Tender For Round The Clock Operation, Guarding & Minor Maintenance Of 1400 M3/Hr Capacity Clear Water Booster Pumping Station With 11Kv Sub Station At Latbagan Under Barrackpore -North Barrackpore Water Treatment Plant For 3 Years 01 Month.
Tender Overview
Project Description
Tender for Round The Clock Operation, Guarding & Minor Maintenance Of 1400 M3/Hr Capacity Clear Water Booster Pumping Station With 11Kv Sub Station At Latbagan Under Barrackpore -North Barrackpore Water Treatment Plant For 3 Years 01 Month.
BOQ
| Sl. No. | Item Description |
| 1 | Round the clock operation & minor maintenance of the pumping station with adequate number of working personnel for each month as per direction of EIC ( For 6 nos working personnel) |
| 2 | For the period of first year |
| 3 | For the period of second year |
| 4 | For the period of third year |
| 5 | Checking of all the Mechanical parts and preventive maintenance of all pump machinary as per technical specification and scope of work and direction of the EIC.(twice a week) |
| 6 | For the period of first year |
| 7 | For the period of second year |
| 8 | For the period of third year |
| 9 | Checking of all the Electrical parts including Battery Bank and preventive maintenance of all electrical machinary as per technical specification and scope of work and direction of the EIC .(Twice a week) |
| 10 | For the period of first year |
| 11 | For the period of second year |
| 12 | For the period of third year |
| 13 | Supervision of all the staffs & look -after the entire pumping station to ascertain the overall condition of all the electro-mechanical equipments and conveying the same to the EIC or his authorized representative and to carry out the instructions given by them within the stipulated time frame.(Twice in a week) |
| 14 | For the period of first year |
| 15 | For the period of second year |
| 16 | For the period of third year |
| 17 | Supplying of the following consumable materials for minor maintenance of all the Electro-mechanical equipments |
| 18 | Gland Packing [upto 25mm] |
| 19 | Cotton Hydraulic Gland Packing |
| 20 | Transformer Oil |
| 21 | Supply of Grease |
| 22 | Indicating Lamp |
| 23 | HRC fuse link (2-40) Amp |
| 24 | 2.5 sqmm'FR' stranded Copper Wire |
| 25 | Supply of MCB |
| 26 | i) 6-32 amp four pole mcb |
| 27 | ii) 63 amp four pole mcb |
| 28 | Supply of conventional industrial batten LED Tube. Make : Phillips |
| 29 | Dehydration of transformer Oil |
| 30 | Cleaning of Pump House & the equipment including supply of consumables like soap, phenyl, duster, mop etc. |
| 31 | For the period of First year |
| 32 | For the period of Second year |
| 33 | For the period of Third year |
| 34 | Alignment of the pump motor after necessary adjustment for required matching of faces to the flexible coupling within allowable tolerance. (6 no Pumps twice a year) |
| 35 | Clearing compound premises of shrubs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared) |
| 36 | Cess @ 1% |
| 37 | Added GST@ 18% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 16 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender