Tender For Complete Overhauling Of Pump Motor Sets Including Replacement Of Damaged Valves At The Pump House For Ensuring Uninterrupted Water Supply At Jalas Ad Bhawan, Salt Lake, Kolkata : 700091.
Tender Value
5.31 Lakhs
Estimated cost
Bid Submission
03 Aug 2026
6 days left
EMD
10635
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
24 Paraganas North → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Complete Overhauling Of Pump Motor Sets Including Replacement Of Damaged Valves At The Pump House For Ensuring Uninterrupted Water Supply At Jalas Ad Bhawan, Salt Lake, Kolkata : 700091.
BOQ
| Sl. No. | Item Description |
| 1 | Manufacture and supply of pump spares/components as per specification, drawing or existing one with proper tolerance and finish as per direction. |
| 2 | Transmission shaft/head shaft/impeller shaft (Material: ST ASTM 276-316 ANLD) |
| 3 | cotton( hydraulic) gland packing |
| 4 | Bearing no - 1210 EKTN9 (SKF) |
| 5 | Gasket |
| 6 | Impeller Lock nut /adjusting nut (Material: SS 410) |
| 7 | Labour charges for disconnecting of 415V, 3 Phase, r.p.m. 1440, 15 Kw Motor (BE) from base frame foundation and de coupling the motor from pump section incl. carraige cost (to & Fro) from Jalasampad Bhawan, to Co's workshop and return back the same after proper repairing job and fitting the same complete in all respect as per direction and upto the satisfaction of EIC. |
| 8 | Cost for dismantling the existing centrifugal pump from pump motor set and carrying the pump to Co's workshop from Jalasampad Bhawan Pump House to Co's workshop for repairing of the faulty pump and retun back the same at site including loading unloading and refitting the same maintaining proper alignment incl testing of complete pump motor set. |
| 9 | Complete overhauling of motor of 15KW/ 20 HP motor incl Cleaning the motor by appropiate cleaning oil, changing of mica sheet, overhauling, baking, varnishing, changing the loops incl cost for heating. |
| 10 | Supplying of different types of valves as mentioned below for pump house |
| 11 | G. M. Gate Valve IS -778 CL-1 (40 mm) Make : Leader or Eq. |
| 12 | BRASS BALL VALVE PN (40 mm) Make : Leader or Eq. |
| 13 | G. M. horizontal check valve PN-25 (500 PsiG) 80 mm dia make : Leader or eq. |
| 14 | Vertical Check Valve PN 16 Make : Leader or Eq. (65 mm) |
| 15 | Complete repairing of pump of 15 Hp/ 20 KW water supply pump-motor set after dismantling from base frame, incl. disconnection of supply and delivery pipe line, changing of coupling , machining of impeller incl machining, drilling, key cutting, S & F of s s shaft, key, gland packing, rubber gasket change, changing of old nuts, bolts and washers etc. complete as per instruction of EIC. |
| 16 | Labour Cost for Repairing works related with Pump : |
| 17 | Plumber 3 Nos x 4 Days = 12 mandays |
| 18 | Ordinary Fitter 2 Nos x 4 Days = 8 mandays |
| 19 | Electrician 1 No x 4 Days = 4 mandays |
| 20 | Helper 4 Nos x 4 Days = 16 mandays |
| 21 | Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately)65 mm dia. medium quality |
| 22 | Preliminary checking of the whole motor (LT sq. cage IM) and testing of I.R. value, load currents, leakage factor of stator & rotor, terminal lead joints of stator connection ends, insulation of glass fibre terminal bar, double cage rotor end rings and all of motor bars and bar joints, housing of D.E. & NDE shield bearing housing etc. before work to detect fault. |
| 23 | Servicing and overhauling the auto star- delta starter (Siemens Make) after opening all the components from its original position, checking the contractors, timer bi- metal relay etc. and fitting fixing the same in original position after completion of pverhauling, testing, heating the timer etc. as required at site as per direction of E.I.C. |
| 24 | Replacement of different panel accessories: |
| 25 | Supply of 3Ph LED Ammeter Cl 0.5 |
| 26 | Supply of 3Ph LED Voltmeter Cl 0.5 |
| 27 | Supply of following materials: |
| 28 | 10 sqmm 'FR' stranded Copper wire |
| 29 | 6 sqmm 'FR' stranded Copper wire |
| 30 | 4.0 sqmm 'FR' stranded Copper wire Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 25, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 03, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysAug 03, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender