Tender For 11 Kv Line Extension And Installation Of 100 Kva Dtr - Ht Abc - Kottayodi [Cw-6681-202627-27]
Tender Value
8.78 Lakhs
Estimated cost
Bid Submission
01 Aug 2026
0 days left
EMD
22000
Bank guarantee accepted
Document Fee
2150
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kannur → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for 11 Kv Line Extension And Installation Of 100 Kva Dtr - Ht Abc - Kottayodi [Cw-6681-202627-27]
BOQ
| Sl. No. | Item Description |
| 1 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 2 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 3 | Dismantling one damaged 11kV TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 4 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 5 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm withbare/insulated Messengerthrough existing poles |
| 6 | Providing Cable Tie |
| 7 | Providing End Caps |
| 8 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 9 | Pole numbering using printed Aluminium sheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level.The number and letters should be in black synthetic enamel paint. The size of the number should be at least 2cm in height x 1.5cm in width. including cost of paint. |
| 10 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 11 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 12 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. |
| 13 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. |
| 14 | Erection of suspension clamp for 11KV ABC of any size |
| 15 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. |
| 16 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. |
| 17 | Erection of suspension clamp for 11KV ABC of any size |
| 18 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. |
| 19 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. |
| 20 | Erection of suspension clamp for 11KV ABC of any size |
| 21 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 22 | Additional rate for reinstalling LT line on the renewed 11kV pole having both HT and LT (HT/LT) lines. |
| 23 | Transporting Transformers by hired vehicle to a distance upto 5km and carrying upto 2 numbers of 63/100/160/250kVATransformers / Ring Main Units excluding loading& unloading charges. |
| 24 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. |
| 25 | Fitting one LT 4 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line. |
| 26 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 27 | Fitting 6 channel cross arms, AB switch, DO fuse, Station class LA, HT & LT connections upto OH lines, etc. on existing DP structure, Fixing distribution box/provision for one set (3No.) of LT fuses, drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing & mounting of Transformer on poles. |
| 28 | Erecting one 100kVA Transformer to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer. |
| 29 | Erection of LT 3 way distribution box (normal size 160x40x90cm) on existing cross arm, giving connection including cable and earth connection (excluding earthing). |
| 30 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and Distribution box to LT OH line. |
| 31 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 32 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. |
| 33 | Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizondal brasing and grills with MS rods 8 mm Dia @ 10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of transportation |
| 34 | Cleaning and levelling of transformer yard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc. |
| 35 | Installing one DTR Meter with box (normal size 40x25x100cm) on existing poles including fixing of 3 CTs on bus bar, laying and termination of control cable using proper lugs, fixing of meters, capacitors, control fuses and giving the complete connections including conveyance of materials. |
| 36 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm)0.45x0.45x1.5m, Plastering (1:3) 12mm0.45x0.45mx5sides. |
| 37 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 38 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 39 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 40 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 41 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 42 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 43 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 44 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 45 | Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole. |
| 46 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 47 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. |
| 48 | Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 49 | Renewal of existing damaged/broken old 11kV Stay to the existing stay rod. |
| 50 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 51 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 52 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 53 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc. |
| 54 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral & Street Main, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 25, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 01, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
TodayAug 04, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender