Tender For Construction/Establishment Of New Institute Data Center (Idc) At Computer Science Engineering (Cse) Department In Ad2 Building At Iit Hyderabad C Us, Kandi, Sangareddy (Sub Head: Electro-Mechanical Works).
Tender Overview
Project Description
Tender for Construction/Establishment Of New Institute Data Center (Idc) At Computer Science Engineering (Cse) Department In Ad2 Building At Iit Hyderabad C Us, Kandi, Sangareddy (Sub Head: Electro-Mechanical Works).
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 18-Aug-2026 | Corrigendum01 | Date | 25-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Part -A: Construction/Establishment of New IDC at IIT Hyderabad campus which includes Planning, Design, Supply, Installation, Testing & Commissioning of Data Centre as per the scope of work, technical specifications and terms,conditions specified in NIT document and as per the Indicative BoQ provided but not limited to the following; |
| 2 | Sub-Head I - Wiring and Internal Lighting Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable etc. as required.Group C - 34 Each. |
| 3 | Wiring for circuit/ submain wiring alongwith earth wire with the following sizes of FRLS PVC insulated copper conductor, single core cable in surface/ recessed medium class PVC conduit as required |
| 4 | 2 X 4 sq. mm + 1 X 4 sq. mm earth wire - 175 Meter. |
| 5 | 4 X 10 sq. mm + 2 X 6 sq. mm earth wire - 50 Meter. |
| 6 | Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required. |
| 7 | 15/16 A switch - 20 Each. |
| 8 | 6 pin 15/16 A socket outlet - 20 Each. |
| 9 | Supplying and fixing following size/ modules, GI box alongwith modular base & cover plate for modular switches in recess etc. as required. |
| 10 | 6 Module - 10 Each. |
| 11 | Supplying and Installation of 2x2 recess type 36W,6500k,LED panel Light suitable for mounting with grid celing , extruded aluminium housing for efficient heat dissipation with polycarbonate diffuser & integrated electronic driver with ISI mark including necessary accessories etc. as required. (Similar to Make: Havells, Model: LHEBAEP71W1W036) - 42 Each. |
| 12 | Sub-Head II - DBs, MCBs, RCCBs, MCCBs, Industrial Sockets, EarthPits, Cable Trays & Cable glandsSupplying and fixing following way, horizontal type three pole and neutral, sheet steel, MCB distribution board, 415 V, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/ Isolator) |
| 13 | 4 way (4 + 12), Double door - 3 Each. |
| 14 | Supplying and fixing following rating, 240/415 V, 10 kA, “C” curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. |
| 15 | Single pole (16A) - 36 Each. |
| 16 | Triple pole (32A) - 28 Each. |
| 17 | Four pole (63A) - 3 Each. |
| 18 | Supplying and installing following size of perforated painted with powder coating M.S. cable trays with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with M.S. suspenders including bolts & nuts, painting suspenders etc. as required. |
| 19 | 150 mm width X 50 mm depth X 1.6 mm thickness - 100 Meter. |
| 20 | 200 mm width X 50 mm depth X 1.6 mm thickness - 60 Meter. |
| 21 | Earthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 meter long etc. with charcoal/ coke and salt as required. - 14 Set. |
| 22 | Earthing with copper earth plate 600 mm X 600 mm X 3 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt as required. - 6 Set. |
| 23 | Providing and fixing 25 mm X 5 mm Copper strip in 40 mm dia G.I. pipe from earth electrode including connection with brass nut, bolt, spring, washer excavation and re-filling etc. as required. - 30 Metres. |
| 24 | Providing and fixing 25 mm X 5 mm G.I. strip in 40 mm dia G.I. pipe from earth electrode including connection with G.I. nut, bolt, spring, washer excavation and re-filling etc. as required. - 80 Metres. |
| 25 | Supplying and laying 25 mm X 5 mm Copper strip at 0.50 meter below ground as strip earth electrode, including connection/ terminating with nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of brass nut bolt & spring washer spaced at 50 mm) - 92 Metres. |
| 26 | Supplying and laying 25 mm X 5 mm G.I strip at 0.50 meter below ground as strip earth electrode, including connection/ terminating with G.I. nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of G.I. nut bolt & spring washer spaced at 50 mm) - 140 Meter. |
| 27 | Providing and fixing 25 mm X 5 mm Copper strip on surface or in recess for connections etc. as required - 275 Meter. |
| 28 | Providing and fixing 25 mm X 5 mm G.I. strip on surface or in recess for connections etc. as required - 105 Meter. |
| 29 | Providing and fixing 6 SWG dia G.I. wire on surface or in recess for loop earthing as required. - 45 Meter. |
| 30 | Sub-Head III - Hume Pipes, Cable ChambersTaking out existing CC interlocking paver blocks from foothpath/Central verge,including removal of rubbish etc.,disposal of unsurvisible material to the dumping ground,for which payment shall be made seperatly and stacking of servicable material with 50 metre lead as per direction of Engineer-in -Charge. - 10 Sqmm. |
| 31 | Laying old cement concrete interlocking paver blocks of any design/shape laid in required line,level,curvature,colour and pattern over and including 50mm thick compacted bed of coarse sand,filling the joints with fine sand etc. all complete as per the direction of Engineer in charge(old paver block shall be supplied by department free of cost) - 10 Sqmm. |
| 32 | Constructing masonry Chamber 60x60x75 cm, inside in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for fire hydrants, with C.I. surface box 350x350 mm top and 165 mm deep ( inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) , i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand:10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design : |
| 33 | With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 - 7 Each. |
| 34 | Sub-Head IV - MV Power CablesSupply, loading, Transportation, unloading at site, storage st site, shifting from storage place to site of following size of XLPE Insulated PVC Sheathed, FRLS, Aluminium Conductor armoured power cable of 1.1 KV grade conforming to IS : 7098 (Part-1) 1988 amended upto date and as per specifications. |
| 35 | 3.5C x 300 Sq.mm - 30 Meter. |
| 36 | 4Cx400 sq mm - 160 Meter. |
| 37 | Supply, loading, Transportation, unloading at site, storage st site, shifting from storage place to site of following size of XLPE Insulated PVC Sheathed, FRLS, Copper Conductor flexible power cable of 1.1 KV grade conforming to IS : 7098 (Part-1) 1988 amended upto date and as per specifications. |
| 38 | 1C x 35 Sq.mm - 40 Meter. |
| 39 | 1C x 150 Sq.mm - 50 Meter. |
| 40 | 1C x 300 Sq.mm - 50 Meter. |
| 41 | Supply, loading, Transportation, unloading at site, storage st site, shifting from storage place to site of following size of HT XLPE Insulated PVC Sheathed, FRLS, armoured power cable of 11 KV grade conforming to IS : 7098 (Part-2) 1985 amended upto date and as per specifications. |
| 42 | 3 Core x 120 sq. mm - 650 Meter. |
| 43 | Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 11 kV grade of following size in the existing RCC/ HUME/ METAL pipe as required. |
| 44 | Upto 120 sq. mm - 80 Meter. |
| 45 | Above 120 sq. mm and upto 400 sq. mm - 260 Meter. |
| 46 | Supplying and making end termination with brass compression gland and aluminium lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 kV grade as required. |
| 47 | 3½ X 300 sq. mm (70mm) - 6 Each. |
| 48 | 3½ X 400 sq. mm (82mm) - 12 Each. |
| 49 | supplying and making indoor cable end termination with heat shrinkable jointing kit complete with all accessories including lugs suitable for following size of 3 core, XLPE aluminium conductor cable of 11 KV grade as required: |
| 50 | 120 sq. mm - 2 Each. |
| 51 | Sub-Head: V Compact Secondary Substation Design, engineering, manufacturing, testing and supply of Outdoor type 11KV Compact Sub-station (CSS) suitable for 11kV, 50Hz, with HT Switchgear, Dry type Transformer and LT Switchgear, Cable termination facility for HT & LT side, internal illumination, earthing, interconnection of Transformer with HT & LT equipments, suitable for ready Plinth and comprising of the following - 1 Set. |
| 52 | a) StructureOutdoor type enclosure having modular construction of 1.6/2.0mm GI Sheet Steel. The enclosure shall have IP54 degree of protection for HT & LT compartment & IP23 degree of protection for Transformer compartment. The enclosure exterior shall be painted with epoxy based powder coated paint (RAL-7032). The bottom base frame shall be welded and black painted Channel structure with lifting arrangement for the completely assembled CSS. Each compartment is provided with door and pad locking arrangement. The Compartment illumination lamp with door operated switch shall be provided for each compartment. The Transformer compartment is provided with Limit switch to trip the HT Switchgear, in case the Transformer compartment door is inadvertently opened in LIVE condition |
| 53 | HT Section:RMU (SF6 gas insulated ): Sheet steel enclosed, free standing, indoor mounted, 11 kV, 630A, 21kA/3s, 3-WAY Non - extensible RMU, consisting of 3 Nos. Fixed VCB (Motorised charging & closing), mechanical ON/OFF indicator, trip coil, Manual Close & Trip PB, live cable indicator, mechanical interlocks, pad locking facility, SF6 gas manometer, cable boots, |
| 54 | a) CTs ratio: 100/1-1A, 2.5/2.5VA, CL: 1/5P10 for Metering & Protection b) CTs ratio: 150/1-1A, 2.5/2.5VA, CL: 1/5P10 for Metering & Protection c) PTs ratio: 11kV/√3 / 110/√3, 50VA, CL: 1 with HT Primary Fuses d) Self Powered Relay 3O/C + 1E/F ( 50,50N,51,51N) Numerical IDMT + DMT+ Inst Relay.e) Digital Multifunction Meter with RS485 Port, Cl: 1f) Voltage Presence Indicator.g) 16 Window Annunciator with Hooter Alarmh) Battery & Battery Charger (I/P-230V AC, O/P-24V DC) 2x12V DC, 12Ah.i) Auxiliary relay for Transformer Fault (WTI-OTI Alarm & Trip )j) Indication lamps: R,Y,B, ON, OFF, TRIPk) Operating Handle All the incoming modules of the RMU shall be capable for cable termination of 3C x 120 sq. mm Al XLPE Cable, incoming cable termination kits shall be in the scope of purchaser only. |
| 55 | Cable connection arrangement from outgoing of HT section to primary of Transformer by 11kV (E) XLPE unarmoured 1C x 240 Sqmm Aluminium cable per phase along along with heat shrink cable kit. |
| 56 | B) TransformerA.630KVA, 11/0.433KV DYn11 Cast resin Dry type transformer with Tap Link, having tapping range of +5% to -5% in steps of 2.5%, Z% : 6% (IST), with ECBC losses (Total Losses at 50% Load = 6.762kW and Total Losses at 100% Load = 17.976kW (MAX)Class H insulation, temp rise: 115 DegC., 3nos. Surge arrestors 9kV 10kA polymeric make Asiatic make/ Eq, 1 no. Digital WTI with Alarm & Trip contacts. |
| 57 | C) LT Panel - 1000 A Aluminium Busbar (100% for Phase & 50% for Neutral) Current Density 1 Amp/Sq mmAluminium PVC sleeved Busbar from transformer Secondary to LT Section (100% for phase, Current density - 1A/ sq mm)C.1) INCOMER From TransformerC.1.1) 1000 Amps 4P 50Hz 66KA EDO Type Air Circuit Breaker (ACB) with microprocessor based Ekip Dip release for overload, short circuit & Earth Fault protection and Auto Transfer Switch (ATS). (One ACB considered as DG incomer) - 2 SetC.1.2) RYB ON OFF TRIP Indication lamps - 2 SetC.1.3) LT side metering CT 2000 A / 5A,5VA, Cl:1.0 - 2 Set. C.1.4) Multifunction meter, CL-1.0 Accuracy with RS485 Port - 2 No.C.2) Outgoing FeedersC.2.1) 1250 Amps 4P 50Hz 50KA EDO type Air Circuit Breaker (ACB) with microprocessor based overload, short circuit & Earth Fault protection - 1 SetC.2.2)800 A MCCB microprocessor based released for OC,SC and EF-01set.C.2.3) 630 A MCCB microprocessor based released for OC,SC and EF-01set.C.2.4) 400 A MCCB microprocessor based released for OC,SC and EF-01set. |
| 58 | D) Outdoor EnclosureOutdoor type enclosure having construction of Galvanised Sheet Steel having 1.5mm thickness for Non-load bearing & 2 mm for Load bearing partition sheets & Door with HRCA 4 mm base frame. The Enclosure shall have IP54 degree of protection for HT & LT switchgear compartment & IP23 degree of protection for Transformer compartment. The enclosure exterior shall be Powder Coated (Colour Light Gray & D.A.Gray ). Each compartment will be provided with the door and pad locking arrangement. The Compartment illumination lamp with door operated switch shall be provided for MV & LV compartment. As per IEC 62271-202 - 1 Set |
| 59 | E) Interconnecting and EarthingInterconnection Between HT switchgear & Transformer using XLPE Single Core Aluminum unarmorured Cable & Interconnection between Transformer & LT switchgear using Aluminum Busbars. Internal earthing connections by using 50X6 GI strips, Transformer Neutral shall be 50X6 CU. - 1 Set |
| 60 | Sub-Head VI - UPS Online UPS- Input supply: Three Phase, Output supply: Three Phase.Supplying, installation, Testing & Commissioning of following capacity at full load (Unity Power Factor) at operating temperature 0 to 40 0C, Relative humidity 0 to 95%, Online double conversion true sine wave Uninterrupted hot swapable (allow for the replacement or addition of battery modules without shutting down the entire system) modular Power Supply (UPS) system with N+1 modules (N denotes total number of modules required for rated capacity). The UPS shall include a Rectifier, inverter, battery bank suitable for 30 minutes back up (Battery VAH capacity shall not be less than 1600 VAH per KVA of UPS rating per Hour backup time) on full load (Battery shall be VRLA, SMF in ABS Container) and Static Bypass switch along with provision for manual bypass, suitable isolation transformer for additional protection against neutral faults etc. UPS shall have inbuilt phase sequence correction. The UPS systems offered are to be of the latest technology with Digital Control Microprocessor based for reliable operation using Bipolar Transistor (IGBT)'s both for the rectifier & inverter (3 Level) with PWM (Pulse Width Modulation). The quality of design, manufacturing and inspection process should confirm to the relevant Inter-national standards such as IEC/EN/VDE. The operating efficiency of the UPS systems shall be >96% while operating on battery mode and delivering quality power to the 100% non-linear loads. Current total harmonic effect(ITHD) on the input grid shall be < 5% at 50 %load. (The required LC ( inductor (L) and a capacitor (C)) filters shall be included in UPS cost), extreme power factor kit to be included to limit the input power factor (PF) to 0.99 and output power factor shall be unity (i.e. kw rating of the UPS shall be kva rating x 1 ), however UPS shall be suitable to take load at 0.7 laging to 0.7 leading power factor loads. UPS shall be suitable for incoming supply AC : 3Phase 400V +/-20%, 50 Hz +/-5 Hz, AC Output voltage: 3Phase 415 Volt, 50 Hz +/- 0.2Hz, Overload capacity of 120% for 10 mins, Sine wave output. Non condensing, noise level less than 60db at 1 meter distance, protections: Input Under voltage over voltage, abnormal out voltage, battery over charging, output over current, short circuit protection, battery deep discharge protection, 10KV surge. |
| 61 | UPS must comply with low voltage electromagnetic compatibility (EMC) achieved as per EN 6204, EN6204 Part I and Part 2, it shall be a Voltage and Frequency Independent (VFI)-type UPS. Communication RS232/ RS485/ SNMP port open protocol for BMS integration, all hardware & software for iOT Communication as per approved by Engineering in charge. Required battery racks and interconnecting copper conductor cables of suitable size and connectors and all required accessories are inclusive of the cost). This system must provide a means for logging and alarming of all monitored points plus email notification. Forced air-cooling with integral inbuilt fans with redundancy (if one fan fail UPS should be able to handle at least 80% of the load, Noise Level 65 DB at 1 meter distance. The system shall be in compliance IEC 62040- 1,2 & 3, IS: 16242 and CPWD Specification. Display Panel (minimum) (In-build 5 inch or more LC Display / LED) to display : a) Input: Voltage, current, Frequency. b) Bypass: Voltage, Frequency. c) Output: Voltage, frequency, Current. d) Battery: Voltage, Capacity. e) Load: KVA, KW, Percentage. f) Temperature: STS, Inverter, PFC. g) Event Logging & Statistical Data (On LCD/LED): UPS should capture and display up to 3000 events like: Over temperature / DC Bus Fail / Fan Fail / Fuse Fail / Overload / Short-circuit / Device Fail / Inverter Fail / Rectifier Fail / Bypass Fail, etc. h) Statistical Data: No. of power failures / Transfers to Bypass / Total Running time, etc. i) Mains Mode of Operation /Battery Mode of Operation / Bypass feeding the load / UPS Fault /Battery charging and discharging, overload, battery voltage and battery capacity. j) Audible Alarms : Mains Failure, Battery Low Alarm, UPS Overload, Fault, Shutdown, Input Over, Under Voltage, Output Over, Under Voltage, Battery Over, Under Voltage, Over Load and short circuit, Over Temperature. The UPS should have QR code which should contain drawing, test report OEM manual, Geo- Tag of manufacturing location etc. |
| 62 | 30KVA (Each Power module shall be < 10 KVA) - 1 Set. |
| 63 | 300KVA (Each Power module shall be < 50 KVA - 1 Set. |
| 64 | Sub-Head VII - MV Electrical PanelsSupply, Installation, Testing and Commissioning of 11kV, 630 A VInd Panel with 630A Vacuum Circuit Breaker- 01Nos., 26.3kA/1Sec, Indoor Type, floor mounted with 800A copper busbar as incomer and 630A Copper Busbar as outgoing with Hongshang sleeve cable entry for Cable. Control Voltage for Closing / Tripping - 24VDC, Spring Charging Motor - 230VAC. Design Ambient - 40 degree. , Paint Shade : RAL 7032 (Only for front door & end cover ). Internal Arc 1 sec, Single Phase Cast Resin wound type CT's for 11KV, 26.3KA for 1Sec. Isf<=10, Insulation class-E100/1-1A Core1:5P10/7VA, Core 2: 1.0/7VAOTHER B/O ITEMSTNC Switch -1 no., L/R Switch -1 no.,Emergency Stop P.B.-1 no.,Lamp Test P.B.-1 no., MCB for Panel DC -3 nos, MCB for Panel AC -3 nos, MCB for Spring Charging Motor -1 no., Main AC MCB-1 No., Main DC MCB-1 no., Indicating Lamps -8 nos, Annunication 8 window-1 No., Toggle Switch for SpaceHeater-1 no., Hooter-1 No., Main Protection Relay:- NUMERICAL COMMUNICABLE on Modbus Protocol - 1 No.Auxiliary / Static / Electromechanical RelaysAntipumping Relay (94) Type: CRM Master Trip Relay (86) Type:PQ8 -1no., Trip Circuit Supervision - 1 JobPSU6(Breaker Contact Multiplier)-1 no., MetersMFM- 1 No., Digital Ammeter with Selector Switch-1 no., RTTB-1No. Power Cable Entry-Rear Bottom with cable extension box - 1 Set. |
| 65 | Supply of floor standing indoor extendable factory built, form 4B type 7 construction, cubical panel, suitable for operation on 415V, 3 Phase, 4 Wire, 50 Hz, AC supply system, fabricated in totally enclosed compartmentalized flush finish design from CRCA not less than 2mm thick for load bearing members and 1.6mm for doors of LT panels, 3mm thick for gland plates in split sections, including powder coating painting in approved shade, provision for incoming & outgoing with suitable capacity bus trunkings/ cable chamber, busbar chamber having horizontal and vertical 4pole bus bars of aluminium Alloy of high conductivity and DMC/ SMC bus bar supports, having short circuit withstand capacity of 31 MVA for 1 Sec., suitable ventilation, bottom base frame with MS channel ISMC 150 designation and fabrication of the panel shall be done in transportable sections, entire width of the panel shall have common Aluminium earth bar. at the rear with 2 Nos. earth stud, connection and interconnections from main bus bar to switch gears with required size of Al. bus bars and control wiring with 1.5 sq.mm. zero halogen fire retardant ZHFR PVC insulated copper conductor single core cable, cable alleys, detachable cable gland plates including providing and fixing the following drawout type ACBs/ MCCBs/ Switchgears /metering accessories, including supplying and fixing of Transient Voltage Surge Suppression ( TVSS of class \\"B\\") device of suitable class etc complete as required. Panels have to conform with IEC 61439-1 & 2 for Type tested assemblies and IEC 61641 for Internal Arc in Vertical bus bar, Horizontal bus bar and functional Unit chambersThe cubical panel shall also generally confirm to CPWD General Specification for Electrical works, Part-I Internal 2013, Part II External 1994 and Part IV substation equipment 2013 as ammended upto date.General arrangement drawing will have to get approved from the Engineer-in-charge before start of fabrication. Panel should be As per SLD & Technical specification. |
| 66 | Splitter Panel Bus Bar : 1600 Amps ,65 KA , 4Pole Aluminium BusbarOUTGOINGS 800 Amps , 4 Pole , Load Break Switch (LBS)-3 No - 1 Each. |
| 67 | DG Synch panelIncomer 800 Amps ,50 KA , 3 Pole , EDO ACB - 3 NOBus Bar : 2000 Amps ,50 KA , 4Pole Aluminium BusbarAccessories Battery charger,Under Voltage Relay , Over current relay, S/C relay, AMF Relay , Load Monitors with RS485 , Indicating Lamps , thermostat , etc.OUTGOINGS 2000 Amps , 50 KA , 3 Pole , EDO ACB - 1 NO - 1 Each. |
| 68 | MAIN LT PANEL -1 INCOMER2000 Amps ,50 KA , 4 Pole , EDO ACB - 3 NO Bus Bar : 3200 Amps ,50 KA , 4Pole Aluminium BusbarAccessories PLC, Under Voltage Relay , Over current relay, S/C relay, TVSS Load Monitors with RS485 , Indicating Lamps, thermostat , Cooling Fan , Tube light etc.OUTGOINGS 800 Amps , 50 KA , 4 Pole , MDO ACB - 1 No630 Amps , 50 KA , 4 Pole , MCCB-1 No400 Amps , 50 KA , 4 Pole , MCCB-2 No63 Amps , 35 KA , 4 Pole , MCCB-1 No125 Amps , 35 KA , 4 Pole , MCCB-2 No63 Amps , 10 KA , 4 Pole , MCB-4 No - 1 Each. |
| 69 | UPS Output Panel for IT Load -1 INCOMER400 Amps , 50 KA , 4 Pole , MCCB-2 NoBus Bar : 1000 Amps ,50 KA , 4Pole Cu. BusbarAccessories Under Voltage Relay , Over current relay, S/C relay, TVSS Load Monitors with RS485 , Indicating Lamps etc.OUTGOINGS 250 Amps , 50 KA , 4 Pole , MCCB-4 No63 Amps , 10 KA , 4 Pole , MCB-2 No800 Amps , 50 KA , 4 Pole , MDO ACB - 1 No - 1 Each. |
| 70 | UPS O/P Panel for Non IT Load INCOMER63 Amps ,4 Pole , 10 KA 4P MCCB - 1 NO Bus Bar : 100 Amps ,16 KA , 4 Pole Copper BusbarAccessories TVSS Load Monitors with RS485 , Indicating Lamps etc.OUTGOINGS 40 Amps ,10 KA, 4P, MCB - 2 NO32 Amps ,10 KA, 4P, MCB - 2 NO - 1 Each. |
| 71 | HVAC Panel 1 & 2 ( Outdoor type)INCOMER630 Amps , 50 KA , 4 Pole , MCCB-1 NoBus Bar :800 Amps ,50 KA , 4Pole Aluminium BusbarAccessories Under Voltage Relay , Over current relay, S/C relay, TVSS Load Monitors with RS485 , Indicating Lamps , thermostat , Cooling Fan , Tube light etc.OUTGOINGS 125 Amps , 25 KA , 4 Pole , MCCB - 1 NO 63 Amps , 10 KA , 4 Pole , MCB - 14 NO - 1 Each. |
| 72 | 63 amp ATS with Outdoor Encloure big size (For PAC) - 5 Each. |
| 73 | APFC Panel -1 (410 KVAR)INCOMERBus Bar : 1100 Amps ,50 KA , 4Pole Aluminium BusbarAccessories Indicating Lamps ,APFC Relay, AmeterOUTGOINGS 75 KVAR Capacitor , 75 KVAR reactor, 200 Amp MCCB 36 KA - 2 No50 KVAR Capacitor , 50 KVAR reactor, 125 Amp MCCB 36 KA - 2 No25KVAR Capacitor , 25 KVAR reactor, 63 Amp MCCB 36 KA - 4 No15 KVAR Capacitor , 25 KVAR reactor, 63 Amp MCCB 36 KA - 4 No - 1 Each. |
| 74 | Sub-Head- VIII : 500 kVA DG Set along with AMF Panel and foudationSupplying, Installation, Testing & Commissioning of ‘Silent Type Diesel Generating set as per CPCB IV + or better norms along with having Prime Power Rating of KVA as below, 415 volts at 1500 RPM, 0.8 lagging power factor at 415 V suitable for 50 Hz, 3 phase system & for 0.85 Load Factor, including testing at factory and site with fuel, load for test and other necessary arrangements Complete as per CPWD specifications, should have QR code which should contain drawing, test report OEM manual,Geo- Tag of manufacturing location, rating plate as per relevant IS Code etc. and consisting of the followings:(A) Diesel Engine:Tourbocharged Diesel engine 4 stroke water cooled, multi cylinder, dynamically balanced fly wheel, electric start of suitable BHP at 1500 RPM suitable for above output of alternator at 40 degC, 50% RH & at 1000 Meter MSL , capable of taking 10% over loading for one hour after 12 hours of continuous operation. The engine will be with Electronic governor, Dry type Air filter with service indicator, first filling of engine fuel (after commissioning) lubricating Oil, Coolant and other consumables complete with all the required accessories, the Electronic governor shall be as per ISO 8528.The engine shall comply to the latest CPCB norms (CPCB IV + or better) and Conforming to BS 5514, BS 649, IS 10000, IS 10002, IS 13018 and as per CPWD specifications.(B) Engine mounted Instrument Panel fitted with and having digital dis Plate for following:(i) Start-stop switch with key(ii) Water temperature indication(iii) Lubrication oil pressure indication(iv) Lubrication oil temperature indication(v) Battery charging indication and Voltage indication(vi) RPM indication(vii) Over speed indication(viii) Low lubricantion Oil trip indication(ix) Engine Running Hours indication(x) Fuel Level |
| 75 | (C) Alternator:Synchronous alternator rated of appropriate KVA, 415 volts at 1500 RPM, 3 phase 50 Hz, AC supply with 0.8lagging power factor at 40 0C, 50% RH & at 1000 Meter MSL. The alternator shall be having Screen Protected Drip Proof (SPDP) enclosure IP23, brushless, continuous duty, dynamically balanced rotor, capable of taking 10% over loading for one hour after 12 hours of continuous operation, self cooled,self-excited and self-regulated through AVR conforming to IS13364(Part 2)/IS: 4722/BS 2613 suitable for tropical conditions and with class- H insulation.(D) Base Frame & Foundation:Both the engine and alternator shall be mounted on suitable base frame made of MS channel with necessary reinforcement which shall be installed on suitable cement concrete foundation and vibration isolation arrangement as per recommendations of manufacturer.(E) FUEL TANK:Daily service fuel tank of suitable liters capacity as per CPWD Specifications, fabricated out of 3 mm thick M.S. sheet complete with all standard accessories and fuel piping between fuel tank and diesel engine with MS class ‘C’ pipes of suitable dia. Complete with valves, level indications & accessories as required as per specifications.(F) Exhaust System:Dry exhaust manifold with hospital type exhaust silencer and catalytic convertor.(G) Starting System:12V/24V DC starting system comprising of starter motors: voltage regulator and arrangement for initialexcitation complete with suitable numbers of batteries (180 AH capacity lead acid SMF type) as required as per specifications. The battery shall be housed inside the acoustic enclosure of DG Set. |
| 76 | (H) Acoustic and weather proof enclosure with arrangement for fresh air intake for cooling of the engine & alternator, extraction, discharging hot air in to the atmosphere and the temperature rise inside the enclosure, noise level outside enclosure. The acoustic enclosure should be suitable for cable connection/ connection through bus-trunking. Such arrangements on acoustic enclosure should be water proof & dust-proof conforming to IP-65 protection. The enclosure shall be as per CPCB IV + or better norms etc. and as per CPWD specifications. (I) AMF Panel: Free standing floor mounted IP 42 automatic mains failure control panel including auto by-pass, suitable for KVA as below for silent type DG set complete with relays, timers, set of CTs for metering & protection and energy analyser to indicate currents, phase and line voltages, frequency, power factor, KWH, Kilo Volt Ampere Reative Hour (KVARH), KVA (Phase & Total), KW & provision for overload, short circuit, restricted earth fault, under frequency, power (aluminium) and control (copper ) cabling of suitable size upto 15 meter between AMF panel, LT Panel and DG Set including connection interconnection etc. as required, all complete and inter locking and communication/ Ethernet /RS485/SNMP port open protocol for BMS integration including suitable software, the panel shall be of DG Set OEM make etc. as per approved by Engineering in charge and including the following:1. Suitable numbers and appropriate capacity 4 pole motorised electrically operated draw out with cradle type 3 position ACB/ MCCB with electronic release for O/C & E/F and shunt trip.2. Auto/Manual/Test/Off selector switch3. Protection for under and over voltage phase reversal (2 nos Over voltage relay, 2 Nos. reverse power relay and 2 Nos. under voltage relay).4. 3 Sets of current transformers 15 P 10 accuracy for protection and 15 VA class-I for metering5. Energy analyser unit to indicate current, Voltage( LN & L_L), kW, kVA (Phase & Total), Frequency, KWH, PF.6. LED Indicating lamps for load on mains and load on set7. Fuse/ MCB for instruments8. Battery charger, complete with transformer/ rectifier, D.C. voltmeter and ammeter, selector switch for trickle, off and boost and current adjustment. |
| 77 | 9. Main supply failure monitor10. Supply failure timer11. Restoration timer12. Control unit with three impulse automatic engine start/stop and failure to start lockout.13. Impulse counter with locking and reset facility.14. ON/OFF/Control circuit switch with indicator15. Audio/Video annunciation for(i) High water temperature(ii) Low lubricating oil pressure(iii) Engine over speed(iv) Engine fails to start(v) Full load/maximum load warning16. Protection for over/under Frequency, Loss of AC sensing, Over Current, Unbalancing load with suitable number of relays and accessories17. Maintenance notification based on Engine Run Hour & due date.18. Load Management through PLC to achieve auto opening and closing of incomer breakers, bus coupler switching of essential panel , interlocking providing signal to AMF Panel for load status and AMF shall give command to DG Set to auto start / auto stop depending upon load status and requirement etc. and necessary hardware and software required to perform the operation shall be provided by the contractorincluding all control wiring. |
| 78 | 500KVA - 1 Set. Please Enable Macros to View BoQ information |
| 79 | 500KVA - 1 Set. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender