Tender For Tender For Installation And Commissioning Of Two Liquid Medical Oxygen (Lmo) Tanks And Comprehensive Operation And Maintenance Contract (Including Spare Parts) For A Period Of 5 Years At Chhatrapati Shivaji Maharaj Hospital
Tender Overview
Project Description
Tender for Tender For Installation And Commissioning Of Two Liquid Medical Oxygen (Lmo) Tanks And Comprehensive Operation And Maintenance Contract (Including Spare Parts) For A Period Of 5 Years At Chhatrapati Shivaji Maharaj Hospital , Transportation Charges (Loading And Unloading Charges) Old 13 Kl Liquid Oxygen Tank From The Vendor Company To Csmh Hospital Thane For Vacuum And Testing After Test. , Transportation Charges (Loading And Unloading Charges) For 500 Nm3 /Hr Av Coil From Vendor Company To Csmh Hospital Thane After Test. , Old 13 Kl Liquid Oxygen Tank Refurbishment Vacuum Testing, Tank Cleaning And Painting , Old 500 Nm3/Av Coil Testing, Tank Cleaning And Painting , 13 Kl Liquid Oxygen Tank And 500 Nm3/Hr Av Coil Civil Foundation Work And Installation, 02 Nossite Plan Approval, Required Vessel Dossier Documents, Rule 18, Rule 19, Required Pipeline For Liquid Tank To Av Coil, Required Valve Safety Valve ,Water Tap Connection Electrification,Fencing Metal Grill, Gate And Provision Of Required Latest Fire Safety Rule, Any Other Required As Per Peso Guidelines (With Peso License) , 3 Way Diverter Of Cryogenic Valve With Stainless Steel Body Make Herose (Use For Liquid Medical Oxygen Pipeline , Busting Disk Make Bs & B (Use For Liquid Medical Oxygen Pipeline) , Safety Valve 1 X 1/2 Make: Herose 17 Bar: , Needle Valve For Lg Pg Manifold Isolation: , Electromagnetic Gauge (0-12000 Mmwc) Name : Hirlekar , Liquid Oxygen Safety Control Panel With Alarm System Cable Required Accessories Tank Level Indicator B) Tank Pressure Indicator 3) Hospital Pipeline Low Pressure Indicator , O& Ed (Operation And Engineering Directives) System For Liquid Medical Oxygen Safety Panel, Pressure Regulator, Pressure Switch, Isolation Valve Vent Valve, Pressure Gauge All Valve Stainless Steel Pipe And Required Accessories , 13 Kl Liquid Oxygen Tank And 500 Nm3/Hr Av Coil Maintenance Contract For 5 Years Along With Spares Parts And Peso License Update For 5 Years (Maintenance Contract With 13 Cmc/Comprehensive Maintenance Contract. , Telemetry System For Online Monitoring Of Liquid Oxygen Level With Nsc National Scheduling Center Machine With Test Kits. , 1 St Year , 2 Nd Year , 3Rd Year , 4Th Year , 5Th Year
BOQ
| Sl. No. | Item Description |
| 1 | Transportation Charges (Loading and Unloading Charges) old 13 KL Liquid oxygen tank from the vendor company to CSMH Hospital Thane for vacuum and testing after test. |
| 2 | Transportation Charges (Loading and Unloading Charges) for 500 NM3 /hr AV Coil from Vendor company to CSMH Hospital Thane after test. |
| 3 | Old 13 KL Liquid oxygen tank Refurbishment vacuum testing, tank cleaning and painting |
| 4 | Old 500 NM3/AV Coil testing, tank cleaning and painting |
| 5 | 13 kl Liquid oxygen tank and 500 NM3/Hr AV Coil Civil foundation work and installation, 02 Nossite plan approval, required Vessel Dossier documents, Rule 18, Rule 19, required pipeline for liquid tank to AV coil, required valve safety valve ,water tap connection electrification,fencing metal grill, gate and provision of required latest fire safety rule, any other required as per PESO guidelines (With PESO License) |
| 6 | 3 Way Diverter of cryogenic Valve with stainless steel body make Herose (Use for liquid medical oxygen pipeline |
| 7 | Busting Disk Make BS & B (Use for liquid medical oxygen Pipeline) |
| 8 | Safety Valve 1\\" x 1/2\\" Make: Herose 17 bar: |
| 9 | Needle Valve for LG PG manifold Isolation: |
| 10 | Electromagnetic Gauge (0-12000 MMWC) Name : Hirlekar |
| 11 | Liquid oxygen Safety Control Panel with alarm system cable required accessories Tank Level Indicator b) Tank Pressure Indicator 3) Hospital Pipeline Low Pressure Indicator |
| 12 | O& ED (Operation and Engineering Directives) system for liquid medical oxygen safety panel, Pressure regulator, Pressure Switch, Isolation Valve Vent Valve, Pressure gauge all valve stainless Steel pipe and required accessories |
| 13 | 13 kl Liquid oxygen tank and 500 Nm3/hr AV coil Maintenance contract for 5 years along with spares parts and peso license update for 5 years (Maintenance contract with 13 CMC/Comprehensive maintenance contract. |
| 14 | Telemetry system for online monitoring of liquid oxygen level with NSC National Scheduling center Machine with test kits. |
| 15 | 1 st YEAR |
| 16 | 2 nd YEAR |
| 17 | 3rd YEAR |
| 18 | 4th YEAR |
| 19 | 5th YEAR Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender