Tender For Repair/Maintenance Of Transformer Including Allied Works In North Area Of Age E/M (Es) Under Ge (U) Meerut Cantt
Tender Overview
Project Description
Tender for Repair/Maintenance Of Transformer Including Allied Works In North Area Of Age E/M (Es) Under Ge (U) Meerut Cantt
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 21-Aug-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 28-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Material & Labour for the fault diagnosis of a distribution transformer up to 1000 KVA by deployment of a qualified electrical team to perform the complete physical disconnection of all HT and LT cable terminations, including removal of the neutral and body earthing links to ensure total isolation for identify the fault with all necessary testing equipment and safety gear, specifically with a calibrated 5 kV digital megger, certified discharge rods for residual charge depletion, and personal protective equipment (PPE). The scope covers all consumables, such as lint-free cleaning cloths and contact cleaner (CRC) for bushing decontamination, followed by comprehensive insulation resistance (IR) testing between HV-LV, HV-Earth, and LV-Earth and to prepare detailed diagnostic report identifying the precise nature of the fault—such as winding insulation breakdown, moisture ingress, or internal short-circuiting for further course of action of department complete all as specified and directed. |
| 2 | M&L for disconnecting all the electrical connections from H.T. and L.T. side of unserviceable transformer of follwoing capacity i.e. Jumpers/cable from the cable end box or bushings & earthing terminal of the transformers by removing the nuts bolts including taking down carefully of defective transformer from 2/4 pole structure/ platform mounted substation or AGE E/M store yard and transporting the same by loading, unloading of transformer & transportation by vehicle to workshop and opening the transformer cover, draining out of transformer oil, assembling, removing of the burnt parts ie. tape, paper insulating strings etc gently and carefully, washing of the dust, rust and dirt from all parts including taking out cooling tubes, welding and re-assembling after carrying out required repair including commissioning and testing and transporting back to site/MES store yard/ installation on existing 2/4 pole structure/ platform with necessary fixing arrengement including connecting up electrically, commissioning and testing all as directed by Engr- in- Charge for the following capaity of Transformer :- |
| 3 | 63 to 315 KVA transformer |
| 4 | 400 to 630 KVA transformer |
| 5 | 1000 to 2000 KVA transformer |
| 6 | NOTE :- (i) The contractor shall produce test certificate as per IS-2026 alongwith high voltage test from the firms after repair.(ii) To accertain the fault of transformer at installed location, the transformer will be tested with HT 10KV magger, multimeter in the presence of AGE E/M/JE E/M. All T&P required like HT magger 10KV, multimeter and cables will be arrenged by contractor.(iii) All the transformer shall be opened in presence of Engr- in- Charge/ his rep veryfy the various repairs/replacement involved and the transformer shall be assembled in the presence of Engr- in- Charge/his rep after necessary repairs/replacement.(iv) All the transformer shall be tested in the factory in the presence of Engr- in- Charge/ his rep, as per ser note No 1 above and also in addition the transformer where specified to be installed and commissioned on the 2/4 pole structure, platform and also shall be tested by the contractor in the presence of Engr- in- Charge.(v) All the testing arrangement shall be provided by the contractor without any extra payment.(vi) The contractor shall also furnished a guarantee certificate himself for rectification of the defects. If any noticed defect during liability period for 01 year from the certified date of completion.(vii) The above shall however does not absolve the responsibility of the contractor for rectification of any defect, if any noticed during guarantee period of 01 year as per condition 46 of IAFW-2249 and the contractor shall be solely responsible for entire completion of work and for rectification of the defect/replacement of items/parts and required pointed out by the GE during defect liability period of 01 year. Payment only for dehydration of the transformer oil and painting of the transformers Please Enable Macros to View BoQ information |
| 7 | NOTE :- (i) The contractor shall produce test certificate as per IS-2026 alongwith high voltage test from the firms after repair.(ii) To accertain the fault of transformer at installed location, the transformer will be tested with HT 10KV magger, multimeter in the presence of AGE E/M/JE E/M. All T&P required like HT magger 10KV, multimeter and cables will be arrenged by contractor.(iii) All the transformer shall be opened in presence of Engr- in- Charge/ his rep veryfy the various repairs/replacement involved and the transformer shall be assembled in the presence of Engr- in- Charge/his rep after necessary repairs/replacement.(iv) All the transformer shall be tested in the factory in the presence of Engr- in- Charge/ his rep, as per ser note No 1 above and also in addition the transformer where specified to be installed and commissioned on the 2/4 pole structure, platform and also shall be tested by the contractor in the presence of Engr- in- Charge.(v) All the testing arrangement shall be provided by the contractor without any extra payment.(vi) The contractor shall also furnished a guarantee certificate himself for rectification of the defects. If any noticed defect during liability period for 01 year from the certified date of completion.(vii) The above shall however does not absolve the responsibility of the contractor for rectification of any defect, if any noticed during guarantee period of 01 year as per condition 46 of IAFW-2249 and the contractor shall be solely responsible for entire completion of work and for rectification of the defect/replacement of items/parts and required pointed out by the GE during defect liability period of 01 year. Payment only for dehydration of the transformer oil and painting of the transformers Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender