Tender For Package-3: Proposed Building Condition Study, Structural Analysis, Submission Of Reports And Supervision Of Partial/Full Demolition Of Properties Identified From Hosahalli Station To Kadabagere Station (Ch. -0.600 Km To Ch.11.907 Km) Exclu
Tender Overview
Project Description
Tender for Package-3: Proposed Building Condition Study, Structural Analysis, Submission Of Reports And Supervision Of Partial/Full Demolition Of Properties Identified From Hosahalli Station To Kadabagere Station (Ch. -0.600 Km To Ch.11.907 Km) Excluding 1.64Kms (Ch: 4.620 Km To 6.260 Km) In Corridor 2 Of Bangalore Metro Rail Project, Phase-3
BOQ
| Sl. No. | Item Description |
| 1 | Item Rate BoQ BoQ_Ver4.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: General Manager (Contracts) Name of Work: Package-3: Proposed Building condition study, structural analysis, submission of reports and supervision of partial/full demolition of properties identified from Hosahalli station to Kadabagere station (Ch. -0.600 Km to Ch.11.907 Km) excluding 1.64Kms (Ch: 4.620 Km to 6.260 Km) in Corridor 2 of Bangalore Metro Rail Project, Phase-3 RFP/ Bid No: BMRCL/Phase-3/BCS Pkg-3/2026/153 Name of the Bidder/ Bidding Firm / Company : PRICE BID - BILL OF QUANTITIES(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description Item Code / Make Quantity Units Total Estimated Cost (Excl. GST) (₹) Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency (%) Percentage Rate (on the Total estimated cost) in figures to be entered by the Bidder Percentageat par / Excess/ Less (on the Total Estimated Cost) VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category Total Amount (Excl. GST) (₹) TOTAL AMOUNT Total Amount In Words |
| 2 | Package-3: Proposed Building condition study, structural analysis, submission of reports and supervision of partial/full demolition of properties identified from Hosahalli station to Kadabagere station (Ch. -0.600 Km to Ch.11.907 Km) excluding 1.64Kms (Ch: 4.620 Km to 6.260 Km) in Corridor 2 of Bangalore Metro Rail Project, Phase-3 Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Bill of Quantities (BoQ) Name of the Assignment-: Package-3: Proposed Building condition study, structural analysis, submission of reports and supervision of partial/full demolition of properties identified from Hosahalli station to Kadabagere station (Ch. -0.600 Km to Ch.11.907 Km) excluding 1.64Kms (Ch: 4.620 Km to 6.260 Km) in Corridor 2 of Bangalore Metro Rail Project, Phase-3 RFP/ Bid No: BMRCL/Phase-3/BCS Pkg-3/2026/153 Item No. Item Description (type or category of building/ structure) Unit Quantity (Approximate Floor Area)in Sqm Rate per Unit (₹) Estimated Cost (Excl. GST) (₹) 1.0 RCC framed Structure with RCC Roof (Type-A) - Full Demolition Sqm 13841.0 479.0 6629839.0 2.0 RCC framed Structure with RCC Roof (Type-A) - Partial Demolition Sqm 14321.0 534.0 7647414.0 3.0 Load bearing wall structure with RCC Roof (Type-B) - Full Demolition Sqm 3182.0 230.0 731860.0 4.0 Load bearing wall structure with RCC Roof (Type-B) - Partial Demolition Sqm 4699.0 276.0 1296924.0 5.0 Other than structures at Item No. 1 to 4 above (Type-C) - Full Demolition Sqm 3750.0 107.0 401250.0 6.0 Other than structures at Item No. 1 to 4 above (Type-C) - Partial Demolition Sqm 2872.0 120.0 344640.0 Total Estimated Cost 17051927.0 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 30 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 32 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender