Tender For Running Tender For Works To Be Executed Under The Full Deposit Scheme Within The Jurisdiction Of The Electricity Distribution Division, Mohammadi.
Tender Overview
Project Description
Tender For Running Tender For Works To Be Executed Under The Full Deposit Scheme Within The Jurisdiction Of The Electricity Distribution Division, Mohammadi.-= 1 Safe Loading Carriage & Unloading Of Following Materials From Centre Store, Lakhimpur To Different Work Sites And Its Stacking Distance Approx (55-100) Kms 2 Line Material 3 Pcc Pole 8.5 Mtr.Long 4 Pcc Pole 9.0 Mtr.Long 5 Stp Pole 11 Mtr. Long 6 T/F 10/16 Kva 7 T/F 25 Kva 8 T/F 63 Kva 9 T/F 100 Kva 10 T/F 250 Kva 11 Acsr Weasel Conductor 12 Acsr Rabit Conductor 13 Acsr Dog Conductor 14 Lt Abc (1X25+1X16) Sqmm 15 Lt Abc (3X50+1X35+1X16) Sqmm 16 Lt Abc (3X95+1X70+1X16) Sqmm 17 Lt Abc (3X120+1X95+1X16)Sqmm 18 11Kv Xlpe Cable (3X70) Sqmm 19 11Kv Xlpe Cable (3X120) Sqmm 20 11 Kv Pilfer Resistant Material Cubical 21 Dp Box 1 Phase / 3 Phase 22 Fabrication, Erection Of Sub-Station Type Double Pole On 8.5 Mtr Long Pcc Pole Along With Fixing Of Necessary Hardware Of Double Pole Along With Necessary Pin Insulator As Per Resspo Specification Complete In All Respect. 23 Fabrication, Erection Of Sub-Station Type Double Pole On 11Mtr Long St Pole Along With Fixing Of Necessary Hardware Of Double Pole Along With Necessary Pin Insulator As Per Resspo Specification Complete In All Respect. 24 Dragging Of Pcc Pole 8.5 Mtr To Pit Site Digging Of Pit Erection Including Providing All Decentralised Material Required For Completion Of Work . Work Is To Be Carried Out As Per Resspo Specification Complete In All Respect. 25 Dragging Of Pcc Pole 9.0 Mtr To Pit Site Digging Of Pit Erection Including Providing All Decentralised Material Required For Completion Of Work . Work Is To Be Carried Out As Per Resspo Specification Complete In All Respect. 26 Dragging Of St Pole 11 Mtr To Pit Site Digging Of Pit Erection Including Providing All Decentralised Material Required For Completion Of Work . Work Is To Be Carried Out As Per Resspo Specification Complete In All Respect. 27 Grouting Of Pcc/St Pole With Cement, Bricks Ballat And River Sand Ratio 1:4:8 28 Providing Nut Bolts Washers Of Different Sizes 29 Ordinary Earthing By Ms Earth Rod 2500Mm Long As Per Resspo Schedule. Only Gi Wire & Earth Rod Shall Be Supplied By The Department 30 Grouting And Nuzzling Of Stay Set Complete Including Its Grouting By Civil Material (Cement, Brick Ballast And River Sand ) Only Stay Wire Shall Be Supplied By The Department 31 Laying And Sagging Of 03 Phase 03 Wire 11Kv Line On Acsr Weasel Conductor As Per Resspo Specification And Direction Of E/I 32 Laying And Sagging Of 03 Phase 03 Wire 11Kv Line On Acsr Rabbit Conductor As Per Resspo Specification And Direction Of E/I 33 Laying And Sagging Of 03 Phase 03 Wire 11Kv Line On Acsr Dog Conductor As Per Resspo Specification And Direction Of E/I 34 Providing And Fixing Of Guarding Angle On Existing 11Kv Support With Clamp And Nut Bolts 35 Laying & Commisioning Of 11 Kv Xlpe Cable (3X70) Sqmm 36 Laying & Commisioning Of 11 Kv Xlpe Cable (3X120) Sqmm 37 Laying Of Cable 11Kv Xlpe Cable (3X70) Sqmm In Pakka Road By Boring Method Laying Cable As Per Resspo Specification & Direction Of E/I 38 Laying Of Cable 11Kv Through Hdpe Pipe(120 Mm) 39 Stringing Of Lt Abc (1X25+1X16) Sqmm 40 Stringing Of Lt Abc (3X50+1X35+1X16) Sqmm 41 Stringing Of Lt Abc (3X95+1X70+1X16) Sqmm 42 Stringing Of Lt Abc (3X120+1X95+1X16)Sqmm 43 Hoisting Of 11Kv Xlpe Cable Will Be Passed Through Ms Pipe Of Required Size Duly Clamped With Pole At The Bottom Middle And Top Of The Pole 44 Supply And Fixing Of 11Kv Cable Joining Kit O/D And I/D 45 Construction Of Brick Masonry Plinth Suitable For Installation Of 11Kv Pilfer Metering Cubical Along With Plastering. 46 Dragging Of 11Kv Pilfer Metering Cubical Inside The Metering Room, Its Installation And Commisioning. 47 Providing Of Holding Clamp For Top Dropper T/F 48 Providing Of Holding Clamp For Pcc/Stp Poles 49 Providing Of F Clamp For Pcc /Stp Poles 50 Drilling Cutting And Making Of Hole. 51 Cutting And Chopping Of Tree Branches For Clearence Of Ht/Lt Line After Clearance Line Throughout Pieces Of Tree Branches Of Site As And When Required For Completion Of Work. 52 Safe Installation & Energisation Of 16/25/63 Kva T/F On Double Pole By Providing And Fixing Of L Piece Lugs Making Ht/Lt Connection And Its Commisioning Only Transformer Shall Be Supplied By The Deparment. 53 Safe Installation & Energisation Of 100/250 Kva T/F On Plinth By Providing And Fixing Of L Piece Lugs Making Ht/Lt Connection And Its Commisioning Only Transformer Shall Be Supplied By The Deparment. 54 Fixing Of Well Type Earthing 01 No Nutral Body And 01 No Body Complete In All Respect As Per Resspo Specification. 55 Construction Of Plinth 2 Meter X 2 Meter X 1.5 Meter For 100/250 Kva. Transformer Plinth Wall Shall Be Brick/ Stone Masonry Of 230 Mm Thick, Outside Of The Wall To Be Plastered With 18 Mm Thick Cement Mortar (1:3), Inside Of The Plinth Shall Be Filled With Borrowedsand Duly Compacted R.C.C. Top Slab (1:2:4) Shall Be 75 Mm Thick (Construction Of Plinth Should Comply With Resspo Norms) 56 Proper Wire Mesh Fencing Of Transformer Alongside The Plinth. The Height Of The Fence Should Be 7 Feets Above From Ground, Providing Fabrication And Fixing The Main Gate In Front Of The Plinth With Provision For Locking System. Painting Of Entire Metal Works/ Main Gate With Wire Mesh With Bus Green Super Enameled Paint In Two Coats On The Primer Coat Of Red Oxide. Complete In All Respect
BOQ
| Sl. No. | Item Description |
| 1 | SAFE LOADING CARRIAGE & UNLOADING OF FOLLOWING MATERIALS FROM CENTRE STORE, LAKHIMPUR TO DIFFERENT WORK SITES AND ITS STACKING DISTANCE APPROX (55-100) KMS |
| 2 | LINE MATERIAL |
| 3 | PCC POLE 8.5 MTR.LONG |
| 4 | PCC POLE 9.0 MTR.LONG |
| 5 | STP POLE 11 MTR. LONG |
| 6 | T/F 10/16 KVA |
| 7 | T/F 25 KVA |
| 8 | T/F 63 KVA |
| 9 | T/F 100 KVA |
| 10 | T/F 250 KVA |
| 11 | ACSR WEASEL CONDUCTOR |
| 12 | ACSR RABIT CONDUCTOR |
| 13 | ACSR DOG CONDUCTOR |
| 14 | LT ABC (1X25+1X16) SQMM |
| 15 | LT ABC (3X50+1X35+1X16) SQMM |
| 16 | LT ABC (3X95+1X70+1X16) SQMM |
| 17 | LT ABC (3X120+1X95+1X16)SQMM |
| 18 | 11KV XLPE CABLE (3X70) SQMM |
| 19 | 11KV XLPE CABLE (3X120) SQMM |
| 20 | 11 KV PILFER RESISTANT MATERIAL CUBICAL |
| 21 | DP BOX 1 PHASE / 3 PHASE |
| 22 | FABRICATION, ERECTION OF SUB-STATION TYPE DOUBLE POLE ON 8.5 MTR LONG PCC POLE ALONG WITH FIXING OF NECESSARY HARDWARE OF DOUBLE POLE ALONG WITH NECESSARY PIN INSULATOR AS PER RESSPO SPECIFICATION COMPLETE IN ALL RESPECT. |
| 23 | FABRICATION, ERECTION OF SUB-STATION TYPE DOUBLE POLE ON 11MTR LONG ST POLE ALONG WITH FIXING OF NECESSARY HARDWARE OF DOUBLE POLE ALONG WITH NECESSARY PIN INSULATOR AS PER RESSPO SPECIFICATION COMPLETE IN ALL RESPECT. |
| 24 | DRAGGING OF PCC POLE 8.5 MTR TO PIT SITE DIGGING OF PIT ERECTION INCLUDING PROVIDING ALL DECENTRALISED MATERIAL REQUIRED FOR COMPLETION OF WORK . WORK IS TO BE CARRIED OUT AS PER RESSPO SPECIFICATION COMPLETE IN ALL RESPECT. |
| 25 | DRAGGING OF PCC POLE 9.0 MTR TO PIT SITE DIGGING OF PIT ERECTION INCLUDING PROVIDING ALL DECENTRALISED MATERIAL REQUIRED FOR COMPLETION OF WORK . WORK IS TO BE CARRIED OUT AS PER RESSPO SPECIFICATION COMPLETE IN ALL RESPECT. |
| 26 | DRAGGING OF ST POLE 11 MTR TO PIT SITE DIGGING OF PIT ERECTION INCLUDING PROVIDING ALL DECENTRALISED MATERIAL REQUIRED FOR COMPLETION OF WORK . WORK IS TO BE CARRIED OUT AS PER RESSPO SPECIFICATION COMPLETE IN ALL RESPECT. |
| 27 | GROUTING OF PCC/ST POLE WITH CEMENT, BRICKS BALLAT AND RIVER SAND RATIO 1:4:8 |
| 28 | PROVIDING NUT BOLTS WASHERS OF DIFFERENT SIZES |
| 29 | ORDINARY EARTHING BY MS EARTH ROD 2500MM LONG AS PER RESSPO SCHEDULE. ONLY GI WIRE & EARTH ROD SHALL BE SUPPLIED BY THE DEPARTMENT |
| 30 | GROUTING AND NUZZLING OF STAY SET COMPLETE INCLUDING ITS GROUTING BY CIVIL MATERIAL (CEMENT, BRICK BALLAST AND RIVER SAND ) ONLY STAY WIRE SHALL BE SUPPLIED BY THE DEPARTMENT |
| 31 | LAYING AND SAGGING OF 03 PHASE 03 WIRE 11KV LINE ON ACSR WEASEL CONDUCTOR AS PER RESSPO SPECIFICATION AND DIRECTION OF E/I |
| 32 | LAYING AND SAGGING OF 03 PHASE 03 WIRE 11KV LINE ON ACSR RABBIT CONDUCTOR AS PER RESSPO SPECIFICATION AND DIRECTION OF E/I |
| 33 | LAYING AND SAGGING OF 03 PHASE 03 WIRE 11KV LINE ON ACSR DOG CONDUCTOR AS PER RESSPO SPECIFICATION AND DIRECTION OF E/I |
| 34 | PROVIDING AND FIXING OF GUARDING ANGLE ON EXISTING 11KV SUPPORT WITH CLAMP AND NUT BOLTS |
| 35 | LAYING & COMMISIONING OF 11 KV XLPE CABLE (3X70) SQMM |
| 36 | LAYING & COMMISIONING OF 11 KV XLPE CABLE (3X120) SQMM |
| 37 | LAYING OF CABLE 11KV XLPE CABLE (3X70) SQMM IN PAKKA ROAD BY BORING METHOD LAYING CABLE AS PER RESSPO SPECIFICATION & DIRECTION OF E/I |
| 38 | LAYING OF CABLE 11KV THROUGH HDPE PIPE(120 MM) |
| 39 | STRINGING OF LT ABC (1X25+1X16) SQMM |
| 40 | STRINGING OF LT ABC (3X50+1X35+1X16) SQMM |
| 41 | STRINGING OF LT ABC (3X95+1X70+1X16) SQMM |
| 42 | STRINGING OF LT ABC (3X120+1X95+1X16)SQMM |
| 43 | HOISTING OF 11KV XLPE CABLE WILL BE PASSED THROUGH MS PIPE OF REQUIRED SIZE DULY CLAMPED WITH POLE AT THE BOTTOM MIDDLE AND TOP OF THE POLE |
| 44 | SUPPLY AND FIXING OF 11KV CABLE JOINING KIT O/D AND I/D |
| 45 | CONSTRUCTION OF BRICK MASONRY PLINTH SUITABLE FOR INSTALLATION OF 11KV PILFER METERING CUBICAL ALONG WITH PLASTERING. |
| 46 | DRAGGING OF 11KV PILFER METERING CUBICAL INSIDE THE METERING ROOM, ITS INSTALLATION AND COMMISIONING. |
| 47 | PROVIDING OF HOLDING CLAMP FOR TOP DROPPER T/F |
| 48 | PROVIDING OF HOLDING CLAMP FOR PCC/STP POLES |
| 49 | PROVIDING OF F CLAMP FOR PCC /STP POLES |
| 50 | DRILLING CUTTING AND MAKING OF HOLE. |
| 51 | CUTTING AND CHOPPING OF TREE BRANCHES FOR CLEARENCE OF HT/LT LINE AFTER CLEARANCE LINE THROUGHOUT PIECES OF TREE BRANCHES OF SITE AS AND WHEN REQUIRED FOR COMPLETION OF WORK. |
| 52 | SAFE INSTALLATION & ENERGISATION OF 16/25/63 KVA T/F ON DOUBLE POLE BY PROVIDING AND FIXING OF L PIECE LUGS MAKING HT/LT CONNECTION AND ITS COMMISIONING ONLY TRANSFORMER SHALL BE SUPPLIED BY THE DEPARMENT. |
| 53 | SAFE INSTALLATION & ENERGISATION OF 100/250 KVA T/F ON PLINTH BY PROVIDING AND FIXING OF L PIECE LUGS MAKING HT/LT CONNECTION AND ITS COMMISIONING ONLY TRANSFORMER SHALL BE SUPPLIED BY THE DEPARMENT. |
| 54 | FIXING OF WELL TYPE EARTHING 01 NO NUTRAL BODY AND 01 NO BODY COMPLETE IN ALL RESPECT AS PER RESSPO SPECIFICATION. |
| 55 | CONSTRUCTION OF PLINTH 2 METER X 2 METER X 1.5 METER FOR 100/250 KVA. TRANSFORMER PLINTH WALL SHALL BE BRICK/ STONE MASONRY OF 230 MM THICK, OUTSIDE OF THE WALL TO BE PLASTERED WITH 18 MM THICK CEMENT MORTAR (1:3), INSIDE OF THE PLINTH SHALL BE FILLED WITH BORROWEDSAND DULY COMPACTED R.C.C. TOP SLAB (1:2:4) SHALL BE 75 MM THICK (CONSTRUCTION OF PLINTH SHOULD COMPLY WITH RESSPO NORMS) |
| 56 | PROPER WIRE MESH FENCING OF TRANSFORMER ALONGSIDE THE PLINTH. THE HEIGHT OF THE FENCE SHOULD BE 7 FEETS ABOVE FROM GROUND, PROVIDING FABRICATION AND FIXING THE MAIN GATE IN FRONT OF THE PLINTH WITH PROVISION FOR LOCKING SYSTEM. PAINTING OF ENTIRE METAL WORKS/ MAIN GATE WITH WIRE MESH WITH BUS GREEN SUPER ENAMELED PAINT IN TWO COATS ON THE PRIMER COAT OF RED OXIDE. COMPLETE IN ALL RESPECT |
| 57 | PROVIDING AND FIXING OF DEAD END CLAMP |
| 58 | PROVIDING OF FIXING OF EYE HOOK |
| 59 | PROVIDING OF FIXING OF J- HOOK |
| 60 | PROVIDING OF FIXING OF SUSPENSION CLAMP |
| 61 | GST EXTRA Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender