Drinking Water Supply and Sanitation Boards / Undertakings / PSU Closing in 5 days TDR #56676182

Tender For Repair/Renovation Of Fluctuator Of Clarifier No-05 Of Hdo Make Installed At Haiderpur Ph-I,Ww.

Issued by Boards / Undertakings / PSU · Delhi, Delhi
Tender Value
Ref. Documents
Estimated cost
Bid Submission
03 Aug 2026
5 days left
EMD
70500
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Delhi → Delhi
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Repair/Renovation Of Fluctuator Of Clarifier No-05 Of Hdo Make Installed At Haiderpur Ph-I,Ww.

BOQ

Name of Work:- Repair/Renovation of fluctuator of clarifier No-05 of HDO make installed at Haiderpur Ph-I,WW.
Sl. No. Item Description
1Dewatering/De-silting of sludge from inside portion of Clarifier No. 05 with the help of 30 HP & 10 HP sludge pump sets. Work including lowering of pump sets by making special lifting / lowering arrangement on the center of clarifier bridge. Removing & taken out the mud/ malba/ earth from the clarifier central pit by using buckets/ phawarah etc. as required by manual labours and removing of plastic/ floating material & heavy sand deposited at bottom up to the height of 6’’ to 9’’ by manual labours and disposal of the same as per direction of Engineer-in-charge. Work also includes laying of temporary electrical cables and installation of Electrical starters for operation of pumping sets and making of electrical connection from electrical source available at Filter House and taken out the pumping sets with all accessories and old material from the clarifier after completion of work and disconnecting the electric supply from the source.
2Lifting of the bridge with the help of mechanical jacks with proper support and holding the bridge with statically balanced support this include the loading, unloading cost of packing and hiring of lifting arrangement to carry out the work, material, wooden square, T&P etc. (also making strong thrust support by welding process with deploying technical staff/ labour, T&P tool & tackles to complete the work as per site requirement.
3Making a temporary platform along the turn table to use as a working platform around the drum so that easily movement of working staff should move around the turn table. 25 Days @ 4000/-Per day.
4Making an arrangement for removing of drive system of turn table like top bearing block, bearing block shaft, bevel pinion also from the top of turn table (centre mechanism) & taking out this item with chain block arrangement to outside of drum at bottom of clarifier & put on safer side of clarifier.
5Cutting of all tensile nut bolt of centre cage of flocculator drum. But gas cutter almost 16 nos. tensile bolt & removing of by hammering etc. as required to free hole of both turn table as well as centre cage. & top big worn gear to be lift by over head two leg lifting arrangement & lifting from the centre mechanism (turn table) & lifting with carefully in parallel way to make free from all side and with help of second chain block arrangement to keep big worn part of centre mechanism slowly-slowly with carefully to outside of drum by mean of chain block system to outside and taking it to bottom of clarifier floor with proper care.
6Cutting of tensile bolt of almost 16 nos. with drum which is moving with main bridge with gas cutter. And same 16 nos. bolt should be remove by hammering & other mechanical arrangements so that the hole should be free from both item and lifting it with proper chain block two leg type with carefully so that it move upwards side and upto free from turn table parts. This known as middle part of turn table & with second chain block it level to outside of drum with chain block arrangement & making down upto clarifier floor level.
7The foundation bolt of bottom part with the RCC block the removing of nut of all foundation bolt removing carefully so that the bottom part should free from foundation bolt & same is lifting with carefully upto the level which can easily removed with other chain block system to outside of drum etc. as required. All above parts should be kept in store as per instruction of engineer-in-charge may be JE(E&M) or AE(E&M) with the help of moving crane of all part kept outside of clarifier.
8Cleaning of all CC structure with proper cotton waste & diesel with proper cleaning of complete surface free from all oil & dust etc. as required.
9Opening of wooden box which is kept in deptt. side (store) open & similarly open & found all parts OK in proper condition. All parts lift one by one in proper position & lift with hydra & one by one all parts should be down in clarifier floor area. And same put of each part of centre mechanism slowly-slowly all parts should be transfer to centre of clarifier by manual heavy labour arrangement.
10First bottom part of new centre mechanism lift with chain block arrangement from bottom floor area of clarifier upto the top of clarifier & same is fixed on foundation bolt making proper level with RCC so that bottom part should be checked properly level with all respect. And tightening of all nut to existing bolt with proper tightening of each nut.
11Fixing of new bronze liner in bottom part with taper pin etc. as required one by one. These are in six nos. parts of one bronze liner with proper dowel pin & making oiling of bottom part in proper way & closed out drum part with plug etc. as required.
12Same way second part also lifts with proper chain block & put in centre of centre mechanism with proper alignment with bottom bronze liner etc. as required. The bronze liner of second part is to be fixed with proper dowel pin etc. as kept level etc. as required. The 8 nos. tensile bolt of middle part tight in centre drum to kept proper alignment etc. as required of each bolt with nut.
13The top part of centre mechanism is to lift with chain block from bottom floor area to top with help of chain block system as previous system kept of second put of centre mechanism with same alignment etc. as required & tightening of tensile bolt with centre cage with proper alignment etc. as required by tightening with proper balance of all parts.
14Fixing of oil in the centre mechanism with proper plug of drain & put oil in proper plug etc. as required & same way the cover of turn table kept on top part etc. as required with nut bolt etc.
15Finally the drive shaft & bevel gear with bearing block etc. as required to lift with chain block & set on turn table with proper system etc. as required.
16Minor structure of member damage will be welding at that point in any side of clarifier.
17Test & Trial of Clarifier No. 05 for 3 to 4 days.
18Polyurethane Lining Removal of old Pu lining by the traction wheel by cutting on machine and making Pu lining as per size OD 508 ± 2 mm, length of 150 mm.
19Repairing of old aluminium armored cable of size 300 mm 4 core by tracing of fault occure in the ground by tracing arrangement and find the fault. After finding the fault same is making digging work for find out the cable upto depth by manual labour & clear from the ground level & also jointing by L.T. joint kit with chemical filling insulated material with M-seal etc. as required, filling of complete all digging work at site.
20Repairing of drive arrangement for clarifiers on path Zone Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56676182
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 03-08-2026
Authority
Authority Name Delhi Jal Board
Work Description Tender for Repair/Renovation Of Fluctuator Of Clarifier No-05 Of Hdo Make Installed At Haiderpur Ph-I,Ww.
Basic Detail
Tender No NIT NO. 04(2026-27) HP-I
Bidding Type Tender
Location
City Delhi
State Delhi
Key Dates
Publish Date 27 Jul 2026
Submission Date 03 Aug 2026
Open Date 03 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee 500
EMD 70500
Exemption Not Available
Document List
BOQ_393847.xls
db7389b8-0593-482c-a1eb-fc8f73a4b595.html
Tendernotice_1 (10).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 27, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 03, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 5 days
Aug 03, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 5 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_393847.xls

html

db7389b8-0593-482c-a1eb-fc8f73a4b595.html

pdf

Tendernotice_1 (10).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders