Tender For Supply And Replacement Of All Plumbing Lines Including Fittings For 3 Nos Cooling Tower (100 Ton Capacity) Including Repairing Of Ct Motor, Supply And Replacement Of Sprinkler System Installed At Nazrul Mancha, Kolkata
Tender Overview
Project Description
Tender for Supply And Replacement Of All Plumbing Lines Including Fittings For 3 Nos Cooling Tower (100 Ton Capacity) Including Repairing Of Ct Motor, Supply And Replacement Of Sprinkler System Installed At Nazrul Mancha, Kolkata
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 04-Aug-2026 | 1st Corrigendum | Date | 17-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbow, nipple, long screw, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required, jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accessories, specials. Payment for painting will be made separately) (a) For Exposed Work : (Dia) 50 mm |
| 2 | …Do…Do... (a) For Exposed Work : (Dia) 25 mm |
| 3 | Supply of Chlorinated Polyvinyl Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007 : (Q) Ball Valve : (Dia) 50 mm |
| 4 | … Do.. Do.. 25 mm |
| 5 | Dismentling the damaged cooling tower Motor (7.5 HP/700 RPM) from its working place and refixing the same after repairing to its original position including removing and re-fixing of all connections, carrying, loading at one end and unloading at the other. |
| 6 | Dismantling of 7.5 HP cooling tower motor part by part at WS for overhauling and repairing by replacement of damaged bearings, cleaning, varnishing stator and rotor, supply and fixing of suitable rain protecting hoot including painting complete as per direction of EIC. |
| 7 | Dismantling and replacing the 2.5\\" PVC header pipes cooling tower, replacement of damaged sprinkler by a new 5\\" X 2.5\\" X 4 way sprinkler set (Supplied separately) including refixing, testing complete as per direction of E.I.C. |
| 8 | Supply of 5\\" X 2.5\\" X 4 way sprinkler made of cast Aluminium alloy complete as per sample. |
| 9 | Add : GST @ 18% |
| 10 | Add : Cess @ 1% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 6 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender