Drinking Water Supply and Sanitation Government Departments Closing in 12 days TDR #56670449

Tender For Removing Of Pipeline Leakages At Various Water Supply Scheme Under Sub Division Sadulsahar

Issued by Government Departments · Ganganagar, Rajasthan
Tender Value
12 Lakhs
Estimated cost
Bid Submission
10 Aug 2026
12 days left
EMD
24000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ganganagar → Rajasthan
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Removing Of Pipeline Leakages At Various Water Supply Scheme Under Sub Division Sadulsahar

BOQ

Name of Work:- Removing of Pipeline Leakages at Various WSS under Sub Division Sadulsahar
Sl. No. Item Description
11.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.1 50/63/75mm
21.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.2 80/90mm
31.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.3 100/110mm
41.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.4 125/140mm
51.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.5 150/160/180mm
61.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.6 200/225mm50
71.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.1 50/63/75mm1.1.2 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.2 Add on above item no. 1.1.1 for B.T. Road
81.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.2 80/90mm1.1.2 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.2 Add on above item no. 1.1.1 for B.T. Road
91.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.3 100/110mm1.1.2 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.2 Add on above item no. 1.1.1 for B.T. Road
101.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.4 125/140mm1.1.2 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.2 Add on above item no. 1.1.1 for B.T. Road
111.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.5 150/160/180mm1.1.2 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.2 Add on above item no. 1.1.1 for B.T. Road
121.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.6 200/225mm1.1.2 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.2 Add on above item no. 1.1.1 for B.T. Road
131.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.1 50/63/75mm1.1.3 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.3 Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.
141.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.2 80/90mm1.1.3 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.3 Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.
151.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.3 100/110mm1.1.3 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.3 Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.
161.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.4 125/140mm1.1.3 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.3 Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.
171.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.5 150/160/180mm1.1.3 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.3 Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.
181.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.1.1 In all type Soil AC/PVC/HDPE pipe1.1.1.6 200/225mm1.1.3 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.3 Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.
191.2 Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.2.1 In all type Soil1.2.1.1 80mm
201.2 Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.2.1 In all type Soil1.2.1.2 100mm
211.2 Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.2.1 In all type Soil1.2.1.3 125mm
221.2 Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.2.1 In all type Soil1.2.1.4 150mm
231.2 Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)1.2.1 In all type Soil1.2.1.5 200mm
241.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)1.4.1 In all type Soil 1.4.1.1 80 mm
251.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)1.4.1 In all type Soil 1.4.1.2 100 mm
261.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)1.4.1 In all type Soil 1.4.1.3 125 mm
271.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)1.4.1 In all type Soil 1.4.1.4 150 mm
281.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.1.5.1 In all type Soil 1.5.1.1 50/63/75mm
291.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.1.5.1 In all type Soil 1.5.1.2 80/90mm
301.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.1.5.1 In all type Soil 1.5.1.3 100/110mm
311.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.1.5.1 In all type Soil 1.5.1.4 125/140mm
321.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.1.5.1 In all type Soil 1.5.1.5 150/160/180mm
331.8 Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as valve pipe piece CID Joints shall be provided by Department free of cost) 1.8.1 In all Type Soil 1.8.1.1 80 mm dia pipe to 100mm
341.8 Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as valve pipe piece CID Joints shall be provided by Department free of cost) 1.8.1 In all Type Soil 1.8.1.2 125 mm dia pipe to 150mm
351.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).1.9.1 In all type Soil 1.9.1.1 80 mm to 110 mm
361.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).1.9.1 In all type Soil 1.9.1.2 125 mm to 165 mm Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56670449
AUTHORITY Government Departments
TENDER VALUE 12 Lakhs
LAST DATE 10-08-2026
Authority
Authority Name Public Health Engineering Department
Work Description Tender for Removing Of Pipeline Leakages At Various Water Supply Scheme Under Sub Division Sadulsahar
Basic Detail
Tender No EE/PHED/SGNR/44-51/2026-27
Bidding Type Tender
Location
City Ganganagar
State Rajasthan
Key Dates
Publish Date 25 Jul 2026
Submission Date 10 Aug 2026
Open Date 11 Aug 2026
Finance
Tender Value 12 Lakhs
Tender Fee 500
EMD 24000
Exemption Available
Document List
a2d11354-3408-447f-9a82-198bf96ca426.html
BOQ_1026699.xls
TD45.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 25, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 10, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 12 days
Aug 11, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 13 days

Tender Documents

Download All (ZIP) ↓
html

a2d11354-3408-447f-9a82-198bf96ca426.html

xls

BOQ_1026699.xls

pdf

TD45.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders