective seat foam cushion. The new seat foam cushion (Make- Sleepwell/ Kurlon) shall be of 40 density covered with white lining cloth and premium quality tapestry cloth (Make: Bombay Dying/D'Decor/Raymond of rate not less than 400 per mtr), shall be provided with nylon zipper at one edge duly covered under the tapestry cloth flap as approved by GE/Engineer-in-Charge., and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.Note :- (i) Each cushion for seat will be measured as single unit.
279Supply and fixing in replacement of old unserviceable Back foam cushion, including dismantling and removal of the damaged/defective Back foam cushion. The new Back foam cushion (Make- Sleepwell/ Kurlon) shall be of 40 density covered with white lining cloth and premium quality tapestry cloth (Make: Bombay Dying/D'Decor/Raymond of rate not less than 600 per mtr), shall be provided with nylon zipper at one edge duly covered under the tapestry cloth flap and fix over the base of seasonned teak wood frame in one piece and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge. Note :- (i) Each cushion for Back will be measured as single unit.
280Supply and fixing in replacement of old unserviceable Plywood of Single seater sofa, including dismantling and removal of the damaged/defective Plywood. The new seat shall be made of 12mm thick BWR ply of grade -A; place and fix in the existing pattern and conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.Make of Plywood: Archid/Greenply/Century or equivalent as approved
281Supply and fixing in replacement of old unserviceable front leg, including dismantling and removal of the damaged/defective front leg. The new front leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
282Supply and fixing in replacement of old unserviceable rear leg, including dismantling and removal of the damaged/defective rear leg. The new rear leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
283Supply and fixing in replacement of old unserviceable Arm rest, including dismantling and removal of the damaged/defective Arm rest. The new Arm rest shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
284Supply and fixing in replacement of old unserviceable Side Rail single seater, including dismantling and removal of the damaged/defective Side Rail single seater. The new Side Rail single seater shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
285Supply and fixing in replacement of old unserviceable Back Rail single seater, including dismantling and removal of the damaged/defective Back Rail single seater. The new Back Rail single seater shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
286Supply and fixing in replacement of old unserviceable Front Rail single seater, including dismantling and removal of the damaged/defective Front Rail single seater. The new Front Rail single seater shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
287Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
288SOFA SET SINGLE SEATER WITH CUSHION (FD/MAP-II/02) : Dismantling and removing the following existing unserviceable components of Sofa Set Single Seater and supplying and fixing a new components made to shape & size as shown in drawing. The work includes careful removal of old unserviceable parts without disturbing to the other parts, and installation of new components, complete in all respects, irrespective of drawing details, and as specified and as directed by the Engineer-in-Charge.
289Supply and fixing in replacement of old unserviceable foam cushion, including dismantling and removal of the damaged/defective foam cushion. The new foam cushion (Make- Sleepwell/ Kurlon) shall be of size 558mm x 533mm x 100mm thick of 40 density covered with white lining cloth and premium quality tapestry cloth (Make: Bombay Dying/D'Decor/Raymond of rate not less than 400 per mtr), shall be provided with nylon zipper at one edge duly covered under the tapestry cloth flap as approved by GE/Engineer-in-Charge., and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.Note :- (i) Each cushion for seat or back will be measured as single unit.
290Supply and fixing in replacement of old unserviceable Plywood of Single seater sofa, including dismantling and removal of the damaged/defective Plywood. The new seat shall be made of 12mm thick BWR ply of grade -A; place and fix in the existing pattern and conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.Make of Plywood: Archid/Greenply/Century or equivalent as approved
291Supply and fixing in replacement of old unserviceable front leg, including dismantling and removal of the damaged/defective front leg. The new front leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
292Supply and fixing in replacement of old unserviceable rear leg, including dismantling and removal of the damaged/defective rear leg. The new rear leg shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
293Supply and fixing in replacement of old unserviceable Arm rest, including dismantling and removal of the damaged/defective Arm rest. The new Arm rest shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
294Supply and fixing in replacement of old unserviceable Side Rail single seater, including dismantling and removal of the damaged/defective Side Rail single seater. The new Side Rail single seater shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
295Supply and fixing in replacement of old unserviceable Back Rail single seater, including dismantling and removal of the damaged/defective Back Rail single seater. The new Back Rail single seater shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
296Supply and fixing in replacement of old unserviceable Front Rail single seater, including dismantling and removal of the damaged/defective Front Rail single seater. The new Front Rail single seater shall be made from seasoned teak wood, free from cracks, knots, and other blemishes, and shall conform to the size, shape, and finish as shown on the approved drawings and as directed by the Engineer-in-Charge.
297Supply and Fixing in replacement of old unserviceable hard PVC/rubber shoe to the bottom of the legs with 30mm long screw wood steel.
298Material and Labour for complete surface preparation of old, existing polished wooden surfaces and re-application of melamine polish with following process, ensuring a smooth and aesthetically appealing glossy or matte finish all as directed: (a) Surface Preparation:(i) Carefully scrape/grind the old polished surface using appropriate tools to remove loose, flaking, or degraded polish.(ii) Clean the surface thoroughly by removing all oily spots and contaminants using mineral spirits or alkaline cleaners as necessary.(iii) Rinse thoroughly with clean water and ensure the surface is completely dry.(iv) Remove all stubborn marks or deposits using emery paper or grinder.(v) Fill all cracks, dents, and pores using high-quality wooden filler/putty matching the wood texture and shade.(vi) Sand the entire surface evenly using 80 to 320-grit sandpaper to achieve a smooth finish.(vii) Clean the surface using a dry, lint-free cloth to remove dust and debris.(viii) Repeat the surface preparation process, if required, as per site condition or direction of Engineer-in-Charge.(b) Staining (if required):(i) Apply approved wood stain evenly across the prepared surface as directed.(ii) Allow the stain to dry completely before further processing.(c) Melamine Polish Application:(i) Prepare the melamine polish by mixing Melamine base and hardener in a 9:1 ratio.(ii) Add recommended thinner to achieve the correct spraying consistency.(iii) Mix thoroughly before use.(iii) Use a spray gun to apply a thin, even coat on the surface.(iv) Allow the first coat to dry for 1–2 hours.(v) Lightly sand with 320-grit sandpaper to ensure an even finish.(d) Re-Coating Process:(i) Apply a total of 2 to 3 coats, sanding lightly between each coat.(ii) Achieve the desired glossy or matte finish as per site requirements.NOTE: All work shall be carried out in a neat, professional manner, adhering strictly to safety, quality, and environmental standards. Materials used shall be of Asian Paints/Nerolac/Dulux Paints/Berger/Nippon Paints as approved make/brand and conform to relevant IS specifications. Work to be carried out to the entire satisfaction of the GE/Engineer-in-Charge.
299Table 3'x2' with/with out drawer (FD-231,224,234, 283 & 284)
300Table Writing (FD-33, 249 & 275)
301Table 900x900x760mm (FD-88 & 291)
302Table dining 4 pers (FD/MAP-II/03
303Table dining 6 pers (FD-30, 239, 273, DB-1108 & FD/MAP-II/03)
304Table dining 8 pers (FD-376)
305Table Bed side (FD-276, 210 & 248)
306Table Centre (FD-235, 274 & 284)
307Table dressing Gents (FD-230 & 379)
308Table dressing ladies (FD-251, 265 & 378)
309Peg Table (FD-236, 266,277 & 384)
310Teapoy (FD-278 & 382)
311Table dressing ladies with stool (FD/MAP-II/07)
312Table office clerk (DB-4121/292)
313Table office officer (WDF-32/FD-139)
314Form with/with out back F-73 & FD-78(M)
315Chair dining with long back (FD-357)
316Chair dining (FD16/203, 279 & 228)
317Chair Easy (FD-17, 229 & 201)
318Chair writing (FD-20/202/250 & 280)
319Chair dining JCOs/OR (FD/E6/MAP-II/05)
320Chair dining officers (FD/E6/MAP-II/04)
321Bed with plywood top (FD-246 & 247)
322Side Board (FD-241 & 1112)
323Bin soiled Multipurpose (FD/E6/MAP/09)
324Hat Stand with mirror (FD-23 & 361)
325Dressing mirror Gents Offrs/JCOs/OR (FD/E6/MAP/16)
326TV Trolly (FD/E6/MAP/04®
327Sofa set 5 seater (FD-281, 373, 258 & FD/MAP-II/02)
328Sofa set four seater (FD-258)
329Sofa set single seater (FD/MAP-II/02) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56695460
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 50 Lakhs
LAST DATE 17-08-2026
Authority
Authority Name Military Engineer Services
Work Description Tender For Repair To Certain Wooden Furniture Including Polishing At Babina Cantt Under Ge Babina.- 1 Table 3’X2’ With / Without Drawer: Dismantling And Removing The Following Existing Unserviceable Components Of Table 3X2 With/Without Drawer And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No.(Fd-231, Fd-224, Fd-234, Fd-283 & Fd-284) 2 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 3 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 4 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 5 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 6 Supply And Fixing In Replacement Of Old Unserviceable Table Long Stiffener, Including Dismantling And Removal Of The Damaged/Defective Long Stiffener. The New Long Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 7 Supply And Fixing In Replacement Of Old Unserviceable Table Short Stiffener, Including Dismantling And Removal Of The Damaged/Defective Short Stiffener. The New Short Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 8 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Table, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 18 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete. Irrespective Of What Ever Is Shown On Drawing All As Specified And As Directed.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 9 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 75 Mm × 30 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed 10 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 11 Table Writing: Dismantling And Removing The Following Existing Unserviceable Components Of Table Writing And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No.( Fd- 33, Fd-249, Fd-275) 12 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 13 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 14 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 15 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 16 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 17 Supply And Fixing In Replacement Of Old Unserviceable Table Bottom Rail, Including Dismantling And Removal Of The Damaged/Defective Bottom Rail. The New Bottom Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 18 Supply And Fixing In Replacement Of The Old, Unserviceable Cabinet (Complete), Including Dismantling And Removal Of The Damaged/Defective Cabinet (Complete). The New Cabinet (Complete) Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Cabinet Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw, 04 Lever Lock With Duplicate Keys Of Make Godrej/Link/Harrison (As Approved) & Magnetic Cather All As Directed.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 19 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Table, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 18 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 20 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 75 Mm × 30 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed 21 Supply And Fixing In Replacement Of Old Unserviceable Lock, Including Dismantling And Removal Of The Damaged/Defective Lock. The New Lock Shall Be, With Duplicate Keys Of Make Godrej/Link/Harrison (As Approved), And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 22 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 23 Table 900X900X760Mm: Dismantling And Removing The Following Existing Unserviceable Components Of Table 900X900X760Mm And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No. (Fd- 88,Fd- 291) 24 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 25 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 26 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 27 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 28 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 29 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 75 Mm × 30 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed 30 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 31 Table Dining 4 Pers: Dismantling And Removing The Following Existing Unserviceable Components Of Table Dining 4 Pers And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No. (Fd/Map-Ii/03) 32 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 33 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 34 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 35 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 36 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 37 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 150 Mm × 30 Mm × 5 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed. 38 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 39 Table Dining 6 Pers: Dismantling And Removing The Following Existing Unserviceable Components Of Table Dining 6 Pers And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No. (Fd -30, Fd-239, Fd-273, Db-1108 & Fd/Map-Ii/03) 40 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 41 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 42 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 43 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 44 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 45 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 150 Mm × 30 Mm × 5 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed 46 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 47 Table Dining 8 Pers: Dismantling And Removing The Following Existing Unserviceable Components Of Table Dining 8 Pers And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No.(Fd-376) 48 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 49 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 50 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 51 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 52 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 53 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 150 Mm × 30 Mm × 5 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed 54 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 55 Table Bed Side: Dismantling And Removing The Following Existing Unserviceable Components Of Table Bed Side And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge.Drg No.(Fd-276, Fd-210 & Fd-248) 56 Supply And Fixing In Replacement Of The Old Unserviceable Table Bed Side Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 57 Supply And Fixing In Replacement Of The Old Unserviceable Table Bed Side Sides, Including Dismantling And Removal Of The Damaged/Defective Sides. The New Side Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 58 Supply And Fixing In Replacement Of The Old Unserviceable Table Bed Side Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 59 Supply And Fixing In Replacement Of The Old Unserviceable Table Bed Side Shelf, Including Dismantling And Removal Of The Damaged/Defective Shelf. The New Shelf Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 60 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 61 Table Centre: Dismantling And Removing The Following Existing Unserviceable Components Of Table Centre And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge.Drg No.(Fd-235, Fd-274 & Fd-384) 62 Supply And Fixing In Replacement Of The Old Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 63 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 64 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 65 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 66 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 67 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New Cleat Shall Be Of Size: 50 Mm × 30 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed. 68 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 69 Table Dressing Gents: Dismantling And Removing The Following Existing Unserviceable Components Of Table Dressing Gents And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No. (Fd-230 & Fd-379) 70 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Table Dressing Gents, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 10 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 71 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Gents Mirror With Frame, Including Dismantling And Removal Of The Damaged/Defective Mirror. The New Mirror Shall Be Make Of Modiguard/Atul/Saint-Gobain Of Thickness 5.5 Mm Nominal Float Glass Mirror (Silvered Reflective Coating With Copper And Protective Backing Paint), Edges Shall Be Machine-Cut, Polished Or Beveled Edges. The Back Of Mirror Shall Be Covered With 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Mirror Frame Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 72 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Gents Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 73 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Gents Bottom, Including Dismantling And Removal Of The Damaged/Defective Bottom. The New Bottom Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 74 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Gents Sides, Including Dismantling And Removal Of The Damaged/Defective Side. The New Side Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 75 Table Dressing Ladies : Dismantling And Removing The Following Existing Unserviceable Components Of Table Dressing Ladies And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge.Drg No.( Fd-251, Fd-265 & Fd-378) 76 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 77 Supply And Fixing In Replacement Of Old Unserviceable Sliding Glass With Aluminium Channel And All As Shown On Drawing And As Directed.Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Sliding Glass With Aluminium Channel, Including Dismantling And Removal Of The Damaged/Defective Glass And Channel. The New Mirror Shall Be Make Of Modiguard/Atul/Saint-Gobain Of Thickness 5 Mm Nominal Clear Float Glass / Toughened Glass, Edges Shall Be Machine-Cut, Polished Or Beveled Edges With Nylon/Steel Ball-Bearing Rollers For Smooth Operation And Flush Handles.The New Aluminium Channel Shall Be Double Track Sliding System, Aluminium Alloy Grade, As Per Design And Functional Requirement, Powder-Coated/Anodized In Approved Colour (Natural/Black/Bronze/As Approved) Make Of Jindal / Hindalco / Bhoruka Or Equivalent Approved Make. This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 78 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge 79 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Mirror With Frame, Including Dismantling And Removal Of The Damaged/Defective Mirror. The New Mirror Shall Be Make Of Modiguard/Atul/Saint-Gobain Of Thickness 5.5 Mm Nominal Float Glass Mirror (Silvered Reflective Coating With Copper And Protective Backing Paint), Edges Shall Be Machine-Cut, Polished Or Beveled Edges. The Back Of Mirror Shall Be Covered With 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Mirror Frame Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 80 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Table Dressing Ladies, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 10 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 81 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Bottom, Including Dismantling And Removal Of The Damaged/Defective Bottom. The New Bottom Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 82 Supply And Fixing In Replacement Of Old Unserviceable Table Dressing Ladies Bottom Frame Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 83 Supply And Fixing In Replacement Of Old Unserviceable Table Dressing Ladies Bottom Frame, Including Dismantling And Removal Of The Damaged/Defective Frame. The New Frame Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 84 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 85 Peg Table Drg No.(Fd-277, Fd-236, Fd-266 & Fd-384): Dismantling And Removing The Following Existing Unserviceable Components Of Peg Table And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 86 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 87 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge 88 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 89 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 90 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 91 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 50 Mm × 30 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed 92 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 93 Teapoy: Dismantling And Removing The Following Existing Unserviceable Components Of Teapoy And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No.(Fd-278 & Fd-382) 94 Supply And Fixing In Replacement Of The Old, Unserviceable Teapoy Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 95 Supply And Fixing In Replacement Of Old Unserviceable Teapoy Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 96 Supply And Fixing In Replacement Of Old Unserviceable Teapoy Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 97 Supply And Fixing In Replacement Of Old Unserviceable Teapoy Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 98 Supply And Fixing In Replacement Of Old Unserviceable Teapoy Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 99 Supply And Fixing In Replacement Of Old Unserviceable Wooden Cleat, Including Dismantling And Removal Of The Damaged/Defective Wooden Cleat. The New L Claimp Shall Be Of Size: 50 Mm × 30 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With 25-35 Mm Long Csk Head Wood Screws As Applicable, Qty 2 Brackets Per Leg (One On Each Side) As Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Table Leg Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Leg-To-Frame Connections And Finishing Complete, All As Specified And Directed 100 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 101 Table Dressing Ladies With Stool Cushioned : Dismantling And Removing The Following Existing Unserviceable Components Of Table Dressing Ladies With Stool Cushioned And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No. (Fd/Map-Ii/07) 102 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Mirror With Frame, Including Dismantling And Removal Of The Damaged/Defective Mirror. The New Mirror Shall Be Make Of Modiguard/Atul/Saint-Gobain Of Thickness 5.5 Mm Nominal Float Glass Mirror (Silvered Reflective Coating With Copper And Protective Backing Paint), Edges Shall Be Machine-Cut, Polished Or Beveled Edges. The Back Of Mirror Shall Be Covered With 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Mirror Frame Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 103 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 104 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Sides, Including Dismantling And Removal Of The Damaged/Defective Side. The New Side Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 105 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 106 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Table Dressing Ladies, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 10 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 107 Supply And Fixing In Replacement Of The Old, Unserviceable Dressing Stool, Including Dismantling And Removal Of The Damaged/Defective Stool. The New Stool Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Bottom Of The Stool Shall Be Fabricated From 18Mm Thick, Bwr Ply Of Grade -A, Conforming To Is: 303 With 04 (Nos) X Swivel Castor As Approved.Make Of Plywood: Archid/ Greenply /Century Or Equivalent As Approved. 108 Supply And Fixing In Replacement Of Old, Unserviceable Drawer Channel, Including Dismantling And Removal Of The Damaged/Defective Channel. The New Drawer Channel Shall Be Of 12 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco With Screw As Approved Shall Be Provided And All As Shown On Drawing And As Directed. 109 Supply And Fixing In Replacement Of The Old, Unserviceable Table Dressing Ladies Bottom, Including Dismantling And Removal Of The Damaged/Defective Bottom. The New Bottom Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 110 Supply And Fixing In Replacement Of Old, Unserviceable Knob/Handles, Including Dismantling And Removal Of The Damaged/Defective Knob/Handles. The New Knob (As Per Sample)/Handles 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw As Approved Shall Be Provided And All As Shown On Drawing And As Directed. 111 Supply And Fixing In Replacement Of Old, Unserviceable Cushion Seat, Including Dismantling And Removal Of The Damaged/Defective Cushion Seat. The New Cushion Seat Shall Be Made Of 75 Mm Thick, 40 Density Cushion (Make:Sleepwell/Kurlon) With Hot Pressed 12Mm Bwr Plywood Seat Covered With Superior Quality (Make: Bombay Dying/DDecor/Raymond) Tapestry Cloth Or Premium Leatherette (As Approved, Cost Of Tapestry Cloth Shall Not Be Less Than Rs 350.00 Per Meter) Complete All As Specified In Drawing And Directed. 112 Supply And Fixing In Replacement Of Old Unserviceable Swivel Castor As Approved Shall Be Provided And All As Shown On Drawing And As Directed. 113 Table Office Clerk Drg O. (Db- 4121/292): Dismantling And Removing The Following Existing Unserviceable Components Of Table Office Clerk And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 114 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 115 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Table Office Clerk, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 18 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 116 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 117 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 118 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 119 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 120 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 121 Table Office Officer : Dismantling And Removing The Following Existing Unserviceable Components Of Table Office Officer And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No. (Wdf- 32/Fd- 139) 122 Supply And Fixing In Replacement Of The Old, Unserviceable Table Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 123 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Table Office Officer, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 18 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete. This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 124 Supply And Fixing In Replacement Of Old Unserviceable Table Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 125 Supply And Fixing In Replacement Of Old Unserviceable Table Long Rail, Including Dismantling And Removal Of The Damaged/Defective Long Rail. The New Long Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 126 Supply And Fixing In Replacement Of Old Unserviceable Table Short Rail, Including Dismantling And Removal Of The Damaged/Defective Short Rail. The New Short Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 127 Supply And Fixing In Replacement Of Old Unserviceable Table Stiffener, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 128 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 129 Form W/O Back: Dismantling And Removing The Following Existing Unserviceable Components Of Form Without Back And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge.Drg No.( F-73) 130 Supply And Fixing In Replacement Of Old Unserviceable Seat, Including Dismantling And Removal Of The Damaged/Defective Seat. The New Seat Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 131 Form With Back : Dismantling And Removing The Following Existing Unserviceable Components Of Form With Back And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. Drg No. (Fd-78(M)) 132 Supply And Fixing In Replacement Of Old Unserviceable Seat, Including Dismantling And Removal Of The Damaged/Defective Seat. The New Seat Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 133 Supply And Fixing In Replacement Of Old Unserviceable Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 134 Chair Dining With Long Back Drg No.( Fd-357): Dismantling And Removing The Following Existing Unserviceable Components Of Chair Dining With Long Back And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 135 Supply And Fixing In Replacement Of Old Unserviceable Seat & Back Of Chair Dining, Including Dismantling And Removal Of The Damaged/Defective Seat & Back. The New Seat & Back Shall Be Made From 75 Mm Thick, 40 Density Cushion (Make:Sleepwell/Kurlon) With Hot Pressed 12Mm Bwr Plywood Seat Covered With Superior Quality (Make: Bombay Dying/ DDecor/ Raymond) Tapestry Cloth Or Premium Leatherette (As Approved, Cost Of Tapestry Cloth Shall Not Be Less Than Rs 350.00 Per Meter) Complete All As Specified In Drawing And Directed. 136 Supply And Fixing In Replacement Of Old Unserviceable Rear/Front Leg, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 137 Supply And Fixing In Replacement Of Old Unserviceable Side Rail, Including Dismantling And Removal Of The Damaged/Defective Side Rail. The New Side Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 138 Supply And Fixing In Replacement Of Old Unserviceable Front Rail, Including Dismantling And Removal Of The Damaged/Defective Front Rail. The New Front Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 139 Supply And Fixing In Replacement Of Old Unserviceable Side Stiffeners, Including Dismantling And Removal Of The Damaged/Defective Side Stiffener. The New Side Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 140 Supply And Fixing In Replacement Of Old Unserviceable Centre Stiffeners, Including Dismantling And Removal Of The Damaged/Defective Centre Stiffener. The New Centre Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 141 Supply And Fixing In Replacement Of Old Unserviceable Back Rest Batten, Including Dismantling And Removal Of The Damaged/Defective Back Rest Batten. The New Back Rest Batten Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 142 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 143 Chair Dining Drg No. (Fd-16, Fd-203, Fd-279, Fd-228): Dismantling And Removing The Following Existing Unserviceable Components Of Chair Dining And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 144 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 145 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 146 Supply And Fixing In Replacement Of Old Unserviceable Front Rail, Including Dismantling And Removal Of The Damaged/Defective Front Rail. The New Front Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 147 Supply And Fixing In Replacement Of Old Unserviceable Back Rail, Including Dismantling And Removal Of The Damaged/Defective Back Rail. The New Back Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 148 Supply And Fixing In Replacement Of Old Unserviceable Side Rail, Including Dismantling And Removal Of The Damaged/Defective Side Rail. The New Side Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 149 Supply And Fixing In Replacement Of Old Unserviceable Back Rest, Including Dismantling And Removal Of The Damaged/Defective Back Rest. The New Back Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 150 Supply And Fixing In Replacement Of Old Unserviceable Stiffeners, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 151 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 152 Material & Labour For Complete Removal Of Unserviceable Or Worn-Out Plastic Cane From Dining Chair. Complete Preparation Of The Surface Including: (A) Filling Of Cracks With Wood Filler, If Any, (B) Tightening Of The Wooden Frame Using Fevicol Or Equivalent Adhesive & (C) Fixing With Wooden Nails Where Necessary.Recaning Of The Chair Using New White Plastic Cane Type I (Virgin Hdpe) Only And Shall Not Be Recycled Type With Cane Size 2Mm Wide With A Border Of 4Mm Wide, 0.4Mm/0.6Mm Thick Respectively Half Round Oval Shape, In Godrej Pattern. All Caning To Be Neatly Woven, All Edges Trimmed, Joints Tight, And Beading Securely Fastened, Complete All As Specified And Directed 153 Chair Easy Drg No. (Fd-17, Fd-229, Fd-201): Dismantling And Removing The Following Existing Unserviceable Components Of Chair Easy And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 154 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 155 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 156 Supply And Fixing In Replacement Of Old Unserviceable Front Rail, Including Dismantling And Removal Of The Damaged/Defective Front Rail. The New Front Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 157 Supply And Fixing In Replacement Of Old Unserviceable Back Rail, Including Dismantling And Removal Of The Damaged/Defective Back Rail. The New Back Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 158 Supply And Fixing In Replacement Of Old Unserviceable Side Rail, Including Dismantling And Removal Of The Damaged/Defective Side Rail. The New Side Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 159 Supply And Fixing In Replacement Of Old Unserviceable Arms Rest, Including Dismantling And Removal Of The Damaged/Defective Arms Rest. The New Arms Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 160 Supply And Fixing In Replacement Of Old Unserviceable Back Frame Rail For Back, Including Dismantling And Removal Of The Damaged/Defective Back Frame Rail For Back. The New Back Frame Rail For Back Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 161 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 162 Material & Labour For Complete Removal Of Unserviceable Or Worn-Out Plastic Cane From Easy Chair. Complete Preparation Of The Surface Including: (A) Filling Of Cracks With Wood Filler, If Any, (B) Tightening Of The Wooden Frame Using Fevicol Or Equivalent Adhesive & (C) Fixing With Wooden Nails Where Necessary.Recaning Of The Chair Using New White Plastic Cane Type I (Virgin Hdpe) Only And Shall Not Be Recycled Type With Cane Size 2Mm Wide With A Border Of 4Mm Wide, 0.4Mm/0.6Mm Thick Respectively Half Round Oval Shape, In Godrej Pattern. All Caning To Be Neatly Woven, All Edges Trimmed, Joints Tight, And Beading Securely Fastened, Complete All As Specified And Directed 163 Chair Writing Fd-20, Fd-202, Fd-250, Fd-280: Dismantling And Removing The Following Existing Unserviceable Components Of Chair Writing And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 164 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 165 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 166 Supply And Fixing In Replacement Of Old Unserviceable Front Rail, Including Dismantling And Removal Of The Damaged/Defective Front Rail. The New Front Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 167 Supply And Fixing In Replacement Of Old Unserviceable Side/Back Rail, Including Dismantling And Removal Of The Damaged/Defective Side/Back Rail. The New Side/Back Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 168 Supply And Fixing In Replacement Of Old Unserviceable Back Rest, Including Dismantling And Removal Of The Damaged/Defective Back Rest. The New Back Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 169 Supply And Fixing In Replacement Of Old Unserviceable Bottom Stiffener, Including Dismantling And Removal Of The Damaged/Defective Bottom Stiffener. The New Bottom Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 170 Supply And Fixing In Replacement Of Old Unserviceable Bottom Centre Stiffener, Including Dismantling And Removal Of The Damaged/Defective Bottom Centre Stiffener. The New Bottom Centre Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 171 Supply And Fixing In Replacement Of Old Unserviceable Arms Rest, Including Dismantling And Removal Of The Damaged/Defective Arms Rest. The New Arms Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 172 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 173 Material & Labour For Complete Removal Of Unserviceable Or Worn-Out Plastic Cane From Writing Chair. Complete Preparation Of The Surface Including: (A) Filling Of Cracks With Wood Filler, If Any, (B) Tightening Of The Wooden Frame Using Fevicol Or Equivalent Adhesive & (C) Fixing With Wooden Nails Where Necessary.Recaning Of The Chair Using New White Plastic Cane Type I (Virgin Hdpe) Only And Shall Not Be Recycled Type With Cane Size 2Mm Wide With A Border Of 4Mm Wide, 0.4Mm/0.6Mm Thick Respectively Half Round Oval Shape, In Godrej Pattern. All Caning To Be Neatly Woven, All Edges Trimmed, Joints Tight, And Beading Securely Fastened, Complete All As Specified And Directed 174 Chair Dining Jcos/Or Fd/E6/Map-Ii/05 : Dismantling And Removing The Following Existing Unserviceable Components Of Chair Dining Jcos/Or And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 175 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 176 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 177 Supply And Fixing In Replacement Of Old Unserviceable Front Rail, Including Dismantling And Removal Of The Damaged/Defective Front Rail. The New Front Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 178 Supply And Fixing In Replacement Of Old Unserviceable Back Rail, Including Dismantling And Removal Of The Damaged/Defective Back Rail. The New Back Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 179 Supply And Fixing In Replacement Of Old Unserviceable Side Rail, Including Dismantling And Removal Of The Damaged/Defective Side Rail. The New Side Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 180 Supply And Fixing In Replacement Of Old Unserviceable Back Rest, Including Dismantling And Removal Of The Damaged/Defective Back Rest. The New Back Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 181 Supply And Fixing In Replacement Of Old Unserviceable Stiffeners, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 182 Supply And Fixing In Replacement Of Old Unserviceable Pvc Seat, Including Dismantling And Removal Of The Damaged/Defective Seat. The New Seat Shall Be Fabricated Of 4Mm Thick Pvc Of Size 405X390Mm (Make Amko/Cello/Milton Or Equivalent As Approved) With Holes & 4 X 10Mm Thick Ribs Moulded Alongwith Sheet In Single Piece, Place And Fix With 20Mm Long Screw Wood Steel And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 183 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 184 Chair Dining Officers (Fd/E6/Map-Ii/04) : Dismantling And Removing The Following Existing Unserviceable Components Of Chair Dining Officers And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 185 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 186 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 187 Supply And Fixing In Replacement Of Old Unserviceable Front Rail, Including Dismantling And Removal Of The Damaged/Defective Front Rail. The New Front Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 188 Supply And Fixing In Replacement Of Old Unserviceable Back Rail, Including Dismantling And Removal Of The Damaged/Defective Back Rail. The New Back Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 189 Supply And Fixing In Replacement Of Old Unserviceable Side Rail, Including Dismantling And Removal Of The Damaged/Defective Side Rail. The New Side Rail Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 190 Supply And Fixing In Replacement Of Old Unserviceable Back Rest With Strips, Including Dismantling And Removal Of The Damaged/Defective Back Rest With Strips. The New Back Rest With Strips Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 191 Supply And Fixing In Replacement Of Old Unserviceable Stiffeners, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 192 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 193 Supply And Fixing In Replacement Of Old Unserviceable Seat Of Chair Dining Officers, Including Dismantling And Removal Of The Damaged/Defective Seat. The New Seat Shall Be Made From 75 Mm Thick, 40 Density Cushion (Make:Sleepwell/Kurlon) With Hot Pressed 12Mm Bwr Plywood Seat Covered With Superior Quality (Make: Bombay Dying/DDecor/Raymond) Tapestry Cloth Or Premium Leatherette (As Approved, Cost Of Tapestry Cloth Shall Not Be Less Than Rs 350.00 Per Meter) And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 194 Bed With Plywood Top Fd-246, Fd-247: Dismantling And Removing The Following Existing Unserviceable Components Of Bed With Plywod Top And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 195 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of Bed, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Seat Shall Be Made Of 12Mm Thick Bwr Ply Of Grade -A; Place And Fix Over The Three Equidistant Stiffener And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Make Of Plywood: Archid/Greenply/Century Or Equivalent As Approved 196 Supply And Fixing Of New Wooden Head Rests In Replacement Of Old, Unserviceable, Or Worn-Out Head Rest. Including Dismantling And Safe Removal Of The Existing Damaged Or Defective Head Rests, Followed By Installation Of New Head Rests As Per The Specifications Detailed Here As Below:-Wood Type: Seasoned Teak Wood, Free From Cracks, Knots, Or Any Other Visible Defects.Vertical Component Dimensions: 75Mm X 22Mm X 460Mm.Horizontal Component Dimensions: 30Mm X 60Mm X 900Mm (With Integrated Leg Connection).Legs: Upper Leg Section: 60Mm X 60Mm In Cross-Section. Over All Leg Length From Bottom: 660Mm. Bottom Section Of Leg: 30Mm X 30Mm In Cross-Section.Both Sides Shall Be Covered From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. All Components Shall Be Neatly Jointed And Securely Fixed, Ensuring No Sharp Edges, Splinters, Or Loose Connections. Fixing Shall Be Carried Out Using Ss Screws And Wood Adhesive Of Approved Make, And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings. This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 197 Supply And Fixing Of New Wooden Foot Rests In Replacement Of Old, Unserviceable, Or Worn-Out Foot Rest. Including Dismantling And Safe Removal Of The Existing Damaged Or Defective Foot Rests, Followed By Installation Of New Foot Rests As Per The Specifications Detailed Here As Belowwood Type: Seasoned Teak Wood, Free From Cracks, Knots, Or Any Other Visible Defects.Three (3) Nos. Battens Of Size 22Mm X 75Mm X 300Mm, Spaced Equally. Battens Shall Be Securely Joined Between The Top And Bottom Horizontal Rails Of The Footboard. Top And Bottom Horizontal Rails Shall Be Of 30Mm X 60Mm X 900 Mm Sectionlegs: Upper Leg Section: 60Mm X 60Mm In Cross-Section. Over All Leg Length From Bottom: 500Mm. Bottom Section Of Leg: 30Mm X 30Mm In Cross-Section.Both Sides Shall Be Covered From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. All Components Shall Be Neatly Jointed And Securely Fixed, Ensuring No Sharp Edges, Splinters, Or Loose Connections. Fixing Shall Be Carried Out Using Ss Screws And Wood Adhesive Of Approved Make, And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings. This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 198 Supply And Fixing In Replacement Of Old Unserviceable Stiffeners, Including Dismantling And Removal Of The Damaged/Defective Stiffener. The New Stiffener Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 199 Supply And Fixing In Replacement Of Old Unserviceable Side Plywood Of Head Rest, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Sides Shall Be Made From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 200 Supply And Fixing In Replacement Of Old Unserviceable Side Plywood Of Foot Rest, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Sides Shall Be Made From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 201 Supply And Fixing In Replacement Of Old Unserviceable Flat Iron Size 150X35X5Mm Made To Shape As Per Drg To Be Fixed With 6 Nos Of Screw Wood Steel 35Mm Long Isi Marked Duly Painted With Paint Synthetic Enamel Black Over A Coat Of Primer Of Each Corners Of Bed Hard/ Bed Plywood Top All As Specified On Drawing Or As Directed By Engineer-In-Charge. 202 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 203 Side Board Fd-241 & 1112 : Dismantling And Removing The Following Existing Unserviceable Components Of Side Board And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 204 Supply And Fixing In Replacement Of The Old, Unserviceable Side Board Sides, Including Dismantling And Removal Of The Damaged/Defective Side. The New Side Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 205 Supply And Fixing In Replacement Of The Old, Unserviceable Side Board Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 206 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Side Board, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 18 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 207 Supply And Fixing In Replacement Of The Old, Unserviceable Door Shutter Of Side Board, Including Dismantling And Removal Of The Damaged/Defective Door Shutter. The New Door Shutter Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Each Shutter Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw, Magnetic Cather And 03 X Soft Closing Concealed Intermate Hinges At Inside All As Directed.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 208 Supply And Fixing In Replacement Of The Old, Unserviceable Side Board Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 209 Supply And Fixing In Replacement Of Old Unserviceable Bottom Frame Of Side Board, Including Dismantling And Removal Of The Damaged/Defective Frame. The New Frame Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 210 Supply And Fixing In Replacement Of Old, Unserviceable Knob/Handles, Including Dismantling And Removal Of The Damaged/Defective Knob/Handles. The New Knob (As Per Sample)/Handles 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw As Approved Shall Be Provided And All As Shown On Drawing And As Directed. 211 Supply And Fixing New L Claimp Shall Be Of Size: 50 Mm × 50 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With Appropriate Size Csk Head Wood Screws As Applicable And Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Connections/Joints And Finishing Complete, All As Specified And Directed 212 Bin Soiled Multipurpose (Fd/E6/Map/09): Dismantling And Removing The Following Existing Unserviceable Components Of Bin Soiled Multipurpose And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 213 Supply And Fixing In Replacement Of The Old, Unserviceable Bin Soiled Multipurpose Sides, Including Dismantling And Removal Of The Damaged/Defective Side. The New Side Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 214 Supply And Fixing In Replacement Of The Old, Unserviceable Bin Soiled Multipurpose Sides Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 215 Supply And Fixing In Replacement Of Old Unserviceable Drawer Of Bin Soiled Multipurpose, Including Dismantling And Removal Of The Damaged/Defective Drawer. The Drawer Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Back And Bottom Of The Drawer Shall Be Fabricated From 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Drawer Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw & 2 X 18 Inch Long Stainless Steel Soft Close Ball Bearing Sliding Telescopic Drawer Channel Of Make: Godrej/Hettich/Ebco Or As Directed By Ge/Engineer-In-Charge Complete.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 216 Supply And Fixing In Replacement Of The Old, Unserviceable Door Shutter Of Bin Soiled Multipurpose, Including Dismantling And Removal Of The Damaged/Defective Door Shutter. The New Door Shutter Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading. The Each Shutter Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw, Magnetic Cather And 03 X Soft Closing Concealed Intermate Hinges At Inside All As Directed.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 217 Supply And Fixing In Replacement Of The Old, Unserviceable Bin Soiled Multipurpose Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 218 Supply And Fixing In Replacement Of Old Unserviceable Bottom Frame Of Bin Soiled Multipurpose, Including Dismantling And Removal Of The Damaged/Defective Frame. The New Frame Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 219 Supply And Fixing In Replacement Of Old, Unserviceable Knob/Handles, Including Dismantling And Removal Of The Damaged/Defective Knob/Handles. The New Knob (As Per Sample)/Handles 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw As Approved Shall Be Provided And All As Shown On Drawing And As Directed. 220 Supply And Fixing New L Claimp Shall Be Of Size: 50 Mm × 50 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With Appropriate Size Csk Head Wood Screws As Applicable And Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Connections/Joints And Finishing Complete, All As Specified And Directed. 221 Hat Stand With Mirror (Fd- 23, Fd-361): Dismantling And Removing The Following Existing Unserviceable Components Of Hat Stand With Mirror And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 222 Supply And Fixing In Replacement Of Old Unserviceable Mirror Of Hat Stand, Including Dismantling And Removal Of The Damaged/Defective Mirror. The New Mirror Shall Be Make Of Modiguard/Atul/Saint-Gobain Of Size 440 X 300 Mm X Thickness 5.5 Mm Nominal Float Glass Mirror (Silvered Reflective Coating With Copper And Protective Backing Paint), Edges Shall Be Machine-Cut, Polished Or Beveled Edges. The Back Of Mirror Shall Be Covered With 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Mirror Frame Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 223 Supply And Fixing In Replacement Of Old, Unserviceable Pegs, Including Dismantling And Removal Of The Damaged/Defective Pegs. The New Brass Pegs (As Per Sample) With Screw As Approved Shall Be Provided And All As Shown On Drawing And As Directed. 224 Supply And Fixing In Replacement Of Old, Unserviceable Key Plate, Including Dismantling And Removal Of The Damaged/Defective Key Plate. The New Key Plate, Rwal Plug (As Per Sample) With Screw As Approved Shall Be Provided And All As Shown On Drawing And As Directed. 225 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of Hat Stand, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Front Shall Be Made From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 226 Dressing Mirror Gents Offrs/Jcos/Or (Fd/E6/Map/16): Dismantling And Removing The Following Existing Unserviceable Components Of Dressing Mirror Gents Offrs/Jcos/Or And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 227 Supply And Fixing In Replacement Of Old Unserviceable Mirror Of Dressing Mirror, Including Dismantling And Removal Of The Damaged/Defective Mirror. The New Mirror Shall Be Make Of Modiguard/Atul/Saint-Gobain Of Size 1080 X 530 Mm X Thickness 5.5 Mm Nominal Float Glass Mirror (Silvered Reflective Coating With Copper And Protective Backing Paint), Edges Shall Be Machine-Cut, Polished Or Beveled Edges. The Back Of Mirror Shall Be Covered With 6Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.The Mirror Frame Of Size 35X6Mm Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.The Each Mirror Shutter Shall Be Provided With 01 X 100Mm Long 8Mm Dia Chrome Plated Oval D Pull Handles With Screw, Magnetic Cather And 03 X Soft Closing Concealed Intermate Hinges At Inside All As Directed.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 228 Supply And Fixing In Replacement Of The Old, Unserviceable Dressing Mirror Bottom, Including Dismantling And Removal Of The Damaged/Defective Bottom. The New Bottom Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 229 Supply And Fixing In Replacement Of The Old, Unserviceable Dressing Mirror Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 230 Supply And Fixing In Replacement Of The Old, Unserviceable Dressing Mirror Sides, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 231 Supply And Fixing In Replacement Of The Old, Unserviceable Dressing Glass Shelf, Including Dismantling And Removal Of The Damaged/Defective Glass Shelf. The New Top Shall Be Of Modiguard/Atul/Saint-Gobain Of 496Mmx95Mm Thickness 5 Mm Nominal Clear Float Glass / Toughened Glass, Edges Shall Be Machine-Cut, Polished Or Beveled Edges.The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 232 Supply And Fixing In Replacement Of The Old, Unserviceable Dressing Mirror Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 233 Supply And Fixing New L Claimp Shall Be Of Size: 50 Mm × 50 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With Appropriate Size Csk Head Wood Screws As Applicable And Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Connections/Joints And Finishing Complete, All As Specified And Directed. 234 Trestle Sr Wooden (Fd- 86/141 ): Dismantling And Removing The Following Existing Unserviceable Components Of Trestle Store Room Wooden And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge 235 Supply And Fixing In Replacement Of Old Unserviceable Top Batten Of Size 2440X100X100Mm Of Trestle Sr Wooden, Including Dismantling And Removal Of The Damaged/Defective Batten. The New Top Batten Shall Be Of Size 2440X100X100Mm Made From Seasoned 2Nd Class Hard Wood (Sal), Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 236 Supply And Fixing In Replacement Of Old Unserviceable Top Batten Of Size 600X60X100Mm Of Trestle Sr Wooden, Including Dismantling And Removal Of The Damaged/Defective Batten. The New Top Batten Shall Be Of Size 600X60X100Mm Made From Seasoned 2Nd Class Hard Wood (Sal), Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 237 Supply And Fixing In Replacement Of Old Unserviceable Top Batten Of Size 2040X60X100Mm Of Trestle Sr Wooden, Including Dismantling And Removal Of The Damaged/Defective Batten. The New Top Batten Shall Be Of Size 2040X60X100Mm Made From Seasoned 2Nd Class Hard Wood (Sal), Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 238 Supply And Fixing In Replacement Of Old Unserviceable Leg Of Trestle Sr Wooden, Including Dismantling And Removal Of The Damaged/Defective Leg. The New Leg Shall Be Made From Seasoned 2Nd Class Hard Wood (Sal), Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 239 Material And Labour For Preparing Of Old Surfaces By Scrapping/Grinding Old Surface And Remove Oil And Contaminants By Solvent Cleaning By Mineral Spirits Or Alkaline Cleaners. Rinse Thoroughly And Dry If Necessary. Remove All Dust By Mechanical Means Such As Wire Brushing, Sanding Or Sandblasting/Abrasive Blasting To Creat A Rough Surface For Better Paint Adhesion. Thereafter, Primer (As Approved By Ge) Shall Be Apply With Spray Gun Machine. Synthetic Enamel Black Paint (Make:Asian Paints/ Berger/ Nerolac) Shall Be Applied One Coat With Spray Gun And Air Dried For A Minimum 08 Hours. The Second Coat Shall Then Be Applied With Spray Gun Complete All Work As Specified And Directed 240 Tv Trolley (Fd/E6/Map/04R): Dismantling And Removing The Following Existing Unserviceable Components Of Tv Trolly And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 241 Supply And Fixing In Replacement Of Old Unserviceable Wheel Of Tv Trolly, Including Dismantling And Removal Of The Damaged/Defective Wheel. The New Swivel Castor (Thread Type Or Push Type As Approved) Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 242 Supply And Fixing In Replacement Of The Old, Unserviceable Tv Trolly Sides, Including Dismantling And Removal Of The Damaged/Defective Sides. The New Sides Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 243 Supply And Fixing In Replacement Of The Old, Unserviceable Tv Trolly Top, Including Dismantling And Removal Of The Damaged/Defective Top. The New Top Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 244 Supply And Fixing In Replacement Of The Old, Unserviceable Tv Trolly Bottom, Including Dismantling And Removal Of The Damaged/Defective Bottom. The New Bottom Shall Be Fabricated From 18Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade With Post-Formed Edge, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 245 Supply And Fixing In Replacement Of The Old, Unserviceable Tv Trolly Back, Including Dismantling And Removal Of The Damaged/Defective Back. The New Back Shall Be Fabricated From 12Mm Thick, Exterior Grade I Medium Density Fibreboard (Mdf) Conforming To Is 12406:2003. It Shall Be Both Sides Laminated (Bsl) - One Side In A Super Matt Finish In An Approved Shade, And The Other Side With Balancing White Laminate. All Exposed Edges Shall Be Finished With 2Mm Thick Pvc Edge Beading.This Specification Shall Be Followed Irrespective Of What Is Shown On The Drawing, And The Work Shall Be Carried Out As Specified And As Directed By The Engineer-In-Charge. 246 Supply And Fixing In Replacement Of The Old, Unserviceable Glass Shutter, Including Dismantling And Removal Of The Damaged/Defective Glass Shutter. The New Glass Shutter Shall Be Of Modiguard/Atul/Saint-Gobain Of Thickness 5.5Mm Nominal Clear Float Glass, Edges Shall Be Machine-Cut, Polished Or Beveled Edges. The Glass Shutter Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And Fixed With 02 Nos (Glass Hinges) With Magnetic Catcher All As Directed By The Engineer-In-Charge. 247 Supply And Fixing New L Claimp Shall Be Of Size: 50 Mm × 50 Mm × 3 Mm Thick L-Brackets, Mild Steel (Ms), Zinc-Coated Or Powder-Coated With Minimum 4 Fixing Holes (2 On Each Side). Fixing Shall Be With Appropriate Size Csk Head Wood Screws As Applicable And Directed By The Engineer-In-Charge. The Work Includes Drilling, Fitting, Additional Fixing Accessories For Joints, Including Wooden Dowels, Ms Screws, Adhesive, And Any Necessary Minor Hardware To Strengthen Connections/Joints And Finishing Complete, All As Specified And Directed 248 Sofa Set 5 Seater With Cushion (Fd- 281, Fd-373 & Fd/Map-Ii/02) : Dismantling And Removing The Following Existing Unserviceable Components Of Sofa Set 5 Seater And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 249 Supply And Fixing In Replacement Of Old Unserviceable Foam Cushion, Including Dismantling And Removal Of The Damaged/Defective Foam Cushion. The New Foam Cushion (Make- Sleepwell/Kurlon) Shall Be Of Size 558Mm X 533Mm X 100Mm Thick Of 40 Density Covered With White Lining Cloth And Premium Quality Tapestry Cloth (Make: Bombay Dying/DDecor/Raymond Of Rate Not Less Than 400 Per Mtr), Shall Be Provided With Nylon Zipper At One Edge Duly Covered Under The Tapestry Cloth Flap As Approved By Ge/ Engineer-In-Charge., And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Note :- (I) Each Cushion For Seat Or Back Will Be Measured As Single Unit. 250 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of 3 Seater Sofa, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Seat Shall Be Made Of 12Mm Thick Bwr Ply Of Grade -A; Place And Fix In The Existing Pattern And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Make Of Plywood: Archid/Greenply/Century Or Equivalent As Approved. 251 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of Single Seater Sofa, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Seat Shall Be Made Of 12Mm Thick Bwr Ply Of Grade -A; Place And Fix In The Existing Pattern And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Make Of Plywood: Archid/Greenply/Century Or Equivalent As Approved. 252 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 253 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 254 Supply And Fixing In Replacement Of Old Unserviceable Arm Rest, Including Dismantling And Removal Of The Damaged/Defective Arm Rest. The New Arm Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 255 Supply And Fixing In Replacement Of Old Unserviceable Side Rail (Size 35Mmx100Mmx725Mm), Including Dismantling And Removal Of The Damaged/Defective Side Rail (Size 35Mmx100Mmx725Mm). The New Side Rail (Size 35Mmx100Mmx725Mm) Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 256 Supply And Fixing In Replacement Of Old Unserviceable Bearers (Size 40Mmx40Mmx725Mm), Including Dismantling And Removal Of The Damaged/Defective Bearers (Size 40Mmx40Mmx725Mm). The New Bearers (Size 40Mmx40Mmx725Mm) Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 257 Supply And Fixing In Replacement Of Old Unserviceable Front Rail Of 3 Seater, Including Dismantling And Removal Of The Damaged/Defective Front Rail Of 3 Seater. The New Front Rail Of 3 Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 258 Supply And Fixing In Replacement Of Old Unserviceable Rear Rail Of 3 Seater, Including Dismantling And Removal Of The Damaged/Defective Rear Rail Of 3 Seater. The New Rear Rail Of 3 Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 259 Supply And Fixing In Replacement Of Old Unserviceable Front Rail Of Single Seater (Size 35Mmx10Mmx530Mm), Including Dismantling And Removal Of The Damaged/Defective Front Rail Of Single Seater (Size 35Mmx10Mmx530Mm). The New Front Rail Of Single Seater (Size 35Mmx10Mmx530Mm) Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 260 Supply And Fixing In Replacement Of Old Unserviceable Rear Rail Of Single Seater (Size 35Mmx10Mmx530Mm), Including Dismantling And Removal Of The Damaged/Defective Rear Rail Of Single Seater (Size 35Mmx10Mmx530Mm). The New Rear Rail Of Single Seater (Size 35Mmx10Mmx530Mm) Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 261 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 262 Sofa Set 5 Seater (Fd-258) : Dismantling And Removing The Following Existing Unserviceable Components Of Sofa Set 5 Seater And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 263 Supply And Fixing In Replacement Of Old Unserviceable Seat Foam Cushion, Including Dismantling And Removal Of The Damaged/Defective Seat Foam Cushion. The New Seat Foam Cushion (Make- Sleepwell/ Kurlon) Shall Be Of 40 Density Covered With White Lining Cloth And Premium Quality Tapestry Cloth (Make: Bombay Dying/DDecor/Raymond Of Rate Not Less Than 400 Per Mtr), Shall Be Provided With Nylon Zipper At One Edge Duly Covered Under The Tapestry Cloth Flap As Approved By Ge/Engineer-In-Charge., And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Note :- (I) Each Cushion For Seat Will Be Measured As Single Unit. 264 Supply And Fixing In Replacement Of Old Unserviceable Back Foam Cushion, Including Dismantling And Removal Of The Damaged/Defective Back Foam Cushion. The New Back Foam Cushion (Make- Sleepwell/ Kurlon) Shall Be Of 40 Density Covered With White Lining Cloth And Premium Quality Tapestry Cloth (Make: Bombay Dying/DDecor/Raymond Of Rate Not Less Than 400 Per Mtr), Shall Be Provided With Nylon Zipper At One Edge Duly Covered Under The Tapestry Cloth Flap And Fix Over The Base Of Seasonned Teak Wood Frame In One Piece And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Note :- (I) Each Cushion For Back Will Be Measured As Single Unit. 265 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of 3 Seater Sofa, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Seat Shall Be Made Of 12Mm Thick Bwr Ply Of Grade -A; Place And Fix In The Existing Pattern And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Make Of Plywood: Archid/Greenply/Century Or Equivalent As Approved 266 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of Single Seater Sofa, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Seat Shall Be Made Of 12Mm Thick Bwr Ply Of Grade -A; Place And Fix In The Existing Pattern And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Make Of Plywood: Archid/Greenply/Century Or Equivalent As Approved 267 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 268 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 269 Supply And Fixing In Replacement Of Old Unserviceable Arm Rest, Including Dismantling And Removal Of The Damaged/Defective Arm Rest. The New Arm Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 270 Supply And Fixing In Replacement Of Old Unserviceable Side Rail 3 Seater, Including Dismantling And Removal Of The Damaged/Defective Side Rail 3 Seater. The New Side Rail 3 Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 271 Supply And Fixing In Replacement Of Old Unserviceable Back Rail 3 Seater, Including Dismantling And Removal Of The Damaged/Defective Back Rail 3 Seater. The New Back Rail 3 Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 272 Supply And Fixing In Replacement Of Old Unserviceable Front Rail 3 Seater, Including Dismantling And Removal Of The Damaged/Defective Front Rail 3 Seater. The New Front Rail 3 Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 273 Supply And Fixing In Replacement Of Old Unserviceable Side Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Side Rail Single Seater. The New Side Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 274 Supply And Fixing In Replacement Of Old Unserviceable Back Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Back Rail Single Seater. The New Back Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 275 Supply And Fixing In Replacement Of Old Unserviceable Front Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Front Rail Single Seater. The New Front Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 276 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 277 Sofa Set Four Seater With Cushion (Fd- 258 ) : Dismantling And Removing The Following Existing Unserviceable Components Of Sofa Set Four Seater And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 278 Supply And Fixing In Replacement Of Old Unserviceable Seat Foam Cushion, Including Dismantling And Removal Of The Damaged/Defective Seat Foam Cushion. The New Seat Foam Cushion (Make- Sleepwell/ Kurlon) Shall Be Of 40 Density Covered With White Lining Cloth And Premium Quality Tapestry Cloth (Make: Bombay Dying/DDecor/Raymond Of Rate Not Less Than 400 Per Mtr), Shall Be Provided With Nylon Zipper At One Edge Duly Covered Under The Tapestry Cloth Flap As Approved By Ge/Engineer-In-Charge., And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Note :- (I) Each Cushion For Seat Will Be Measured As Single Unit. 279 Supply And Fixing In Replacement Of Old Unserviceable Back Foam Cushion, Including Dismantling And Removal Of The Damaged/Defective Back Foam Cushion. The New Back Foam Cushion (Make- Sleepwell/ Kurlon) Shall Be Of 40 Density Covered With White Lining Cloth And Premium Quality Tapestry Cloth (Make: Bombay Dying/DDecor/Raymond Of Rate Not Less Than 600 Per Mtr), Shall Be Provided With Nylon Zipper At One Edge Duly Covered Under The Tapestry Cloth Flap And Fix Over The Base Of Seasonned Teak Wood Frame In One Piece And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. Note :- (I) Each Cushion For Back Will Be Measured As Single Unit. 280 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of Single Seater Sofa, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Seat Shall Be Made Of 12Mm Thick Bwr Ply Of Grade -A; Place And Fix In The Existing Pattern And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Make Of Plywood: Archid/Greenply/Century Or Equivalent As Approved 281 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 282 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 283 Supply And Fixing In Replacement Of Old Unserviceable Arm Rest, Including Dismantling And Removal Of The Damaged/Defective Arm Rest. The New Arm Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 284 Supply And Fixing In Replacement Of Old Unserviceable Side Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Side Rail Single Seater. The New Side Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 285 Supply And Fixing In Replacement Of Old Unserviceable Back Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Back Rail Single Seater. The New Back Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 286 Supply And Fixing In Replacement Of Old Unserviceable Front Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Front Rail Single Seater. The New Front Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 287 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 288 Sofa Set Single Seater With Cushion (Fd/Map-Ii/02) : Dismantling And Removing The Following Existing Unserviceable Components Of Sofa Set Single Seater And Supplying And Fixing A New Components Made To Shape & Size As Shown In Drawing. The Work Includes Careful Removal Of Old Unserviceable Parts Without Disturbing To The Other Parts, And Installation Of New Components, Complete In All Respects, Irrespective Of Drawing Details, And As Specified And As Directed By The Engineer-In-Charge. 289 Supply And Fixing In Replacement Of Old Unserviceable Foam Cushion, Including Dismantling And Removal Of The Damaged/Defective Foam Cushion. The New Foam Cushion (Make- Sleepwell/ Kurlon) Shall Be Of Size 558Mm X 533Mm X 100Mm Thick Of 40 Density Covered With White Lining Cloth And Premium Quality Tapestry Cloth (Make: Bombay Dying/DDecor/Raymond Of Rate Not Less Than 400 Per Mtr), Shall Be Provided With Nylon Zipper At One Edge Duly Covered Under The Tapestry Cloth Flap As Approved By Ge/Engineer-In-Charge., And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Note :- (I) Each Cushion For Seat Or Back Will Be Measured As Single Unit. 290 Supply And Fixing In Replacement Of Old Unserviceable Plywood Of Single Seater Sofa, Including Dismantling And Removal Of The Damaged/Defective Plywood. The New Seat Shall Be Made Of 12Mm Thick Bwr Ply Of Grade -A; Place And Fix In The Existing Pattern And Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge.Make Of Plywood: Archid/Greenply/Century Or Equivalent As Approved 291 Supply And Fixing In Replacement Of Old Unserviceable Front Leg, Including Dismantling And Removal Of The Damaged/Defective Front Leg. The New Front Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 292 Supply And Fixing In Replacement Of Old Unserviceable Rear Leg, Including Dismantling And Removal Of The Damaged/Defective Rear Leg. The New Rear Leg Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 293 Supply And Fixing In Replacement Of Old Unserviceable Arm Rest, Including Dismantling And Removal Of The Damaged/Defective Arm Rest. The New Arm Rest Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 294 Supply And Fixing In Replacement Of Old Unserviceable Side Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Side Rail Single Seater. The New Side Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 295 Supply And Fixing In Replacement Of Old Unserviceable Back Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Back Rail Single Seater. The New Back Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 296 Supply And Fixing In Replacement Of Old Unserviceable Front Rail Single Seater, Including Dismantling And Removal Of The Damaged/Defective Front Rail Single Seater. The New Front Rail Single Seater Shall Be Made From Seasoned Teak Wood, Free From Cracks, Knots, And Other Blemishes, And Shall Conform To The Size, Shape, And Finish As Shown On The Approved Drawings And As Directed By The Engineer-In-Charge. 297 Supply And Fixing In Replacement Of Old Unserviceable Hard Pvc/Rubber Shoe To The Bottom Of The Legs With 30Mm Long Screw Wood Steel. 298 Material And Labour For Complete Surface Preparation Of Old, Existing Polished Wooden Surfaces And Re-Application Of Melamine Polish With Following Process, Ensuring A Smooth And Aesthetically Appealing Glossy Or Matte Finish All As Directed: (A) Surface Preparation:(I) Carefully Scrape/Grind The Old Polished Surface Using Appropriate Tools To Remove Loose, Flaking, Or Degraded Polish.(Ii) Clean The Surface Thoroughly By Removing All Oily Spots And Contaminants Using Mineral Spirits Or Alkaline Cleaners As Necessary.(Iii) Rinse Thoroughly With Clean Water And Ensure The Surface Is Completely Dry.(Iv) Remove All Stubborn Marks Or Deposits Using Emery Paper Or Grinder.(V) Fill All Cracks, Dents, And Pores Using High-Quality Wooden Filler/Putty Matching The Wood Texture And Shade.(Vi) Sand The Entire Surface Evenly Using 80 To 320-Grit Sandpaper To Achieve A Smooth Finish.(Vii) Clean The Surface Using A Dry, Lint-Free Cloth To Remove Dust And Debris.(Viii) Repeat The Surface Preparation Process, If Required, As Per Site Condition Or Direction Of Engineer-In-Charge.(B) Staining (If Required):(I) Apply Approved Wood Stain Evenly Across The Prepared Surface As Directed.(Ii) Allow The Stain To Dry Completely Before Further Processing.(C) Melamine Polish Application:(I) Prepare The Melamine Polish By Mixing Melamine Base And Hardener In A 9:1 Ratio.(Ii) Add Recommended Thinner To Achieve The Correct Spraying Consistency.(Iii) Mix Thoroughly Before Use.(Iii) Use A Spray Gun To Apply A Thin, Even Coat On The Surface.(Iv) Allow The First Coat To Dry For 1–2 Hours.(V) Lightly Sand With 320-Grit Sandpaper To Ensure An Even Finish.(D) Re-Coating Process:(I) Apply A Total Of 2 To 3 Coats, Sanding Lightly Between Each Coat.(Ii) Achieve The Desired Glossy Or Matte Finish As Per Site Requirements.Note: All Work Shall Be Carried Out In A Neat, Professional Manner, Adhering Strictly To Safety, Quality, And Environmental Standards. Materials Used Shall Be Of Asian Paints/Nerolac/Dulux Paints/Berger/Nippon Paints As Approved Make/Brand And Conform To Relevant Is Specifications. Work To Be Carried Out To The Entire Satisfaction Of The Ge/Engineer-In-Charge. 299 Table 3X2 With/With Out Drawer (Fd-231,224,234, 283 & 284) 300 Table Writing (Fd-33, 249 & 275) 301 Table 900X900X760Mm (Fd-88 & 291) 302 Table Dining 4 Pers (Fd/Map-Ii/03 303 Table Dining 6 Pers (Fd-30, 239, 273, Db-1108 & Fd/Map-Ii/03) 304 Table Dining 8 Pers (Fd-376) 305 Table Bed Side (Fd-276, 210 & 248) 306 Table Centre (Fd-235, 274 & 284) 307 Table Dressing Gents (Fd-230 & 379) 308 Table Dressing Ladies (Fd-251, 265 & 378) 309 Peg Table (Fd-236, 266,277 & 384) 310 Teapoy (Fd-278 & 382) 311 Table Dressing Ladies With Stool (Fd/Map-Ii/07) 312 Table Office Clerk (Db-4121/292) 313 Table Office Officer (Wdf-32/Fd-139) 314 Form With/With Out Back F-73 & Fd-78(M) 315 Chair Dining With Long Back (Fd-357) 316 Chair Dining (Fd16/203, 279 & 228) 317 Chair Easy (Fd-17, 229 & 201) 318 Chair Writing (Fd-20/202/250 & 280) 319 Chair Dining Jcos/Or (Fd/E6/Map-Ii/05) 320 Chair Dining Officers (Fd/E6/Map-Ii/04) 321 Bed With Plywood Top (Fd-246 & 247) 322 Side Board (Fd-241 & 1112) 323 Bin Soiled Multipurpose (Fd/E6/Map/09)
Basic Detail
Tender No 8565/E8
Bidding Type Tender
Location
City Jhansi
State Uttar Pradesh
Key Dates
Publish Date 27 Jul 2026
Submission Date 17 Aug 2026
Open Date 22 Aug 2026
Finance
Tender Value 50 Lakhs
Tender Fee 500
EMD 1 Lakhs
Exemption Available
Document List
18e4f11c-9d50-4732-b146-6f5e348e56f9.html
8565Tenderdoc.pdf
BOQ_874953.xls
Tendernotice_1.pdf
Tender_Acceptance_Letter.pdf
Workdetails.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 27, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 17, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 19 days
Aug 22, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 24 days

Tender Documents

Download All (ZIP) ↓
html

18e4f11c-9d50-4732-b146-6f5e348e56f9.html

pdf

8565Tenderdoc.pdf

xls

BOQ_874953.xls

pdf

Tendernotice_1.pdf

pdf

Tender_Acceptance_Letter.pdf

pdf

Workdetails.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders